Thursday, 08 January 2008 Our Ref:69310
Warrnambool.doc MD0143
Wes Viti Facilities Management Services Division Geelong Campus
Pigdons Road GEELONG, VIC, 3217
Dear Wes,
Re: Hazardous Materials Audit - Warrnambool Campus, Sherwood
Park, Princess Highway, Warrnambool, VIC
Please find enclosed our Hazardous Materials Audit report,
reference 69310, conducted at Warrnambool Campus, Sherwood Park,
Princess Highway, Warrnambool, VIC. This work was conducted for
Deakin University on Monday, 17 November 2008 through to Friday, 28
November 2008 by Vaughan Buckingham. This report complies with Part
4.3, Division 5 of the current Victorian Occupational Health and
Safety Regulations - 2007. If any further information is required
or if you have any queries regarding this information please do not
hesitate to contact this office on (03) 9890 8811. Yours sincerely,
NOEL ARNOLD & ASSOCIATES PTY LTD
VAUGHAN BUCKINGHAM Property Risk Consultant
-
Noel Arnold & Associates Pty Ltd Level 3 / 818 Whitehorse
Road Box Hill Victoria 3128 Australia
Ph: (03) 9890 8811 Fax: (03) 9890 8911
www.noel-arnold.com.au
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc;Vaughan
Buckingham
Asbestos & Hazardous Materials Risk Assessment Deakin
University
Warrnambool Campus, Sherwood Park, Princess Highway,
Warrnambool, VIC
Our Ref [MD0143:69310]
January 2009
-
January 2009
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: I
Asbestos & Hazardous Materials Risk Assessment
Warrnambool Campus, Sherwood Park, Princess Highway,
Warrnambool, VIC Executive Summary This report documents the
findings of the Asbestos & Hazardous Materials risk assessment
conducted at Warrnambool Campus, Sherwood Park, Princess Highway,
Warrnambool, VIC. The risk assessment was performed by Vaughan
Buckingham on Monday, 17 November 2008, through to Friday, 28th
November 2008. This report was prepared in accordance with the
National Code of Practice for the Management and Control of
Asbestos in Workplaces [NOHSC:2018 (2005)] and the Victorian
Occupational Health and Safety Regulations (2007). The objective of
an Asbestos & Hazardous Materials Risk Assessment is to: •
Identify, so far as is practical, whether asbestos and hazardous
materials are present in
the workplace. • Assess the risks posed by the asbestos and
hazardous materials identified. • Recommend control actions
necessary to manage asbestos and hazardous material
related risks. The identification of asbestos materials was
restricted to accessible and representative areas., of each campus
building This executive summary is not to be used without reference
to the body of the report. The limitations of this risk assessment
are detailed in the body of the report. The major findings and key
recommendations of this risk assessment are:
Hazard Specific Location
Feature Material Priority Recommendations / Comments
Building: R; LEVEL 1; Room: R1.01, R1.02, External Asbestos
Throughout Ceiling/Roof
Covering Corrugated
cement sheet P1 The corrugated cement
sheet panels should be encapsulated with any visible holes
repaired by a licensed asbestos removal contractor as a matter of
priority in the short term. In the long term, the corrugated cement
sheet panels should be removed by a licensed asbestos removal
contractor. Until the short term remedial measures have been
completed, this room should have restricted access and all impact
activities should be avoided.
-
January 2009
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: II
Other hazardous materials were identified throughout the
premises. These materials are in a stable condition and should be
managed in accordance with the recommendations stipulated in
Appendix A: Hazardous Materials Register. Details of findings and
other recommendations relating to the management of the identified
asbestos materials are contained in the body of this report. Our
professional judgement and experience was used in the
identification and location of hazardous materials in accessible
and representative areas. Should any personnel come across any
suspected hazardous material or materials unknown to them, further
investigation and assessments will need to be conducted and
appropriate access to these areas controlled.
-
January 2009
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: III
Asbestos & Hazardous Materials Risk Assessment Warrnambool
Campus, Sherwood Park, Princess Highway, Warrnambool, VIC
Table of Contents 1.
Introduction...........................................................................................................
4 2. Scope of Work
......................................................................................................
4 3. Limits of Risk Assessment
.....................................................................................
6 4. Methodology
........................................................................................................
7
4.1 Site
Inspection.................................................................................................
8 4.2 Other Hazardous Materials
............................................................................
