Faculty of Engineering, Kasetsart University
Mr.Wirote BuakleeFebruary 17, 2013
Reliability Improvement Method
in a Smart Distribution Grid
Page 2
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 2/63
Selected Paper
[1] Kazemi, S.; Fotuhi-Firuzabad, M.; Billinton, R.,” Reliability assessment of
an automated distribution system”, IET Generation, Transmission & Distribution, 2007, Page(s): 223-233.
[2] Taylor, T.; Fahey, T.; Royster, T.; Engler, D.,”New Recloser functionalityenhances feeder automation”, IEE/PES Transmission and DistributionConference and Exposition, 2008, Page(s): 1-8.
[3] Kazemi, S.; Fotuhi-Firuzabad, M.; Sanaye-Pasand, M.; Lehtonen, M.,” Impacts of automatic control systems of loop restoration scheme on thedistribution system reliability”, IET Generation, Transmission & Distribution, 2009, Page(s): 891- 902.
[4] Wernsing, R.; Hubertus, J.; Duffy, M.; Hataway, G.; Conner, D.; Nelson,E.,” Implementation of an innovative advanced loop scheme to provide
distribution reliability improvement”, IEEE Rural Electric Power Conference(REPC), 2010, Page(s): B2-B2-8.
[5] Kim, J.-C.; Cho, S.-M.; Shin, H.-S.,” Advanced Power Distribution SystemConfiguration for Smart Grid”, IEEE Transactions on Smart Grid, 2013,Page(s): 1-6.
2
Page 3
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 3/63
3
Presentation Topics
I. Introduction
II. Reliability Improvement Method for Distribution System
Apply Loop Restoration Scheme(LRS) [1,2]
Use Close Tie before Open Method [3]
Employ Single Phase Tripping&Lock Out Scheme [4]
Apply Closed loop scheme [5]
III. Conclusion
IV. Future Research
Page 4
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 4/63
• Advanced technologies for reliability improvement
• Ease of Control and Management
• Integrating of Distributed Energy Resources
• Supporting Demand Response
“SMART GRID” a conventional electric power systemthat has been equipped with …
I. Introduction
4
Page 5
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 5/63
I. Introduction
• Radial Scheme
• Loop Scheme
•
Mesh Scheme
5
Typical Distribution Configuration
Page 6
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 6/63
I. Introduction
6
Sub1
Sub
2
Relay
Relay
R1
Recloser
R1
Recloser
R2
Recloser
R2
Recloser
TieRecloser
Radial Scheme
Page 7
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 7/63
I. Introduction
7
Sub1
Sub
2
Relay
Relay
R1
Recloser
R1
Recloser
R2
Recloser
R2
Recloser
TieRecloser
Loop Scheme
Page 8
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 8/63
I. Introduction
8
Sub1
Sub
2
Relay
Relay
R1
Recloser
R1
Recloser
R2
Recloser
R2
Recloser
TieRecloser
Tie
Tie
Mesh Scheme
Page 9
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 9/63
Type of Loop Scheme
9
Page 10
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 10/63
Loop Scheme without Communication
10
R6
Sub
1
Sub
2
Relay
Relay
Recloser
R10
R1
Recloser
Recloser
R9
R2
Recloser
Recloser
R8
R3
Recloser
Recloser
R7
R5
R4
Recloser
Recloser
Recloser
Page 11
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 11/63
Loop Scheme with Communication
11
R6
Sub
1
Sub
2
Relay
Relay
Recloser
R10
R1
Recloser
Recloser
R9
R2
Recloser
Recloser
R8
R3
Recloser
Recloser
R7
R5
R4
Recloser
Recloser
Recloser
SCADA
Page 12
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 12/63
II. Reliability Improvement Method
• Apply Loop Restoration Scheme(LRS)
• Use Close Tie before Open Method
•
Employ Single Phase Tripping and Lock Out Scheme• Apply Closed loop scheme
12
Page 13
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 13/63
Apply Loop Restoration Scheme(LRS)
with Automatic Control System (ACS)
13
Page 14
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 14/63
Automated Scheme
14
Page 15
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 15/63
Loop Restoration Scheme
15
Page 16
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 16/63
Case Study of RBTS Bus 2
16
Case Study
FG-First GroupSG-Second Group
Page 17
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 17/63
Case Study of RBTS Bus 2
17
Comparison of Sustained Interruption Frequency
Page 18
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 18/63
Case Study of RBTS Bus 2
18
Comparison of Sustained Annual Outage Time
Page 19
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 19/63
