DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT PROPINSI : ACEH KOTA : LANGSA TAHUN ANGGARAN : 2010 PAKET : SEKTOR AIR BERSIH DAN DRAINASE PEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE KOTA LANGSA No. Uraian Jenis Satuan Harga (Rp) A. UPAH U01 Pekerja Org/ Hari 49,700.00 U02 Mandor Org/ Hari 82,300.00 U03 Tukang Org/ Hari 78,700.00 U04 Kepala Tukang Org/ Hari 94,500.00 U05 Operator Org/ Hari 122,300.00 U06 Pembantu Operator Org/ Hari 75,000.00 U07 Mekanik Org/ Hari 122,300.00 U08 Mekanik Pembantu Org/ Hari 75,000.00
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT
PROPINSI : ACEHKOTA : LANGSATAHUN ANGGARAN : 2010PAKET : SEKTOR AIR BERSIH DAN DRAINASEPEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA
No. Uraian Jenis Satuan Harga (Rp)
A. UPAH
U01 Pekerja Org/ Hari 49,700.00 U02 Mandor Org/ Hari 82,300.00 U03 Tukang Org/ Hari 78,700.00 U04 Kepala Tukang Org/ Hari 94,500.00 U05 Operator Org/ Hari 122,300.00 U06 Pembantu Operator Org/ Hari 75,000.00 U07 Mekanik Org/ Hari 122,300.00 U08 Mekanik Pembantu Org/ Hari 75,000.00
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT
PROPINSI : ACEHKOTA : LANGSATAHUN ANGGARAN : 2010PAKET : SEKTOR AIR BERSIH DAN DRAINASEPEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA
No. Uraian Jenis Satuan Harga (Rp)
B. BAHAN
M01 Air Bersih Pengecoran Liter 150.00
M02 Angker Bolt D22+Mur+Ring Bh 42,000.00
M03 Bar Pengaman Unit 1,200,000.00 M04 Baja profil Kg 28,300.00
M05 Bambu Btg 34,100.00
M06 Batu Bata Buah 600.00
M07 Batukali / Batu Belah (Sungai / Gunung) 202,800.00
M08 Batu pecah 3 - 5 cm 290,950.00
M09 Batu pecah 2 - 3 cm 647,600.00
M10 Baut dan Mur Steel 1 1/2" Bh 22,000.00
M11 Bh 12,000.00
M12 Base Plat 16 mm Bh 170,000.00
M13 Besi beton polos Kg 16,200.00
M14 Besi beton ulir/strip Kg 24,800.00 M15 Cat Tembok Kg 25,900.00
M16 Cat Menie Besi Kg 22,200.00 M17 Filter Bh 400,000.00 M18 Formite/penjaga jarak bekisting/spacer Bh 4,000.00 M19 Ijuk Kg 13,600.00 M20 Kantor Lapangan (Type C) 2,220,000.00 M21 Kawat beton Kg 10,500.00 M22 Kawat Bronjong dia. 5 mm Kg 22,800.00 M23 Kawat las Kg 16,000.00 M24 Koral Beton 141,100.00 M25 Balok Kayu Klas II 3,926,100.00 M26 Kayu Klas III (Borneo) 3,553,900.00 M27 Kayu Klas IV (Sengon) untuk Papan Begesting 2,948,100.00 M28 Btg 62,500.00 M29 Lempengan Rumput 28,100.00 M30 Minyak Bensin Ltr 8,100.00 M31 Minyak cat Ltr 21,700.00 M32 Minyak Solar Ltr 8,100.00 M33 Minyak Tanah Ltr 6,700.00 M34 Minyak Bekisting Ltr 3,800.00 M35 Paku Kayu Kg 11,600.00 M36 Pasir beton/Kerikil 141,100.00 M37 Pasir Pasang 129,600.00 M38 Pasir urug 112,500.00 M39 Paving blok 83,700.00 M40 Pelumas / Oli Ltr 36,200.00 M41 Plywood 9 mm Lbr 150,500.00 M42 Btg 71,900.00 M43 Semen Portland (@ 40 Kg) Zak 50,300.00 M44 Tanah Timbun 51,700.00 M45 Tanah Timbun Pilihan 122,600.00 M46 Plat Baja, t = 5 mm m2 25,700.00
M47 Pintu Air Sorong (B = 0,7 H = 1,0) Lengkap+pemasangan Set 3,000,000.00
