Top Banner
Renew Atlanta - Cascade Corridor October 13, 2016 Cascade Corridor Resurfacing The Cascade Corridor will be resurfaced from the Atlanta City limits up to Ralph D. Abernathy Blvd. Council Districts 4, 10 and 11; NPU’s I, R, S and T Estimated project cost $4M Funding source – Renew Atlanta and Partnership Funding Target Construction Start – End of 2017 Cascade TCC (Traffic Communications Corridor) The Cascade Corridor will get signal upgrades and timing optimization from Childress Dr to Lawton St. Council Districts 4, 10 and 11; NPU’s I, R, S and T Estimated project cost $4M Funding source – Renew Atlanta and Partnership Funding Target Construction Start – End of 2017 Cascade Corridor Streetscape The Cascade Corridor will get sidewalks, lighting and bus stop enhancements including street furniture. Phase 1 Streetscapes from the Atlanta City limit to Willis Mill Rd and from Delowe Dr to Avon Ave. Council Districts 4, 10 and 11; NPU’s I, R, and S Estimated project cost $10.3M Funding source – Renew Atlanta and Partnership Funding Target Construction Start – End of 2017 Phase 2 Streetscapes from Avon Ave to Ralph D. Abernathy Blvd. Council Districts 4, 10 and 11; NPU’s S and T Estimated project cost $7.7M Funding source – Proposal being developed and finalized Target Construction Start – End of 2018 Previously Constructed Streetscapes Previous projects have constructed sidewalks and lighting along the Cascade Corridor from Willis Mill to Delowe Dr. Council Districts 4, 10 and 11; NPU’s I, R, and S Please direct any questions to Renew Atlanta, [email protected] Please visit Renew Atlanta’s website at www.RenewAtlantaBond.com
10

Renew Atlanta - Cascade Corridor€¦ · Renew Atlanta to plant additional trees along the streetscape. Two involve street furniture asking Renew Atlanta to put benches at more MARTA

Jul 11, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Renew Atlanta - Cascade Corridor€¦ · Renew Atlanta to plant additional trees along the streetscape. Two involve street furniture asking Renew Atlanta to put benches at more MARTA

Renew Atlanta - Cascade Corridor

October 13, 2016

Cascade Corridor Resurfacing

The Cascade Corridor will be resurfaced from the Atlanta City limits up to Ralph D. Abernathy Blvd.

Council Districts 4, 10 and 11; NPU’s I, R, S and T

Estimated project cost $4M

Funding source – Renew Atlanta and Partnership Funding

Target Construction Start – End of 2017

Cascade TCC (Traffic Communications Corridor)

The Cascade Corridor will get signal upgrades and timing optimization from Childress Dr to Lawton St.

Council Districts 4, 10 and 11; NPU’s I, R, S and T

Estimated project cost $4M

Funding source – Renew Atlanta and Partnership Funding

Target Construction Start – End of 2017

Cascade Corridor Streetscape

The Cascade Corridor will get sidewalks, lighting and bus stop enhancements including street furniture.

Phase 1 Streetscapes from the Atlanta City limit to Willis Mill Rd and from Delowe Dr to Avon Ave.

Council Districts 4, 10 and 11; NPU’s I, R, and S

Estimated project cost $10.3M

Funding source – Renew Atlanta and Partnership Funding

Target Construction Start – End of 2017

Phase 2 Streetscapes from Avon Ave to Ralph D. Abernathy Blvd.

Council Districts 4, 10 and 11; NPU’s S and T

Estimated project cost $7.7M

Funding source – Proposal being developed and finalized

Target Construction Start – End of 2018

Previously Constructed Streetscapes

Previous projects have constructed sidewalks and lighting along the Cascade Corridor from Willis Mill to Delowe Dr.

