Top Banner
Häny AG - Mixing and Injection Technology Häny AG - Misch- und Injektionstechnik Häny SA - Technique de mélange et d‘injection Buechstrasse 20 CH-8645 Jona Tel. +41 44 925 41 11 Fax +41 44 923 62 45 [email protected] www.haeny.com Reference object Subject to changes PM4-101558 00 / 08.2016 Slurry Wall at train station Oerlikon Switzerland Häny HCM 800 mixing plant with storage silos Slurry Wall The construction company Implenia was awarded by “SBB Immobilien” to build the 80 m tall “Andreasturm” at the train station Zurich- Oerlikon. The “Andreasturm” will have approx. 20'000 m 2 of office space as well as additional space for retail stores and restaurants. As part of the foundation work a slurry wall is being built and the necessary bentonite slurry is being prepared with the help of an au- tomated Häny mixer of the type HCM 800. One silo is mounted on top of the mixing tank and the bentonite is fed through a rotary feeder into the Häny unit. A 3 - 4 % bentonite mix is prepared with the mixer. From the mixer the bentonite is transferred into the 4 storage silos installed right next to the mixing plant. Scope of supply: 1 x Häny mixer HCM 800 with an automated PLC control panel Year of Delivery: 2016
1

Reference object Slurry Wall at train station Oerlikon ... · Häny AG - Mixing and Injection Technology – Häny AG - Misch- und Injektionstechnik – Häny SA - Techniue de mlange

Sep 06, 2018

Download

Documents

vanxuyen
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Reference object Slurry Wall at train station Oerlikon ... · Häny AG - Mixing and Injection Technology – Häny AG - Misch- und Injektionstechnik – Häny SA - Techniue de mlange

Häny AG - Mixing and Injection Technology – Häny AG - Misch- und Injektionstechnik – Häny SA - Technique de mélange et d‘injectionBuechstrasse 20 • CH-8645 Jona • Tel. +41 44 925 41 11 • Fax +41 44 923 62 45 • [email protected] • www.haeny.com

Reference object

Subject to changes

PM4-101558 00 / 08.2016

Slurry Wall at train station OerlikonSwitzerland

Häny HCM 800 mixing plant with storage silos Slurry Wall

The construction company Implenia was awarded by “SBB Immobilien” to build the 80 m tall “Andreasturm” at the train station Zurich-Oerlikon. The “Andreasturm” will have approx. 20'000 m2 of office space as well as additional space for retail stores and restaurants.As part of the foundation work a slurry wall is being built and the necessary bentonite slurry is being prepared with the help of an au-tomated Häny mixer of the type HCM 800.

One silo is mounted on top of the mixing tank and the bentonite is fed through a rotary feeder into the Häny unit. A 3 - 4 % bentonite mix is prepared with the mixer. From the mixer the bentonite is transferred into the 4 storage silos installed right next to the mixing plant.

Scope of supply:1 x Häny mixer HCM 800 with an automated PLC control panelYear of Delivery:2016