M48 Pintu Air Koklep (B = 0,7 H = 1,25) Lengkap+pemasanga Set 4,000,000.00 M49 M' 96,006.00 M50 M' 200,946.00 M51 M' 272,689.50 M52 M' 344,433.00
Air Realease CI Ø 50 mmAir Realease CI Ø 75 mmAir Realease CI Ø 100 mmAir Realease CI Ø 150 mmAir Realease CI Ø 200 mm
All Range Bend 45°
Bend CI 22.5° Ø 75 mmBend CI 45° Ø 75 mmBend CI 90° Ø 75 mmBend CI 45° Ø 100 mmBend CI 45° Ø 150 mmBend CI 90° Ø 100 mmBend CI 45° Ø 200 mmBend CI 90° Ø 200 mmBend CI 45° Ø 250 mmBend CI 90° Ø 250 mm
Flexible Joint Ø 150 mmFlexible Joint Ø 200 mmGate Valve CI Ø 100 mmGate Valve CI Ø 150 mmGate Valve CI Ø 200 mmPerangkat Mur, Baut & Ring Flange Ø 100 mmPerangkat Mur, Baut & Ring Flange Ø 150 mmPerangkat Mur, Baut & Ring Flange Ø 200 mmReducer GIP Ø 100-75 mmReducer GIP Ø 150-100 mmReducer GIP Ø 200-100 mmSocket GIP Ø 100 mmSocket GIP Ø 150 mm
Tee GIP Ø 150-150-150 mmTee GIP Ø 200-200-200 mmTee GIP Ø 200 - 100 - 200 mmTee GIP Ø 150 - 100 - 150 mmTee All Flange CI Ø 150-100-150 mmTee All Flange CI Ø 200-100-200 mmTee All Flange CI Ø 200-150-200 mmTee All Flange CI Ø 200-200-200 mm
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT
PROPINSI : ACEHKOTA : LANGSATAHUN ANGGARAN : 2010PAKET : SEKTOR AIR BERSIH DAN DRAINASEPEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT
PROPINSI : ACEHKOTA : LANGSATAHUN ANGGARAN : 2010PAKET : SEKTOR AIR BERSIH DAN DRAINASEPEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
PROPINSI : ACEHKOTA : LANGSATAHUN ANGGARAN : 2010PAKET : SEKTOR AIR BERSIH DAN DRAINASEPEKERJAAN : PEMBANGUNAN JARINGAN PIPA TRANSMISI DAN DRAINASE
KOTA LANGSA
No. Uraian Jenis Satuan Harga (Rp)
C. SEWA ALATA01 Alat Pengetesan Pipa Hk 75,000.00 A02 Jack Hammer Hk 150,000.00 A03 Concrete Mixer dan Vibrator Hk 100,000.00 A04 Stamper Hk 150,000.00 A05 Excavator Jam 343,208.28 A06 Buldozer Jam 547,125.46 A07 Vibro roller Jam 267,913.36 A08 Mesin Las Hk 100,000.00 A09 Alat Bantu Perpipaan (tracker & katrol) Hk 50,000.00
PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA
PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN 1. Jenis Peralatan EXCAVATOR 80-140 HP A05 2. Tenaga Pw 80.0 HP 3. Kapasitas Cp 0.5 M3 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam c. Harga Alat B 770,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru b. Jam Kerja Dalam 1 Tahun W' 2,000 Jam Alat Baru c. Harga Alat (*) B' 770,000,000 Rupiah Alat Baru
B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 77,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -(1 + i)^A' - 1
3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B' - C ) x D E 115,862.57 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 770.00 RupiahW'
Biaya Pasti per Jam = ( E + F ) G 116,632.57 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 97,200.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 43,440.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 57,750.00 Rupiah perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 17,471.43 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,714.29 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 226,575.71 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 343,208.28 Rupiah
