    REBUILD H U T NSTREET AND

    DRAINAGE

    FLOODING & DRAINAGE COMMITTEE

  • 8/3/2019 Rebuild Houston Street and Drainage

    2/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    2

    November 2, 2010 Houston voters pass Proposition 1which requires:

    - -You-Go Fund for Drainage and Streets.

    Inclusion of the following funding sources:

    Drainage charges initially set at levels to generate at least $125million annually

    11.8 of the Cit s ro ert tax Proceeds from Metro, TxDOT, federal, other contracts or grants

    Prohibition on the use of debt funding

    mp ementat on y u y ,

  • 8/3/2019 Rebuild Houston Street and Drainage

    3/20

    DEDICATED STREET AND DRAINAGE

    3

    Rebuild Houston Horizon Funding Sources

    Developer ImpactFee2%

    3rd Party Funds(Metro, TxDOT orFederal Grants)

    19%

    Pay As You Go51%Drainage Utility Fee

  • 8/3/2019 Rebuild Houston Street and Drainage

    4/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    4

    n y proper es rece v ng ra nage serv ces w

    pay drainage charges

    roper es exemp rom a ra nage ee w e on ythose required to be exempt by state law

    o one sec or su s z ng ano er

    (residential/commercial/industrial/other)

    proper es w e c arge on e as s o e ramount of impervious area

  • 8/3/2019 Rebuild Houston Street and Drainage

    5/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    5

    A lot or tract to which drainage service is made available.

    An area compacted or covered such that it does not readily absorb

    water or does not allow water to percolate through to undisturbed

    un er ying soi strata.

    Notification Letter

    ,exact drainage charge the user shall be billed per year.

    Drainage Utility Local Government Code, Ch. 552, is Texas Municipal Drainage Utility

    Systems Act

  • 8/3/2019 Rebuild Houston Street and Drainage

    6/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    6

    Color Infrared Imagery

    Oblique-Derived Building Footprint Polygons

    Parcel Boundaries

    . .

    Owner Data

  • 8/3/2019 Rebuild Houston Street and Drainage

    7/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    Exam le:

    7

    Residential curb and gutter street Typical lot size: 5,000 sq ft

    yp ca ouse groun oor garage r veway: , sq. .(impervious cover)

    Monthly fee: (1,875 x $.032)/12 = $5.00

    pen tc street

    Typical lot size: 5,000 sq ft

    Typical house ground floor/garage/driveway: 1,875 sq. ft.(impervious cover)

    Monthly fee: (1,875 x $.026)/12 = $4.06

    Commercial Industrial ro erties

    Fee calculated to be (hard areas sq. ft. x $.032)/12

  • 8/3/2019 Rebuild Houston Street and Drainage

    8/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    CREDITS

    DEFINITION IMPERVIOUS SURFACE8

    Calculation of im ervious surface ma be ad usted b

    the director based on utilization of specific storm water

    management techniques on the benefitted property.

    Examples of techniques for possible adjustment ofdetermination are:

    Porous pavement (based on demonstrated infiltration rate

    exceeding minimum standard)

    mitigation standards)

    Rain barrels

  • 8/3/2019 Rebuild Houston Street and Drainage

    9/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    Eight of the ten largest Texas cities have drainage charges, with Corpus

    9

    r s an mar o no curren y av ng ra nage c arges

    Houston

    Dallas

    Austin

    El Paso

    Lubbock

    Abilene

    ,exempt schools. El Paso has a 10% discount for schools

    None of the 8 cities exempt churches

  • 8/3/2019 Rebuild Houston Street and Drainage

    10/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    10

    School Districts,2.5%

    ReligiousOr anizations 2.1%

    Counties, 1.6%

    Municipalities, 5.5%

    Residential - SingleFamily (Curb &Gutter), 22.6%

    Residential - SingleFamily (Open Ditch),

    7.3%

    -

    Non-Residential,48.7%

    Multi-Family,

    9.7%

  • 8/3/2019 Rebuild Houston Street and Drainage

    11/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    Scenarios(ExemptionsAllowablebyStateLaw)11