8
4.2.1 Synthetic Mineral Fibre
............................................................................
8 4.2.2 Polychlorinated Biphenyls
(PCBs)........................................................... 8
4.2.3 Lead Containing
Paintwork.....................................................................
8 4.2.4 Ozone Depleting
Substances..................................................................
8
4.3 Risk Assessment
Factors.................................................................................
8 4.3.1
Asbestos....................................................................................................
8 4.3.2 Hazardous Building
Materials..................................................................
9
5. Findings
.................................................................................................................
9 5.1 Discussions with Relevant
Personnel.............................................................
9 5.2 Review of Available
Documentation............................................................
9 5.3 Visual Inspection and Sampling
Program.................................................... 9 5.4
Summary of Findings
....................................................................................
10
6.
Recommendations.............................................................................................
10 6.1 Short to Medium term Recommendations
................................................. 10 6.2 Management
Recommendations...............................................................
10
Appendix A: Asbestos & Hazardous Materials Register
........................................i Appendix B:
Photographs..................................................................................
ccvi Appendix C: Asbestos Identification Analysis (Bulk Sample)
Results .......... ccxiii Appendix D: Risk Assessment Factors &
Risk Priority Assessment ................ ccxiv Appendix E:
Hazardous Building Materials Information
.............................. ccxviii Appendix F: National Code of
Practice & OHS Legislative Requirements ccxxiii Appendix G:
Limitations
...............................................................................
ccxxviii Appendix H: Glossary of Terms & Reference Documents
............................ccxxx Appendix I: Site
Drawings.............................................................................
ccxxxiii
-
January 2009
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: 4
1. Introduction This report documents the findings of the
Asbestos & Hazardous Materials Risk Assessment conducted at
Warrnambool Campus, Sherwood Park, Princess Highway, Warrnambool,
VIC. The risk assessment was performed by Vaughan Buckingham on
Monday, 17 November 2008. This report was prepared in accordance
with the National Code of Practice for the Management and Control
of Asbestos in Workplaces [NOHSC:2018 (2005)], other relevant Codes
pertaining to hazardous materials and the Victorian Occupational
Health and Safety Regulations (2007) as detailed within Appendix F.
At the time of preparation of this assessment, there was no
reported planned redevelopment; refurbishment or demolition of the
site and no drawings or schedule of works was received indicating
any work. Prior to future works, this risk assessment must be
reviewed, incorporating a more detailed and intrusive audit of
areas affected by the planned works, including any currently
inaccessible areas where materials are likely to be disturbed by
the works.
2. Scope of Work The scope of this Asbestos & Hazardous
Materials Risk Assessment was to: • Inspect representative and
accessible areas of the site to identify asbestos and hazardous
materials. • Review previous asbestos documentation provided to
identify evidence and records of
any asbestos removal and audit undertaken at the site. • Compile
an up-dated asbestos and hazardous materials register for the site.
• Make comments for ongoing management of the asbestos and
hazardous materials. The physical scope of the audit, based on
supplied information includes the following buildings:
Building Age (circa)
Levels Approximate Area
Construction Type
Roof Type
A 0 2 1410m 2 Concrete Metal B 0 3 3916m 2 Concrete Metal C 0 2
2826m 2 Brick Metal Countryside Residence 1980 1 280m 2 Brick Tiles
D 0 2 1454m 2 Brick Metal E 0 1 1647m 2 Brick Metal E2 0 1 143m 2
Metal Metal E3 0 1 208m 2 Concrete
Block Metal
E4 0 1 141m 2 Concrete Block