E. LAIN - LAIN 1. Tingkat Suku Bunga i 20.00 % / Tahun 2. Upah Operator / Sopir U1 17,471.43 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam 4. Bahan Bakar Bensin Mb 8,100.00 Liter 5. Bahan Bakar Solar Ms 8,100.00 Liter 6. Minyak Pelumas Mp 36,200.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
PEMBANGUNAN TANGGUL SUNGAI PAOH KOTA LANGSA
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN 1. Jenis Peralatan VIBRATORY ROLLER 5-8 T. A07 2. Tenaga Pw 75.0 HP 3. Kapasitas Cp 7.0 Ton 4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,600.0 Jam c. Harga Alat B 431,200,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun Sewa Alat b. Jam Kerja Dalam 1 Tahun W' 1,280 Jam Sewa Alat c. Harga Alat (*) B' 287,466,667 Rupiah Sewa Alat
B. BIAYA PASTI PER JAM KERJA 1. Nilai Sisa Alat = 10 % x B C 43,120,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.38629 -(1 + i)^A' - 1
3. Biaya Pasti per Jam :a. Biaya Pengembalian Modal = ( B' - C ) x D E 73,740.98 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 449.17 RupiahW'
Biaya Pasti per Jam = ( E + F ) G 74,190.15 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 91,125.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 40,725.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 33,687.50 Rupiah perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 17,471.43 Rupiah 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,714.29 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 193,723.21 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 267,913.36 Rupiah
E. LAIN - LAIN 1. Tingkat Suku Bunga i 20.00 % / Tahun 2. Upah Operator / Sopir U1 17,471.43 Rp./Jam 3. Upah Pembantu Operator / Pmb.Sopir U2 10,714.29 Rp./Jam 4. Bahan Bakar Bensin Mb 8,100.00 Liter 5. Bahan Bakar Solar Ms 8,100.00 Liter 6. Minyak Pelumas Mp 36,200.00 Liter 7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
PERHITUNGAN PRODUKSI ALAT
1. BULDOZER
Kapasitas bucket = 4.40 m3Beban = 4.4 x 1.65 = 7.26 tonKoefisien traksi = 0.7Reaksi kritis = 0.7 x 7.26 = 5.08 tonKecepatan maju = 4.7 km/jam = 78.33 m/menitKecepatan mundur = 5.5 km/jam = 91.67 m/menitJarak dorong rata-rata = 50.00 mWaktu maju (Wp) = 0.64 menitWaktu mundur (Wj) = 0.55 menitWaktu buang/pindah, dll = 0.30 menitTotal waktu (Ws) = 1.48 menitTrip perjam = 40.44 tripProduksi maks. alat = 4.4 x 40.44 = 177.93 m3
Faktor koreksi (Fk)Efisiensi kerja siang (a) = 0.75Ketrampilan operator (b) = 0.75Cuaca cerah (C) = 0.90Cara kerja (d) = 0.90Kekerasan tanah (e) = 0.75Total Fk = a x b x c x d x e = 0.34Taksiran produksi = 177.93 x 0.34 = 60.80 m3/jamDibulatkan 61.00 m3/jam