    A B C D E F G

    SingleFamilyResidential,OpenDitch 2.60 2.67 2.67 2.67 2.73 2.71 2.74 2.80

    . . . . . . . .PercentIncrease

    ifExemptionsAllowed 2.5% 2.8% 2.5% 4.8% 4.4% 5.5% 7.5%Counties

    ExemptionsAllowablebyStateLaw SchoolDistricts

    ReligiousOrganizations

    ExampleMonthlyBillforSingleFamilyHouse(1,875squarefeetofImperviousSurfaceona5,000sf lot)

    ExemptionScenario No A B C D E F GOpenDitch $4.06 $4.17 $4.17 $4.17 $4.27 $4.23 $4.28 $4.38

    Curb&Gutter $5.00 $5.13 $5.14 $5.13 $5.25 $5.22 $5.28 $5.38

  • 8/3/2019 Rebuild Houston Street and Drainage

    12/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    Billin

    12

    On existing water bill (annual charge number of billing cycles per year)

    Billing on separate bill

    W.A.T.E.R Fund As of July 1, 2011, this charitable fund established to assist low income residents

    ,

    Appeals can be made online or in writing using the appropriate form

    Documentation should be presented in the form of a drawing with precise

    measurements and an affidavit

  • 8/3/2019 Rebuild Houston Street and Drainage

    13/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    Committee

    13

    The Mayor and Council will appoint an oversightcommittee, including stakeholders with significant

    exper ence n construct on, eng neer ng, nance, etc. Appointees WILL NOT be city employees

    ,engineers or firms participating in the street anddrainage program

    Oversight

    Members will advise on project priorities and process

  • 8/3/2019 Rebuild Houston Street and Drainage

    14/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    14

    Reduce the risk of flooding

    Improve mobility and road safety

    Address areas of greatest need first (worst first)

  • 8/3/2019 Rebuild Houston Street and Drainage

    15/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    15

    Street and Traffic

    Major Thoroughfares & Collectors

    Storm Drainage

    Major Storm Drainage

    Local Non-Residential Street

    Local Residential Streets

    Neighborhood/Area Storm Drainage

    Local Drainage

    ng e urpose ro ec s

    Intersections

    Pedestrian Bic cle

    Access Management

    Neighborhood Traffic Mgmt.

    Railroad Safety and Quiet Zones

  • 8/3/2019 Rebuild Houston Street and Drainage

    16/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    16

    800

    700

    ReBuild Houston Total CapitalImprovement Project Fund

    Capital Improvement ProjectFund with New Bonds

    500

    Adopted CIP

    300

    400

    100

    200

    0

  • 8/3/2019 Rebuild Houston Street and Drainage

    17/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    17

    800

    600

    700 Captured Ad Valorm Tax Impact Fee

    Drainage Utility Storm Bond Funding

    500

    Street Bond Funding Third Party Funding

    fDollars

    300Millionso

    100

    200

    0CIP Prop 1 CIP Prop1 CIP Prop 1

    Fiscal Year 2015 Fiscal Year 2032Fiscal Year 2011

  • 8/3/2019 Rebuild Houston Street and Drainage

    18/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    CIP TRANSITION

    - o -

    FY12- FY16 Update

    18

    Maintain previous commitments for FY12 through FY15

    New Candidate Projects (FY16)

    ons ruc on assoc a e w ex s ng es gn comm men s

    Design Starts

    Next Phases of existing projects

    SWEET Priorities from on-going Feasibility Assessments

    Feasibility Assessments included annually for storm

    and street infrastructure categories

    FY13- FY17 & Beyond

  • 8/3/2019 Rebuild Houston Street and Drainage

    19/20

    REBUILD HOUSTON: STREET AND DRAINAGE

    19

    City of Houston website www.houstontx.gov

    Council District CIP Meetings (February & March)

    Adopted CIP

    New ReBuild Houston Website rebuildhouston.org

    How do I provide input to ReBuild Houston?

    Council District CIP Meetings

    Rebuild Houston Website www.rebuildhouston.org