Metal
F 0 3 1339m 2 Brick Metal G 0 2 526m 2 Brick Metal H 0 1 794m 2
Concrete
Block Metal
H2 0 1 233m 2 Metal Metal H4 0 1 334m 2 Metal Metal I 0 1 243m 2
Concrete
Block Metal
-
January 2009
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: 5
if 0 1 34m 2 Concrete Block
Metal
J 0 3 3319m 2 Concrete Block
Metal
K 0 1 1058m 2 Concrete Block
Metal
Q 0 1 1172m 2 Metal Metal R 0 3 850m 2 Concrete
Block Fibre Cement
Riverview Residence 1970 1 280m 2 Brick Tiles S 0 1 162m 2
Concrete
Block Metal
T 0 1 359m 2 Concrete Block
Metal
U1 0 1 162m 2 Brick Tiles U2 0 1 194m 2 Brick Tiles U3 0 1 194m
2 Brick Tiles U4 0 1 156m 2 Brick Tiles U5 0 1 192m 2 Brick Tiles
U6 0 1 156m 2 Brick Tiles U7 0 1 195m 2 Brick Tiles V1 0 1 111m 2
Concrete
Block Metal
V2 0 1 152m 2 Concrete Block
Metal
V3 0 1 111m 2 Concrete Block
Metal
V4 0 1 159m 2 Concrete Block
Metal
V5 0 1 159m 2 Concrete Block
Metal
V6 0 1 159m 2 Concrete Block
Metal
W2 0 2 500m 2 Concrete Block
Metal
W3 0 2 526m 2 Concrete Block
Metal
W4 0 2 526m 2 Concrete Block
Fibre Cement
X1 0 1 432m 2 Concrete Block
Metal
X2 0 1 329m 2 Concrete Block
Metal
X3 0 1 421m 2 Concrete Block
Metal
-
January 2009
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: 6
YA 0 1 211m 2 Concrete Block
Metal
YB 0 1 248m 2 Concrete Block
Metal
YC 0 1 243m 2 Concrete Block
Metal
YD 0 1 211m 2 Concrete Block
Metal
Z1 0 2 333m 2 Concrete & Brick
Metal
Z2 0 2 333m 2 Concrete & Brick
Metal
3. Limits of Risk Assessment This report must not be used for
the purposes of asbestos abatement works unless accompanied by a
site specific asbestos abatement scope of works and supporting safe
work procedures. This report cites areas of the site where more
intrusive checks must be conducted prior to commencement of any
such works. It is noted that given the constraints of practicable
access encountered during the risk assessment survey, the following
specific site areas were not accessed or inspected: Building Level
Room Reason for No Access /
Comments A LEVEL 2 A2.52.01 No keys available A LEVEL 3 A3.50.01
No keys available A LEVEL 3 A3.55.01 No keys available A LEVEL 3
Plant Room 3 No safe footing B LEVEL 1 B1.12 No keys available B
LEVEL 1 B1.12.02 No keys available B LEVEL 1 B1.21.02 No keys
available B LEVEL 2 B2.37 No keys available B LEVEL 2 B2.43.06 No
keys available C LEVEL 2 C2.13 No keys available D LEVEL 2 D2.32.01
No keys available D LEVEL 2 D2.32.02 No keys available E3 LEVEL 1
E3.02 No keys available E4 LEVEL 1 E4.1.01 Occupied F LEVEL 1 F1.01
Occupied F LEVEL 1 F1.01.01 Occupied F LEVEL 1 F1.02 Occupied F
LEVEL 3 F3.06 No keys available F LEVEL 3 F3.06.01 No keys
available H LEVEL 1 - CAFE H1.10 No keys available R LEVEL 1 R1.04
No keys available
-
January 2009
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: 7
R LEVEL 1 R1.05 No keys available R LEVEL 1 R1.08 No keys
available R LEVEL 2 R2.19.01 No safe footing R LEVEL 2 R2.19.02 No
safe footing Riverview Residence
Level 1 Bungalow - internal No keys available
Countryside Residence
Level 1 Garage Occupied
Other areas not accessed or inspected are described in Appendix
A and Appendix G. These areas should be assumed to contain asbestos
until such a time that they can be assessed for the presence of
asbestos containing or other hazardous materials.
4. Methodology The scope of the asbestos identification survey
involved a visual inspection of accessible and representative
construction materials and the collection and analysis of materials
suspected of containing asbestos. This survey was undertaken in
accordance with the requirements outlined in the Compensation
Council (ASCC) Code of Practice for the Management and Control of
Asbestos in Workplaces [NOHSC: 2018 (2005)] and the Victorian
Occupational Health and Safety Regulations (2007). The survey
involved: • Discussions with relevant personnel to ascertain the
building age and history. • Review of relevant documentation
including previous audit reports and abatement
records. • A visual inspection of the condition of accessible
and representative asbestos materials.
The buildings were occupied at the time of assessment and the
survey was conducted during normal business hours.
• The collection and analysis of materials suspected of
containing asbestos. Small representative samples were collected in
plastic bags with clip-lock seals. These samples were analysed in
Noel Arnold & Associates' NATA-accredited laboratory for the
presence of asbestos by Polarised Light Microscopy.
