Top Banner
Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois
51

Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Mar 30, 2015

Download

Documents

Easton Haught
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Reliability Engineering

Richard C. Fries, PE, CRECorporate Manager, Reliability EngineeringBaxter HealthcareRound Lake, Illinois

Page 2: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Definition of Reliability

The probability, at a desired confidence level,

that a device will perform a specified function,

without failure,under stated conditions,

for a specified period of time

Page 3: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Customer’s Definition of Reliability

A reliable product:

One that does what the customer wants,

when the customer wants to do it

Page 4: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Reliability Basics

Reliability cannot be tested into a product

It must be designed and manufactured into it

Testing only indicates how much reliability is in the product

Page 5: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Purpose of the Reliability Group

Determine the weaknesses in a design

AND correct them

before the device goes to the field

Page 6: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Areas Covered by Reliability

Electrical

Mechanical

Software

System

Page 7: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Electrical ReliabilityF

ailu

re R

ate

T im e

Page 8: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Mechanical ReliabilityF

ailu

re R

ate

T im e

Page 9: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Theoretical Software Reliability

Fa

ilure

Ra

te

T im eX -Axis

X-A

xis

Page 10: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Practical Software ReliabilityF

ailu

re R

ate

T im eX -Axis

X-A

xis

Page 11: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

System ReliabilityF

ailu

re R

ate

T im e

Page 12: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Set the Reliability Goal

Based on similar equipmentUsed as the basis for a reliability

budgetListed as Mean Time Between Failures

(MTBF) in hours or cyclesMTBF = the time at which 63% of the

units in the field will have failedMinimum goal is ten years with a 98%

reliability

Page 13: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Parts Count Prediction

Uses MIL-HDBK-217

Indicates whether the design approximates the reliability goal

Indicates those areas of the design with high failure rates

Page 14: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Chemical Compatibility

Test plastics with typically used chemical agents (alcohol, anesthetic agents, cleaning agents)

Cleaning agents are the worst

Page 15: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Force Puller

Page 16: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Component Testing

Cycle/life testing of individual components

Comparison of multiple vendors of components

Determine applicability for the intended use

Page 17: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Philosophy of Testing

Test to have the units pass

Test with the addition of stresses to check the margins of functionality

Page 18: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Types of Tests

Time terminated, failed parts replacedTime terminated, no replacementFailure terminated, failed parts

replacedFailure terminated, no replacementTest until first failureTest until all samples fail

Page 19: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Determining Sample Size

Uses Chi-Square table

SS = Chi-square Value(MTBF goal)/2

Chi-square value includes confidence level and degrees of freedom = 2f+2

Component testing – 90% confidence levelLife testing – 95% confidence level

Page 20: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Sample Calculation

Want to test valves to be used for 2,000,000 cycles per year with a 10% failure rate after 10 years

Reliability = e(-t/MTBF)MTBF = -t/ln Reliability = -20,000,000/ln 0.90 = 389,914,514 cycles

Page 21: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Sample Calculation

MTBF = 389,914,514 cycles

Number of Samples Number of Cyles10 89,777,817

50 17,955,563 100 8,977,782

Page 22: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Component Test Setup

Page 23: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Component Test Setup

Page 24: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Component Test Setup

Page 25: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Calculating Sample MTBF

MTBF = (# of samples)(length of test) # of failures

Page 26: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Calculating MTBF Where No Failures Occur

A sample MTBF cannot be calculatedA lower one-sided confidence limit is

calculated and the MTBF stated to be greater than that number

One-sided limit = 2(#units)(test time) Chi square value for the confidence limit and 2 degrees of freedom

Page 27: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Sample Calculation for a No Failure Test

10 valves are tested for 10,000 cycles with no failures. Calculate using a 90% confidence level.

One-sided limit = 2(10)(10,000) 4.605 = 43,431 cycles MTBF > 43,431 cycles

Page 28: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

HALT

Acronym for Highly Accelerated Life Testing

Used to find the weak links in the design and fabrication process

Usually performed during the design phase

Page 29: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

HALT Testing

Possible stresses that can be applied:random vibrationrapid temperature transitionsvoltage marginingfrequency margining

The product is stressed far beyond its specifications

The test can be set up to find the destruct limits

Page 30: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

HALT Chamber

Page 31: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Goal of HALT Testing

Overstress the productQuickly induce failuresBy applying the stresses in a

controlled, stepped fashion, while continuing monitoring for failures, the testing results in the exposure of the weakest points in the design

This test, if successful, will expose weak points in the design

Page 32: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Environmental Testing

Operating temperature/humidityStorage temperature/humidityEMC

Surges/transients Brown-outs Electrocautery Cell phones

ESDAltitude

Page 33: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Environmental Testing

AutoclaveShockVibrationShipping Tip testingThreshold testing

Page 34: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Temperature Chamber

Page 35: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Walk-In Temperature Chamber

Page 36: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Autoclave Testing

Page 37: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Customer Misuse

Excess weight on tabletopFluid spillageCross connection of wiresPulling unit by non-pulling partsWrong order of pressing keys“Knowing” how to operate the unit without

reading the manual

Page 38: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Making a Design Foolproof

The biggest mistake engineers makewhen trying to make a design

completely foolproofis underestimating the ingenuity

of complete fools

Page 39: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Failure Analysis

Failure: device does not operate according to its specification

Determine root cause of the failure

Suggest methods to address the failure

Page 40: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Prototype Front Panel

Page 41: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Plastic Structure

Page 42: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Plastic Structure

Page 43: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Autoclave Testing

Page 44: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Manifold Port

Page 45: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Prototype Port

Page 46: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Life Testing

Operate the device in its typical environment and application

Use appropriate on/off cyclesCan be used to verify the reliability

goal or a specific period of time, such as the warranty period

Page 47: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Tracking Reliability Growth in the Field

Collect manufacturing data on how many units were manufactured by month

Collect field failure data, by monthDevelop a reliability growth chart

Page 48: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Reliability Growth Example

Ventilator Reliability Growth

0

20000

40000

60000

80000

1997 1998 1999 2000

Year of Report

MT

BF

(H

ou

rs)

Page 49: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Reliability Growth Example

Ventilator Reliability Growth

0

50000

1996 1997 1998 1999 2000

Year of Report

MT

BF

(ho

urs

)

Page 50: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

Reliability Growth Example

Estimate of Two Vaporizer Builds

0

50000

100000

150000

200000

Year of Build

MT

BF

(h

ou

rs)

Pre-June, 1997Build

Post-June, 1997Build

Page 51: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois.

The Reliability Group

You make it,We’ll break it