RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2 SPPD SPD /SPPD : CHECK LIST FOR SCHEDULING S.No. Verification Check List SPD ANNEXURE

Nov 21, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2 SPPD SPD /SPPD : CHECK LIST FOR SCHEDULING S.No. Verification Check List SPD ANNEXURE
Page 2: RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2 SPPD SPD /SPPD : CHECK LIST FOR SCHEDULING S.No. Verification Check List SPD ANNEXURE
Page 3: RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2 SPPD SPD /SPPD : CHECK LIST FOR SCHEDULING S.No. Verification Check List SPD ANNEXURE

RECORD NOTES OF THE MEETING ON SCHEDULING AND

KHAN
Rectangle
Page 4: RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2 SPPD SPD /SPPD : CHECK LIST FOR SCHEDULING S.No. Verification Check List SPD ANNEXURE

Annexure-1(1/2)

Page 5: RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2 SPPD SPD /SPPD : CHECK LIST FOR SCHEDULING S.No. Verification Check List SPD ANNEXURE

Annexure-1(2/2)

Page 6: RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2 SPPD SPD /SPPD : CHECK LIST FOR SCHEDULING S.No. Verification Check List SPD ANNEXURE

SPPD

Description Status Yes /

No

Remarks SPD1 SPD2 SPPD

1

Register with SRLDC as User ( Entity )

Yes / No Appendix - IV ( Fees & Charges

of RLDC , CERC Regulations ,

2015

2as per CERC , RE Framework Sch. & forcasting : Annexure - I

Yes / No Annexure - I ( Technical Data )

3

SLD : Visible ( PDF )

Yes / No Complete Project w.r .t

Metering , Protection , Scheme

, etc.

4Notarized copy of PPAs w. r .t connectivity with SPPD

Yes / No

5

Forecast and Schedule Data to be submitted by Wind/Solar

plants/ Lead generator, Principal generator , ( Annexure - II )

Yes / No Annexure - II ( forecast Data )

6 Real Time Avilabiltiy ( Annexure -III ) Yes / No Annexure - III

7generation data ( Annexure - IV )

Yes / No Annexure - IV

8ABT compliant meters at inter - connection points ( ABT

compliant meters shall have provision of automatic meter

reading technology for data transfer to SRLDC )

Yes / No

8.1

SEM Sample Data : NPC (Text file ) , for L&T : DAT , Secure :

MRI ….

Yes / No

8.2 Make of meter / Meter Sl. No. / CT & VT Ratio Yes / No

8.3 Time drift statement Yes / No

9 Notarized copy of PPA RATES on Affidavit TO SRPC for DSM

Preparation

Yes / No Affidavit

10 shall be responsible for sending the SCADA data to the RLDC

and to the Renewable Energy management Center , as and

when required.

Yes / No

11Undertaking by Licensee / Generating Company

Yes / No

11.1Shall be responsible for ensuring metering ( ABT compliant

meter ) , data collection and weekly transmission of data ( in

SRLDC data format ) to SRLDC as per IEGC and extant CERC

Regulations

Yes / No

11.2

Shall under take commercial settlement of all deviation

settlement charges to the Regional Pool Account on Weekly

basis , as per applicable CERC Regulations

Yes / No

11.3

Shall be responsible for commercial settlement on scheduled

generation with it beneficiaries as per the monthly Regional

Energy Account (REA ) issued by SRPC .

Yes / No

SPD /SPPD : CHECK LIST FOR SCHEDULING

S.No. SPD Verification Check List

ANNEXURE 2

Page 7: RECORD NOTES OF THE MEETING ON SCHEDULING AND · SPPD Description Status Yes / No Remarks SPD1 SPD2 SPPD SPD /SPPD : CHECK LIST FOR SCHEDULING S.No. Verification Check List SPD ANNEXURE

SPPD

Description Status Yes /

No

Remarks SPD1 SPD2 SPPD

SPD /SPPD : CHECK LIST FOR SCHEDULING

S.No. SPD Verification Check List

ANNEXURE 2

11.4shall abide by the IEGC and CEA Regulations.

Yes / No

11.5shall follow the new element / generator procedure of SRLDC

while connecting to the grid .

Yes / No

11.6shall undertake to indemnify , defend and save SRLDC

harmless from any and all damages , losses including

commercial lossess due to forecasting error , claims and

actions including commercial losses due to forecasting error ,

claims and actions including those relating to injury to or

death of any person or damage to property , demands , suits

, recoveries , costs and expenses , court costs , attorney fees ,

and all other obligations by or to third parties , arising out of

or resulting from thetransactions undertaken by the

generators .

Yes / No

11.7Shall inform SRLDC regarding the new additions / deletion of

Power system elements within the solar park , as and when

there is a change .

No

11.8Shall be responsible for getting approval of SRPC of the

metering scheme and accounting methodology of solar park

and for each SPD.

No

11.9Shall provide the information sought by SRLDC & SRPC

regarding the solar park activities from time by coordinating

with the SPDs.

No

12

Shall submit to SRLDC the grant of connectivity agreement

with CTU / STU and the agreements entered with SPDs.

Yes / No

13Exemption of transmission charges and losses for the use of

ISTS network ( as per Central Electricity Regulatory

Commission (Sharing of Inter State Transmission Charges and

Losses) (Fifth Amendment) Regulations, 2017. dated :

14.12.2017 )

Yes / No

14

LTA Operationalization

Yes / No