Top Banner
Recommended Practices for Construction of Residential Masonry Basements in Minnesota Fifth Edition Includes cold weather masonry construction guidelines and recommended radon guidelines
60

Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

Mar 28, 2018

Download

Documents

trinhdiep
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

Recommended Practicesfor Construction ofResidential MasonryBasements in MinnesotaFifth Edition

Includes cold weather masonry construction guidelinesand recommended radon guidelines

Page 2: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

Recommended Practices for Construction of Residential Masonry Basements in Minnesota (w/ Recommended One and Two Family Residential Cold Weather Masonry Construction Guidelines) 5th Edition and Radon Rules as of June 2009

© MMPC – 01/11 (5th Edition)

Disclaimer:The information presented in this pamphlet is intended to be used as a general construction guide and is not all encompassing. Your project may have specific conditions which dictate different construction practices. Consult your engineer, architect, or building official for job specific design and construction practices.

Section 1• Recommended Practices for Construction of Residential Masonry Basements in Minnesota pg. 1.1

Diagram/Table Pages • Diagram/MinnesotaFrostDepthMap pg. A• UnifiedSoilClassificationChart pg. B• Diagram1:Foundationwall(uppersection) pg. C• Diagram2:Foundationwall(lowersection) pg. C• Diagram3:CantileveredWallSection pg. D• Diagram4:ProppedCantileveredWallSection pg. E• Diagram5:PortlandCement&LimeCard pg. F• Diagram6:Mortar&CementCard pg. F• MaximumAnchorBoltSpacing pg. G• 2006IRCRequirements pg. H-I• Tables1-4&6,7,&8 pg. J-T

Section 2• Cold Weather Masonry Construction Guidelines pg. 2.1

Section 3• Radon Rules pg. 3.1

Produced and published by:

Midwest MasonryPromotion Council1711WestCountyRoadBSuite207SSaintPaul,MN55113(612)670-9142Phone(612)338-7981Faxwww.mmpc.info

Page 3: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

1.1

INTRODUCTION

The information presented in this publication is intended to be used as a general field construction guide and is not all encompassing.

Severalphasesofconstructionwillbeaddressedinthebasementconstructionprocess:

1.Excavation2.ConcreteFootings3.Mortar&Grout4.ConcreteBlockWallConstruction5.DampProofing6.Waterproofing7.Insulation8.Drainage9.Backfilling

Ineachphasewewillhighlightsignificantmaterialspecifications,designdetailsandconstructiontechniques.This information can be used to coordinate tradespeople who are collectively responsible for the construction of residential basements.Theresponsibilitiesoftheexcavator/backfiller,themason contractor and the builder’s laborers will be discussed.

Graphicillustrationsofthedesigndetailsdiscussedinthispublication are included for your reference and clarification.

Itshouldbeemphasizedthatthishandbookisnotadesignmanual or guide to the structural design of footings or walls. Eachprojectmayhavespecificconditionswhichdictatedifferentconstructionpractices.Consultyourengineer/architectorbuilding official for job specific design and construction details.

Thegoalofthispublicationistoemphasizetheinfluencethateach construction phase and trade has on the entire basement system.Suggestionsonmaterialselection,detailing,andconstruction will also be offered.

Note:This guide contains changes included in the 2007 state building code. Refer to www.MMPC.net for updates to this document and Radon Rules June 2009.

RefertotheMinnesotaBuildingCodeformoreinformation.www.dli.mn.gov/ccld/codes.asp

Page 4: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

1.2

1. ExCavaTION

1-1 PREPaRaTION

1-1.1 Coordinatethefoundationexcavationwiththemasoncontractorwhilereviewingtheapprovedstakesurvey.Makesurethatallundergroundutilitiesaremarkedandcleared(GopherStateOneCall:#800-252-1166or#651-454-0002).

1-2 ExECUTION

1-2.1 Careshouldbetakentoremainoncorrectperimeterexcavationlinestoallowtheconcretefootingstobeaccuratelyaligned.Out-of-squarefootingsmayresultinmisalignmentoftheconcreteblockwallorpossiblefooting failure.

1-2.2 Removeallunstableanddegradablematerials.Fillanysuch area with additional concrete or compacted granular fill.

1-2.3 Locateutilitytrenches.Makesuretrenchesarefilledwith granular fill and compacted prior to placement of concrete footings.

1-2.4 Limittheover-digareato2-4feetbeyondtheoutsideedge of the footing location. This will provide enough roomfordampproofing/waterproofinganddrainageworkwhilereducingthebackfillweightagainstthewall.

1-2.5 Keeptheelevationofthefloorslabarea4”–6”higherthantheinteriorperimeterdrainarea(bottomoffooting).Bydoingso,acollectionchannelwillbecreatedwhich will allow water to pass through the footing weeps orunderneaththefloorslab.Incaseoftransiteheat,thedrain tile must be located below transite heat.

1-3 STaTIONING

1-3.1 Placealayerofaggregateinthebasementfloorareabeforedeliveryoftheconcreteblocktoprotecttheconcreteblockfromdirtandmud.

1-3.2 Accessshouldbemadeformaterialdeliveriessuchasconcreteblockandfootingconcrete.

Page 5: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

1.3

2. CONCRETE FOOTINGS

2-1 DESIGN

2-1.1 Concrete footings must bear on soil which is beneath themaximumfrostpenetrationdepth.Refertothe[AppendixpageAfortheMinnesotaFrostDepthMap.]

2-1.2 Refer to IRC Table 403.1 for minimum footing width. Formostconditionstypicalfootingsizeis8”highby16”or20”wide.Footingdimensionrequirementscanvarydependingonsoilandloadconditions.Footingprojectionsshouldbeatleast2inchesbeyondthefoundation wall.

2-1.3 Footingconcreteshouldhaveaminimumcompressivestrengthof2,500p.s.i.Specifically,callforthestrengthofconcreteyourprojectrequires.ReferenceAppendixTables6,7,&8onpagesQ-Tofthisbooklet.CantileverFoundationsrequireaminimumcompressivestrengthof3,000p.s.i.

2-1.4 Althoughnotalwaysmandatory,two½”minimumreinforcingrods(rebar)placed3inchesfromthebottom of the footing running parallel to the wall, are recommendedtohelpavoidcrackingand/ordifferentialsettlement of the footing.

2-1.5 Footingsshouldbecontinuous.Footingheightchangesare typically accomplished by the use of vertical bulkheadsreinforcedwithtwo½”(minimum)reinforcingrods.

2-1.6 Dowelsinthefootingsarenottypicallyrequiredbycodeforresidentialconcreteblockwalls.Exception:SomeCantileverWallsconditionsmayrequiredowels.SeeAppendixTables6,7&8onpageQ-Tofthisbooklet.Referencetofootnoteh.

2-2 CONSTRUCTION

2-2.1 The footings should be formed and poured as soon as possibleaftertheexcavationiscompleted.Thiswillavoidexcessivemoisture(rain,snow)fromsaturatingthegroundandpossiblydestabilizingthesoil.Ifthesoildoesbecome“soft”,theareashouldbescrapedofforre-dug.Takepropercaretoensurethatminimumelevationandclearance from the water table is attained.

Page 6: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

1.4

2-3 Donotpourfootingsoverunstablematerialsuchastreeroots,constructiondebris,softspots,ice,etc.Removeallunstable material and fill resulting voids with compacted granular fill or concrete before forming or pouring footings.

2-4 Footingalignmentmustbeaccuratesothatthecenterlineoftheconcreteblockwallstaysascloseaspossibletothe center line of the footing.

2-5 Cautionshouldbetakenwhenaddingwatertoconcreteinthefield.Excessivewatercanseverelyreducethestrength of concrete.

2-6 Donottrowelfootingsurfaces.Aslightlyroughfootingsurface helps assure a good bond between the first course ofconcreteblockandthefooting.

3. MORTaR & GROUT

3-1 MORTaR •PreblendedMortar:AdrymixtureofPortland

Cement,HydratedLimeandOvenDriedMasonrySandformulatedandblendedinamanufacturingfacility to meet the property specification requirementsofASTMC270.

•FieldMixedMortars:AmixtureofPortlandCement,HydratedLimeandMasonrySandorMasonry/MortarCementandMasonrySandmixedatthejobsitetotheproportionspecificationrequirementsofASTMC270.

3-1.1 AllmortarusedinfoundationworkshouldbeTypeSorTypeM.RefertoMCMAMortarCardsonpageF.

3-1.2 Mortarmaybepre-blendedorproportionedon-siteandshouldmeetASTMC270.

3-1.3 Watershouldbepotableandshouldnotexceed160˚F(71˚C).

3-1.4 The preparation of mortar and grout in the field is an integralpartoftheconstructionofmasonrywalls.Toprovide consistent batching, materials used to charge the mixermustbecontrolled.

Page 7: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

1.5

3-1.5 Pre-Blended Mortar3-1.5.1 Proper Mixing Procedures

Duetothefactthattherearemanytypesofmixers,thisprocedurereferstomixingmasonrymortarsinastandardmechanicalmixer.

1. Add2/3ofrequiredwatertoanempty,cleanmixerandstartthemixer.

2. AddPreblendedMortar,PreblendedColoredMortarorGrouttothemixer.

3. Ifnecessary,addremainingwatertothemixeruntilproper consistency is achieved.

4. Mixbetween3and10minutes.

Note: Completely empty mortar content into wheelbarrow or container.

3-1.6 Proportioning On-Site Mortar3-1.6.1 The Mortar Cement and Masonry Cement table and

the Portland Cement and LimetableontheappendixpageFofthisbookreferencetypicalmortartypesandproportioningusingASTMC270.

3-1.6.2Asidefromsand,mortaringredientsaretypicallysoldprepackagedinbagsbyweight.Sincemortarisproportionedbyvolume,itisnecessarytoknow:

Cementitious Material WeightCementitiousMaterial PoundsperCubicFoot

PortlandCement 94

Blended&HydraulicCement 85to94*

MortarCement 70to90*

MasonryCement 70to90*

HydratedLime 40*Seeweightonbag

3-1.6.3 SandArecommendedmethodofmeasuringsandisbyusingafivegallonpail(volumetricmeasure).Inthefield,sandistypicallymeasuredbytheuseofashovel.Itisimportanttocheckforshovelconsistencyatleasttwicedaily.Additionalchecksshouldbeperformedifthesandmoisture content changes or if a new load of sand is delivered.Afivegallonpailholdsabout2/3ofacubicfootofsandindamp,loosecondition.Therefore,3cubicfeetofsandisequaltoabout4½fivegallonbuckets.

Page 8: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

1.6

3-1.6.4Proper Mixing ProceduresDuetothefactthattherearemanytypesofmixers,thisprocedurereferstomixingmasonrymortarsinamechanicalmixer.

1. Add2/3ofrequiredwatertoanempty,cleanmixerandstartthemixer.

2. Add½theamountofsandrequiredtothemixer3. Addanycoloringpigmentstothemixer(where

applicable).4. Addlimetothemixer(ifapplicable).5. Addcementtothemixer:(Cement,Masonry

Cement,orMortarCement).6. Addremainingsandtothemixer.7. Ifnecessary,addremainingwatertothemixeruntil

proper consistency is achieved.8. Mixbetween3minutes(minimum)*and15

minutes(maximum)afteraddingthelastofthewaterinstep(7)above.