A strategy of using representative samples of suspected
hazardous containing materials has been used to minimise the number
of samples and degree of disturbance. Because of this strategy,
findings of the audit should be interpreted such that all visually
similar materials in the same vicinity must be assumed to be
composed of the same material until proven otherwise. Inaccessible
areas that are likely to contain asbestos have been assumed to
contain asbestos until further inspection and analysis of samples
has been undertaken by an approved analyst. Where it was determined
that asbestos was present, the risk assessment was based on the
following factors: • Type of asbestos-containing material (ACM); •
Degree of friability of ACM; • Surface treatment of ACM; • Physical
condition of ACM; • Location and accessibility of ACM; & •
Building use and occupancy, activity, and disturbance potential of
ACM. The ranking of the exposure risk posed by the
asbestos-containing materials evaluates (i) the potential for fibre
generation, and, (ii) the potential for exposure to person(s).
Where these factors have indicated that there is a possibility of
exposure to airborne fibres, appropriate risk
-
January 2009
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: 8
control measures are recommended. A priority assessment system
(as defined in Appendix D) is adopted to assist with identifying
priorities for control of asbestos and hazardous material risk
items based upon exposure risk and for the purposes of programming
and budgeting control actions and any abatement works.
4.1 Site Inspection An inspection of the campus buildings was
conducted to locate, identify and record the typical locations and
applications in which asbestos materials have been used. The scope
of the survey was limited to a visual examination of the accessible
structural elements of the campus buildings, the construction and
finishing materials and the fixed equipment (associated with the
building services), and the collection and analysis of building
materials suspected to contain asbestos. Materials not associated
with the building fabric and operational services (e.g. non-fixed
manufacturing equipment, stored materials, etc.) were not included
in the survey.
The survey also included an overview of other hazardous
materials such as lead paint, synthetic mineral fibre,
polychlorinated biphenyls and ozone depleting substances as
detailed in Section 4.2.
4.2 Other Hazardous Materials 4.2.1 Synthetic Mineral Fibre
Accessible areas where Synthetic Mineral Fibre (SMF) insulation was
visually confirmed as being present were noted to give a general
indication to the presence of SMF materials throughout the
buildings.
4.2.2 Polychlorinated Biphenyls (PCBs) Representative light
fittings containing capacitors were inspected and details noted for
cross-referencing with the ANZECC Identification of PCB containing
capacitors - 1997. Where metal capacitors were not listed on the
database, these capacitors are noted as suspected to contain
polychlorinated biphenyls.
4.2.3 Lead Containing Paintwork Lead containing paintwork was
assessed using an on-site lead swab test. Lead swabs give an
instantaneous qualitative result and can detect lead down to 1-2
micrograms. Lead paint was tested on nominated surfaces to give a
general indication of the presence of lead containing
paintwork.
4.2.4 Ozone Depleting Substances Representative items of air
conditioning and chiller plant suspected of containing ozone
depleting gases were noted and cross referenced with known ozone
depleting gases published by the United Nations Environment
Program.
4.3 Risk Assessment Factors 4.3.1 Asbestos The qualitative risk
assessment and recommended hazard control strategies for the
asbestos materials were prepared within the guidelines documented
in the Code of Practice for the Management and Control of Asbestos
in Workplaces [NOHSC: 2018 (2005)].
The presence of asbestos-containing materials does not
necessarily constitute a health risk. However, if the
asbestos-containing material is sufficiently disturbed to cause the
release of airborne respirable fibres, then a health risk may be
posed to exposed individuals.
-
January 2009
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: 9
To assess the health risk posed by the presence of
asbestos-containing material, all relevant factors must be
considered. These factors include:
• Evidence of physical/water damage; • Proximity of air plenums
and direct air stream; • Friability of asbestos material; •
Likelihood of disturbance of the asbestos material; •
Accessibility; • Exposed surface areas; & • Environmental
conditions These aspects are in turn judged upon; (i) potential for
fibre generation, and, (ii) the potential for exposure. Where these
factors have indicated that there is a possibility of exposure to
airborne fibres, appropriate recommendations for repair,
maintenance or abatement of the asbestos-containing materials are
made.
4.3.2 Hazardous Building Materials The risk assessment factors
utilised in this report relate to the potential of exposure of the
construction workers during refurbishment or demolition works
(excluding programmed hazardous material removal works). This
assessment is based on the following factors:
• Innate health risk potential of the material; • Condition of
the material; • Volatility; • Location of the material; • Potential
of disturbance. Where these factors have indicated that there is a
possibility of exposure to a hazard, appropriate recommendations
for the removal or management of the material in question are
made.
