Redevelopment of Anand Vihar Railway Station Presentation to Governing Body, UTTIPEC 19 th December 2014
24

Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

May 14, 2018

Download

Documents

trinhnga
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

Redevelopment of Anand Vihar

Railway Station

Presentation to Governing Body, UTTIPEC

19th December 2014

Page 2: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

Introduction

• Indian Railways have identified five major railway stations to be developed to World Class standards

• Anand Vihar Railway Station is destined to be a significant multi modal transit hub with multiple modes of transport culminating at a single location.

• Traffic Impact and Connectivity proposals of the complex are presented

Page 3: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

Emerging as Major Railway Terminal

Anand ViharRailway Station

Key Indian Railways Lines

Metro

Road

New Delhi Jn.

• Existing 14 Trains to 118 trains in future.• Five Platform to 11 Platform

Page 4: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

KARKARDOOMA METRO STN

1. SITE FOR PROPOSED T.O.D

ANAND VIHAR ISBT

2. PROPOSED BRT CORRIDOR FROM MUKUNDPUR TO KONDLI

PROPOSED BRT CORRIDOR FROM GOKALPURI TO KARKARI MOR

3. PROPOSED RRTS STATION

Anand Vihar Interstate Bus

Terminal

Anand Vihar Metro Station

Anand Vihar Railway Station

• Existing

– Rail, ISBT,Metro

• Proposed• Karkarduma Transit

Oriented Development• BRT• RRTS• Metro Phase -3• Integrated passenger terminal

KaushambiBus Stand

Anand Vihar: Multi Modal Transport Hub

4. ANAND VIHAR METRO STN (PROPSED)

IPT

Page 5: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

• A comprehensive Traffic Demand study undertaken

• Traffic Impact Assessment was done

• Proposals of necessary transport infrastructure improvements for the redevelopment of Anand Vihar Railway Station are made– Multi-modal traffic Integration plan for category of

modes

– Road and junction capacity enhancement

– Traffic circulation plan in and around the station area

– Improved pedestrian access and dispersal plan

– Parking management plan for all categories of modes

Traffic Impact Study and Transport Network Improvement

Page 6: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

ANAND VIHAR METRO STATION

Existing Issues 1. CONGESTION on Road No. 56 (only approach road to Railway Station) due to single entry/exit to complex, pedestrian dispersal, Hawkers and Station bound traffic

2. LONGER WALKING DISTANCESfor passengers to interchange / dispersal.

LOCALBUSES

INTERSTATEBUSES

IDLE PARKING

ENTRY TO I.S.B.T

EXIT FROM I.S.B.T

ENTRY / EXIT FOR RAILWAY STATION

Page 7: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

Indirect Connection of Railway Station and ISBT

No direct connection

Passengers commute through punctures in boundary wall – informal access

Uncomfortable for women, children, elderly as well as travellers with heavy luggages

Existing Issues

Page 8: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

Where can I rest?Where is the comfort?Can we have a surface level crossing?Where is the SPACE?

Page 9: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

Unorganized IPT

Entrance to Anand Vihar ISBT

Gramin Sewa/Auto stand

FOBStaircase

Hawkers

MetroCorridor

ENCROACHMENT -

Hawkers , G ramins ewa,

autos

F oot Over B ridge to

cros s R oad no. 56

overcrowded

Open to s ky

E s calator for

as cending only

Many level changes

from origin to des tination

Existing Issues

Page 10: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

ACCESS FROM ROAD NO. 56 ONLY

Existing Issues : Single Access to entire complex by Saturated Road

Location

Configuration

Capacity (P

CU

/hr)

Volume in peak

hour (PC

U)

Volume: C

apacity (V

/C) R

atio

Level of service

Road no. 56

6 lanedivided 7,714 7,840 1.02 F

Traffic from all directions have to acces s

Anand Vihar from R oad no. 56 ONLY

C onges tion is experienced in peak hours

in this s tretch.

CRITICAL LIMITATION for a Multi

modal complex.

However R OW of R oad is 60m and

capacity can be increas ed to 5X2 lanes by

rationalizing lanes & s ervice lanes

Page 11: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

Internal Circulation

Existing Circulation – Car/2w

Existing Issus : Complex Circulation

Mixing up at various locations with Pedestrians causing conflict points

Page 12: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

Commuters from the northern side of the Railway line (Karkardooma, YojnaVihar) conveyed a need for direct vehicular connection to Anand Vihar

Users complained that foot over bridge is too narrow of pedestrians moving on it in both directions, and most feel that it does not take them near their destination

User OpinionPedestrian Facilities

Access to Station

Com

mut

ers

Need Extra Entry

Page 13: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

Station Load and Handling Capacity

• Station would reach its capacity in 2038

• Station to be planned for 210,393 pax/day and 21,372 peak pax

• With all mode functioning complex will handle about 500000

passenger/day

PAX

LOA

D

YearStation PAX load

Pax/day Peak pax2013 76,110 8,3722019 97,291 10,7022025 123,549 13,5902032 163,228 17,9552038 206,336 21,372

TOTA

L FO

OTF

ALL

YearStation Footfall

Pax/day Peak pax2013 95,137 10,4652019 118,412 13,0252025 147,008 16,1712032 189,764 20,8742038 235,849 24,618

Train Category Pax/hr Pax/day

Long Haul (44 trains) 3,257 47,991EMU (34 trains) 5,011 57,570

Terminating (40 trains) 13,104 104,832

Ultimate peak capacity of station 21,372

Ultimate/day capacity of station 210,393HAN

DLI

NG

C

APA

CIT

Y

Pax Demand Estimation Maximum Handling Capacity of Station

Page 14: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

Traffic Impact Assessment Modelling

• Additional road connection are crucial for complex to cater to increased traffic requirements

