CITY OF CALGARY RECEIVED IN COUNCIL CH AMBER JUL 3 0 20'!8 ITEM ·i ,~ ~\\ f~ ~ ~O = CITY CLERK'S DEPARTME NT Hotchkiss Timeline Hopewell purchases first parcel Annexation Growth Management Initiated by City South Shepard ASP initiated by City of Calgary Infrastructure constructed for Hotchkiss ($7M)* South Shepard ASP approved Developer Funded ASP's initiated Developer funded ASP's approved Hopewell makes land use application Hotchkiss GMO removal recommended by PFC Hotchkiss GMO removal tabled by Council to Ql 2018 Hotchkiss GMO removal tabled by Council to Q2 2018 If Recommended for Approval July 30, 2018: GMO Removal Public Hearing Land Use Redesignation Stripping and Grading ($9M) Underground and surface construction ($15.4M) Show home construction start ($6M) Lift Station Construction ($7.SM) Show home opening Phase 2 Construction ($13M) Roundabout Construction ($13.SM) 2004 2007 2011 2012 2013 May 2013 December 2013 Sept.2014-Dec.2015 April 2016 June 2017 July 2017 January 2018 September 2018 October 2018 Spring 2019 Summer 2019 Fall 2019 Fall/Winter 2019 Spring 2020 2020 2019/2020 Notes: Assumed absorptions are 300 SF units per year starting in 2021 First residents of Hotchkiss in January 2021 Approx. investment shown in brackets above * lnfratructure previously constructed for Hotchkiss includes the Mahogany Lift Station, Mahogany Storm Trunk and East McKenzie Feedermain. Approximate cost allocated to Hotchkiss is $7M .
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
CITY OF CALGARY RECEIVED
IN COUNCIL CHAMBER
JUL 3 0 20'!8
ITEM ·i ,~~\\f~~~O = CITY CLERK'S DEPARTMENT
Hotchkiss Timeline
Hopewell purchases first parcel
Annexation
Growth Management Initiated by City
South Shepard ASP initiated by City of Calgary
Infrastructure constructed for Hotchkiss ($7M)*
South Shepard ASP approved
Developer Funded ASP's initiated
Developer funded ASP's approved
Hopewell makes land use application
Hotchkiss GMO removal recommended by PFC
Hotchkiss GMO removal tabled by Council to Ql 2018
Hotchkiss GMO removal tabled by Council to Q2 2018
If Recommended for Approval July 30, 2018:
GMO Removal Public Hearing
Land Use Redesignation
Stripping and Grading ($9M)
Underground and surface construction ($15.4M)
Show home construction start ($6M)
Lift Station Construction ($7.SM)
Show home opening
Phase 2 Construction ($13M)
Roundabout Construction ($13.SM)
2004
2007
2011
2012
2013
May 2013
December 2013
Sept.2014-Dec.2015
April 2016
June 2017
July 2017
January 2018
September 2018
October 2018
Spring 2019
Summer 2019
Fall 2019
Fall/Winter 2019
Spring 2020
2020
2019/2020
Notes: Assumed absorptions are 300 SF units per year starting in 2021
First residents of Hotchkiss in January 2021
Approx. investment shown in brackets above
* lnfratructure previously constructed for Hotchkiss includes the Mahogany Lift
Station, Mahogany Storm Trunk and East McKenzie Feedermain. Approximate
cost allocated to Hotchkiss is $7M.
East Regional Context Study Map2
Future Planning Cells
Legend
City Limits
Railway
LJ Transportation/ Utility Corridor
- • Study Area Boundary
[:i:J Planning Cell
0
Kilometres
As amended by Calgary City Council. Areas do not correspond with maps B, C, F, G and H in Appendix A.
This map is conceptual only No measurements of dislances or areas should be laken from Lhis map