(*Additionalmixingtimeuptotenminutesmayberequiredwhenusingmortarmaterialscontainingovendriedsand.)Note: Completely empty mortar contents into wheelbarrow or container.

3-1.6.5 Retempering Freshmortarshouldbepreparedattherateitisusedtomaintainworkabilityandconsistencyonthejobsite.Mortarthathasbeenmixedbutnotusedimmediatelywillexperiencestiffeningastheproductdriesout.Toreduce this evaporation effect, you may wet the mortar board and cover the mortar in the tub or wheelbarrow. Ifnecessarytorestoreworkability,mortarmayberetemperedbyaddingsmallamountsofwater.Ingeneral,mortarmayberetemperedupto2½hoursafteroriginalmixing.Mortarover2½hoursoldshouldbediscarded.

3-2 GROUT •PreblendedGrout:AdrymixtureofPortland

Cement,OvenDriedMasonrySandandAggregateformulated and blended in a manufacturing facility tomeettherequirementsofASTMC476.

3-2.1 Groutmaybepre-blended,proportionedon-site,ordeliveredbyready-mixtruckandshouldmeetASTMC476.

Page 9: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

1.7

3-2.2 Pre-Blended Grout3-2.2.1Proper Mixing Procedures

Duetothefactthattherearemanytypesofmixers,thisprocedurereferstomixingmasonrymortarsinastandardmechanicalmixer.

1. Add2/3ofrequiredwatertoanempty,cleanmixerandstartthemixer.

2. AddGrouttothemixer.3. Ifnecessary,addremainingwatertothemixeruntil

proper consistency is achieved.4. Mixbetween3and10minutes.

Note: Completely empty grout contents into wheelbarrow or container.

3-2.3 Proportioned On-Site Grout3-2.3.1Proportions for Fine Grout Use1partcementmixedwith2¼to3partssand.

3-2.3.2Proportions for Coarse Grout Use1partcementmixedwith2¼partssandand1to2

parts3/8"aggregate.

3-2.3.3 Proper Mixing ProceduresDuetothefactthattherearemanytypesofmixers,thisprocedurereferstomixingmasonrymortarsinamechanicalmixer.

1. Add2/3ofrequiredwatertoanempty,cleanmixerandstartthemixer.

2. Addsandand3/8”aggregatetothemixerandmixfor30seconds.

3. Addcementtothemixer.4. Ifnecessary,addremainingadmixturesandwaterto

themixeruntilproperconsistencyisachieved.5. Mixbetween3minutes(minimum)*and15

minutes(maximum)afteraddingthelastofthewaterinstep(4)above.

3-3 PROTECTING MaSONRy MaTERIalS Bagged Materials

• Storeonpalletsofftheground• Completelycovertoprotectfromrainorsnow• Stockpileonoppositesideofmixerfromwater

supply and sand

Page 10: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

1.8

Sand (On-site proportioning)• Placestockpileontarptoprotectfrom

contamination from below• Coverwithtarpwhennotinusetomaintain

consistent moisture content and avoid contaminants• Storeonoppositesideofmixerfrombagged

materials• Storedifferentaggregatesseparatelytoavoidcross

contaminationofstockpiles

Concrete Masonry Units (CMU or Block)• Coverstockpilestokeepdryandclean.• Storeawayfrommixingsiteand/orcement

materials

3-4 HOT WEaTHER MORTaR aND GROUT ISSUESHotweatherconstructionoccurswhentheambienttemperatureexceeds90°Fwithawindvelocityofgreaterthan8mph.

Potential problems of hot weather construction:• Rapidlossofworkability• Rapidevaporationofwaterrequiredforcement

hydration and curing.

Procedures to follow when working with masonry in hot weather:

• Keepmortar,groutandCMU’sascoolaspracticalusingtechniquessuchasplacingmaterialsintheshadeandusingcoolwaterwhenmixing.

• Keepanysurfacethatcomesincontactwiththemortarorgroutsuchasmixers,wheelbarrows,shovels, mortar boards, trowels damp.

• Limittheamountofmortarthatisspreadonthebedjointsto4feetaheadoftheCMU.PlaceCMUwithin one minute of spreading the mortar.

• Inhot,dryandwindyweather,lightlyfogormistthe finished wall, if possible.

3-5 PROTECTION OF UNFINISHED WallSAllunfinishedwallsshouldbecoveredwithweather-resistant material, on both sides, from the top of thewalldowntothefootingsfor48hoursafterconstruction.Wherenecessary,installwindbreakswhenwindvelocityexceeds15mph(6.7m/s).

Page 11: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

1.9

4. CONCRETE BlOCK Wall CONSTRUCTION

4-1 MaTERIalS

4-1.1 Concreteblockusedforresidentialfoundationsshould complywithASTMC90.Propercareshouldbetakento

maintaindryconcreteblockpriortobuildingthewall.

4-2 DESIGN

4-2.1 Priortolayingthefirstcourseofconcreteblock,reviewthe layout, dimensions and locations of all wall openings. Determineifshorterconcreteblocklengths(cuts)arerequired.Startingyourwallwiththecuts(ifbondwillallow)orplacingcutsoneithersideofwallopeningswillmakeforamoreattractivewall.

4-2.2 Structuralfoundationblocksmustbeaminimum6"width.Whereawallchangeswidth,thetopcourseofthewiderblockshouldbeeitherasolidunitorgroutedsolid.

4-2.3 Minimumverticalreinforcementbarsizeandspacingfor8",10"and12"nominalwallthicknessshouldcomplywithTablesR404.1.1(1),R404.1.1(2),R4041.1(3)orR404.1.1(4)ofthe2006InternationalResidentialCode™(IRC).RefertopagesJ-Pfortables1-4.Alternatereinforcingbarsizesandspacinghavinganequivalentcross-sectionalareaofreinforcementperlineal foot of wall should be permitted provided the spacingofthereinforcementdoesnotexceed72inches.SeeAppendixforTables2,3,and4onpagesK-Pwithalternatebarsizes,spacingandsoilclasses.

Permanentlysupportedfoundationwallswhicharesupportedatthetopbyfloormembersshallhavereinforcing bars positioned toward the inside face shell oftheconcreteblockcore.Bypositioningthereinforcingbars in this manner, the walls will have greater resistance to lateral earth pressures. The distance from the face of the soil side of the wall to the center of vertical reinforcement should be the minimum specified at each table:8"CMU=5",10"CMU=6.75"and12"CMU=8.75".SoilclassesareinaccordancewiththeUnifiedSoilClassificationSystemreferencedinIRCTableR405.1onpageB.

Page 12: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

1.10

4-2.4 Foundationwallswhicharenotpermanentlysupportedatthetopbyfloormembersareconsidered“cantileveredwalls.”RefertoFootnoteConTables6,7,and8onAppendixpagesQ-Tforwallreinforcementrequirementsfor8",10"and12"walls.Notefootnotes(g)and(h)forconditionswhichmayrequire“proppedcantileveredwalls”(seediagram4onpageE)ormayrequiredowelingtothefootings.SpecialDesignisalwaysanalternativetothetables.AnotheralternativeistobuildthewallfullheighttofloorbearingandreinforcetoTables2,3or4onpagesK-P.Notethatshortwallstypicaltofrostfootingorlook-outfoundationsdonotrequirereinforcement.

4-2.5 The wood sill plate should be anchored to the foundation withanchorboltsspacedamaximumof6feetoncenter.SeeAppendixpageGformaximumboltspacing.Whenverticalreinforcingisrequired,theanchorboltsorstrapsshould align with the reinforcing. Note: Not all bolts or straps need to be placed at corefills. Anchorboltsshouldalsobelocatedwithin12inchesfromtheendsofeachplatesection. Note: Where longer walls require multiple sill plate sections, consider installing an additional bolt at anticipated joint locations.Boltsshouldbeatleast½inchindiameterandshouldextendaminimumof7inchesintomasonryor concrete. anchor Bolts require a 2" diameter by 0.125" galvanized thick washer counter sunk 0.25" into top of sill plate. Foundation anchor straps may be used when spaced as required to provide equivalent anchorage to 1/2 –inch diameter (12.7 mm) anchor bolts. When vertical reinforcing is required by other sections of this code, the foundation anchor straps should align with the reinforcing.

4-3 CONSTRUCTION

4-3.1 The top of the footing must be clean, free of dirt, mud, iceoranymaterialwhichmightweakenthebondbetween the mortar and footing.

4-3.2 Layfirstcourseofconcreteblockonthecenterlineofthefooting.Allfaceshellsoftheconcreteblockshouldbesetinmortar.Wherethewallistobegrouted,mortarshould be placed so it does not severely project into the corestobegroutedwhichwillpermitthegrouttomakefull contact with the footing.

4-3.3 Layconcreteblockinarunningbondwitha3/8"mortarjointcoveringthehorizontalandverticalfaceshells.

Page 13: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

1.11

4-3.4 Allheadjointsandbedjointsshouldbefilledsolidwithmortar for a distance measured in from the face of the unitnotlessthanthethicknessoftheconcreteblockfaceshell.

4-3.5 Exteriormortarjointsoverwhichthedampprooforwaterproofcoatingisappliedshouldbecutflushortooled and be without voids.

4-3.6 Interiormortarjointsshouldbefirmlytooledafterthemortarhasbecomethumbprinthard(whenaclearthumb-printcanbeimpressedandthecementpastedoesnotadheretothethumbwhenremoved).Ifcolorconsistency of the mortar joint is important, remember wettoolingwillresultinalightcolor.Dryorstifftoolingwillresultindarkcoloredmortarjoint.

5. DaMP PROOFING

5-1 DESIGN aND CONSTRUCTION

5-1.1 Dampproofingisaminimumrequirementforbasementwallswherehydrostaticpressuredoesnotoccur.Damp-proofing consists of applying materials to prevent the passage of water vapor through the walls.

5-1.2 Various dampproofing products or systems may be used whenapprovedbythebuildingofficial.Manufacturer’srecommendations should be consulted for product limitationsandproperinstallationrequirements.Pargingonmasonryfoundationwallsisnotrequiredwhenthedampproofing product is approved for direct application.

6. WaTERPROOFING

6-1 DESIGN

6-1.1 Waterproofingisrequiredwherethefoundationwallwill be partially or fully below the ground water table orwherepoorlydrainedorimpermeablesoils(clayandsomesilts)arepresent.Eitherconditioncanresultintheformationofhydrostaticpressuresontheexteriorsurface of the foundation. Various waterproofing systems or products may be used when approved by the building official.Manufacturer’srecommendationsshouldbeconsulted for product limitations and proper installation

Page 14: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

1.12

requirements.

6-1.2 Areasofthebasementwallwhereporch,garage,fireplace or other walls intersect should be waterproofed. Contact the product manufacturer or distributor for specific recommendations.

6-2 CONSTRUCTION

6-2.1 Applywaterproofcoatingtoconcreteblockwallsthatareclean, free of dirt, mud, ice or any material which might reduce the bond between the coating and the concrete blocksurface.

6-2.2 Coverthebaseintersectionoftheexteriorconcreteblockwall and the concrete footing surface.