5. Findings The findings of this identification and risk
assessment are presented in Appendix A: Asbestos & Hazardous
Materials Register. The following sections describe the previous
records and documents provided on request and verbal information
provided by nominated site contacts:
5.1 Discussions with Relevant Personnel Discussions were held
with the following people who provided relevant information on the
likelihood of there being asbestos containing materials on site:
Date Name - Title Company Information Provided 17th – 28th
November, 2008
Leigh Henry – Facilities Manager
Deakin University
Age of building Date and extent of refurbishment Knowledge of
presence of hazardous materials Knowledge of abatement activity
5.2 Review of Available Documentation On request, a hazardous
materials database was provided by Wesley Viti of Deakin University
that detailed asbestos containing materials throughout all
campuses. 5.3 Visual Inspection and Sampling Program Sixty-Five
(65) samples of suspected asbestos containing materials were
collected during the assessment; of which detailed findings of the
risk assessment are contained in Appendix A - Asbestos Materials
Register.
-
January 2009
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: 10
5.4 Summary of Findings The major findings of this risk
assessment are:
Hazard Specific Location Feature Material Priority Building: R;
LEVEL 1; Room: R1.01, R1.02, External
Asbestos Throughout Ceiling/Roof Covering
Corrugated cement sheet
P1
Other Priority 3 and 4 hazardous materials were identified
throughout the premises. These materials are in a stable condition
and should be managed in accordance with the recommendations
stipulated in Appendix A: Hazardous Materials Register. 6.
Recommendations Based on the findings of this risk assessment the
following recommendations are made:
6.1 Short to Medium term Recommendations The corrugated cement
sheet panels should be encapsulated with any visible holes repaired
by a licensed asbestos removal contractor as a matter of priority
in the short term. In the long term, the corrugated cement sheet
panels should be removed by a licensed asbestos removal contractor.
Until the short term remedial measures have been completed, this
room should have restricted access and all impact activities should
be avoided. 6.2 Management Recommendations • A number of priority 3
and 4 asbestos containing materials are present within the
buildings
of the campus these materials include: Asbestos Cement Sheet
infill panels, walls and ceiling Asbestos containing vinyl floor
tiles Millboard backed sheet vinyl Mastic expansion joints to
structural walls Assumed positive asbestos millboard lining to
switchboards.
In their current condition these materials present no immediate
exposure risk. They should be maintained in a good condition,
labelled where suitable and reinspected as stipulated.
• A Hazardous Materials Management Plan (HMP) should be
established to manage the risks associated with remaining in-situ
hazardous materials located at the site. The purpose of a HMP is to
have control over identified asbestos and hazardous materials on
site in order to minimise the risk of disturbance and to protect
maintenance personnel and staff from exposure to asbestos fibres
and dusts. The AMP should stipulate the following key actions:
-
1. Ensure all asbestos-containing materials are labelled
appropriately (where suitable) to warn of the dangers of disturbing
the surfaces of these materials. 2. Schedule periodic re-assessment
of the asbestos materials remaining on-site to monitor their
aging/deterioration. 3. Inform all staff, Health & Safety
representatives, maintenance personnel about the exact locations of
asbestos and other hazardous materials prior to any works being
carried out. 4. Adopt suitable controls for any key maintenance
activities needed to be carried out on or in the location of
asbestos and other hazardous materials. • Areas highlighted in
Appendix A, as areas of 'no access' should be presumed to
contain
asbestos. Appropriate management planning should be implemented
in order to control access and maintenance activities to these
areas, until such a time as they can be accessed and the presence
or absence of asbestos containing materials can be confirmed.
-
January 2009
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: 11
• Future works will require a new Division 6 Asbestos and
Hazardous Materials audit specific
to any other scope or work or area prior to demolition,
refurbishment, alteration or modification works.
• Should any personnel come across any suspected asbestos or
other hazardous material or materials unknown to them, work should
cease immediately in the affected areas until further sampling and
investigation is performed.
