1

on the REBO terminal in ENERGY PORT OOSTENDE MARITIME ACCESS & LOGISTIC OPERATIONS

Emmanuël Timmermans

business development manager

Page 2: Rebo general 2015-05-04

2

RENEWABLE ENERGY BASE OOSTENDE

– priority for offshore installation vessels –

- easy access by: airplane; road; railway; helicopter - no locks - loading & unloading - storage area - O&M facilities

Page 3: Rebo general 2015-05-04

3

MISSION STATEMENT

“To make the Port of Ostend the beating heart of the offshore wind business in a radius of 200 km around Ostend”

Page 4: Rebo general 2015-05-04

4

1 / LOCATION 2 / MARITIME ACCESS 3 / REBO 4/ INFRASTRUCTURE & LOGISTICS 5/ REALISATIONS 6/ O&M

Page 5: Rebo general 2015-05-04

5

Page 6: Rebo general 2015-05-04

6

1/ LOCATION Europe – Belgium – Oostende

BERLIN

MILAN

PARIS

LONDON

270 km

300 km

1000 km

850 km

BRUSSELS

OOSTENDE

900 km ESJBERG

Page 7: Rebo general 2015-05-04

7

1/ LOCATION Belgian sea ports

OOSTENDE

BRUSSELS

ANTWERP

GHENT

HASSELT BRUGES

KORTRIJK

WALLONIE

FLANDERS

ZEEBRUGGE

Page 8: Rebo general 2015-05-04

8

1/ LOCATION neighboring ports

300 NM

243 NM

80 NM

160 NM

OOSTENDE

BREMERHAVEN

HULL

PORTSMOUTH

ROTTERDAM

ESJBERG 486 NM

Page 9: Rebo general 2015-05-04

9

1/ LOCATION windfarms in the North Sea

OOSTENDE 200 km

Page 10: Rebo general 2015-05-04

10

1/ LOCATION

map of the port

- open sea - inner water - railway - highway - airway

COMPLETE INDUSTRIAL AREA IS MULTIMODAL UNLOCKED:

outer port inner port

Page 11: Rebo general 2015-05-04

11

Page 12: Rebo general 2015-05-04

12

2/ MARITIME ACCESS

geographical position

Page 13: Rebo general 2015-05-04

13

2/ MARITIME ACCESS

approach from open sea to port

alignment 143° indicated by leading lights new construction of 2 moles > access of vessels up to 200 m length > entrance = 130 m wide at -8.4 m TAW > broadens out 5 cables inside the entrance

> to a turning basin with a diameter of 300 m

1-2 3 4

Page 14: Rebo general 2015-05-04

14

2/ MARITIME ACCESS

approach from open sea to port

300 m

270 m

150m (-8,5m TAW)

Page 15: Rebo general 2015-05-04

15

2/ MARITIME ACCESS

approach from open sea to port – harbour wall heads

Page 16: Rebo general 2015-05-04

16

2/ MARITIME ACCESS

approach from open sea to port – widening eastern shore 2015

Page 17: Rebo general 2015-05-04

17

2/ MARITIME ACCESS

approach from open sea to port

Neptune

Length over all (LOA) 60 m

Width 38 m

Maximum draft 3,9 m

accomodation 60 p

Page 18: Rebo general 2015-05-04

18

2/ MARITIME ACCESS

approach from open sea to port Pacific Osprey

Length over all (LOA) 160,9 m

Width 49 m

Minimum draft 5,5 m

Maximum draft 6 m

accomodation 111 p

Page 19: Rebo general 2015-05-04

19

2/ MARITIME ACCESS

Port Control & MRCC: Maritime Rescue & Coordination Centre

Page 20: Rebo general 2015-05-04

20

2/ MARITIME ACCESS

Port Control & MRCC: Maritime Rescue & Coordination Centre

PORT CONTROL & MRCC

Page 21: Rebo general 2015-05-04

21

Page 22: Rebo general 2015-05-04

22

3/ REBO

Renewable Energy Base port of Oostende

assembly & storage area with direct access to open sea

assembly & storage area behind the locks

offices & storage

Page 23: Rebo general 2015-05-04

23

3/ REBO

shareholders & goal SHAREHOLDERS Public Private Founded 2012 GOAL 1. Invest in existing and new port infrastructures to attract offshore wind activities. 2. Exploitation of a 15 ha offshore terminal.

