November 2, 2010 Houston voters pass Proposition 1which requires:
- -You-Go Fund for Drainage and Streets.
Inclusion of the following funding sources:
Drainage charges initially set at levels to generate at least $125million annually
11.8 of the Cit s ro ert tax Proceeds from Metro, TxDOT, federal, other contracts or grants
Prohibition on the use of debt funding
mp ementat on y u y ,
8/3/2019 Rebuild Houston Street and Drainage
3/20
DEDICATED STREET AND DRAINAGE
3
Rebuild Houston Horizon Funding Sources
Developer ImpactFee2%
3rd Party Funds(Metro, TxDOT orFederal Grants)
19%
Pay As You Go51%Drainage Utility Fee
8/3/2019 Rebuild Houston Street and Drainage
4/20
REBUILD HOUSTON: STREET AND DRAINAGE
4
n y proper es rece v ng ra nage serv ces w
pay drainage charges
roper es exemp rom a ra nage ee w e on ythose required to be exempt by state law
o one sec or su s z ng ano er
(residential/commercial/industrial/other)
proper es w e c arge on e as s o e ramount of impervious area
8/3/2019 Rebuild Houston Street and Drainage
5/20
REBUILD HOUSTON: STREET AND DRAINAGE
5
A lot or tract to which drainage service is made available.
An area compacted or covered such that it does not readily absorb
water or does not allow water to percolate through to undisturbed
un er ying soi strata.
Notification Letter
,exact drainage charge the user shall be billed per year.
Drainage Utility Local Government Code, Ch. 552, is Texas Municipal Drainage Utility
Systems Act
8/3/2019 Rebuild Houston Street and Drainage
6/20
REBUILD HOUSTON: STREET AND DRAINAGE
6
Color Infrared Imagery
Oblique-Derived Building Footprint Polygons
Parcel Boundaries
. .
Owner Data
8/3/2019 Rebuild Houston Street and Drainage
7/20
REBUILD HOUSTON: STREET AND DRAINAGE
Exam le:
7
Residential curb and gutter street Typical lot size: 5,000 sq ft
yp ca ouse groun oor garage r veway: , sq. .(impervious cover)
Monthly fee: (1,875 x $.032)/12 = $5.00
pen tc street
Typical lot size: 5,000 sq ft
Typical house ground floor/garage/driveway: 1,875 sq. ft.(impervious cover)
Monthly fee: (1,875 x $.026)/12 = $4.06
Commercial Industrial ro erties
Fee calculated to be (hard areas sq. ft. x $.032)/12
8/3/2019 Rebuild Houston Street and Drainage
8/20
REBUILD HOUSTON: STREET AND DRAINAGE
CREDITS
DEFINITION IMPERVIOUS SURFACE8
Calculation of im ervious surface ma be ad usted b
the director based on utilization of specific storm water
management techniques on the benefitted property.
Examples of techniques for possible adjustment ofdetermination are:
Porous pavement (based on demonstrated infiltration rate
exceeding minimum standard)
mitigation standards)
Rain barrels
8/3/2019 Rebuild Houston Street and Drainage
9/20
REBUILD HOUSTON: STREET AND DRAINAGE
Eight of the ten largest Texas cities have drainage charges, with Corpus
9
r s an mar o no curren y av ng ra nage c arges
Houston
Dallas
Austin
El Paso
Lubbock
Abilene
,exempt schools. El Paso has a 10% discount for schools
None of the 8 cities exempt churches
8/3/2019 Rebuild Houston Street and Drainage
10/20
REBUILD HOUSTON: STREET AND DRAINAGE
10
School Districts,2.5%
ReligiousOr anizations 2.1%
Counties, 1.6%
Municipalities, 5.5%
Residential - SingleFamily (Curb &Gutter), 22.6%
Residential - SingleFamily (Open Ditch),
7.3%
-
Non-Residential,48.7%
Multi-Family,
9.7%
8/3/2019 Rebuild Houston Street and Drainage
11/20
REBUILD HOUSTON: STREET AND DRAINAGE
Scenarios(ExemptionsAllowablebyStateLaw)11
A B C D E F G