6-2.3 Mostcoatingsrequiremodifiedmixingandapplicationprocedureswhentemperaturesdropbelow20˚F.Contact the coating manufacturer or distributor for specific recommendations.

7. INSUlaTION

7-1 DESIGN aND CONSTRUCTION

7-1.1 Allfoundationwallsshouldhaveexterior,integralorinteriorinsulationconformingtotherequirementsoftheMinnesotaEnergyCode.RefertotheMinnesotaEnergyCodeforspecificrequirements.

7-1.2 Integralinsulationincludesplasticfoamandrigidpolystyreneinserts.Rigidpolystyreneinserts,designedto be continuous, allow for grout and reinforcing in the insulatedcores.ToverifysystemR-values,referencetheNationalConcreteMasonryAssociation“NCMAConcreteMasonryR-ValueEvaluation.”

8. DRaINaGE

8-1 DESIGN aND CONSTRUCTION

8-1.1 Therearetwopurposesofadrainagesystem:

1. Relievethewallsandfloorslabofhydrostaticpressure by drawing down subsurface water to a

Page 15: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

1.13

levelwhichisbelowthefloorslab.

2. Collectanddrainawaywaterthatseepsdownthroughthebackfillfromrainfall,snowmeltandroofrun-off.

8-1.2 Drainsshouldbeprovidedaroundmasonryfoundationsthat retain earth and enclose habitable or usable spaces locatedbelowgrade.Drainagetiles,gravelorcrushedstone drains, perforated pipe or other approved systems or materials should be installed at or below the area to be protected and should discharge by gravity or mechanical meansintoanapproveddrainagesystem.Gravelorcrushedstonedrainsshouldextendatleast1footbeyondtheoutsideedgeofthefootingand6inchesabovethetop of the footing and be covered with an approved filter membrane material . The top of open joints of drain tiles should be protected with strips of building paper, and the drainage tiles or perforated pipe should be placed on a minimumof2inchesofwashedgravelorcrushedrockatleastonesievesizelargerthatthetilejointopeningorperforationandcoveredwithnotlessthat6inchesofthesame material. Exception: A drainage system is not required when the foundation is installed on well-drained ground or sand-gravel mixture soil is according to the Unified Soil Classification System, Group I Soils, as detailed in Table-IRC R405.1 on page B.

9. BaCKFIllING

9-1 PREPaRaTION

9-1.1 Donotplacebackfillmaterialbeforeconcreteblockwallshavebeenproperlycuredandbracedorthesubfloorsystem is in place.

9-1.2 Aminimumwoodbracingsystemissuggestedtoconsistof4"x4"beams,oneplacedverticallyagainstthewallandtheothersetata45degreeangleagainsttheverticalatthe7thor8thconcreteblockcourseona12coursewall,securedtotheverticalwitha2"x4"tieandanchoredbydriving2"x6"stakesatleast12"intotheground.Ifthe4"x4"inclinedbraceislongerthan8',anadditional2"x4"braceshouldbesecuredtothebottomoftheverticalbraceandnailedintotheinclinedbrace.Ifusinga mechanical bracing system, follow manufacturer’s recommendations. NOTE:Bracingshouldremainuntil

Page 16: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

1.14

subfloorsystemisinplace.

9-1.3 Bracingshouldbepositionedatamaximumof8'on center with offsets braced at one side of all inside corners,

preferably, and where possible brace walls at corefill locations.

9-1.4 Backfillonlyafterthewaterproofinganddrainagesystems is in place.

9-2 ExECUTION

9-2.1 Backfillingshouldtakeplaceinseveralliftsusingmaterialwhichisfreeoflargestones,frozenearth,organic materials or construction debris.

9-2.2 Caremustbetakennottodamagethedrainagesystem,waterproofcoatingorexteriorinsulationduringbackfilling.

9-2.3 Donotbackfillwithwatersaturateddirt,soil,orothermaterials(especiallysoilswithhighclaycontents)orplacebackfillwhereanyappreciableamountofwaterisstanding.Wetmaterialsmaycreateexcessivehydrostaticpressure and could lead to wall failure.

9-2.4 Avoidsubjectingthewallstohighimpactloadslikeearthsliding down a steep slope or boulders rolling into the wall.

9-2.5 Do not operate equipment over the backfill during the backfilling operation or after construction operations. Equipment should never be operated within 3 feet of any basement wall system. Compaction of backfill near the structure must not be done with heavy equipment.

9-2.6 Donotoperateheavyequipmentataperpendicularor90°angletothewallwhenbackfilling.Operatingequipmentata45°reducespressureagainstthewall.

9-2.7 Masonryfoundationwallsshouldextendabovefinishedgradeaminimumof6inches.ReferenceIRCR404.1.6.Seediagram1onpageC.

9-2.8 Backfillaroundthefoundationshouldbecoveredwitha low permeability soil sloping away from the wall a minimumof6inchesinthefirst10’.

Page 17: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

1.15

References:1.“BuildingFoundationDesignHandbook”,preparedbythe

UndergroundSpaceCenterattheUniversityofMinnesota,forOakRidgeNationalLaboratoryandtheU.S.DepartmentofEnergy,1988.

2.“RecommendedPracticesforMasonryBasementWallConstruction”,bytheconcreteandmasonrycommitteeoftheNorthStarChapter(Minnesota)ofICBO,1983.

3.“RecommendedPracticesforConstructionofResidentialMasonryBasements”,byNewYorkStateConcreteMasonryAssociation,1994.

4.InternationalResidentialCode2006TM

5.NationalConcreteMasonryAssociationPublicationTR68B

6.RecommendedPracticesforConstructionofResidentialMasonryBasementsinMinnesota4thEdition

7.MinnesotaStateBuildingCode

8.MinnesotaStateEnergyCode

9.MCMAMortarCards

Page 18: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

1.16

Tables

UnifiedSoilClassificationChart

Table2-1MinimumConcreteTemperatures

MaximumAnchorBoltSpacingforSupportedFoundationWall

AppendixTable1[Basedonthe2006IRCTableR404.1.1(1)PlainMasonryFoundationWalls]

AppendixTable2[Basedonthe2006IRCTableR404.1.1(2)]8InchMasonryFoundationWallswithReinforcing[d>5inches(a)]

AppendixTable3[BasedonIRCTableR404.1.1(3)]10InchMasonryFoundationWallswithReinforcing[d>6.75inches(a)]

AppendixTable4[BasedonIRCTableR404.1.1(4)]12InchMasonryFoundationWallswithReinforcing[d>8.75inches(a)]

AppendixTable6[BasedonIRCTableR404.1.1(6)]8"CantileveredConcreteandMasonryFoundationWalls

AppendixTable7[BasedonIRCTableR404.1.1(7)]10"CantileveredConcreteandMasonryFoundationWalls

AppendixTable8[BasedonIRCTableR404.1.1(8)]12"CantileveredConcreteandMasonryFoundationWalls

Diagrams

MinnesotaFrostDepthMap

Diagram1-FoundationWall(uppersection)

Diagram2-FoundationWall(lowersection)

Diagram3-CantileverWallSection

Diagram4-TypicalProppedCantileveredWallSection

Mortar Cards

1)MortarCementandMasonryCement

2)PortlandCementandLime

Page 19: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

A

Page 20: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

B

UNIFIED SOIl ClaSSIFICaTION CHaRTPropertiesofSoilsClassifiedAccordingtotheUnifiedSoil

ClassificationSystemFromtheIRCTableR405.1

SoilGroup

UnifiedSoil

SystemSymbol SolidDescription

DrainageCharacteristics

(a)

FrostHeave

Potential

Volume Change Potential

Expansion(b)

Group1

GW

GP

Well-gradedgravels,sandmixtures,littleornofines.Poorly-gradedgravelsorgravelsandmixtures,littleor no fines.

Good

Good

Low

Low

Low

Low

SW Wellgradedsands,gravellysands, little or no fines. Good Low Low

SPPoorly-gradedsandsorgravelly sands, little or no fines.

Good Low Low

GM Siltygravels,gravel-sand-siltmixtures. Good Medium Low

SM Siltyandsand-siltmixture. Good Medium Low

Group2

GC Clayeygravels,gravel-sand-claymixture. Medium Medium Low

SC Claysands,sand-claymixture. Medium Medium Low

ML

Inorganicsiltsandveryfinesand,rockflour,siltyorclayfine sands or clayey silts with slightly plasticity.

Medium High Low

CL

Inorganicclaysoflowtomedium plasticity, gravelly clays, sandy clays, silty clays, lean clays.

Medium Medium MediumtoLow

Group3

CH Inorganicclaysofhighplasticity, fat clays. Poor Medium High

MHInorganicsilts,micaceousordiatomaceous fine sandy or silty soils, classic silts.

Poor High High

Group4

OL Organicsiltsandorganicsilty clays of low plasticity. Poor Medium Medium

OH Organicclaysofmediumtohigh plasticity, organic silts. Unsatisfactory Medium High

PT Peatandotherhighlyorganic soils. Unsatisfactory Medium High

(a).Thepercolationrateforgooddrainageisover4inchperhour,mediumdrainageis2inchesto3inchesperhour,andpoorislessthan2inchesperhour.

(b).Soilswithalowpotentialexpansiontypicallyhaveaplasticityindex(PI)of0to15,soilswithamediumpotentialexpansionhaveaPIof10to35andsoilswithahighpotentialexpansionhaveaPIgreaterthan20.

Page 21: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

C

Page 22: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

D

Page 23: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

E

Page 24: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

F

Portland Cement and LimeProportion Specifications

Type

Type IPortlandM

S

N

Lime

Type IPortland

Lime

Type IPortland

Lime

* Approximate

Note: 1 1⁄2 5 Gallon Buckets = 1 Cubic Foot of Sand

1⁄4

1⁄2

Cementitious(bags)

Sand-damp and loose Water*

(5 gallon buckets)

5 1/2

6 3/4

9

1

1 1/4

1 1/2

Mortar Cement and Masonry CementProportion Specifications

Type

Type MMortar/MasonryM

S

N

Type SMortar/Masonry

Type NMortar/Masonry

* Approximate

Note: 1 1⁄2 5 Gallon Buckets = 1 Cubic Foot of Sand

Cementitious(bags)

Sand-damp and loose Water*

(5 gallon buckets)

4 1/2

4 1/23/4

4 1/2

1

1

Page 25: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

G

TaBlE R404.1 (2)Maximum Anchor Bolt Spacing For

Supported Foundation Wall

MaximumWall

Height

MaximumUnbalanced

BackfillHeight SoilClasses

SoilLoad(pdf/ft)

TopofWall

Reaction(plf )ˆb

1/2"diameterAnchorBolt

Spacing(inches)ˆa

8'-0" 7'-4"

GW,GPSW,&SP 30 250 72

GM,GC,SM-SC,&ML 45 370 72

SC,MH,ML-CL,&I-CL 60 490 48

9'-0" 8'-4"

GW,GP,SW,&SP 30 320 72

GM,GC,SM-SC,&ML 45 480 48

SC,MH,ML-CL,&I-CL 60 640 40

Page 26: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

H

2006INTERNATIONALRESIDENTIALCODE(TM)REQUIREMENTSFORFOUNDATION

WALLSWITHMINNESOTABUILDING CODEAMENDMENTS

Thefollowinginformationhasbeeneditedfromthe2006InternationalResidentialCodeandtheMinnesotaBuildingCode.ThesesectionsareessentialtomeettherequirementsformasonryandconcretefoundationwallsconstructedinMinnesota.The2006InternationalResidentialCodeandtheMinnesotaBuildingCodeshouldbeconsultedforcompleterequirementsanddetails.