Page 24: Rebo general 2015-05-04

24

3/ REBO

investments REBO invested more than € 15.000.000 (2013 -2014): -> reinforcement of the sea bed along the quays (new jackup vessels)

Page 25: Rebo general 2015-05-04

25

3/ REBO

investments REBO invested more than € 15.000.000 (2013 -2014): -> reinforcement of the sea bed along the quays (new jackup vessels) -> reinforcement > 10 Ha of terminal surfaces (heavy lift capacity: 10 - 20 T/m²)

Page 26: Rebo general 2015-05-04

26

3/ REBO

investments REBO invested more than € 15.000.000 (2013 -2014): -> reinforcement of the sea bed along the quays (new jackup vessels) -> reinforcement > 10 Ha of terminal surfaces (heavy lift capacity: 10 - 20 T/m²) -> invest in real estate (project management and O&M infrastructure)

Page 27: Rebo general 2015-05-04

27

3/ REBO

Wind farms in the North Sea windfarms in the Belgian part of the North Sea

REBO terminal

Page 28: Rebo general 2015-05-04

28

3/ REBO

share holders Belgian wind farms / share holders REBO

Page 29: Rebo general 2015-05-04

29

3/ REBO

• outstanding geographical location

• excellent & immediate access to open sea

• no locks

• 127 ha available in the port of Oostende for renewable energy activities

• quays with a capacity able to handle from 4 T/m² to 20T/m²

• 15 Ha of terminal surfaces (with heavy lift capacity) and with capacity for extension

• priority to offshore wind vessels

summary

Page 30: Rebo general 2015-05-04

30

Page 31: Rebo general 2015-05-04

31

4.1/ INFRASTRUCTURE

gravel reinforced sea bed

Page 32: Rebo general 2015-05-04

32

4.1/ INFRASTRUCTURE

RORO pontoons

Page 33: Rebo general 2015-05-04

33

4.1/ INFRASTRUCTURE

Bold Tern – Fred Olsen / HEAVY LIFT QUAY

Page 34: Rebo general 2015-05-04

34

4.1/ INFRASTRUCTURE

Innovation – GeoSea

Page 35: Rebo general 2015-05-04

35

4.1/ INFRASTRUCTURE

Innovation – GeoSea

Port of Aalborg (DK) Project: Westermost Rough Offshore Windfarm (UK)

Page 36: Rebo general 2015-05-04

36

4.1/ INFRASTRUCTURE

Neptune – GeoSea

Page 37: Rebo general 2015-05-04

37

4.1/ INFRASTRUCTURE

> 127 ha dedicated areas for wind farm logistics > 15 Ha of terminal surfaces with heavy lift capacity up to 20 T/m2 > heavy load bearing quays > dedicated pontoons, mooring facilities for workboats, tugboats, crew vessels

summary

Page 38: Rebo general 2015-05-04

38

4.2 / LOGISTICS

Construction & loading of 6 Gravity Base Foundations (GBF)

site Halve Maan – unit weight: 2700 tons

Page 39: Rebo general 2015-05-04

39

4.2 / LOGISTICS

GBF – preparation for loading with Rambiz floating crane

Page 40: Rebo general 2015-05-04

40

4.2 / LOGISTICS

GBF – move on SPMT

Page 41: Rebo general 2015-05-04

41

4.2 / LOGISTICS

GBF – half submerged (weight reduction)

Page 42: Rebo general 2015-05-04

42

4.2 / LOGISTICS

storage for jacket on pontoons

Page 43: Rebo general 2015-05-04

43

prepiles – Flinder Rose unloading

4.2 / LOGISTICS

Page 44: Rebo general 2015-05-04

44

prepiles – storage on quay side

4.2 / LOGISTICS

Page 45: Rebo general 2015-05-04

45

nacelles, 4 hubs, 8 tower sections – pontoon manoeuvering

4.2 / LOGISTICS

Page 46: Rebo general 2015-05-04

46

blades arrival by road (night transport only) (63,5 m long) truck turning into harbour area

4.2 / LOGISTICS

Page 47: Rebo general 2015-05-04

47

blades arrive by ship – unloading blades

4.2 / LOGISTICS

Page 48: Rebo general 2015-05-04

48

arrival & unloading of Alstom Haliade (420 T) – arrival on pontoon square onto the quay

