Top Banner
connect • communicate • collaborate Renewable Energy in Ireland Greenstar Network, Mantychore 2012 Andrew Mackarel, HEAnet for GEANT NA3-T3 Workshop 2012
13

Renewable Energy in Ireland Greenstar Network, Mantychore 2012

Feb 08, 2016

Download

Documents

Kyoko

Renewable Energy in Ireland Greenstar Network, Mantychore 2012. Andrew Mackarel, HEAnet for GEANT NA3-T3 Workshop 2012. Agenda. Quick overview of changing environment Rational Background to investigating Renewable Energy Technologies Greenstar Mantychore Questions and Answers. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Renewable Energy in Ireland  Greenstar Network, Mantychore 2012

connect • communicate • collaborate

Renewable Energy in Ireland Greenstar Network, Mantychore

2012

Andrew Mackarel, HEAnetfor

GEANT NA3-T3 Workshop 2012

Page 2: Renewable Energy in Ireland  Greenstar Network, Mantychore 2012

connect • communicate • collaborate

Agenda

Quick overview of changing environmentRational Background to investigating Renewable Energy TechnologiesGreenstarMantychoreQuestions and Answers

Page 3: Renewable Energy in Ireland  Greenstar Network, Mantychore 2012

connect • communicate • collaborate

Changes in GHG emissions(source: UNFCCC)Country GHG emission

2004 (Mtonne of CO2)

GHG emission change 1990-

2004

Kyoto Treaty obligation 2008-

2012

Austria 79 15.7% -13%Canada 599 26.6% -6%Denmark 70 -1.1% -8%European Comm 4253 -0.6% -8%

Finland 71 14.5% -8%Germany 1226 -17.2% -8%Hungary 123 -31.8% -6%Iceland 3 -5.0% +10%Ireland 56 23.1% -8%Poland 564 -31.2% -6%Sweden 72 -3.5% -8%USA 6103 15.8%

Page 4: Renewable Energy in Ireland  Greenstar Network, Mantychore 2012

connect • communicate • collaborate

European and Irish Wind Resource

Average PoP 6KW 11KW Windmill at 15m HeightArea size 20m by 20mCost approx 50k EurosPayback 8-10 Years at full load 14-16 Years for Normal PoPBattery and Inverter facility needed

Page 5: Renewable Energy in Ireland  Greenstar Network, Mantychore 2012

connect • communicate • collaborate

Wind Power Installations in Europe 2010

2010 84 Gw Europe, 194Gw World

Page 6: Renewable Energy in Ireland  Greenstar Network, Mantychore 2012

connect • communicate • collaborate

Wind Generation targets for 2020

Portugal

Spain

France

Ireland

UK

Belgium

Germany

Denmark

Sweden

Finland

Poland

Hungary

Austria

Italy

Greece

0 5 10 15 20 25 30 35 40

23

21

10

37

20

5

19

30

8

6

15

4

6

5

25

15

14

2

10

3

2

9

24

3

1

2

1

3

3

4

20102020

National Wind Generation targets introducesnew challenges for Power Generators and NRENS

Page 7: Renewable Energy in Ireland  Greenstar Network, Mantychore 2012

connect • communicate • collaborate

Ireland’s Annual Solar Resource(kWh/m2 per year)

Annual Solar Energy on 1m2surface at 30 degree inclination900 KWh/m2 – 1200 KWh/m2

Average PoP 6KW => approx 50 Solar PanelsArea size 20m by 20mCost approx 50k EurosPayback 20 - 30 YearsBattery and Inverter facility needed

Page 8: Renewable Energy in Ireland  Greenstar Network, Mantychore 2012

connect • communicate • collaborate

The GreenStar Network Map

8

Green Star consortium universities , data centresand renewable power generators

Page 9: Renewable Energy in Ireland  Greenstar Network, Mantychore 2012

connect • communicate • collaborate

GSN Architecture

9

• Follow the Sun/Follow the Wind– Optimize distribution of VMs according to availability of intermittently available green power

Device level Interface

Firmware Intelligence

Page 10: Renewable Energy in Ireland  Greenstar Network, Mantychore 2012

connect • communicate • collaborate

On demand provisioning of network resources.Recursive delegation of access right over managed resources.Lightweight Abstracted operational model.

Decoupled from actual vendor-specific details.Flexible enough to accomodate different designs and orientationsFixed enough so common tools can be build and reused across plugins.– Security– Lifecycle– Monitoring– Deployment and upgrade.

Page 11: Renewable Energy in Ireland  Greenstar Network, Mantychore 2012

connect • communicate • collaborate

   Service integration Test Case

Mantychore/GSN use case“As a GSN administrator, I want to provision a tunnel between my cloud and a remote cloud for VM migration”

Draft API and messagingclass Universe {    Cloud myCloud    Vector<Clouds> remoteClouds}

class Cloud {    String id;    String gatewayIP;    String location;    Vector<String> hostIPs;}

pubic String tunnelUp(String cloudId, String targetHostIP) throws SomeException {

    Cloud cloud = remoteClouds.getCloud(cloudId);    String targetGatewayIP = cloud.getGateway(hostIP);

    String connectionID = mantychoreWrapper.setupConnection(myCloud.getSourceGatewayIP(), targetGatewayIP)     return connectionID.}

public void tunnelDown(String connectionId) throws SomeException {    mantycoreWrapper.teardownConnection(connectionId);}

Page 12: Renewable Energy in Ireland  Greenstar Network, Mantychore 2012

connect • communicate • collaborate

   Network integration 2012

Current network status• Connectivity to CANARIE/GSN via private routed networks• Irish sites at EPA and DKIT and New Euro GSN Hub servers• Nordunet , i2CAT

3 Logical Routers in Canada, Ireland and Iceland aligned for Mantychore provisioning

Page 13: Renewable Energy in Ireland  Greenstar Network, Mantychore 2012

connect • communicate • collaborate

Questions and

Answers Thank You