SECTIONR404(Minnesota1309.0404)FOUNDATIONANDRETAININGWALLS

R404.1Concreteandmasonryfoundationwalls.Concreteandmasonryfoundation walls shall be selected and constructed in accordance with theprovisionsofSectionR404orinaccordancewithACI318,ACI332,NCMATR68-A,ACI530/ASCE5/TMS402orotherapprovedstructuralstandards.WhenACI318,ACI332orACI530/ASCE5/TMS402ortheprovisionsofSectionR404areusedtodesignconcrete or masonry foundation walls project drawings, typical details andspecificationsarenotrequiredtobearthesealofthearchitectorengineerresponsiblefordesign,unlessotherwiserequiredbythestatelawofthejurisdictionhavingauthority.Foundationwallsthatmeetallofthefollowingshallbeconsideredlaterallysupported: 1. Fullbasementfloorshallbe3.5inchesthickconcreteslabpoured

tight against the bottom of the foundation wall. 2. Floorjoistandblockingshallbeconnectedtothesillplateat

thetopofthewallbytheprescriptivemethodcalledoutinTableR404.1(1),or;shallbeconnectedwithanapprovedconnectorwithlistedcapacitymeetingTableR404.1(1).

3. BoltspacingforthesillplateshallbenogreaterthanperTableR404.1(2).

4. Floorshallbeblockedbyperpendiculartothefloorjoists.Blockingshall be full depth within two joist spaces of the foundation.

5. Wherefoundationwallssupportunbalancedloadonoppositesidesof the building, such as a daylight basement, the rim board shall beattachedtothesillwitha20gagemetalangleclipat24inchesoncenter,withfive8dnailsperleg,oranapprovedconnectorsupplying230poundsperlinearfootcapacity.

R404.1.1Masonryfoundationwalls.ConcretemasonryandclaymasonryfoundationwallsshallbeconstructedassetforthinTablesR404.1.1(1),R404.1.1(2),R404.1.1(3)orR404.1.1(4)andshallalsocomplywiththeprovisionsofSectionR404andtheapplicableprovisionsofSectionsR606,R607andR608.RubblestonemasonryfoundationwallsshallbeconstructedinaccordancewithSectionsR404.1.8andR607.2.2.CantileveredmasonryfoundationwallsshallbeconstructedassetforthinTableR404.1.1(6),R404.1.1(7),orR404.1.1(8).Cantileveredmeans:foundationwallsthatdonothavepermanent lateral support at the top.

Page 27: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

I

R404.1.2Concretefoundationwalls.ConcretefoundationwallsshallbeconstructedassetforthinTablesR404.1.1(5),andshallalsocomplywiththeprovisionsofSectionR404andtheapplicableprovisionsofSectionR404.2.CantileveredconcretefoundationwallsshallbeconstructedassetforthinTableR404.1.1(6),R404.1.1(7),orR404.1.1(8).Cantileveredmeans:foundationwallsthatdonothavepermanent lateral support at the top.

R404.1.3Designrequired.Concreteormasonryfoundationwallsshallbe designed in accordance with accepted engineering practice when eitherofthefollowingconditionsexist: 1. Wallsaresubjecttohydrostaticpressurefromgroundwater. 2. Wallssupportingmorethan48inchesofunbalancedbackfillthat

do not have permanent lateral support at the top and bottom. Exception:CantileveredconcreteandmasonryfoundationwallsconstructedinaccordancewithTableR404.1.1(6),R404.1.1(7),orR404.1.1(8).

R404.1.5Foundationwallthicknessbasedonwallssupported.Thethicknessofconcreteandmasonryfoundationwallsshallnotbelessthanthethicknessofthewallsupported,exceptthatfoundationwallsofatleast8-inchnominalthicknessshallbepermittedunderbrick-veneeredframewallsandunder10-inchwidecavitywallswherethetotalheightofthewallssupported,includinggables,isnotmorethan20feet,providedtherequirementsofSectionsR404.1.1andR404.1.2aremet.

R404.1.6Heightabovegrade.Concreteandmasonryfoundationwallsshallextendabovethefinishedgradeadjacenttothefoundationatallpointsaminimumof4incheswheremasonryveneerisusedandaminimumof6incheselsewhere.

R404.1.7Backfillplacement.Backfillshallnotbeplacedagainstthewalluntilthewallhassufficientstrengthandhasbeenanchoredtothefloorabove,orhasbeensufficientlybracedtopreventdamagebythebackfill.

Exception:bracingisnotrequiredforwallssupportinglessthan4feetofunbalancedbackfill.

Page 28: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

J

TaBlE 1PlaIN MaSONRy FOUNDaTION WallS

[Basedonthe2006IRCtableR404.1.1(1)]

MaximumWallHeight(feet)

MaximumUnbalanced

BackfillHeight(feet)

PlainMasonryMinimumNominalWallThickness(inches)

SoilClasses

GW,GP,SW,&GP

GM,CG,SM,SM-SC,&

ML

SC,MH,ML-CL,andInorganicCL

54 6solidor8 6solidor8 6solidor8

5 6solidor8 8 10

6

4 6solidor8 6solidor8 6solidor8

5 6solidor8 8 10

6 8 10 12

7

4 6solidor8 8 8

5 6solidor8 10 10

6 10 12 10solid

7 12 10solid 12solid

8

4 6solidor8 6solidor8 8

5 6solidor8 10 12

6 10 12 12solid

7 12 12solid Footnotee

8 10solid 12solid Footnotee

9

4 6solidor8 6solidor8 8

5 8 10 12

6 10 12 12solid

7 12 12solid Footnotee

8 12solid Footnotee Footnotee

9 Footnotee Footnotee Footnotee

ForSI:1inch=25.4mm,1foot=304.8mm,1poundpersquareinch-6.895Pa.

a.MortarshallbeTypeMorSandmasonryshallbelaidinrunningbond.Ungroutedhollowmasonryunitsarepermittedexceptwhereotherwiseindicated.

b.SoilclassesareinaccordancewiththeUnifiedSoilClassificationSystem.RefertoTableR405.1

c.Unbalancedbackfillheightisthedifferenceinheightbetweentheexteriorfinishgroundlevel and the lower of the top of the concrete footing that supports the foundation wall or theinteriorfinishgroundlevel.Whereaninteriorconcreteslab-on-gradeisprovidedandisin contact with the interior surface of the foundation wall, measurement of the unbalanced backfillheightfromtheexteriorfinishgroundleveltothetopoftheinteriorconcreteslabispermitted.

d.Solidgroutedhollowunitsorsolidmasonryunits.

e.WallconstructionshallbeinaccordancewitheTableR404.1.1(2)oradesignshallbeprovided.Whenthemaximumunbalancedbackfillheightexceeds6feetconsiderusingreinforcementschedulesfromtables2,3,or4.Variablesinbackfillingconditionsandwallbracingmaymakewall reinforcement advisable under these conditions.

Page 29: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

K

TaBlE 28" MaSONRy FOUNDaTION WallS

WITH REINFORCING[Basedonthe2006IRCtableR404.1.1(2)]

Whered>5inches(a)

WallHeightHeightof

UnbalancedBackfill(e)

MinimumVerticalReinforcement(b,c)SoilClassesandlateralload(d)(psfperfootbelowgrade)

GW,GP,SW,&SPSoils

GM,CG,SM,SM-SC,&MLSoils

SC,ML-CL,and InorganicCLSoils

6ft.8in.

4ft.(orless) #4@48"(#5@72")

#4@48"(#5@72")

#4@48"(#5@72")

5feet #4@48"(#5@72")

#4@48"(#5@72")

#4@48"(#5@72")

6ft.8in. #4@48"(#5@72")

#5@48"(#4@24")(#6@64")

(#7@72")

#6@48"(#4@16")(#5@32")

(#7@64")

7ft.4in.

4ft.(orless) #4@48"(#5@72")

#4@48"(#5@72")

#4@48"(#5@72")

5feet #4@48"(#5@72")

#4@48"(#5@72")

#4@48"(#5@72")

6feet #4@48"(#5@72")

#5@48"(#4@24")(#6@64")

(#7@72")

#5@48"(#4@24")(#6@64")

(#7@72")

7ft.4in.#5@48"

(#4@24")(#6@64")(#7@72")

#6@48"(#4@16")(#5@32")

(#7@64")

#6@40"(#4@16")(#5@24")

(#7@48")

8feet

4ft.(orless) #4@48"(#5@72")

#4@48"(#5@72")

#4@48"(#5@72")

5feet #4@48"(#5@72")

#4@48"(#5@72")

#4@48"(#5@72")

6feet #4@48"(#5@72")

#5@48"(#4@24")(#6@64")

(#7@72")

#5@48"(#4@24")(#6@64")

(#7@72")

7feet#5@48"

(#4@24")(#6@64")(#7@72")

#6@48"(#4@16")(#5@32")

(#7@64")

#6@40"(#4@16")(#5@24")

(#7@48")

8feet#5@48"

(#4@24")(#6@64")(#7@72")

#6@48"(#4@16")(#5@32")

(#7@64")

#6@32"(#5@16")(#7@40")

8ft.8in.

4ft.(orless) #4@48"(#5@72")

#4@48"(#5@72")

#4@48"(#5@72")

5feet #4@48"(#5@72")

#4@48"(#5@72")

#5@48"(#4@24")(#6@64")

(#7@72")

6feet #4@48"(#5@72")

#5@48"(#4@24")(#6@64")

(#7@72")

#6@48"(#4@16")(#5@32")

(#7@64")

7feet#5@48"

(#4@24")(#6@64")(#7@72")

#6@48"(#4@16")(#5@32")

(#7@64")

#6@40"(#4@16")(#5@24")

(#7@48")

8ft.8in.#6@48"

(#4@16")(#5@32")(#7@64")

#6@32"(#5@16")(#7@40")

#6@24"(#5@16")(#7@32")

9ft.4in.