4.2 / LOGISTICS

Page 49: Rebo general 2015-05-04

49

arrival & unloading of Alstom Haliade (420 T) – off it comes

4.2 / LOGISTICS

Page 50: Rebo general 2015-05-04

50

arrival & unloading of Alstom Haliade (420 T) – ready positioned

4.2 / LOGISTICS

Page 51: Rebo general 2015-05-04

51

4.2 / LOGISTICS

cable Northwind –Jan De Nul

Page 52: Rebo general 2015-05-04

52

4.2 / LOGISTICS

cable Northwind –Jan De Nul

Page 53: Rebo general 2015-05-04

53

4.2 / LOGISTICS

ready for assembly

Page 54: Rebo general 2015-05-04

54

4.2 / LOGISTICS

Neptune & Goliath in the port

Page 55: Rebo general 2015-05-04

55

4.2 / LOGISTICS

Neptune for C-Power

Page 56: Rebo general 2015-05-04

56

4.2 / LOGISTICS

Thor for C-Power

Page 57: Rebo general 2015-05-04

57

4.2 / LOGISTICS

Thor for C-Power

Page 58: Rebo general 2015-05-04

58

4.2 / LOGISTICS

WIND for Belwind

Page 59: Rebo general 2015-05-04

59

4.2 / LOGISTICS

Thor & Wind

Page 60: Rebo general 2015-05-04

60

4.2 / LOGISTICS

quay

Page 61: Rebo general 2015-05-04

61

4.2 / LOGISTICS

Bold Tern

Page 62: Rebo general 2015-05-04

62

4.2 / LOGISTICS

hub with blades on Neptune

Page 63: Rebo general 2015-05-04

63

4.2 / LOGISTICS

positioning in between spuds & towers

Page 64: Rebo general 2015-05-04

64

4.2 / LOGISTICS

Haliade 150 6MW loaded on Bold Tern in floating position

Page 65: Rebo general 2015-05-04

65

4.2 / LOGISTICS

ready to go to sea

Page 66: Rebo general 2015-05-04

66

4.2 / LOGISTICS

passing harbour walls heads

Page 67: Rebo general 2015-05-04

67

4.2 / LOGISTICS

Bold Tern sailing out with haliade 150 6MW

Page 68: Rebo general 2015-05-04

68

4.2 / LOGISTICS

Deme platforms at work

Page 69: Rebo general 2015-05-04

69

4.2 / LOGISTICS

Bold Tern at work

Page 70: Rebo general 2015-05-04

70

Page 71: Rebo general 2015-05-04

71

5/ REALISATIONS

INSTALLATION ZONE

O&M ZONE

Page 72: Rebo general 2015-05-04

72

5/ REALISATIONS

C-Power - Northwind – Belwind I – Alstom

C-Power I, II, III 52 x 6,15 MW Senvion turbine total 325,2 MW

Belwind I 55 x 3 MW Vestas turbine total 165 MW

Northwind 72 x 3 MW Vestas turbine total 216 MW

Belwind I (Alstom test) 1 x 6 MW Haliade 150 turbine total 6 MW

Page 73: Rebo general 2015-05-04

73

Page 74: Rebo general 2015-05-04

74

6/ O&M

new & renovated buildings along the quay

MHI Vestas – Alstom – Parkwind - Geosea

Page 75: Rebo general 2015-05-04

75

new & renovated buildings with direct access to the quay

Falck Safety Services – Cofely – Senvion – OWA – Technum – Flidar – eCoast (sanitary facilities for up to 100 people)

6/ O&M

Page 76: Rebo general 2015-05-04

76

new & renovated buildings with direct access to the quay

Falck Safety Services: training basin & boat landing

6/ O&M

Page 77: Rebo general 2015-05-04

77

new & renovated buildings with direct access to the quay

Falck Safety Services: tower

6/ O&M

Page 78: Rebo general 2015-05-04

78

6/ O&M

heli port

Page 79: Rebo general 2015-05-04

79

6/ O&M

3 pontoons and 1 fixed crane for service vessels

Page 80: Rebo general 2015-05-04

80

6/ O&M

3 pontoons and 1 fixed crane for service vessels

Page 81: Rebo general 2015-05-04

81

6/ O&M

6000 movements (2013 - 2014)

Page 82: Rebo general 2015-05-04

82

6/ O&M

online pontoon booking system ‘Ensor’

Page 83: Rebo general 2015-05-04

83

6/ O&M

Oostende, homebase for …

Page 84: Rebo general 2015-05-04

84

SEE YOU SOON www.reboostende.be

Page 85: Rebo general 2015-05-04

85

CONTACT

Rebo

Emmanuël Timmermans Business development manager [email protected] www.reboostende.be Address : REBO nv. Slijkensesteenweg 2, 8400 Oostende, Belgium (Europe) Tel : 0032 (0) 59.34.07.51. Mob. : 0032 (0) 475.42.48.85.

Port of Oostende

Paul Gérard General manager Port of Oostende [email protected] www.portofoostende.be Address : Port of Oostende. Slijkensesteenweg 2, 8400 Oostende, Belgium (Europe) Tel : 0032(0) 59.34.07.11 [email protected]