1 m3 tanah diperlukan faktor alat (buldozer) = 0.0164 jam1 m2 tanah diperlukan faktor alat (buldozer) = 0.0049 jam = 203.33 m2/jam1 Ha tanah diperlukan faktor alat (buldozer) = 49.1803 jam
= 0.0203 Ha/jam
Sumber : Hasil Perhitungan
2. EXCAVATOR
Kapasitas bucket = 0.80 m3Beban = 0.8 x 1.65 = 1.32 tonBerat excavator = 18.50 tonBerat total = 19.82 tonKoefisien traksi = 0.55Reaksi kritis = 0.55 x 19.82 = 10.90 tonKecepatan maju = - km/jam = - m/menitKecepatan mundur = - km/jam = - m/menitJarak dorong rata-rata = - mWaktu maju (Wp) = - menitWaktu mundur (Wj) = - menitWaktu buang/pindah, dll = 0.62 menitTotal waktu (Ws) = 0.62 menitTrip perjam = 96.77 tripProduksi maks. alat = 0.8 x 96.77 = 77.42 m3
Faktor koreksi (Fk)Efisiensi kerja siang (a) = 0.80Ketrampilan operator (b) = 0.80Cuaca cerah (C) = 0.90Faktor muat (d) = 0.90Kekerasan tanah (e) = -Total Fk = a x b x c x d = 0.52Taksiran produksi = 77.42 x 0.52 = 40.13 m3/jamDibulatkan 40.00 m3/jam
1 m3 tanah diperlukan faktor alat (buldozer) = 0.0250 jam1 m2 tanah diperlukan faktor alat (buldozer) = 0.0075 jam = 133.33 m2/jam1 Ha tanah diperlukan faktor alat (buldozer) = 75.0000 jam
= 0.0133 Ha/jam1 m3 tanah diperlukan faktor alat (excavator) = 0.0250 jam
Sumber : Hasil Perhitungan
PERHITUNGAN PRODUKSI ALAT
3. VIBRATOR ROLLER
Kecepatan alat (V) = 3.00 km/jamLebar efektif pemadatan (B) = 1.10 mEffisiensi (E) = 0.80Faktor kembang (Fk) = 1.20Tebal hamparan (t) = 0.30 mJumlah lintasan (N) = 10.00
Produksi alat = (V x B x t x E) / (N x Fk) = 66.00 m3/jam
1 m3 tanah diperlukan faktor alat (Vibrator roller) = 0.0152 jam
Sumber : Hasil Perhitungan
PEMERINTAH ACEHDINAS BINA MARGA DAN CIPTA KARYA
Jln. Jenderal Sudirman No. 01 Telp. (0651) 46767, 47009, 46915
BIDANG PROGRAM DAN PELAPORANPERENCANAAN PENGEMBANGAN INFRASTRUKTUR
ENGINEER ESTIMATE (EE)
KONSULTAN PERENCANA
A. PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA -
SMA 2 LANGSA
PEMERINTAH ACEHDINAS BINA MARGA DAN CIPTA KARYA
Jln. Jenderal Sudirman No. 01 Telp. (0651) 46767, 47009, 46915
CV. ZIYAD IDOLA CONSULTANTKONSULTAN PERENCANAAN UMUM DAN PENGAWASAN
Head Office : Jl. Prada Utama Lr. Delima No. 10 Banda Aceh
PEMERINTAH ACEHDINAS BINA MARGA DAN CIPTA KARYA
Jln. Jenderal Sudirman No. 01 Telp. (0651) 46767, 47009, 46915
BIDANG PROGRAM DAN PELAPORANPERENCANAAN PENGEMBANGAN INFRASTRUKTUR
ENGINEER ESTIMATE (EE)
NOMOR KONTRAK : 07-AC/CTR/BPP.P-OTSUS/DBC/APBA/2010TANGGAL : 20 MEI 2010PEKERJAAN : Perencanaan Pengembangan Infrastruktur (KOTA LANGSA)KODE PAKET : PR INFRA 13/2010NILAI KONTRAK : Rp. 162.923.000,-NILAI KONTRAK FISIK : Rp. 6.447.585.000,-SUMBER DANA : OTSUSDPA SKPA : TAHUN ANGGARAN 2010
KONSULTAN PERENCANA
CV. ZIYAD IDOLA CONSULTANTKONSULTAN PERENCANAAN UMUM DAN PENGAWASAN
Head Office : Jl. Prada Utama Lr. Delima No. 10 Banda Aceh
REKAPITULASI TOTAL
KEGIATAN : PERENCANAAN PENGEMBANGAN INFRASTRUKTUR (KOTA LANGSA) LOKASI : KOTA LANGSATAHUN ANGGARAN : 2010
NO. U R A I A N TOTAL HARGA (Rp.)
A. PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA-SMA2
LANGSA Rp. 2,370,121,110.20
B. SISTEM DRAINASE KOMPLEK PERUMAHAN SUNGAI PAOH KECAMATAN
LANGSA BARAT Rp. 3,491,320,400.74
TOTAL Rp. 5,861,441,510.94
PPn 10% Rp. 586,144,151.09
JUMLAH SELURUHNYA Rp. 6,447,585,662.03
DIBULATKAN Rp. 6,447,585,000.00
Terbilang : Enam Milyar Empat Ratus Empat Puluh Tujuh Juta Lima Ratus Delapan Puluh Lima Ribu Rupiah,-
Disetujui Oleh : Banda Aceh, September 2010Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Perencana,Perencanaan Pengembangan Infrastruktur CV. ZIYAD IDOLA CONSULTANTDinas Bina Marga dan Cipta Karya Aceh
Mawaddah Noer, ST Abdullah, STNip. 197404142006042002 Direktur
Mengetahui ;Kepala Bidang Program dan Pelaporan
Dinas Bina Marga dan Cipta Karya Kuasa Pengguna Anggaran / Kuasa Pengguna Barang
Kegiatan : Sistem Drainase Komplek Perumahan Sei Pauh dan Dusun Makmur Sei Pauh Kec. Langsa BaratPekerjaan : Pembangunan Tanggul Pengamanan Komplek Perumahan Sei Pauh Lokasi : Kecamatan Langsa Barat, Kota LangsaTahun Anggaran : 2010
NO. URAIAN PEKERJAAN SATHARGA JUMLAHSATUAN HARGA
(Rp) (Rp)1 2 3 4 6 7 = 4 x 6
I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Ls 1.00 A.1 21,000,000.00 21,000,000.00
2 Pembersihan Lapangan Ls 1.00 Taksir 2,000,000.00 2,000,000.00
3 Dewatering Ls 1.00 Taksir 6,500,000.00 6,500,000.00
4 Sewa Direksi Keet Unit 1.00 Taksir 2,000,000.00 2,000,000.00
5 Papan Nama Proyek Unit 1.00 Taksir 750,000.00 750,000.00
6 Adm. / Gbr. Lap / Dok. / Pas. Profil Ls 1.00 Taksir 4,500,000.00 4,500,000.00
36,750,000.00
II. PEKERJAAN TANGGUL BANJIR
1 Timbunan Tanah Didatangkan dan
dipadatkan dengan Alat Berat 3,099.57 B.6 156,697.00 485,693,320.29
7 Beton Struktur K.225 31.02 C.3 1,184,505.00 36,743,345.10
8 Pekerjaan Besi Kg 842.66 C.4 18,165.00 15,306,918.90
9 Bekisting 123.75 C.7 511,321.00 63,275,973.75
10 M' 20.00 M49 96,006.00 1,920,120.00
11 Pintu Air Sorong (B = 0,7 H = 1,0) Set 2.00 M47 3,000,000.00 6,000,000.00
12 Pintu Air Koklep (B = 0,7 H = 1,25) Set 2.00 M48 4,000,000.00 8,000,000.00
156,543,537.39
KUANTITAS KODE ANALISA
Jumlah Harga Pekerjaan I (dipindah ke lembar Rekapitulasi)
M3
M2
Jumlah Harga Pekerjaan II (dipindah ke lembar Rekapitulasi)
M3
M3
M3
M3
M3
M3
M2
Jumlah Harga Pekerjaan III (dipindah ke lembar Rekapitulasi)
M3
M3
M3
M3
M3
M3
M3
M2
Pipa Sandaran Galvanis Ø3"
Jumlah Harga Pekerjaan IV (dipindah ke lembar Rekapitulasi)
DAFTAR KUANTITAS DAN HARGA
Kegiatan : Sistem Drainase Komplek Perumahan Sei Pauh dan Dusun Makmur Sei Pauh Kec. Langsa BaratPekerjaan : Pembangunan Tanggul Pengamanan Komplek Perumahan Sei Pauh Lokasi : Kecamatan Langsa Barat, Kota LangsaTahun Anggaran : 2010
NO. URAIAN PEKERJAAN SATHARGA JUMLAHSATUAN HARGA
(Rp) (Rp)1 2 3 4 6 7 = 4 x 6
KUANTITAS KODE ANALISA
REKAPITULASIDAFTAR KUANTITAS DAN HARGA
Kegiatan : Sistem Drainase Komplek Perumahan Sei Pauh dan Dusun Makmur Sei Pauh Kec. Langsa BaratPekerjaan : Pembangunan Tanggul Pengamanan Komplek Perumahan Sei Pauh Lokasi : Kecamatan Langsa Barat, Kota LangsaTahun Anggaran : 2010
NO. URAIAN PEKERJAANJUMLAHHARGA KET.