4ft.(orless) #4@48"(#5@72")

#4@48"(#5@72")

#4@48"(#5@72")

5feet #4@48"(#5@72")

#4@48"(#5@72")

#5@48"(#4@24")(#6@64")

(#7@72")

6feet #4@48"(#5@72")

#5@48"(#4@24")(#6@64")

(#7@72")

#6@48"(#4@16")(#5@32")

(#7@64")

7feet#5@48"

(#4@24")(#6@64")(#7@72")

#6@48"(#4@16")(#5@32")

(#7@64")

#6@40"(#4@16")(#5@24")

(#7@48")

8feet#6@48"

(#4@16")(#5@32")(#7@64")

#6@40"(#4@16")(#5@24")

(#7@48")

#6@24"(#5@16")(#7@32")

9ft.4in.#6@40"

(#4@16")(#5@24")(#7@48")

#6@24"(#5@16")(#7@32") #6@16"

Page 30: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

L

10feet

4feet(orless) #4@48"(#5@72")

#4@48"(#5@72")

#4@48"(#5@72")

5feet #4@48"(#5@72")

#4@48"(#5@72")

#5@48"(#4@24")(#6@64")

(#7@72")

6feet #4@48"(#5@72")

#5@48"(#4@24")(#6@64")

(#7@72")

#6@48"(#4@16")(#5@32")

(#7@64")

7feet#5@48"

(#4@24")(#6@64")(#7@72")

#6@48"(#4@16")(#5@32")

(#7@64")

#6@32"(#5@16")(#7@40")

8feet#6@48"

(#4@16")(#5@32")(#7@64")

#6@32"(#5@16")(#7@40")

#6@24"(#5@16")(#7@32")

9feet#6@40"

(#4@16")(#5@24")(#7@48")

#6@24"(#5@16")(#7@32") #6@16"

10feet #6@32"(#5@16")(#7@40") #6@16" #6@16"

a.MortarshallbeTypeMorSandmasonryshallbelaidinrunningbond.b.ThefirstreinforcingbarsizeandspacingisasprescribedintheIRCtablesandisfollowedbyalternative

barsizesandspacinghavinganequivalentcross-sectionalareaofreinforcementperlinealfootofwallaspermitted,providingthespacingofthereinforcementdoesnotexceed72inches.

c.VerticalreinforcementshallbeGrade60minimum.Thedistancefromthefaceofthesoilsideofthewalltothecenterofverticalreinforcementshallbeatleast5inches.

d.SoilclassesareinaccordancewiththeUnifiedSoilClassificationSystemanddesignlateralsoilloadsareformoistconditionswithouthydrostaticpressure.RefertoTable1.

e.Unbalancedbackfillheightisthedifferenceinheightoftheexteriorfinishgroundlevelandthelowerof the top of the concrete footing that supports the foundation wall or the interior finish ground level. Whereaninteriorconcreteslab-on-gradeisprovidedandisincontactwiththeinteriorsurfaceofthefoundationwall,measurementoftheunbalancedbackfillheightfromtheexteriorfinishgroundleveltothe top of the interior concrete slab is permitted.

Page 31: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

M

TaBlE 310" MaSONRy FOUNDaTION WallS

WITH REINFORCING[Basedonthe2006IRCtableR404.1.1(3)]

Whered>6.75inches(a)

WallHeightHeightof

UnbalancedBackfill(e)

MinimumVerticalReinforcement(b,c)SoilClassesandlateralload(d)(psfperfootbelowgrade)

GW,GP,SW,&SPSoils

GM,CG,SM,SM-SC,&MLSoils

SC,ML-CL,and InorganicCLSoils

6ft.8in.

4ft.orless #4@56"(#5@72")

#4@56"(#5@72")

#4@56"(#5@72")

5feet #4@56"(#5@72")

#4@56"(#5@72")

#4@56"(#5@72")

6ft.8in. #4@56"(#5@72")

#5@56"(#4@32")(#6@72")

#5@56"(#4@32")(#6@72")

7ft.4in.

4ft.(orless) #4@56"(#5@72")

#4@56"(#5@72")

#4@56"(#5@72")

5feet #4@56"(#5@72")

#4@56"(#5@72")

#4@56"(#5@72")

6feet #4@56"(#5@72")

#4@56"(#5@72")

#5@56"(#4@32")(#6@72")

7ft.4in. #4@56"(5@72")

#5@56"(#4@32")(#6@72")

#6@56"(#4@24")(#5@32")

(#7@72")

8feet

4ft.(orless) #4@56"(#5@72")

#4@56"(#5@72")

#4@56"(#5@72")

5feet #4@56"(#5@72")

#4@56"(#5@72")

#4@56"(#5@72")

6feet #4@56"(#5@72")

#4@56"(#5@72")

#5@56"(#4@32")(#6@72")

7feet #4@56"(#5@72")

#5@56"(#4@32")(#6@72")

#6@56"(#4@24")(#5@32")

(#7@72")

8feet #5@56"(#4@32")(#6@72")

#6@56"(#4@24")(#5@32")

(#7@72")

#6@48"(#4@16")(#5@32")

(#7@64")

8ft.8in.

4ft.(orless) #4@56"(#5@72")

#4@56"(#5@72")

#4@56"(#5@72")

5feet #4@56"(#5@72")

#4@56"(#5@72")

#4@56"(#5@72")

6feet #4@56"(#5@72")

#4@56"(#5@72")

#5@56"(#4@32")(#6@72")

7feet #4@56"(#5@72")

#5@56"(#4@32")(#6@72")

#6@56"(#4@24")(#5@32")

(#7@72")

8ft.8in. #5@56"(#4@32")(#6@72")

#6@48"(#4@16")(#5@32")

(#7@64")

#6@32"(#5@16")(#7@40")

9ft.4in.

4ft.(orless) #4@56"(#5@72")

#4@56"(#5@72")

#4@56"(#5@72")

5feet #4@56"(#5@72")

#4@56"(#5@72")

#4@56"(#5@72")

6feet #4@56"(#5@72")

#5@56"(#4@32")(#6@72")

#5@56"(#4@32")(#6@72")

7feet #4@56"(#5@72")

#5@56"(#4@32")(#6@72")

#6@56"(#4@24")(#5@32")

(#7@72")

8feet #5@56"(#4@32")(#6@72")

#6@56"(#4@24")(#5@32")

(#7@72")

#6@40"(#4@16")(#5@24")

(#7@48")

9ft.4in.#6@56"

(#4@24")(#5@32")(#7@72")

#6@40"(#4@16")(#5@24")

(#7@48")

#6@24"(#5@16")(#7@32")

Page 32: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

N

10feet

4feet(orless) #4@56"(#5@72")

#4@56"(#5@72")

#4@56"(#5@72")

5feet #4@56"(#5@72")

#4@56"(#5@72")

#4@56"(#5@72")

6feet #4@56"(#5@72")

#5@56"(#4@32")(#6@72")

#5@56"(#4@32")(#6@72")

7feet #5@56"(#4@32")(#6@72")

#6@56"(#4@24")(#5@32")

(#7@72")

#6@48"(#4@16")(#5@32")

(#7@64")

8feet #5@56"(#4@32")(#6@72")

#6@48"(#4@16")(#5@32")

(#7@64")

#6@40"(#4@16")(#5@24")

(#7@48")

9feet#6@56"

(#4@24")(#5@32")(#7@72")

#6@40"(#4@16")(#5@24")

(#7@48")

#6@24"(#5@16")(#7@32")

10feet#6@48"

(#4@16")(#5@32")(#7@64")

#6@32"(#5@16")(#7@40")

#6@24"(#5@16")(#7@32")

a.MortarshallbeTypeMorSandmasonryshallbelaidinrunningbond.b.ThefirstreinforcingbarsizeandspacingisasprescribedintheIRCtablesandisfollowedbyalternative

barsizesandspacinghavinganequivalentcross-sectionalareaofreinforcementperlinealfootofwallaspermitted,providingthespacingofthereinforcementdoesnotexceed72inches.

c.VerticalreinforcementshallbeGrade60minimum.Thedistancefromthefaceofthesoilsideofthewalltothecenterofverticalreinforcementshallbeatleast3.75inches.

d.SoilclassesareinaccordancewiththeUnifiedSoilClassificationSystemanddesignlateralsoilloadsareformoistconditionswithouthydrostaticpressure.SeeTableR405.1

e.Unbalancedbackfillheightisthedifferenceinheightoftheexteriorfinishgroundlevelandthelowerof the top of the concrete footing that supports the foundation wall or the interior finish ground level. Whereaninteriorconcreteslab-on-gradeisprovidedandisincontactwiththeinteriorsurfaceofthefoundationwall,measurementoftheunbalancedbackfillheightfromtheexteriorfinishgroundleveltothe top of the interior concrete slab is permitted.

Page 33: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

O

TaBlE 412" MaSONRy FOUNDaTION WallS

WITH REINFORCING[Basedonthe2006IRCtableR404.1.1(4)]

Whered>8.75inches(a)

WallHeightHeightof

UnbalancedBackfill(e)

MinimumVerticalReinforcement(b,c)SoilClassesandlateralload(d)(psfperfootbelowgrade)

GW,GP,SW,&SPSoils

GM,CG,SM,SM-SC,&MLSoils

SC,ML-CL,and InorganicCLSoils

6ft.8in.

4ft.orless #4@72" #4@72" #4@72")5feet #4@72" #4@72" #4@72"

6ft.8in. #4@72" #4@72" #5@72"(#4@40")

7ft.4in.

4ft.(orless) #4@72" #4@72" #4@72"5feet #4@72" #4@72" #4@72"

6feet #4@72" #4@72" #5@72"(#4@40")

7ft.4in. #4@72" #5@72"(#4@40")

#6@72"(#4@32")(#5@48")

8feet

4ft.(orless) #4@72" #4@72" #4@72"5feet #4@72" #4@72" #4@72"

6feet #4@72" #4@72" #5@72"(#4@40")

7feet #4@72" #5@72"(#4@40")

#6@72"(#4@32")(#5@48")

8feet #5@72"(#4@40")

#6@72"(#4@32")(#5@48")

#6@64"(#4@24")(#5@40")

(#7@72")

8ft.8in.

4ft.(orless) #4@72" #4@72" #4@72"5feet #4@72" #4@72" #4@72"

6feet #4@72" #4@72" #5@72"(#4@40")

7feet #4@72" #5@72"(#4@40")

#6@72"(#4@32")(#5@48")

8ft.8in. #5@72"(#4@40")

#7@72"(#4@24")(#5@32")

(#6@48")

#6@48"(#4@16")(#5@32")

(#7@64")

9ft.4in.

4ft.(orless) #4@72" #4@72" #4@72"5feet #4@72" #4@72" #4@72"

6feet #4@72" #5@72"(#4@40")

#5@72"(#4@40")

7feet #4@72" #5@72"(#4@40")

#6@72"(#4@32")(#5@48")

8feet #5@72"(#4@40")

#6@72"(#4@32")(#5@48")

#6@56"(#4@24")(#5@32")

(#7@72")

9ft.4in. #6@72"(#4@32")(#5@48")

#6@48"(#4@16")(#5@32")

(#7@64")

#6@40"(#4@16")(#5@24")

(#7@48")

10feet

4feet(orless) #4@72" #4@72" #4@72"5feet #4@72" #4@72" #4@72"

6feet #4@72" #5@72"(#4@40")

#5@72"(#4@40")

7feet #4@72" #6@72"(#4@32")(#5@48")

#6@72"(#4@32")(#5@48")

8feet #5@72"(#4@40")

#6@72"(#4@32")(#5@48")

#6@48"(#4@16")(#5@32")

(#7@64")

9feet #6@72"(#4@32")(#5@48")

#6@56"(#4@24")(#5@32")

(#7@72")

#6@40"(#4@16")(#5@24")

(#7@48")

10feet#6@64"

(#4@24)(#5@40")(#7@72")

#6@40"(#4@16")(#5@24")

(#7@48")

#6@32"(#5@16")(#7@40")

a.MortarshallbeTypeMorSandmasonryshallbelaidinrunningbond.b.ThefirstreinforcingbarsizeandspacingisasprescribedintheIRCtablesandisfollowedbyalternative

barsizesandspacinghavinganequivalentcross-sectionalareaofreinforcementperlinealfootofwallaspermitted,providingthespacingofthereinforcementdoesnotexceed72inches.

c.VerticalreinforcementshallbeGrade60minimum.Thedistancefromthefaceofthesoilsideofthewalltothecenterofverticalreinforcementshallbeatleast8.75inches.