Council Districts 4, 10 and 11; NPU’s I, R, and S

Please direct any questions to Renew Atlanta, [email protected] Please visit Renew Atlanta’s website at www.RenewAtlantaBond.com

Page 2: Renew Atlanta - Cascade Corridor€¦ · Renew Atlanta to plant additional trees along the streetscape. Two involve street furniture asking Renew Atlanta to put benches at more MARTA

Summary of Comments Public Meeting

Cascade Corridor Streetscape October 13, 2016

The Public Meeting for the Cascade Corridor was held on October 13, 2016 at the Vicars located

at 838 Cascade Rd SW, Atlanta, GA 30311.

56 comments were received. Of the 56 responses, 32 were in favor of the project,

3 were uncommitted at the time, 5 were conditionally in favor or the project, 15 respondents did

not specify their position, and 1 respondent was against the project.

Major Concerns/Comments

The major concerns were organized into 4 areas – roadway traffic concerns, construction

concerns, functionality and beautification concerns, and concerns about the different modes of

transportation.

1. 14 comments regarding roadway traffic concerns a. 6 comments regarding the intersection of Cascade Ave and Ralph D. Abernathy b. 2 comments regarding the lane configuration along the Cascade Corridor c. 6 comments regarding traffic calming

2. 19 comments regarding construction concerns

a. 4 comments regarding utilities along the corridor

b. 10 comments regarding detailed plans or a visual preference survey

c. 5 comments regarding funding of the streetscape corridor

3. 28 comments regarding functionality and beautification concerns.

a. 12 comments regarding beautification (trees, street furniture and trash cans)

b. 5 comments regarding ADA compliance

c. 11 comments regarding lighting along the Cascade Corridor

4. 51 comments regarding the different modes of transportation.

a. 11 comments regarding vehicular traffic

b. 16 comments regarding bicycles and bike lanes

c. 15 comments regarding pedestrians

d. 9 comments regarding transit users

Page 3: Renew Atlanta - Cascade Corridor€¦ · Renew Atlanta to plant additional trees along the streetscape. Two involve street furniture asking Renew Atlanta to put benches at more MARTA

Summary of Comments Public Meeting

Cascade Corridor Streetscape October 13, 2016

Responses to Questions/Comments

1. Roadway traffic concerns

a. The intersection of Cascade Ave and Ralph D. Abernathy: The six comments talk

about the difficulty to travel east through the intersection due to a few cars trying

to turn left onto Ralph D. Abernathy. Or difficulty getting back over in order to turn

left onto Langhorn.

Response: Renew Atlanta will look into adding a small turn lane for the eastbound direction

allowing for one or two left turning cars which will provide two lanes for the cars going

straight through the intersection

b. Lane configuration along the Cascade Corridor: The two comments referring to

the lane configuration have asked to remove the bike lanes on Cascade Ave and

return to the four lane configuration.

Response: The intent of the project is to build a multimodal corridor along Cascade,

therefore no existing bike lanes will be removed. The design of the TCC (Traffic

Communication Corridor), signal timing upgrades will take lane configuration into account

when the signals are retimed. Timing of the signals will have the biggest impact on moving

vehicles through the corridor.

c. Traffic calming: The six comments about traffic calming are referring to ideas,

suggestion, or the request to do something to slow the cars down for the safety of

the other Cascade Corridor users such as the pedestrians, the bicyclists and the

transit users. The suggestions include speed humps, buffered bike lanes, and both

the planting and clearing of trees.

Response: Renew Atlanta will look into all safety measures that improves safety along the

corridor for all users. This includes safety improvements for pedestrians and bicyclists as

well as cars. Speed humps are only allowed on local neighborhood roads, Cascade is

considered to be an arterial street; therefore, Renew Atlanta cannot place speed humps.

The speed limit along the corridor is 35mph, so buffering the bikes lanes is not necessary.

And trees inside the City’s Right of Way that block the view of cars may be removed.