Case Study of RBTS Bus 2
19
Comparison of Momentary Interruption Frequency
Page 20
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 20/63
Case Study of RBTS Bus 2
20
Comparison of System Reliability Indices
Page 21
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 21/63
Use Close Tie before Open Method in Advanced Loop Scheme(ALS)
21
Page 22
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 22/63
The Starting Point –
Automation Without Communication
Sub
1
Sub
2
Relay
Relay
R1
Recloser
R1
Recloser
R2
Recloser
R2
Recloser
TieRecloser Normally
Open Tie
Page 23
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 23/63
Sub
1
Sub
2
Relay
Relay
R1
Recloser
R1
Recloser
R2
Recloser
R2
Recloser
TieRecloser
Original Scheme Helpful But
Not Perfect
Fault Occurs
Normally
Open Tie
Page 24
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 24/63
Sub
1
Sub
2
Relay
Relay
R1
Recloser
R1
Recloser
R2
Recloser
R2
Recloser
TieRecloser
Original Scheme Helpful But
Not Perfect
R1 Opens toClear Fault
Normally
Open Tie
Page 25
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 25/63
Sub
1
Sub
2
Relay
Relay
R1
Recloser
R1
Recloser
R2
Recloser
R2
Recloser
TieRecloser
Original Scheme Helpful But
Not Perfect
Tie Senses Loss
of Voltage
R2 Senses Lossof Voltage
Normally
Open Tie
Page 26
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 26/63
Original Scheme Helpful But
Not Perfect
R2 Changes Settings After Time DelaySub
1
Sub
2
Relay
Relay
R1
Recloser
R1
Recloser
R2
Recloser
R2
Recloser
TieRecloser Normally
Open Tie
Page 27
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 27/63
Sub
1
Sub
2
Relay
Relay
R1
Recloser
R1
Recloser
R2
Recloser
R2
Recloser
TieRecloser
Original Scheme Helpful But
Not Perfect
Tie Closes After
Time Delay
Normally
Open Tie
Page 28
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 28/63
Original Scheme Helpful But
Not Perfect
R2 Opens for Fault
Sub
1
Sub
2
Relay
Relay
R1
Recloser
R1
Recloser
R2
Recloser
R2
Recloser
TieRecloser Normally
Open Tie
Page 29
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 29/63
Sub
1
R1
R2
Tie
R2
R1
Sub
2
Sub
1
R1
R2
Tie
R2
R1
Sub
2
Sub
1
R1
R2
Tie
R2
R1
Sub
2
Close Tie Before Clearing Fault to
Prevent Unnecessary Interruptions
Page 30
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 30/63
Fast, Secure Communications
Between Devices Are Key
Control 2Control 1.....
..... .....
.....
TR ANSMIT
TMB1
TMB2
.
.
.
TMB8
RMB1
RMB2
RMB8
TMB1
TMB2
TMB8
RMB1
RMB2
RMB8
RECEIVE
TR ANSMIT
RECEIVE
0
0
0
0
0
0
1
0
0
1
0
0
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Page 31
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 31/63
Start With Original Circuit
Sub
1
Sub
2
Relay
Relay
R1
Recloser
R1
Recloser
R2
Recloser
R2
Recloser
TieRecloser Normally
Open Tie
Page 32
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 32/63
Insert Devices
R6
Sub
1
Sub
2
Relay
Relay
Recloser
R10
R1
Recloser
Recloser
R9
R2
Recloser
Recloser
R8
R3
Recloser
Recloser
R7
R5
R4
Recloser
Recloser
Recloser
ReduceCustomers
Per Section Normally
Open Tie
Page 33
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 33/63
Add Fiber Communication
R6
Sub
1
Sub
2
Relay
Relay
Recloser
R10
R1
Recloser
Recloser
R9
R2
Recloser
Recloser
R8
R3
Recloser
Recloser
R7
R5
R4
Recloser
Recloser
Recloser
SCADA
Page 34
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 34/63
Control-to-Control Communication
Relay
Relay
Recloser
Recloser
Recloser
Recloser
Recloser
Recloser
Recloser
Recloser
Recloser
Recloser
Page 35
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 35/63
R6 Recloser
R5
R4
Recloser
Recloser
R1
Recloser
R2
Recloser
R3
Recloser
Sub
1
Relay
Use Blocking Scheme to Coordinate
High-Density Protection
Normally
Open
Block Block Block
Page 36
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 36/63
ALS Initializing
1: 51T Asserted
2: Latch Set3: Bit Transmitted
4: Bit Received
5: Latch Set
6: Bit Transmitted
7: Bit Received
8: Bit Transmitted
(Echo)
9: Bit Received
10: Tie Close
Asserted
R6 Recloser
R5
R4
Recloser
Recloser
R1
Recloser
R2
Recloser
R3
Recloser
Sub
1
Relay
Blocked Blocked
Normally
Open
Blocked
Page 37
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 37/63
R6 Recloser
R5
R4
Recloser
Recloser
R1
Recloser
R2
Recloser
R3
Recloser
Sub
1
Relay