Page 34: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

P

d.SoilclassesareinaccordancewiththeUnifiedSoilClassificationSystemanddesignlateralsoilloadsareformoistconditionswithouthydrostaticpressure.SeeTableR405.1

e.Unbalancedbackfillheightisthedifferenceinheightoftheexteriorfinishgroundlevelandthelowerof the top of the concrete footing that supports the foundation wall or the interior finish ground level. Whereaninteriorconcreteslab-on-gradeisprovidedandisincontactwiththeinteriorsurfaceofthefoundationwall,measurementoftheunbalancedbackfillheightfromtheexteriorfinishgroundleveltothe top of the interior concrete slab is permitted.

Page 35: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

Q

TaBlE 68" CaNTIlEvERED CONCRETE aND

MaSONRy FOUNDaTION WallS[Basedonthe2006IRCtableR404.1.1(6)]

MaximumWall

Height(j)(feet)

MaximumUnbalancedBackfill(e)

(feet)

MinimumVerticalReinforcementSizeandSpacingfor 8-INCHNominalWallThickness(a)(b)(c)(e)(f )(i)(k)

SoilClasses(d)

GW,GP,SW,&SPSoils

GM,GC,SM,SM-SC,&ML

Soils

SC,MH,ML-CL,andInorganicCL

Soils

43 NoneRequired NoneRequired NoneRequired

4 NoneRequired NoneRequired #2@72"o.c.

5

3 NoneRequired NoneRequired NoneRequired

4 #4@72"o.c. #4@56"o.c.(h)(#5@72"o.c.)

#4@40"o.c.(g)(#5@56"o.c.) (#6@72"o.c.)

5 #4@72"o.c. #4@56"o.c.(h)(#5@72"o.c.)

#4@40"o.c.(g)(#5@56"o.c.) (#6@72"o.c.)

a.MortarshallbeTypeMorSandmasonryshallbelaidinrunningbond.Minimumunitcompressivestrengthis1900PSI.

b.ThefirstreinforcingbarsizeandspacingisasprescribedintheIRCtablesandisfollowedbyalternativebarsizesandspacinghavinganequivalentcross-sectionalareaofreinforcementperlinealfootofwallaspermitted,providingthespacingofthereinforcementdoesnotexceed72inches.

c.VerticalreinforcementshallbeGrade60minimum.Thedistancefromthefaceofthesoilsideofthewalltothecenterofverticalreinforcementshallbenogreaterthan2.5inches.

d.SoilclassesareinaccordancewiththeUnifiedSoilClassificationSystem.RefertoTableR405.1.

e.Interiorconcretefloorslabshallbeplacedtighttothewall.Theexteriorgradelevelshallbe6:minimumbelowthetopofwall.Maximumheightfromtopofslabtobottomoffloorjoistis10'-0".Unbalancedbackfillheightisthedifferenceinheightoftheexteriorfinishgroundlevelsandthetopoftheinteriorconcreteslab-on-grade.

f.Minimumfootingsizeof20"by8"shallbeplacedonsoilwithabearingcapacityof2000psf.Minimumconcretecompressivestrengthoffootingshallbe3000psi.

g.Provideproppedcantileverwall:topoffootingshallbe16"belowthebottomoftheconcretefloorslabminimum.

h.Provide#5Grade60dowels,1'-6"long,toconnectfootingtowall.Embeddowel5"intofooting.Placedowelsincenterofwallthicknessspacedat32"o.c.maximum.Nodowelsarerequiredwherelengthofthefoundationwallbetweenperpendicularwallsis2timesthefoundation wall height or less.

i. This table is applicable where the length of the foundation wall between perpendicular walls is 35feetorless,orwherethelengthofthefoundationlaterallysupportedononlyoneendbyaperpendicularwallis17feetorless.

j.Maximumwallheightismeasuredfromtopofwalltobottomoffloorslab.

k.InstallfoundationanchorageperR403.1.6.

Page 36: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

R

TaBlE 710" CaNTIlEvERED CONCRETE aND

MaSONRy FOUNDaTION WallS[Basedonthe2006IRCtableR404.1.1(7)]

MaximumWall

Height(j)(feet)

MaximumUnbalanced

Backfill (e)(feet)

MinimumVerticalReinforcementSizeandSpacingfor 10-INCHNominalWallThickness(a)(b)(c)(e)(f )(i)(k)

SoilClasses(d)

GW,GP,SW,&SPSoils

GM,GC,SM,SM-SC,&ML

Soils

SC,MH,ML-CL,andInorganicCL

Soils

43 NoneRequired NoneRequired NoneRequired

4 NoneRequired NoneRequired NoneRequired

5

3 NoneRequired NoneRequired NoneRequired

4 NoneRequired #4@72"o.c. #4@64"o.c.(h)(#5@72"o.c.)

5 #4@72"o.c. #4@72"o.c. #4@56"o.c.(g)(#5@72"o.c.)

6

3 NoneRequired #4@72"o.c. #4@72"o.c.

4 #4@72"o.c. #4@72"o.c. #4@64"o.c.(h)(#5@72"o.c.)

5 #4@64"o.c.(h)(#5@72"o.c.)

#40@40"o.c.(g)(h)(#5@56"o.c.) (#6@72"o.c.)

#5@48"o.c.(g)(h)(#6@64"o.c.) (#7@72"o.c.)

6 #4@64"o.c.(h)(#5@72"o.c.)

#40@40:o.c.(g)(h)(#5@56"o.c.) (#6@72"o.c.)

#5@48"o.c.(g)(h)(#6@64"o.c.) (#7@72"o.c.)

a.MortarshallbeTypeMorSandmasonryshallbelaidinrunningbond.Minimumunitcompressivestrengthis1900PSI.

b.ThefirstreinforcingbarsizeandspacingisasprescribedintheIRCtablesandisfollowedbyalternativebarsizesandspacinghavinganequivalentcross-sectionalareaofreinforcementperlinealfootofwallaspermitted,providingthespacingofthereinforcementdoesnotexceed72inches.

c.VerticalreinforcementshallbeGrade60minimum.Thedistancefromthefaceofthesoilsideofthewalltothecenterofverticalreinforcementshallbenogreaterthan2.5inches.

d.SoilclassesareinaccordancewiththeUnifiedSoilClassificationSystem.RefertoTableR405.1.

e.Interiorconcretefloorslabshallbeplacedtighttothewall.Theexteriorgradelevelshallbe6"minimumbelowthetopofwall.Maximumheightfromtopofslabtobottomoffloorjoistis10'-0".Unbalancedbackfillheightisthedifferenceinheightoftheexteriorfinishgroundlevelsandthetopoftheinteriorconcreteslab-on-grade.

f.Minimumfootingsizeof20"by8"shallbeplacedonsoilwithabearingcapacityof2000psf.Minimumconcretecompressivestrengthoffootingshallbe3000psi.

g.Provideproppedcantileverwall:topoffootingshallbe16"belowthebottomoftheconcretefloorslabminimum.

h.Provide#5Grade60dowels,1'-6"long,toconnectfootingtowall.Embeddowel5"intofooting.Placedowelsincenterofwallthicknessspacedat32"o.c.maximum.Nodowelsarerequiredwherelengthofthefoundationwallbetweenperpendicularwallsis2timesthefoundation wall height or less.

i. This table is applicable where the length of the foundation wall between perpendicular walls is 35feetorless,orwherethelengthofthefoundationlaterallysupportedononlyoneendbyaperpendicularwallis17feetorless.

j.Maximumwallheightismeasuredfromtopofwalltobottomoffloorslab.

k.InstallfoundationanchorageperR403.1.6.

Page 37: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

S

TaBlE 812" CaNTIlEvERED CONCRETE aND

MaSONRy FOUNDaTION WallS[Basedonthe2006IRCtableR404.1.1(8)]

MaximumWall

Height(j)(feet)

MaximumUnbalancedBackfill(e)

(feet)

MinimumVerticalReinforcementSizeandSpacingfor 12-INCHNominalWallThickness(a)(b)(c)(e)(f )(i)(k)

SoilClasses(d)

GW,GP,SW,&SPSoils

GM,GC,SM,SM-SC,&ML

Soils

SC,MH,ML-CL,andInorganicCL

Soils

43 NoneRequired NoneRequired NoneRequired

4 NoneRequired NoneRequired NoneRequired

5

3 NoneRequired NoneRequired NoneRequired

4 NoneRequired NoneRequired #4@72"o.c.

5 #4@72"o.c. #4@72"o.c. #4@72"o.c.

6

3 NoneRequired NoneRequired NoneRequired

4 NoneRequired NoneRequired #4@72"o.c.

5 #4@72"o.c. #4@56"o.c.(h)(#5@72"o.c.)

#4@40"o.c.(g)(#5@56"o.c.) (#6@72"o.c.)

6 #4@72"o.c. #4@56"o.c.(h)(#5@72"o.c.)

#4@32"o.c.(g)(h)(#5@48"o.c.) (#6@72"o.c.)(#7@64"o.c.)

7

3 NoneRequired NoneRequired NoneRequired

4 NoneRequired #4@72"o.c. #4@72"o.c.

5 #4@72"o.c. #4@56"o.c.(h)(#5@72"o.c.)

#4@40"o.c.(g)(#5@56"o.c.)(#6

@72"o.c.)

6 #4@48"o.c.(#5@72"o.c.)

#5@48"o.c.(g)(h)

(#6@64"o.c.) (#7@72"o.c.)

#6@48"o.c.(g)(h)

(#7@64"o.c.)

7 #4@48"o.c.(#5@72"o.c.)

#4@40"o.c.(g)(h)

(#5@56"o.c.) (#6@72"o.c.)

#6@48"o.c.(g)(h)

(#7@64"o.c.)

a.MortarshallbeTypeMorSandmasonryshallbelaidinrunningbond.Minimumunitcompressivestrengthis1900PSI.

b.ThefirstreinforcingbarsizeandspacingisasprescribedintheIRCtablesandisfollowedbyalternativebarsizesandspacinghavinganequivalentcross-sectionalareaofreinforcementperlinealfootofwallaspermitted,providingthespacingofthereinforcementdoesnotexceed72inches.

c.VerticalreinforcementshallbeGrade60minimum.Thedistancefromthefaceofthesoilsideofthewalltothecenterofverticalreinforcementshallbenogreaterthan2.5inches.

d.SoilclassesareinaccordancewiththeUnifiedSoilClassificationSystem.RefertoTableR405.1.

e.Interiorconcretefloorslabshallbeplacedtighttothewall.Theexteriorgradelevelshallbe6"minimumbelowthetopofwall.Maximumheightfromtopofslabtobottomoffloorjoistis10'-0".Unbalancedbackfillheightisthedifferenceinheightoftheexteriorfinishgroundlevelsandthetopoftheinteriorconcreteslab-on-grade.

f.Minimumfootingsizeof20"by8"shallbeplacedonsoilwithabearingcapacityof2000psf.Minimumconcretecompressivestrengthoffootingshallbe3000psi.

g.Provideproppedcantileverwall:topoffootingshallbe16"belowthebottomoftheconcretefloorslabminimum.