-
January 2009
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: i
Asbestos & Hazardous Materials Risk Assessment Deakin
University Warrnambool Campus, Sherwood Park, Princess Highway,
Warrnambool, VIC Appendix A: Asbestos & Hazardous Materials
Register
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: ii
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Building: A; LEVEL 2; Room: A2.20 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.21 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.22 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.24 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.25 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.26 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.27 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.28 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.29 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.30 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.41 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.45 Asbestos 'John
Sherwoods
Things'cupboard Shingles Paint coatings -
Serpentine rock sample
69310-25 Negative
Building: A; LEVEL 2; Room: A2.46
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: iii
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Ozone Depleting
South throughout Fridge Refrigerant gas - 3 units
Assumed Positive
P4 This item presents no immediate risk. Ozone depleting
refrigerants must be decanted and disposed of in accordance with
EPA regulations prior to the disposal of refrigeration units.
Building: A; LEVEL 2; Room: A2.47 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.48 Asbestos North bench
Oven Insulation -
Insulation to hot plate
69310-26 Negative
Ozone Depleting
Throughout Fridge Refrigerant gas - 4 units
Assumed Positive
P4 This item presents no immediate risk. Ozone depleting
refrigerants must be decanted and disposed of in accordance with
EPA regulations prior to the disposal of refrigeration units.
Asbestos West wall Oven Insulation - Watson Victor Ltd
incubator
3085
No Sample Taken
Assumed Positive
Photo 33 1 unit Good Low Non-Friable
Low November 2013
P4 Reason not Sampled: Unable to access / locked. Maintain in
current condition, label where suitable and reinspect as
stipulated. Material must be removed by licensed asbestos removal
contractor prior to demolition or refurbishment works likely to
disturb the material.
Asbestos North bench Insulation Insulation - Gloves
69310-27 Negative
Building: A; LEVEL 2; Room: A2.49
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: iv
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Asbestos Throughout Wall Construction joint mastic -
Throughout
building
69310-28 Positive Photo 35 1 m Good Low Non-Friable
Low November 2013
P4 Maintain in current condition, label where suitable and
reinspect as stipulated. Material must be removed by licensed
asbestos removal contractor prior to demolition or refurbishment
works likely to disturb the material.
Building: A; LEVEL 2; Room: A2.49.01 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.49.02 No hazardous
materials observed Building: A; LEVEL 2; Room: A2.49.03 No
hazardous materials observed Building: A; LEVEL 2; Room: A2.50 No
hazardous materials observed Building: A; LEVEL 2; Room: A2.50.01
No hazardous materials observed Building: A; LEVEL 2; Room:
A2.50.02 No hazardous materials observed Building: A; LEVEL 2;
Room: A2.51 No hazardous materials observed Building: A; LEVEL 2;
Room: A2.51.01 No hazardous materials observed Building: A; LEVEL
2; Room: A2.52 Asbestos Adjacent Room
A2.56 entrance Infill panels Flat cement
sheet - Painted Similar To 69310-22
Assumed Positive
2 m2 Good Low Non-Friable
Low November 2013
P4 Maintain in current condition, label where suitable and
reinspect as stipulated. Material must be removed by licensed
asbestos removal contractor prior to demolition or refurbishment
works likely to disturb the material.
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: v
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Building: A; LEVEL 2; Room: A2.52.01 No access Reason: No keys
available Building: A; LEVEL 2; Room: A2.52.02 No hazardous
materials observed Building: A; LEVEL 2; Room: A2.52.03
SMF Throughout Pipework insulation
Glass fibre - Unwrapped
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: A; LEVEL 2; Room: A2.52.04 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.53 Asbestos Under sink Sink
splashback Bituminous
membrane - Lining under sink
Similar To 69310-24
Assumed Negative
Building: A; LEVEL 2; Room: A2.53.01 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.54 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.55 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.56 No hazardous materials
observed Building: A; LEVEL 2; Room: A2.57
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: vi
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Ozone Depleting
Throughout Fridge Refrigerant gas - 'Kitchenmaid'
Assumed Positive
Photo 38 P4 This item presents no immediate risk. Ozone
depleting refrigerants must be decanted and disposed of in
accordance with EPA regulations prior to the disposal of
refrigeration units.
Building: A; LEVEL 2; Room: External Asbestos Throughout Wall
Construction
joint mastic - Throughout
building
Similar To 69310-28
Assumed Positive
20 m Good Low Non-Friable
Low November 2013
P4 Maintain in current condition, label where suitable and
reinspect as stipulated. Material must be removed by licensed
asbestos removal contractor prior to demolition or refurbishment
works likely to disturb the material.