• Delhi Transport Demand model was run for two scenarios– Do Nothing:

Existing Network and Forecasted traffic of complex

– Improved situation: with all new roads and connections

Page 15: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

Improvement Plan : Proposed Access and connections

Multiple Entry/Exit Points Multiple Dispersal Roads Additional Loop Ramps for better network

connections around complex

Page 16: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

PROPOSED ROAD LINK

PROPOSED ROAD LINK

PROPOSED ROAD LINK

ANAND VIHAR MASTER PLAN PROPOSED ROAD LINK

EXISTING ROAD LINKS

EXISTING ROAD LINK

ANAND VIHAR MASTER PLAN

PROPOSED ROAD LINK I.S.B.T

METRO

RAILWAY STATION

PROPOSED ALTERNATE ENTRY/ EXIT TO RAILWAY

STATION

ONE WAY

ANAND VIHAR MASTER PLAN PROPOSED

ROAD LINK

TO-

GA

ZIP

UR

TO-S

HA

HD

RA

TO Y

AM

UN

A S

PO

RTS

C

OM

PLE

X

EXISTING ROAD LINKS

NEW PROPOSED ROAD LINKS

ROAD LINKS PROPOSED IN MASTER PLAN

INDUSTRIAL AREA

INDUSTRIAL AREA

SWAM

I DAY

ANA

ND

MAR

G

Improvement Plan : Proposed Multiple Entry/Exits Points

1. Multiple Entry/Exit to complex2. Increased capacity by providing

additional links3. Efficient external dispersal

EXISTING ROAD LINKS

ENTRY FOR RAILWAY STATION

EXIT OF BUSES FROM ISBT

Page 17: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

EXISTING ROAD LINKS

PROPOSED ROAD LINK

PROPOSED ROAD LINK

PROPOSED ROAD LINK

EXISTING ROAD LINKS

EXISTING ROAD LINK

ANAND VIHAR MASTER PLAN

PROPOSED ROAD LINK

ENTRY FOR RAILWAY STATION

EXIT OF BUSES FROM ISBT

I.S.B.TMETRO

RAILWAY STATION

PROPOSED BAY FOR PICK-UP / DROP-OFF

ONE WAY

ANAND VIHAR MASTER PLAN PROPOSED

ROAD LINK

TO-

GA

ZIP

UR

TO-S

HA

HD

RA

TO Y

AM

UN

A S

PO

RTS

C

OM

PLE

X

EXISTING ROAD LINKS

NEW PROPOSED ROAD LINKS

ROAD LINKS PROPOSED IN I.S.B.T MASTER PLAN

(UTTIPEC APPROVED)

INDUSTRIAL AREA

INDUSTRIAL AREA

SWAM

I DAY

ANA

ND

MAR

G

OTHER PROPOSED LINKS

ANAND VIHAR MASTER PLAN PROPOSED ROAD LINK

Proposed External Circulation

Access to Multimodal Complex

Dispersal From Multimodal Complex

Page 18: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

PICK UP/ DROP OFF ZONE

PRIVATE VEHICLE LANE

TAXI LANE

AUTO RICKSHAW LANECYCLE RICKSHAW LANE

BUS LANE

ENTRY TO BASEMENT PARKING

Proposed Multimodal Circulation at Railway Station

Page 19: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

Proposed Integrated Pedestrian Connectivity

• Integrated Pedestrian connectivity• Seamless pedestrian movement connecting all

modal centers• Escalators and travelators can be used• Sufficient widths of the walkways to be

provided

Industrial area

IPT Second entry

Page 20: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

Proposed Parking & Pick Drop Provisions

Mode

Required Bays

2038

Car (drop/pick) 9

2W (drop/pick) 4

Taxi (parking) 86

Taxi (drop/pick) 12

Auto (drop/pick) 48

Gramin Sewa 8

Bus (drop/pick) 22

Rickshaw (drop) 26Total Parking Bays 1,274 Additional Parking

Mini LCV/LCV - Parcel 33Mini LCV - Food 11

Bus parking 5Army (trucks/bus) 10

Emergency veh. parking 5

• Currently 240 ECS are available.

• Total 700 Equivalent Car Spaces required in the year 2038.

Modes Share Car 5.0

2W 2.0

Auto 23.0

Taxi 5.0

Local Bus 25.0

Inter-state Bus 1.0

Metro/RRT 35.0

Train 1.0

Cycle-Rick. 1.0

Gramin Sewa 1.0

Walk 1.0Total 100

Page 21: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

Proposed Conceptual Connectivity of Anand Vihar Complex with East West Corridor

Page 22: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

• To Handle the Traffic Load of Complex:

• Need additional links for multiple entry/exits and efficient traffic dispersal

• Rationalisation of service lanes to achieve capacity of 5x2 lanes

• Two Station entries ( additional entry from north)• Need additional loops/connections• Integrated Pedestrian Connectivity with sufficient

capacity ( 6 to 12 m wide).• Clear & Simple one way circulation• Provision of pickup/drop off bays for car, taxi, auto ,

Bus NMT.• Adequate provisions for parking• Connectivity of East – West Corridor with complex

Summary

Page 23: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

Ground Floor Plan

Thank You

Page 24: Redevelopment of Anand Vihar Railway Stationuttipec.nic.in/writereaddata/linkimages/4981522113.pdf• A comprehensive Traffic Demand study undertaken • Traffic Impact Assessment

Thank You