Page 38: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

T

h.Provide#5Grade60dowels,1'-6"long,toconnectfootingtowall.Embeddowel5"intofooting.Placedowelsincenterofwallthicknessspacedat32"o.c.maximum.Nodowelsarerequiredwherelengthofthefoundationwallbetweenperpendicularwallsis2timesthefoundation wall height or less.

i. This table is applicable where the length of the foundation wall between perpendicular walls is 35feetorless,orwherethelengthofthefoundationlaterallysupportedononlyoneendbyaperpendicularwallis17feetorless.

j.Maximumwallheightismeasuredfromtopofwalltobottomoffloorslab.

k.InstallfoundationanchorageperR403.1.6.

Page 39: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

Recommended One & TwoFamily Residential ColdWeather MasonryConstruction Guidelines

A part of the Recommended Practices Manual, 5th ed.

Page 40: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

NOTES

Page 41: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

2.1

1. INTRODUCTION

1-1 Sinceitisoftenimpracticaltoencloseandheatmasonryconstruction in a residential setting, the following guidelines were developed to enhance cold weather masonryconstructiontechniquesinMinnesota.

1-2 These recommended guidelines should be following in additiontothepracticesdiscussedin“RecommendedPracticesforConstructionofResidentialMasonryBasementsinMinnesota,”availablefromMMPC.

1-3 Priortooratthetimeofbuildingpermitapplication,the applicant should submit these cold weather masonry guidelinestothebuildingofficialforapproval.Anyotherrequirementsbythebuildingofficialshouldbenotedand resolved with the building permit applicant prior to issuance of the permit.

2. FOOTING CONSTRUCTION

2-1 Workshouldnotcommence,unlessat6:00a.m.,theambientairtemperatureis0°Forhigher,andforecasttorise.

2-2 Donotplacefootingsonfrozensoil.Protectfootingsandadjoiningsoilfromfrostpenetrationduringfreezingtemperatures.

2-3 Afterforming,useadequateinsulatingblanketstoprevent frost from penetrating the soil.

2-4 Immediatelyafterconcreteplacement,adequateinsulatingblanketsshouldbeplacedovertheconcrete.Straworhayshouldnotbeallowedasaninsulatingmaterial.

2-5 Concrete delivered in cold weather should have the applicableminimumtemperatureindicatedintable2-1.

Table 2-1: Minimum Concrete Temperature

AirTemperature ThinSections& HeavySections& UnformedSlabs MassConcrete

30–45˚F 60˚F 50˚F0–30˚F 65˚F 55˚F

Below0˚F 70˚F 60˚F

Page 42: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

2.2

Themaximumtemperatureofconcreteproducedwithheatedaggregates, heated water, or both, should at no time during its productionortransportationexceed90°F.Note: The temperature of the concrete produced during hot weather should be as low as practical.

3. MaSONRy MaTERIalS

3-1 Masonrymaterials(ConcreteBlock,BrickorStone)storedonthejobshouldbecoveredandkeptdry.

3-2 Allmasonrylaidshouldbefreefromiceandsnow.

3-3 Whenambienttemperaturesare25°Forlower,allwallsafterconstructionshouldbecoveredwithwind-resistantmaterial, on both sides, from the top of the wall down to the footings.

4. MORTaR aND GROUT

4-1 The following recommendations should be met for the following temperatures.

• Temperatures40°F-32°F ConstructionRequirements:Heatmaterialstoproducemortarorgroutbetween40°F-120°F (4°C-49°C).

• Temperatures32°Fandbelow ConstructionRequirements:Heatmaterialstoproducemortarorgroutbetween40°F-120°F (4°C-49°C).Maintainmortarorgroutabovefreezinguntilusedinmasonry.

4-2 AdditionalComments

a. Incoldweatherconditions,acceleratingtheinitialset time of mortar or grout materials may be desired.Useoneofthesemethods:

a.TypeIIImaybeusedinplaceofTypeIfor faster initial set time and faster initial strength gain.

b.Setacceleratedpre-blendedmortarmaybe used for faster initial set time and faster initial strength gain.

c.Aliquidsetacceleratormaybeaddedtomortar or grout for faster initial set time

Page 43: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

2.3

and faster initial strength gain.

b.Mortarshouldbemixedinsmalleramountssoitcan be used before it cools.

c. Everyeffortshouldbemadetoproduceconsecutivebatches of mortar with consistent temperatures.

d.Coverwallswithwind-resistantmaterialstopreventrapid heat loss or water from entering masonry.

References:

1.“RecommendedOneandTwoFamilyColdWeatherMasonryConstructionGuidelines”,MinnesotaCodesandFireSafetyCouncil,1993.

Tables

Table2-1MinimumConcreteTemperatures

Diagrams

MinnesotaFrostDepthMap

Mortar Cards

1)MortarCementandMasonryCement

2)PortlandCementandLime

Page 44: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

2.4

NOTES

Page 45: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

2.5

RecommendedRadon Guidelines

A part of the Recommended Practices Manual, 5th ed.

Page 46: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

NOTES

Page 47: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

3.1

INTRODUCTION

AsofJune1,2009allnewhousesbuiltinMinnesotaarerequiredtoincludefeaturesdesignedtoresistorreducetheinfiltrationofradongas.Radon,anodorless,tastelessgasthatforms from the decay of naturally occurring uranium found in rockandsoilthroughoutMinnesota,isthesecondleadingcauseoflungcancerintheU.S. Thechangetothestatebuildingcoderequiresbuilderstoinstalla“passive”radonmitigationsystemthatdoesnotincludeapoweredexhaustfan.Thesesystemsreducesoilgasentrypointsand provide a route to vent the gases to the outdoors. Formoreinformationonthehealthrisksassociatedwithradon,visitwww.health.state.mn.us/radon.FormoreinformationonMinnesotabuildingcodesrelatedtoradon,contactDonSivigny,MNDepartmentofLabor&Industry,[email protected].

1322.2100 INCORPORaTION By REFERENCE

AppendixF,RadonControlMethods,ofthe2006editionoftheInternationalResidentialCode(AppendixF)aspromulgatedbytheInternationalCodeCouncil,Inc.(ICC),FallsChurch,VA22041,isincorporatedbyreferenceandmadepartoftheMinnesotaStateBuildingCodeexceptasqualifiedbytheapplicableprovisionsinchapter1300,andasamendedinparts1322.2101to1322.2103.AppendixFisnotsubjecttofrequentchangeandacopyofAppendixF,withamendmentsforusinMinnesota,isavailableintheofficeofthecommissioneroflaborandindustry.Portionsofparts1322.2101to1322.2103reproducetextandtablesfromAppendixF,whichiscopyrightedbytheICC.Allrightsreserved.

Statutory authority: MS s 326B.02; 326B.101; 326B.106; 326B.13

History: 33 SR 1480 Posted: June 17, 2009

Page 48: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

3.2

1322.2101 SECTION aF101, SCOPE

Subpart1.General.AppendixF,SectionAF101,isamendedtoreadasfollows: Thepurposeofparts1322.2101to1322.2103istoestablishrequirementsforradon-resistantconstructioninnewresidentialconstructionbuilttotherequirementsofMinnesotaRules,chapter1305or1309.

Subp.2.Figure aF101.AppendixF,FigureAF101,isdeleted in its entirety.

Subp.3.Table aF101(1).AppendixF,TableAF101(1),is deleted in its entirety.

Statutory authority: MS s 326B.02; 326B.101; 326B.106; 326B.13

History: 33 SR 1480 Posted: June 17, 2009

Page 49: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

3.3

1322.2102 SECTION aF102, DEFINITIONS

Subpart1.General. AppendixF,SectionAF102,isamendedtoreadasfollows: aF102.1 General. The definitions in this part apply to

MinnesotaRules,parts1322.2101 to 1322.2103.

SUB-SlaB DEPRESSURIZaTION SySTEM (Passive). Asystemdesignedtoachievelowersub-slabairpressurerelativeto indoor air pressure by use of a vent pipe routed through the conditionedspaceofabuildingandconnectingthesub-slabareawithoutdoorair,therebyrelyingontheconvectiveflowofairupward in the vent to draw air from beneath the slab.

SUB-SlaB DEPRESSURIZaTION SySTEM (active). Asystemdesignedtoachievelowersub-slabairpressurerelativetoindoorairpressurebyuseofafan-poweredventdrawingairfrom beneath the slab.

DRaIN TIlE lOOP.Acontinuouslengthofdraintileorperforatedpipeextendingaroundalloftheinternalperimeterofa basement or crawl space.

RaDON GaS.Anaturallyoccurring,chemicallyinert,radioactivegasthatisnotdetectablebyhumansenses.Asagas,itcanmovereadilythroughparticlesofsoilandrockandcanaccumulate under the slabs and foundations of homes where it caneasilyenterintothelivingspacethroughconstructioncracksand openings.

SOIl-GaS RETaRDER.Acontinuousmembraneof6-mil(0.15mm)polyethylene,3-mil(0.075mm)cross-laminatedpolyethylene,orotherequivalentmaterialusedtoretardtheflowof soil gases into a building.

SUB-MEMBRaNE DEPRESSURIZaTION SySTEM. Asystemdesignedtoachievelowersub-membraneairpressurerelative to crawl space air pressure by use of a vent drawing air frombeneaththesoil-gas-retardermembrane.

Subp.2.Figure aF102.

Page 50: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

3.4

TYPICAL SUB-SLAB DEPRESSURIZATIONPASSIVE RADON SYSTEM

ATTIC

LIVING AREA

BASEMENT

SLABPOLYETHYLENESHEETING

GRAVEL

GRADEGRAVEL

PASSIVE RADON SYSTEM USINGDRAIN-TILE LOOP

FIGURE AF102RADON-RESISTANT CONSTRUCTION DETAILS FORFOUR FOUNDATION TYPES

ATTIC

LIVING AREA

BASEMENT

SLAB POLYETHYLENESHEETING

DRAIN TILE LOOP

GRADEGRAVEL

GRAVEL

Page 51: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

3.5

PASSIVE RADON SYSTEM VENTEDTHROUGH SUMP

SUB-MEMBRANE DEPRESSURIZATION SYSTEMFOR CRAWL SPACE

ATTIC

LIVING AREA

BASEMENT

SLABPOLYETHYLENESHEETING

GRAVEL

SUMP PIT

SUMPCOVER

GRADEGRAVEL

ATTIC

LIVING AREA

CRAWL SPACE

POLYETHYLENESHEETING

PERFORATEDDRAIN TILEGRADE

GRAVEL

Page 52: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

3.6

1322.2103 SECTION aF103, REqUIREMENTS

AppendixF,SectionAF103,isamendedtoreadasfollows:

aF103.1 General. The following passive construction techniquesareintendedtoresistradonentryandpreparethebuildingforpostconstructionactiveradonmitigation.(seeFigureAF102).

aF103.2 Subfloor preparation.Alayerofgas-permeablematerialshallbeplacedunderallconcreteslabsandotherfloorsystems that directly contact the ground and are within the walls of the living spaces and conditioned crawl spaces of the building, tofacilitatetheinstallationofanactivesub-slabdepressurizationsystemifneeded.Thegas-permeablelayershallconsistofoneofthefollowing:

1.Auniformlayerofcleanaggregate,aminimumof4inches(102mm)thick.Theaggregateshallconsistofmaterialthatwillpassthrougha2-inch(51mm)sieveandberetainedbya1/4-inch(6.4mm)sieve.