(Rp)1 2 3 4
I. PEKERJAAN PERSIAPAN 36,750,000.00
II. PEKERJAAN TANGGUL BANJIR 627,521,173.59
III. PEKERJAAN SALURAN DRAINASE 2,670,505,689.76
IV. PEKERJAAN PINTU AIR (1 UNIT) 156,543,537.39
A. Jumlah Harga 3,491,320,400.74
B. Pajak Pertambahan Nilai (PPn) = 10 % (A) 349,132,040.07
C. Jumlah (A) + (B) 3,840,452,440.81
D. DIBULATKAN 3,840,452,000.00
Terbilang : Tiga Milyar Delapan Ratus Empat Puluh Juta Empat Ratus Lima Puluh Dua Ribu Rupiah,-
ENGINEER'S ESTIMATE
KEGIATAN : PEMBANGUNAN JARINGAN AIR BERSIH MEURANDEH - LANGSA LAMA - SMA 2 LANGSA
B B A H A N1 Pasir Beton kg 760.00 100.79 76,597.14 2 Kerikil kg 1,029.00 104.52 107,549.56 3 PC kg 326.00 1,257.50 409,945.00 4 Air Liter 215.00 150.00 32,250.00 56
C PERALATAN123
Jumlah (termasuk biaya umum dan keuntungan 739,466.10 Harga pekerjaan (diluar PPN) 739,466.10 Jumlah dibulatkan 739,466.00
Sumber : Analisa SNI 2007
JENIS PEKERJAAN : BETON STRUKTUR K.225 (TANPA ACUAN)SATUAN PEKERJAAN : M3
NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH Rp. Rp.
B B A H A N1 Kerikil (batu pecah 2-3 cm) kg 1,047.00 479.70 502,249.78 2 Pasir Beton kg 698.00 100.79 70,348.43 3 PC kg 371.00 1,257.50 466,532.50 4 Air Liter 215.00 150.00 32,250.00
C PERALATAN12
Jumlah (termasuk biaya umum dan keuntungan 1,184,505.11 Harga pekerjaan (diluar PPN) 1,184,505.11 Jumlah dibulatkan 1,184,505.00
Sumber : Analisa SNI 2007
JENIS PEKERJAAN : BESI TULANGAN POLOSSATUAN PEKERJAAN : 10 KG
NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH Rp. Rp.
B B A H A N1 Besi beton polos kg 10.5000 16,200.00 170,100.00 2 Kawat Beton kg 0.1500 10,500.00 1,575.00
C PERALATAN1
Jumlah (termasuk biaya umum dan keuntungan 181,653.70 Harga pekerjaan (diluar PPN) 181,653.70 Jumlah untuk 1 Kg Besi 18,165.37 Jumlah dibulatkan 18,165.00
Sumber : Analisa SNI 2007
JENIS PEKERJAAN : BESI TULANGAN ULIRSATUAN PEKERJAAN : 10 KG
NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH Rp. Rp.
B B A H A N1 Besi beton ulir kg 10.5000 24,800.00 260,400.00 2 Kawat Beton kg 0.1500 10,500.00 1,575.00
C PERALATAN1
Jumlah (termasuk biaya umum dan keuntungan 271,953.70 Harga pekerjaan (diluar PPN) 271,953.70 Jumlah untuk 1 Kg Besi 27,195.37 Jumlah dibulatkan 27,195.00
Sumber : Analisa SNI 2007
JENIS PEKERJAAN : ACUAN BETON/BEKISTING UNTUK PONDASISATUAN PEKERJAAN : M2
NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH Rp. Rp.
B B A H A N1 Paku kg 0.4000 11,600.00 4,640.00 2 Kayu kelas III m3 0.0300 3,553,900.00 106,617.00 3 Balok kayu kelas II m3 0.0200 3,926,100.00 78,522.00 4 Minyak bekisting liter 0.2000 3,800.00 760.00 5 Plywood tebal 9 mm lembar 0.3500 150,500.00 52,675.00 6 Kayu dolken batang 3.0000 62,500.00 187,500.00 7 Formite/penjaga jarak bekisting/spacer buah 4.0000 4,000.00 16,000.00
C PERALATAN1
Jumlah (termasuk biaya umum dan keuntungan) 511,321.40 Harga pekerjaan (diluar PPN) 511,321.40 Jumlah dibulatkan 511,321.00
Sumber : Analisa SNI 2007
JENIS PEKERJAAN : ACUAN BETON/BEKISTING UNTUK LANTAISATUAN PEKERJAAN : M2
NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAH Rp. Rp.