Page 4: Renew Atlanta - Cascade Corridor€¦ · Renew Atlanta to plant additional trees along the streetscape. Two involve street furniture asking Renew Atlanta to put benches at more MARTA

Summary of Comments Public Meeting

Cascade Corridor Streetscape October 13, 2016

2. Construction concerns

a. Utilities: The four comments for utilities pointed out two major concerns. First,

Cascade has been resurfaced in the past and almost immediately torn up again

for utility work followed by a patch job. Second, the utility lines along the Cascade

Corridor are above ground and some members of the community would like to

see them buried.

Response: Renew Atlanta is working with The Department of Watershed and The

Department of Public Works to make sure that all work is being coordinated. In addition

Renew Atlanta is coordinating with utilities throughout the span of the project.

Unfortunately, burying the utilities is cost prohibitive.

b. Visual Preference Survey and Detailed Plans: There were 10 comments asking to

see detailed plans before construction begins. Five of those comments first want

for Renew Atlanta to conduct a Visual Preference survey.

Response: Renew Atlanta will to conduct a Visual Preference Survey, for various project

elements (lighting, street furniture, bike lanes v. no bike lanes, etc.)

c. Funding the Streetscape Corridor: There are five comments that wanted to better

understand how the funds for this project will be spent. The concerns range from

asking about phase 2 funding, where the money is coming from and where it is

going, and if Renew Atlanta is working with other agencies so that the resources

are not being doubled up.

Response: Renew Atlanta is funded by the Renew Atlanta Bond that was voted for by 80%

of all voters. In addition the Cascade Corridor includes projects on the new voter

approved TSPLOST. Renew Atlanta will follow City of Atlanta guidelines for the work that is

contracted out; more than 30% of the contracted money will go to disadvantaged and

minority owned business. Also, Renew Atlanta is coordinating with other agencies such as

MARTA to make sure that the money and resources spent on the corridor are fully

coordinated.

Refer to:

http://renewatlantabond.com/wp-content/uploads/2015/10/Renew-Atlanta-2015-Bond-

Presentation.pdf

Page 5: Renew Atlanta - Cascade Corridor€¦ · Renew Atlanta to plant additional trees along the streetscape. Two involve street furniture asking Renew Atlanta to put benches at more MARTA

Summary of Comments Public Meeting

Cascade Corridor Streetscape October 13, 2016

3. Functionality and beautification concerns

a. Beautification (trees, street furniture and trash cans: The twelve comments

regarding beautification include five comments concerning trees asking Renew

Atlanta to be mindful of the trees that already line the corridor and also asking

Renew Atlanta to plant additional trees along the streetscape. Two involve street

furniture asking Renew Atlanta to put benches at more MARTA bus stops and to

place bike racks at the commercial centers. The five comments regarding littering

and trash are asking Renew Atlanta to place trash can along the corridor.

Response: Renew Atlanta will address these concerns. Trees inside the City’s Right of Way

that block the view of cars may be removed. However, Renew Atlanta will look into

adding trees along the corridor provided they are on the City’s approved list and do not

create safety issues.

b. ADA Compliance (Americans with Disabilities Act): There are five comments that

mention how many people in wheel chairs use the corridor. They want to make

sure that the corridor will accommodate wheelchairs.

Response: Renew Atlanta will construct the streetscape in compliance with ADA

regulations. Not only is ADA compliance a law, but it is a priority for all Renew Atlanta

Streetscape and resurfacing projects.

c. Lighting along the Cascade Corridor: The eleven comments about lighting along

the corridor all want the streetscape to be lighted. Many are asking what the lamp

posts would look like and citing other local projects as an example of what they

would like to see. A few mention fixing or replacing the existing lights that are not

currently working.

Response: Renew Atlanta will put street lamps along the entire Cascade Corridor. There

will be a Visual Preference Survey so that the community can give input on how the

pedestrian lamp posts will look.