ALS Sectionalizing
19: Trip Asserted
18: Bit Received
17: Bit Transmitted
16: Trip Asserted
15: Bit Received
14: Bit Transmitted
(Echo)
13: Bit Received
12: Bit Transmitted
11: Tie ClosedNormally
Open
Blocked BlockedBlocked
Page 38
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 38/63
ALS Post-Event Topology
R6 Recloser
R5
R4
Recloser
Recloser
R1
Recloser
R2
Recloser
R3
Recloser
Sub
1
Relay
InitializingRecloser Open
Isolating
Recloser Open
Tie ClosedNormally
Open
Page 39
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 39/63
Case Study of PSE&G Company, USA
39
Before After
Page 40
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 40/63
Case Study of PSE&G Company, USA
40
Page 41
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 41/63
Case Study of PSE&G Company, USA
41
Page 42
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 42/63
Case Study of PSE&G Company, USA
42
Page 43
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 43/63
Employ Single Phase Tripping and
Lock Out Scheme
43
Page 44
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 44/63
Automated Loop Sectionalizing Scheme
44
Three-Phase, Five-Recloser Loop Sectionalizing Scheme
Page 45
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 45/63
Single Phase Tripping and Lock out
45
Page 46
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 46/63
Fault at F1
46
Page 47
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 47/63
Fault at F2
47
Page 48
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 48/63
Fault at F3
48
Page 49
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 49/63
Case Study of Dominion Company, USA
49
5 reclosers, 45 mile, 34.5 kV
5,145 customers
Page 50
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 50/63
Case Study of Dominion Company, USA
50
Page 51
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 51/63
Advanced Distribution System
Configuration(Closed loop scheme)
51
Page 52
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 52/63
Conventional Distribution System
52
DAS-5 min
Anti-Islanding of DG = 0.5 sec
DG reconnecting = 5 min
Page 53
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 53/63
Closed Loop Configuration
53
C S d f KEPCO K
Page 54
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 54/63
Case Study of KEPCO, Korea
54
C St d f KEPCO K
Page 55
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 55/63
Case Study of KEPCO, Korea
55
C St d f KEPCO K
Page 56
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 56/63
Case Study of KEPCO, Korea
56
Loss during 24 hour for each case
C St d f KEPCO K
Page 57
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 57/63
Case Study of KEPCO, Korea
57
Voltage Profile for Case 1 and Case 3
L C fi ti S l ti Al ith
Page 58
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 58/63
Loop Configuration Selection Algorithm
58
for loss maximization
Generate tie switch cases for loop configuration
Carry out power flow analysis for 24 h
Calculate Accumulated Switch Voltage (ASV)
Select the case with the maximum total ASV for loss
minimization.
C St d f KEPCO K
Page 59
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 59/63
Case Study of KEPCO, Korea
59
ASV for each tie-switch
C St d f KEPCO K
Page 60
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 60/63
Case Study of KEPCO, Korea
60
Voltage Profile with DG for Case 1 and Case 3
III C l i
Page 61
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 61/63
61
III. Conclusion
There are a lot of methods to be applied in a SmartDistribution Grid to improve the system reliability
Operate as Closed loop configuration can improve bothreliability indices and system loss as well as voltageprofile.
IV F t R h
Page 62
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 62/63
62
IV. Future Research
Optimal of automatic device (RTU, Switch,) should befurther studied.
Reliability Assessment in Closed loop distribution systemshould be studied
Study of the impact on Power Quality in case of usingSingle Phase Tripping and Lock out scheme should bedone
T d G d H i S i t
Page 63
7/27/2019 Reliability Improvement Methodin a Smart Distribution Grid
http://slidepdf.com/reader/full/reliability-improvement-methodin-a-smart-distribution-grid 63/63
Toward Green and Happiness Society