Top Banner
Dan Brown, P.E. DFI Minnesota 2010 1 5/4/2012 Recent Advances in the Selection and Use of Drilled Foundations Recent Advances in the Selection and Use of Drilled Foundations Dan Brown, P.E., Ph.D. Dan Brown and Associates Dan Brown, P.E., Ph.D. Dan Brown and Associates Overview Micropiles Continuous Flight Auger Piles Drilled Displacement Piles Drilled Shafts
23

Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

May 30, 2018

Download

Documents

vucong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

1

5/4/2012

Recent Advances

in the Selection and Use of

Drilled Foundations

Recent Advances

in the Selection and Use of

Drilled Foundations

Dan Brown, P.E., Ph.D.Dan Brown and Associates

Dan Brown, P.E., Ph.D.Dan Brown and Associates

Overview

Micropiles

Continuous Flight Auger Piles

Drilled Displacement Piles

Drilled Shafts

Page 2: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

2

5/4/2012

Micropiles

Typically <12” dia

Relies on steel for structural capacity

Installed with lightweight, versatile drilling equipment

Effective in difficult ground conditions

World Trade Center, NYC

Advancements in Micropiles

Standards for design & construction

Higher capacity piles

Improvements in drilling and more versatile drilling rigs

Innovative applications

Page 3: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

3

5/4/2012

Micropiles – Design Details

Casing near surface

Center bar(s) through bond zone

AASHTO Design Section 10.9

FHWA Micropile Manual, Dec. 2005

Micropiles – Design Details

Example Cross-sections

Page 4: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

4

5/4/2012

Micropiles in Difficult Ground Conditions

Karst

Till & Boulders

Difficult Site Access

Restricted Headroom

Drilled Shaft

Cumberland River

Micropile VE solution for difficult access piers

Drilled through

boulders

Slope Stability

Concerns

Page 5: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

5

5/4/2012

Cumberland River

Bronx Whitestone Bridge, NYC

Innovative r/c percussion drilling

techniques through boulders & till

Page 6: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

6

5/4/2012

Case History – Foothills Bridge

Foothills Bridge

Abutment 2

Abutment 1Area of Colluvium

Page 7: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

7

5/4/2012

Foothills Bridge

Cased zone

4.6 m (15 ft) uncased bond

zone

Anchor (to rock)

Residual Soil

Weathered Rock

Sound Rock

Pier

Foothills Bridge

Page 8: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

8

5/4/2012

Foothills – Trestle Foundation

Foothills – Pier Foundations

Page 9: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

9

5/4/2012

Continuous Flight Auger Piles

Continuous Flight Auger Piles

Drill rig capabilities – deeper, larger diameter

Control of the drilling process in unstable soils

Control of the casting process for quality control / quality assurance

Page 10: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

10

5/4/2012

Continuous Flight Auger Piles

Use of Automated Monitoring Systems

Drilled Displacement Piles

Page 11: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

11

5/4/2012

Drilled Displacement Piles

Reduce or eliminate spoil

Increased axial resistance

Improve ground

Eliminate risk of subsidence

Drill effort related to axial resistance

Requires heavier, more expensive drilling equipment than CFA

Slower than CFA

Limited depth of penetration

Kentucky Hospital

Drilled displacement columns for ground improvement

Liquefaction mitigation

Bearing capacity for spread footings

Page 12: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

12

5/4/2012

Drilled Displacement Piles

Bearing Tests

‐60

‐50

‐40

‐30

‐20

‐10

0

0 100 200 300 400

Displacemetn, m

m

Average Bearing Pressure, kPa

Test 1

Test 2

Test 3

Page 13: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

13

5/4/2012

Drilled Shafts

Larger, Deeper Machine Capabilities Oscillator/Rotator Machines

Reverse Circulation

Base Grouting

Verification Testing

Oscillator Equipment

Page 14: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

14

5/4/2012

Rotator Equipment

Seating Casing into Rock

Page 15: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

15

5/4/2012

Considerations

Advantages

Stability of fully cased excavation

Minimal vibrations for casing installation

Easy removal of spoil & obstructions

Avoid or minimize slurry materials

Limitations

Mobilization cost

Equipment support requirements

Potential to become stuck for deep shafts

Non-level base with hammer-grab excavation

Slip-in Can for Column Connection

Oscillator Casing

Slip-in Casing

Page 16: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

16

5/4/2012

Rotator Construction – Huey P. Long Bridge, New Orleans

Huey Long Bridge Shaft/Cap Connection

Isolation Casing

Shaft Cutoff at -11

Page 17: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

17

5/4/2012

Completed Foundation

Surface Texture

Page 18: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

18

5/4/2012

Restricted Headroom with Rotator Casing

Permanent Casing

Moses Wheeler Bridge, Connecticut

Obstructions?

VE solution to cut through existing piling

Page 19: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

19

5/4/2012

Reverse Circulation Top-Drive Drill

Drilling rock socket into schist

Reverse Circulation Drilling Wolf Creek Dam

Page 20: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

20

5/4/2012

Deeper Drilled Shafts

Case History: Wolf Creek Dam, Kentucky

Embankment wall

Secant pile wall

275 ft deep

Wolf Creek Dam Secant Piles

Page 21: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

21

5/4/2012

Base Grouting

-7

-6

-5

-4

-3

-2

-1

0

0 500 1,000 1,500 2,000 2,500 3,000 3,500O-cell load (tons)

Dis

plac

emen

t of

O-c

ell p

late

(in

ches

) -177.8

-152.4

-127.0

-101.6

-76.2

-50.8

-25.4

0.0

0 5 10 15 20 25 30O-cell load (MN)

Dis

plac

emen

t of

O-c

ell P

late

(m

m)

T3(Not Grouted)

Widespread Use of Polymer Slurry

Disposal advantages

Improved side resistance

Benefits in degradable shales

Page 22: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

22

5/4/2012

Verification Testing

Integrity Testing

Load Testing

Verification testing allows performance basis for specification Design-build

Value engineering

ATC, Mississippi River Bridge, St. Louis

O-cells

Cored rock from test shaft excavation

Page 23: Recent Advances in the Selection and Use of Drilled ...danbrownandassociates.com/wp-content/uploads/2012/05/DB-drilled...Recent Advances in the Selection and Use of ... Standards for

Dan Brown, P.E. DFI Minnesota 2010

23

5/4/2012

Summary

Substantial advances across the broad spectrum of drilled foundations: Equipment & drilling capabilities

More diversity in foundation solutions

Verification testing, alternative project delivery allows implementation of innovation