Page 6: Renew Atlanta - Cascade Corridor€¦ · Renew Atlanta to plant additional trees along the streetscape. Two involve street furniture asking Renew Atlanta to put benches at more MARTA

Summary of Comments Public Meeting

Cascade Corridor Streetscape October 13, 2016

4. Different modes of transportation

a. Comments about cars: There are 11 comments concerned about cars along the

corridor. The majority of the concerns are about traffic flow and getting caught at

lights because of a left turner or behind a bus picking transit riders.

Response: Renew Atlanta is doing a TCC (Traffic Communication Corridor) in conjunction

with the streetscape project. The TCC will update the signal timing and movements from

Childress Drive to Lawton Street. This will greatly improve the flow of traffic along the

corridor, and this will be done at the end of 2017 along with resurfacing of the entire

corridor.

b. Comments about bicycles: The 16 comments about bicycles include a few that

don’t want bike lanes and would like to remove the ones that are already there.

But the majority of comments want to see the existing bike lanes extended to cover

the length of the corridor.

Response: Renew Atlanta will not remove any existing bike lanes. Limited Right of Way

may restrict the addition of bike lanes from the Atlanta City limit to Willis Mill Rd, and Renew

Atlanta is looking into the best ways to connect the existing bike lanes that run from

Sandtown/Pollard past Beecher Street all the way up to the Beltline.

c. Comments about pedestrians: The 15 comments about pedestrians were mostly

concerned with safety; safer crossing for pedestrians and ADA compliance so

wheelchairs can safely use the roadway. There were some comments that would

like to see nice sidewalks on both sides of the road throughout the corridor.

Response: Renew Atlanta will put sidewalks on both sides of the road. The sidewalks will

look like the sidewalks on Cascade Road between Willis Mill Rd and Delowe Dr, with either

brick inlay or stamped concrete to look like brick inlay. All sidewalks and crosswalks will be

built to meet ADA requirements and Renew Atlanta is working to identify locations where

crosswalks can be added or improved for safety.

d. Comments about transit riders: The nine comments about transit and it’s riders

along the corridor were mixed. There were some that don’t want MARTA busses

using the corridor. Others want to see street furniture and more lights at the bus

stops they use.

Response: Renew Atlanta has reached out to MARTA for ridership data and learned that

and average of 1,000+ people ride the buses every weekday. Transit is clearly an

important part of the Cascade Corridor. The ridership data has helped identify which bus

stops are the busiest and in most need of street furniture and trash cans.

Page 7: Renew Atlanta - Cascade Corridor€¦ · Renew Atlanta to plant additional trees along the streetscape. Two involve street furniture asking Renew Atlanta to put benches at more MARTA

Summary of Comments Public Meeting

Cascade Corridor Streetscape October 13, 2016

Number of Comment Received: 56

Question 1: Do you support the project?

Potential Response Number of Responses

For 32

Against 1

Conditional 5

Uncommitted 3

No Response 15

Question 2: How did you hear about this meeting?

Potential Response Number of Responses

Internet (Renew Atlanta website/Social

Media)

6

Flyer in Mailbox 7

Signs 10

Word of Mouth 14

Other 1

Email 9

No Response 14 *Many respondents mentioned multiple ways in which they heard about the meeting

Question 3: Do you understand the project after attending this meeting?

Potential Response Number of Responses

Yes 34

No 5

No Response 17

Page 8: Renew Atlanta - Cascade Corridor€¦ · Renew Atlanta to plant additional trees along the streetscape. Two involve street furniture asking Renew Atlanta to put benches at more MARTA

Public Meeting Comment Card

Cascade Corridor October 13, 2016

Your comments can be submitted by any of the following ways: 1 – Complete this form and place in the drop box. 2 – Complete this form and mail to: City of Atlanta Renew Atlanta Program 55 Trinity Avenue, SW Suite 4350 Atlanta, GA 30303 3 – Email your comments to [email protected]

Please print responses.