2.Auniformlayerofsand(nativeorfill),aminimumof4inches(102mm)thick,overlainbyalayerorstripsofgeotextiledrainagemattingdesignedtoallowthelateralflowofsoilgases.

3.Othermaterials,systems,orfloordesignswithdemonstratedcapabilitytopermitdepressurizationacrosstheentiresub-floorarea.

aF103.3 Soil-gas-retarder.Aminimumof6-mil(0.15mm)[or3-mil(0.075mm)cross-laminated]polyethyleneorequivalentflexiblesheetingmaterialshallbeplacedontopofthegas-permeablelayerpriortocastingtheslaborplacingthefloorassemblytoserveasasoil-gas-retarderbybridginganycracksthatdevelopintheslaborfloorassemblyandtopreventconcretefrom entering the void spaces in the aggregate base material. Thesheetingshallcovertheentirefloorareawithseparatesectionsofsheetinglappedatleast12inches(305mm).The sheeting shall fit closely around any pipe, wire, or other penetrationsofthematerial.Allpuncturesortearsinthematerial shall be sealed or covered with additional sheeting.

aF103.4 Entry routes.PotentialradonentryroutesshallbeclosedinaccordancewithSectionsAF103.4.1throughAF103.4.10.

aF103.4.1 Floor openings.Openingsaroundbathtubs,showers, water closets, pipes, wires, or other objects

Page 53: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

3.7

thatpenetrateconcreteslabsorotherfloorassembliesshallbefilledwithapolyurethanecaulkorequivalentsealant applied in accordance with the manufacturer’s recommendations.

aF103.4.2 Concrete joints.Allcontroljoints,isolationjoints, construction joints, and any other joints in concrete slabs or between slabs and foundation walls shallbesealedwithacaulkorsealant.Gapsand

joints shall be cleared of loose material and filled with polyurethanecaulkorotherelastomericsealantappliedin accordance with the manufacturer’s recommendations.

aF103.4.3 Condensate drains. Condensate drains shall

be trapped or routed through nonperforated pipe to daylight.

aF103.4.4 Sumps.Sumppitsopentosoilorservingastheterminationpointforsub-slaborinteriordraintileloopsshallbecoveredwithagasketedorotherwisesealedlid.Sumpsusedasthesuctionpointinasub-slabdepressurizationsystemshallhavealiddesignedtoaccommodatetheventpipe.Sumpsusedasafloordrainshallhavealidequippedwithatrappedinlet.

aF103.4.5 Foundation walls.Hollowblockmasonryfoundation walls shall be constructed with either a continuous course of solid masonry, one course of masonry grouted solid, or a solid concrete beam at or above finished ground surface to prevent passage of air fromtheinteriorofthewallintothelivingspace.Whereabrickveneerorothermasonryledgeisinstalled,thecourse immediately below that ledge shall be sealed. Joints,cracks,orotheropeningsaroundallpenetrationsofbothexteriorandinteriorsurfacesofmasonryblockorwood foundation walls below the ground surface shall

befilledwithpolyurethanecaulkorequivalentsealant.Penetrationsofconcretewallsshallbefilled.

aF103.4.6 Waterproofing/dampproofing.Theexteriorsurfacesofportionsofconcreteandmasonryblockwalls below the ground surface shall be dampproofed or waterproofedinaccordancewithSectionR406ofthiscode.

aF103.4.7 air-handling units.Air-handlingunitsincrawl spaces shall be sealed to prevent air from being drawn into the unit.

Page 54: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

3.8

Exception:Unitswithgasketedseamsorunitsthatareotherwisesealedbythemanufacturertopreventleakage.

aF103.4.8 Ducts.Ductworkpassingthroughor beneath a slab shall be of seamless material unless the

air-handlingsystemisdesignedtomaintaincontinuouspositivepressurewithinsuchducting.Jointsinsuchductworkshallbesealedtopreventairleakage.

Ductworklocatedincrawlspacesshallhaveallseamsand joints sealed by closure systems in accordance with MinnesotaRules,chapter1346.

aF103.4.9 Unconditioned crawl space floors. Openingsaroundallpenetrationsthroughfloorsaboveunconditionedcrawlspacesshallbecaulkedorotherwisefilledtopreventairleakage.

aF103.4.10 Unconditioned crawl space access.Accessdoors and other openings or penetrations between basements and adjoining unconditioned crawl spaces shallbeclosed,gasketed,orotherwisefilledtopreventairleakage.

aF103.5 Passive sub-membrane depressurization system. Inbuildingswithcrawlspacefoundations,thefollowingcomponentsofapassivesub-membranedepressurizationsystemshall be installed during construction.

aF103.5.1 ventilation.Unconditionedcrawlspacesshallbeprovidedwithventstotheexteriorofthebuilding. The minimum net area of ventilation openings shallcomplywithSectionR408.1ofthiscode.

aF103.5.2 Soil-gas-retarder. The soil in crawl spaces shall be covered with a continuous layer of minimum

6-mil(0.14mm)polyethylenesoil-gas-retarder.Thegroundcovershallbelappedaminimumof12inches(305mm)atjointsandshallextendtoallfoundationwalls enclosing the crawl space area.

aF103.5.3 vent pipe. Aplumbingteeorotherapprovedconnectionshallbeinsertedhorizontallybeneaththesheetingwithone10-footsectionofaperforatedpipeconnectedtoeachsideofthe“T”fittingandthenconnectedtoa3-or4-inchdiameter(76mmor102mm)fittingwithaverticalventpipeinstalledthroughthe sheeting. The vent pipe shall be of solid piping

Page 55: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

3.9

materialandshallbeextendedupthroughthebuildingfloors,terminatedatleast12inches(305mm)abovetheroofinalocationatleast10feet(3,048mm)away

from any window or other opening into the conditioned spacesofthebuildingthatislessthan2feet(610mm)

belowtheexhaustpoint,and10feet(3,048mm)fromany window or other opening in adjoining or adjacent buildings.

aF103.6 Passive sub-slab depressurization system. Inbuildingswithbasements,foundations,and/orconditionedcrawlspaces,orslab-on-gradebuildings,thefollowingcomponentsofapassivesub-slabdepressurizationsystemshallbe installed during construction. aF103.6.1 vent pipe.Aminimum3-inchdiameter(76

mm)ABS,PVC,orequivalentgastightpipeshallbeembeddedverticallyintothesub-slabaggregateorotherpermeablematerialbeforetheslabiscast.A“T”fittingwithone10-footsectionofaperforatedpipeconnectedtoeachsideofthe“T”fittingorequivalentmethodshallbe used to ensure that the pipe opening remains within thesub-slabpermeablematerial.Alternatively,the3-inch(76mm)pipeshallbeinserteddirectlyintoaninteriorperimeter drain tile loop or through a sealed sump cover wherethesumpisexposedtothesub-slabaggregateorconnected to it through a drainage system.

Thepipeshallbeextendedupthroughthebuildingfloors,terminateatleast12inches(305mm)abovethesurfaceoftheroofinalocationatleast10feet(3048mm)awayfromanywindoworotheropeningintotheconditionedspacesofthebuildingthatislessthan2feet(610mm)belowtheexhaustpoint,and10feet(3048mm)fromanywindoworotheropeninginadjoiningoradjacent buildings.

Exception:Ifanactivesub-slabdepressurizationsystemisinstalled, the vent pipe may be routed through unconditioned space within the building or garage, provided the vent pipe is in-sulatedtoaminimumofR-4.Radonventpipesshallterminateatleast12inchesabovetherooforshallbeconnectedtoasingleventthatterminatesatleast12inchesabovetheroof.Foractivesystems,asystemmonitoringdevicemustalsobeinstalled.Allotherrequirementsofthissectionapply.

aF103.6.2 Multiple vent pipes.Inbuildingswhereinteriorfootingsorotherbarriersseparatethesub-slab

Page 56: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

3.10

aggregateorothergas-permeablematerial,eachareashallbefittedwithanindividualventpipe.Radonventpipes shall connect to a single vent that terminates at least12inchesabovetherooforeachindividualvent

pipeshallterminateseparatelyatleast12inchesabovethe roof.

aF103.7 vent pipe drainage.Allcomponentsoftheradonventpipe system shall be installed to provide positive drainage to the groundbeneaththeslaborsoil-gas-retarder.

aF103.8 vent pipe accessibility.Radonventpipesshallprovideenough space around the pipe for future installation of a fan system. The space provided for installation of a future fan shall beaminimumof24inchesindiameter,centeredontheaxisoftheventstack,andshallextendforaminimumverticaldistanceof3feet.

Exception: The radon vent pipe need not be accessible in an at-tic space where an approved rooftop electrical supply is provided for future use.

aF103.9 vent pipe identification.Allradonventpipesshallbeidentifiedwithatleastonelabeloneachfloorandinaccessibleattics.Thelabelshallread:“RadonReductionSystem.”

aF103.10 Combination foundations.Combinationbasement/crawlspaceorslab-on-grade/crawlspacefoundationsshallhaveseparate radon vent pipes installed in each type of foundation area.Eachradonventpipeshallterminateabovetherooforshallbe connected to a single vent that terminates above the roof.

Exception:Asingleventpipeisallowedinabuildingwithacombinationfoundationaslongassoilgasescanflowfreelybetween the areas of the combination foundations and it is con-nected to an approved vent pipe.

aF103.11 Building depressurization.JointsinairductsandplenumsinunconditionedspacesshallmeettherequirementsofMinnesotaRules,chapter1346.Thermalenvelopeairinfiltrationrequirementsshallcomplywiththeenergyconservationprovi-sionsinchapter1322.FirestoppingshallmeettherequirementscontainedinSectionR602.8.

Page 57: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

3.11

aF103.12 Power source.Toprovideforfutureinstallationofanactivesub-membraneorsub-slabdepressurizationsystem,anelectricalcircuitterminatedinanapprovedboxshallbeinstalledduring construction in the attic or other anticipated location of vent pipe fans.

Statutory authority: MS s 326B.02; 326B.101; 326B.106; 326B.13

History: 33 SR 1480

Posted: June 17, 2009

Page 58: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

3.12

NOTES

Page 59: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

3.13

NOTES

Page 60: Recommended Practices for Construction of - Superior Concretesuperiorconcretemn.com/Media/Recommended Practices for Construct… · Recommended Practices for Construction of Residential

Midwest Masonry Promotion Council1711WestCountyRoadB,Suite207S

SaintPaul,MN55113(612)670-9142•(612)338-7981Fax

www.mmpc.info