SingleFamilyResidential,OpenDitch 2.60 2.67 2.67 2.67 2.73 2.71 2.74 2.80
. . . . . . . .PercentIncrease
ifExemptionsAllowed 2.5% 2.8% 2.5% 4.8% 4.4% 5.5% 7.5%Counties
ExemptionsAllowablebyStateLaw SchoolDistricts
ReligiousOrganizations
ExampleMonthlyBillforSingleFamilyHouse(1,875squarefeetofImperviousSurfaceona5,000sf lot)
ExemptionScenario No A B C D E F GOpenDitch $4.06 $4.17 $4.17 $4.17 $4.27 $4.23 $4.28 $4.38
Curb&Gutter $5.00 $5.13 $5.14 $5.13 $5.25 $5.22 $5.28 $5.38
8/3/2019 Rebuild Houston Street and Drainage
12/20
REBUILD HOUSTON: STREET AND DRAINAGE
Billin
12
On existing water bill (annual charge number of billing cycles per year)
Billing on separate bill
W.A.T.E.R Fund As of July 1, 2011, this charitable fund established to assist low income residents
,
Appeals can be made online or in writing using the appropriate form
Documentation should be presented in the form of a drawing with precise
measurements and an affidavit
8/3/2019 Rebuild Houston Street and Drainage
13/20
REBUILD HOUSTON: STREET AND DRAINAGE
Committee
13
The Mayor and Council will appoint an oversightcommittee, including stakeholders with significant
exper ence n construct on, eng neer ng, nance, etc. Appointees WILL NOT be city employees
,engineers or firms participating in the street anddrainage program
Oversight
Members will advise on project priorities and process
8/3/2019 Rebuild Houston Street and Drainage
14/20
REBUILD HOUSTON: STREET AND DRAINAGE
14
Reduce the risk of flooding
Improve mobility and road safety
Address areas of greatest need first (worst first)
8/3/2019 Rebuild Houston Street and Drainage
15/20
REBUILD HOUSTON: STREET AND DRAINAGE
15
Street and Traffic
Major Thoroughfares & Collectors
Storm Drainage
Major Storm Drainage
Local Non-Residential Street
Local Residential Streets
Neighborhood/Area Storm Drainage
Local Drainage
ng e urpose ro ec s
Intersections
Pedestrian Bic cle
Access Management
Neighborhood Traffic Mgmt.
Railroad Safety and Quiet Zones
8/3/2019 Rebuild Houston Street and Drainage
16/20
REBUILD HOUSTON: STREET AND DRAINAGE
16
800
700
ReBuild Houston Total CapitalImprovement Project Fund
Capital Improvement ProjectFund with New Bonds
500
Adopted CIP
300
400
100
200
0
8/3/2019 Rebuild Houston Street and Drainage
17/20
REBUILD HOUSTON: STREET AND DRAINAGE
17
800
600
700 Captured Ad Valorm Tax Impact Fee
Drainage Utility Storm Bond Funding
500
Street Bond Funding Third Party Funding
fDollars
300Millionso
100
200
0CIP Prop 1 CIP Prop1 CIP Prop 1
Fiscal Year 2015 Fiscal Year 2032Fiscal Year 2011
8/3/2019 Rebuild Houston Street and Drainage
18/20
REBUILD HOUSTON: STREET AND DRAINAGE
CIP TRANSITION
- o -
FY12- FY16 Update
18
Maintain previous commitments for FY12 through FY15
New Candidate Projects (FY16)
ons ruc on assoc a e w ex s ng es gn comm men s
Design Starts
Next Phases of existing projects
SWEET Priorities from on-going Feasibility Assessments
Feasibility Assessments included annually for storm
and street infrastructure categories
FY13- FY17 & Beyond
8/3/2019 Rebuild Houston Street and Drainage
19/20
REBUILD HOUSTON: STREET AND DRAINAGE
19
City of Houston website www.houstontx.gov
Council District CIP Meetings (February & March)
Adopted CIP
New ReBuild Houston Website rebuildhouston.org
How do I provide input to ReBuild Houston?
Council District CIP Meetings
Rebuild Houston Website www.rebuildhouston.org
3-1-1 Service Helpline
8/3/2019 Rebuild Houston Street and Drainage
20/20
REBUILD HOUSTON: STREET AND DRAINAGE
20
www.rebuildhouston.org