Name

Address

Do you support the project? For Against Conditional Uncommitted

How did you hear about this meeting? Radio/Television Newspaper Signs

Word of Mouth Other

Do you understand the project after attending this meeting? Yes No

Please list additional comment/questions you may have (Feel free to use the back of this sheet for additional space):

Please share your suggestions on improving the way the Renew Atlanta team conducts public

meetings:

Written comments will be accepted until October 27, 2016.

Page 9: Renew Atlanta - Cascade Corridor€¦ · Renew Atlanta to plant additional trees along the streetscape. Two involve street furniture asking Renew Atlanta to put benches at more MARTA

""'C >

cc

> C

nl C: I... QJ 0

<C •

C

C 0..

nl a:::

0 �

� ·-

E ·-

> � ·-

u nl

C: nl

QJ C

E 0 I...

• I

·-I...I...0u

QJ ""'C nl u V) nl u

;: ., • >

.. MS Id tn:•e"'o• u :3

MS IS t:ut11doH l ... "'E •"

MS ts vo1••1

MSJd PV3 M 3: .. ., ! : I"'

3: .. "•ii .. = � • ; ,,.. "

;:.. 0 " s•"'

..J M_'S l $' UIOllffh•1

•..

a�v OUIP1UQ M_

MS IS Hnh

M •

MS 15 jQ1J 'f':JW

3: ..•> .. � • 0

;:

-C QJ �

C, -

c;"SW .. u ·g2

MS •O•

;: "' 0

Pl H

C 0·­--·-E" •"

-Cl').

8 C

0·-u :::,...

� C 0 u

-cQJ..,nJE·-

� L&J

;: •

N.s"a•• ,, ... ..

lSW

• a

0..... ti -Cl: I--C

...J-u z

:::) 0 u

-c QJ N ·-"' C

-c C

ii'

"' -c QJ a.0 -� -c 00 C·-QJ.c-"' en 0 a. e a.00 C·--c C �

LL

00 ..... 0 N

0 -c C QJ .., n, C 0

MS Ill IIOa"I)

MS Id .<pr-�

3: "'" ., 1$ .:,11,1Ag;;

� jj

MS IS P00MIY :I: .. ;; 'Ii ,, i.,

MS J•l 1f.J"'fli"1d ;: "' � 0 0 ,5 e • ? • >

'a, MS)(] au-11>oH 3:

• ' g C

• "- ••.. "

C • .. E

? 0

� .. ;: .,,..,0:: "O C !! .., l! 0::

MS aQ PUC'1'11'O

3: ., .. ""'.....

MS /1y JJOMO ;: ;: .. "'• • • > .. .. = MS 1S 1J,01A = !! .. A. "

ID

..

MS Id •,rpur

�-" Cl: l

- t;-◄c

...J

uz

:::)

8

;: .. c • l! > i-'

MS Id •�u

3: .,, a... �

• > r·-·--•,.•-r I. , .. e • g"'

MS IS I AiO!U I'll

MS 11 ,;uo1:,

::' •g IC

MS C lftlOUUl)t

-;: "" 0 -" 0

-QJ � -CD -..... QJ en nJ .c Q.

'Ii C:

C 0·­--·-E m• 0 ..... -Cl').

8 C 0·-u � ....

� C

8 -c QJ.., n,

E·-� L&J

• I•I

QO C·--c C '2 a.·-.c

� cu C

� "' Q. -c C "' "'..,C "' -< 3 cu C QJ Cl:

.ro<k c. , �w., "'

MS1> ••••

C

O' SW �

i: .. Q •

0

I

" ..... 0 N... QJ .c E

0-"' 0 C, � "' �

C 0·-u :::,...

� C

0 u

'I. :11

IW

I ;• • ...........