B B A H A N1 Paku kg 0.4000 11,600.00 4,640.00 2 Kayu kelas III m3 0.0400 3,553,900.00 142,156.00 3 Balok kayu kelas II m3 0.0150 3,926,100.00 58,891.50 4 Minyak bekisting liter 0.2000 3,800.00 760.00 5 Plywood tebal 9 mm lembar 0.3500 150,500.00 52,675.00 6 Kayu dolken batang 6.0000 62,500.00 375,000.00
-
C PERALATAN1
Jumlah (termasuk biaya umum dan keuntungan) 698,729.90 Harga pekerjaan (diluar PPN) 698,729.90 Jumlah dibulatkan 698,730.00
Sumber : Analisa SNI 2007
Kebutuhan Waktu dan Tenaga untuk Pemasangan Tulangan PengelakTukanjam 0.27Besi Bkg 1.10produkg 4.12Satu hkg/hari 32.96Vol. bkg #REF!waktujam #REF!jika d hari #REF!Pekerja jam 0.13Besi Beton Ulir kg 1.10produksi 1jam tukang kg 8.27Satu hari (8 jam) kg/hari 66.17Vol. baja yang akan dikerjakan kg #REF!waktu yang dibutuhkan jam #REF!jika dikerjakan 50 orang hari #REF!Kebutuhan Waktu dan Tenaga untuk Pemasangan Bekisting dan Perancah PengelakPekerja jam 2.45Kayu acuan dan perancah m3 0.52produksi 1 jam pekerja m3/jam 0.21Satu hari (8 jam) m3/hari 1.68Vol. Bekisting dan perancah m3 #REF!waktu yang dibutuhkan jam #REF!jika dikerjakan 1 orang hari #REF!Kebutuhan Waktu dan Tenaga untuk Pemasangan Tulangan PeimpahTukanjam 0.27Besi Bkg 1.10produkg 4.12Satu hkg/hari 32.96Vol. bkg #REF!waktujam #REF!jika d hari #REF!Pekerja jam 0.13Besi Beton Ulir kg 1.10produksi 1jam tukang kg 8.27Satu hari (8 jam) kg/hari 66.17Vol. baja yang akan dikerjakan kg #REF!waktu yang dibutuhkan jam #REF!jika dikerjakan 50 orang hari #REF!Kebutuhan Waktu dan Tenaga untuk Pemasangan Bekisting dan Perancah PelimpahPekerja jam 2.45Kayu acuan dan perancah m3 0.52produksi 1 jam pekerja m3/jam 0.21Satu hari (8 jam) m3/hari 1.68Vol. Bekisting dan perancah m3 #REF!waktu yang dibutuhkan jam #REF!jika dikerjakan 1 orang hari #REF!
JENIS PEKERJAAN : PENGELASAN SATUAN PEKERJAAN : M'
NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.
A TENAGA1 Tukang OH 0.5000 49,700.00 24,850.00 2 Kepala Tukang OH 0.0210 82,300.00 1,728.30 3
B B A H A N1 Kawat Las Kg 2.3000 16,000.00 36,800.00 2 Solar Liter 0.7500 8,100.00 6,075.00
C PERALATAN1 Mesin Las (sewa) Jam 0.0710 14,285.71 1,014.29 2
Jumlah (termasuk biaya umum dan keuntungan) 70,467.59 Harga pekerjaan (diluar PPN) 70,467.59 Jumlah dibulatkan 70,468.00
Sumber : Hasil Perhitungan
JENIS PEKERJAAN : PEMASANGAN PIPA PVC DIA. 75 MM - 100 MMSATUAN PEKERJAAN : M'
NO URAIAN SATUAN KUANTITAS HARGA SATUAN JUMLAHRp. Rp.