Top Banner
1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November 4-7, 2012
15

Regulatory Developments and Impacts Involving Electricity Storage in Texas

Jan 29, 2016

Download

Documents

dana

Regulatory Developments and Impacts Involving Electricity Storage in Texas. Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November 4-7, 2012. The usual disclaimers. This is not legal advice or legal services This is no one’s opinion but mine, & might not stay mine - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Regulatory Developments and Impacts Involving Electricity Storage in Texas

11

Regulatory Developmentsand Impacts

Involving Electricity Storage in Texas

Elizabeth Drews31st USAEE/IAEE North American Conference

Austin TX, November 4-7, 2012

Page 2: Regulatory Developments and Impacts Involving Electricity Storage in Texas

2

The usual disclaimers

• This is not legal advice or legal services

• This is no one’s opinion but mine, & might not stay mine

• This is a summary

• Laws & facts change

Page 3: Regulatory Developments and Impacts Involving Electricity Storage in Texas

33

Why storage could especially benefit ERCOT

ERCOT’s

• Electrical isolation from other grids

• > 11,000 MW wind (# 1 in US, # 6 in world, > 2,000 MW coastal) 12,277 MW by 2014

• Growing demand

• Potential capacity shortfalls

• Nodal market design

Page 4: Regulatory Developments and Impacts Involving Electricity Storage in Texas

4

Where would storage fit in ERCOT?Capacity, Demand, Reserves Report (May 2012)

Page 5: Regulatory Developments and Impacts Involving Electricity Storage in Texas

5

Generation under study in ERCOT *

* No firm commitment to build+ Calculated at 8.7% of nameplate capacity

Fuel typeCancelled studies (MW)

Suspended studies (MW)

Active studies (MW)

Gas 1,939 2,890 8,317

Nuclear 5,900

Coal 3,635

Wind + 394 1,092 1,560

Solar 236 353 856

Biomass 50 100

Storage 906

Other 700 1,480

Total 7,400 21,747 16,854

Peak demand68,379 MW

Wind record8,368 MW (17.64% of 47,452 MW load) of which 7,381 non-coastal

Page 6: Regulatory Developments and Impacts Involving Electricity Storage in Texas

6

Some IPP storage development in Texas

Compressed Air Energy Storage Battery

Apex: 275 MW AES: 40 MW

Chamisa: 270 MW, expandable to 810 MW

Xtreme/Duke: 36 MW, behind meter w/ wind

ConocoPhillips: behind meter w/ wind or solar

Source: filings in Public Utility Commission of Texas (PUCT) Projects 39764, 39917, 41026

Page 7: Regulatory Developments and Impacts Involving Electricity Storage in Texas

77

Some uses of electricity storage

• Energy time-shift• Peak shave• Ancillary services• Reliable power in outage• Address voltage, frequency variations• Transmission support• ↓ transmission congestion• Defer T&D upgrades

Adapted from PUCT 2011 Scope of Competition Report

Page 8: Regulatory Developments and Impacts Involving Electricity Storage in Texas

88

Generalized attributes of storage technologies

CAES Battery

Can inject for hours-days Can inject ≤ hour

Can respond to grid needs in minutes

Can respond to grid needs in seconds

Hundreds of MW Tens of MW, modular

$ hundreds of millions $ 1-10 million

2 years to build 1 year to build

Must be near cavern or similar, TX has

Attributes/capabilities vary by project & technologies are evolving

Page 9: Regulatory Developments and Impacts Involving Electricity Storage in Texas

99

Regulatory limits on uses of ERCOT storage

In non-retail choice areas, utility, coop, muni can own G&T

• Can own storage that serves both functions

In retail choice areas, utility owns T&D, power generation company owns generation

• Protects competition

• Keeps storage from supplying & being paid for all its uses

Page 10: Regulatory Developments and Impacts Involving Electricity Storage in Texas

1010

Storage as transmission

PUCT Docket 35994, ETT

• Transmission/distribution utility owns 4 MW battery to help voltage & delay transmission in remote area, does not own or sell energy from the battery

• PUC: transmission asset, can put in rate base• Operational since 2010

Page 11: Regulatory Developments and Impacts Involving Electricity Storage in Texas

1111

Storage as generation

2011 statute (SB 943) – Texas storage:

• Intended to sell energy or ancillary services at wholesale is generation

• May interconnect, obtain transmission service, sell electric energy & ancillary services at wholesale consistent w/ TX law re: power generation company or EWG

• Must register as power generation company

Page 12: Regulatory Developments and Impacts Involving Electricity Storage in Texas

1212

PUCT pricing rule on storage(2012, Project 39917) 3 main decisions

• Electricity purchases by storage for charging are wholesale, not retail (same as FERC)

• Such electricity purchases are settled nodally (at bus that connects the storage facility), not zonally like a load

• Retail transmission & ancillary service charges do not apply to such electricity purchases

Page 13: Regulatory Developments and Impacts Involving Electricity Storage in Texas

1313

ERCOT rule changes, integration issues

ERCOT’s Emerging Technologies Working Group

IDs & proposes changes to ERCOT requirements that preclude market participation of emerging technologies

• Has addressed # issues relating to storage

• Is developing a list of operations issues relating to storage

Page 14: Regulatory Developments and Impacts Involving Electricity Storage in Texas

1414

PUCT ERCOT pilot project rule(2012, Project 40150)

Allows ERCOT pilot projects for storage/other ET• ERCOT may temporarily exempt pilot participants from specific ERCOT requirements• ERCOT board must approve pilot project; board decision appealable to PUCT• Rule leaves many issues, e.g. cost allocation & post-pilot transition if any, to ERCOT pilot review process to resolve

Page 15: Regulatory Developments and Impacts Involving Electricity Storage in Texas

1515

Pilot projects at ERCOT

• ERCOT posts documents for each pilot project on its website• ERCOT has been working on a pilot project for a Fast Responding Regulation Service (similar to FERC Order 755, “pay for performance”)