"'

M& ,aa 110,1t..r1

i .. Q

J �

,,•• li"'

3: .. :

{•

..........ti -Cl:

t; -C

...J-u

z

:::) 0 u

;: "' a

i 0 • ;; " � ->

� .;; •"•>

3: .,"...E " .. C • :f

0 ..... 1--u -Cl:

t; -C ...J-u

z

:::) 0 u

3: !/l JQ u

3: ., • � • • >

0

V •

100

flt••·-·-·-· ·-·-·--·-·

3: "' Q ...• 0 .. C " li"'

0••"E ;::,

3: "' ""'

• I 1' I I ., ., ,

I "'� . .....3: I � "' . o I ., : r, � • : . , ,:,, I ? ! l � I' • ; � · l

MS •l pnqp•>f i � J ♦ • i•

3: ., • > ◄ C Q

;: .. •> .. C

0 �

., ,,, ...... ·� .... ....... ........

;: "' .!!,, C •

'i 0

C -' .., i

·--....

� M-S Ml put -.CO 0

•-� "1s :... •-•- •1a ;, ""'ii.,;;�-- "--·, •

I•I

• I • I

M.S JO ozua101 • I

Y.S ".)

""-o \> ..

MS PW t6p1,1 •3

MS JQ JUOWMJ!)

MS JQ P00•1t=>O'")

3:

0 .. .. 1f ,

I.J

:,, i.., �• .,

• I•I I•I•I•I •

I

i. � I ., . �

I ._ . ,::-

1 MS 16 IHUl'f' �e> I � . ..,I IYiS ,a uap,c� a, • I•I•I • I • I•

I ;•I-I• I

N.....

b -Cl:

I--C

v-,vs

PIV

i ' ...J I qN.O M • I

-u •

I z • ' • I •

I

"· :::)0 u

• I • I•I

t I

: r···-·•·-·--·-....... _ � i ;:... _ .

� ·-·- a:, C

3:..• • ..,

l: -·-·-

.J ...

"J,.

� .... __ "' ri,,. �

� • • ..,• •

MS JQ 1UMOQ

-•-

Q ,. C .. e C

... �,!,�- (; -.:, "'

j .,

t

.,

,,

\ \ '

\

MS JQ f S

'..'• ' ' ' •

• ' •� i

c! •I � I

_':!-..

I •

l C

I I ;I • I

i• I• I• 1 I i i•

D ..

..........

b -Cl:

t; -C ...J-u

z :::) 0 u

..

-QJ 00 C l! 0 -C 0·-u � ...

� C

8 en :::, 0·-�

Q.

H.arbla. Rd S'li

-c C nJ en QJ a."' u

i �

-c QJ

u :::,...

� C

0 u en 1:j QJ ....... e a. en ::::, 0·->

� Q.

I..,

� ·-...C

QJ

-QJ C

.9 -c Cl: --·-en·­--§ E e

JJ -

·-en

\.� sW

Q

M.£.10 ll!U f!#'t l I I

�SW

• I•I•I I i

r • I • I • I •

I • I •

I • I ! I..

I

i

,, i

MS -"O uruoqpw

s

0

3: ..ct' "

MS JQ s,wepy

;: "' Q "D 15 "

--� --::::------f!L••11•••·•·••-•....:::: • .,._, ___ , __ ..... ,l1£t L ■•-•••••--••••t ;: ,.

••••

... 0 -c ·-......8 QJ -0

.c 3: QJ .c 1--

-c cu

E E l!

e a. > -c n,

� -n,

QO C·--c

C �

LL

n, .., C "' -< 3 QJ C cu Cl:

I

QO C ·-u

� ::::, en cu Cl:

tlO C·--c C �

LL

a.·-.c

� QJ C

� "' Q.

-c C nJ

jg CnJ -<

t C QJ Cl:

� ..... •N -Cl').

I

C

0·-..... "'C·--c...0 0 u-nJ C tlO·-

V)

-cu

� ..c "' QJ QJ en -

-n, 3: cu -c ·-en

QO C·-..,.c QO·-

...J I

cn QJ a. t3 cn tj �

..... •� N -Cl').

