De-packaging unit ` Sealed trailer Quick Mix Underground slurry store Fast opening/closing roller doors Inside the reception building Reception Building Deliveries arrive at site and are weighed at the weighbridge. Weighbridge A delivery approaches the fast opening/ closing roller doors of the reception building. Delivery vehicle drives into the reception building and the roller doors close automatically behind it. Roller doors open automatically, and biofilter extraction doubles in power to create a negative pressure inside the shed, drawing outside air into the shed. Food waste is emptied into the import bunker. Food waste is transferred into the de-packaging unit via a combination of walking floors and augers to obtain a clean feedstock. Grass/maize is either unloaded in the reception hall for immediate use, otherwise it is emptied into a clamp in the feed store. Solid crops are mixed with slurries to obtain a feedstock of the correct consistency. Slurries are unloaded directly into the sealed underground slurry tank via a filling cone. All the different feedstocks are piped into the food buffer tank. Here they are blended together to obtain the perfect nutritional composition required by the micro- organisms to breakdown the organic material and create biogas. Food waste ...to the Anaerobic Digester (AD)... Operating Procedure Building Plan