I

..... C QJ

E �

� C -...0 -c·-......8-

Page 10: Renew Atlanta - Cascade Corridor€¦ · Renew Atlanta to plant additional trees along the streetscape. Two involve street furniture asking Renew Atlanta to put benches at more MARTA

Ralph David

Abernat

hyBlvd

Langhorn St SW

WhiteSt

SW

SpringPark DrSW

CascadeF

al lsD

rSW

Chatham AveSW

EastridgeRd SW

Beecher RdSW

DolphinDr SW

Westmont Rd SW

PollardDrSW

Avon

Ave

SW

Belmon

te

CirSW

West

wood A

veSW

BeechcrestRd

Oglet

horp e

AveS

W

Beec

her S

tSW

Hopkins St SW

Alleg

heny

St S

W

Blvd Lorraine SW

Donn

ellyAv

e SW

Montr

eat A

veSW

Benja

min

EMa

ysDr

SW

Delowe Dr SW

Sandt

own Rd

SW

HarbinRdSW

Kenmore

St SW

Richla

ndRd

SW

FontaineAve SW

Mayflo

wer

AveSW

Mayflow

erAve

SW

Olym

pian

Way S

W

Blvd Granada SW

LynhurstDrSW

Havilo

nDr

SW

Muse St SW

Childress Dr SW

Olym

pianC

irSW

FlamingoDr SW

Altad

ena P

lSW

Cope

land

Ave S

WShore Dr SW

ShanterTrlSW

HerringRd SW

Pinevi

ew Te

r SW

Roge

rsAv

e SW

W esth

aven

DrSW

Orlando

St SW

Casca

de Te

r SW

AnchorTerSW

Cahaba

DrSW

Adams Dr SW

Kings

dale

Dr S

W

Casca

de Rd

Ocala

AveSW

Belmonte

Dr

SW

Old S

andto

wnRd

SW

Centra Villa Dr SW

Clearbrook DrSW

Veltre Cir SW

Woodland Ter SW

Casca

de Ci

r SW

Willis Mill Rd SW

MelbenanDrSW

DodsonDrSWWillis Mill Rd SW

Lynw

ayLn SW

Tuckawanna DrSW

Audu

bon

Ct

John

A.

White

Golf

Cour

se

Gree

nwoo

dCe

meter

y

Krog

erSh

oppin

g Cen

ter

US Po

st Of

fice

Casc

ade

Eleme

ntary

Lege

nd Ped C

rashe

sBik

e Cras

hes

Injury

Cras

hes

Non-I

njury

Cras

hes

01,9

003,8

005,7

0038

076

01,1

401,5

20Fe

et

Mann

er of

Collis

ion201

3 (July

-Dec)

2014

2015

2016 (J

an-Sep

t)Gra

nd To

talAn

gle19

5651

55181

(33.8%

)He

ad On

710

38

28 (5.

2%)

Not A

Collis

ion wi

th Mo

tor Ve

hicle

23

68

19 (3.

5%)

Rear E

nd27

6359

65214

(39.9%

)Sid

eswipe

-Oppo

site Di

rectio

n1

36

717

(3.2%

)Sid

eswipe

-Same

Direc

tion

926

2418

77 (14

.4%)

Grand

Total

65161

149161

536

Mann

er of

Collis

ion201

3 (July

-Dec)

2014

2015

2016 (J

an-Sep

t)Gra

nd To

talNo

n-Inju

ry56

118121

124419

(78.2%

)Inj

ury7

4326

35111

(20.7%

)Pe

destr

ian0

02

24 (0

.7%)

Bike

20

00

2 (0.4%

)Gra

nd To

tal65

161149

161536

Casc

ade C

orrido

r Cras

h Den

sity M

ap (J

uly 20

13 - S

ept 2

016)