Building: A; LEVEL 3; Room: A3.21 No hazardous materials
observed Building: A; LEVEL 3; Room: A3.22 No hazardous materials
observed Building: A; LEVEL 3; Room: A3.23 No hazardous materials
observed Building: A; LEVEL 3; Room: A3.24 No hazardous materials
observed Building: A; LEVEL 3; Room: A3.25 No hazardous materials
observed Building: A; LEVEL 3; Room: A3.26 No hazardous materials
observed Building: A; LEVEL 3; Room: A3.27 No hazardous materials
observed Building: A; LEVEL 3; Room: A3.29 No hazardous materials
observed
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: vii
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Building: A; LEVEL 3; Room: A3.40 No hazardous materials
observed Building: A; LEVEL 3; Room: A3.41 No hazardous materials
observed Building: A; LEVEL 3; Room: A3.45 No hazardous materials
observed Building: A; LEVEL 3; Room: A3.48 No hazardous materials
observed Building: A; LEVEL 3; Room: A3.49 Asbestos Throughout
Infill panels Flat cement
sheet - Lower wall
69310-23 Positive Photo 27 1 m2 Good Low Non-Friable
Low November 2013
P4 Maintain in current condition, label where suitable and
reinspect as stipulated. Material must be removed by licensed
asbestos removal contractor prior to demolition or refurbishment
works likely to disturb the material.
Building: A; LEVEL 3; Room: A3.49.01 No hazardous materials
observed Building: A; LEVEL 3; Room: A3.49.02 No hazardous
materials observed Building: A; LEVEL 3; Room: A3.49.03 No
hazardous materials observed Building: A; LEVEL 3; Room: A3.50 No
hazardous materials observed Building: A; LEVEL 3; Room: A3.50.01
No access Reason: No keys available Building: A; LEVEL 3; Room:
A3.50.02 No hazardous materials observed Building: A; LEVEL 3;
Room: A3.51 No hazardous materials observed
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: viii
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Building: A; LEVEL 3; Room: A3.52 SMF West wall Hot water
service insulation Glass fibre -
Rheem Positive P4 This material presents no immediate risk.
Synthetic mineral fibre materials should be handled with care
using appropriate personal protective equipment and in accordance
with the ASCC National Code of Practice for the Safe Use of
Synthetic Mineral Fibres [NOHSC:2006(1990)].
Building: A; LEVEL 3; Room: A3.53 Asbestos Under sink Sink
splashback Bituminous
membrane - Lining undersink
69310-24 Negative
Building: A; LEVEL 3; Room: A3.53.01 Asbestos Throughout Infill
panels Flat cement
sheet - Panel behind cistern
Similar To 69310-23
Assumed Positive
1 m2 Good Low Non-Friable
Low November 2013
P4 Maintain in current condition, label where suitable and
reinspect as stipulated. Material must be removed by licensed
asbestos removal contractor prior to demolition or refurbishment
works likely to disturb the material.
Building: A; LEVEL 3; Room: A3.54 No hazardous materials
observed Building: A; LEVEL 3; Room: A3.55 No hazardous materials
observed Building: A; LEVEL 3; Room: A3.55.01 No access Reason: No
keys available Building: A; LEVEL 3; Room: A3.55.02 No hazardous
materials observed Building: A; LEVEL 3; Room: A3.55.03
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: ix
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
SMF Throughout Pipework insulation
Glass fibre - Unwrapped
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: A; LEVEL 3; Room: A3.55.04 No hazardous materials
observed Building: A; LEVEL 3; Room: A3.56 No hazardous materials
observed Building: A; LEVEL 3; Room: A3.57 Asbestos Throughout
Infill panels Flat cement
sheet - Access to service void -
unpainted
69310-22 Positive Photo 29 2 m2 Fair Low Non-Friable
Low November 2013
P3 Maintain in current condition, label where suitable and
reinspect as stipulated. Material must be removed by licensed
asbestos removal contractor prior to demolition or refurbishment
works likely to disturb the material.
Building: A; LEVEL 3; Room: A3.58 No hazardous materials
observed Building: A; LEVEL 3; Plant Room A
PCB Throughout Fluorescent light fitting
Capacitor - Approx. 10
fittings Assumed Positive
Photo 25 P4 This item presents no immediate risk. Capacitors
containing PCB material must be removed from light fittings and
disposed of in accordance with EPA requirements prior to disposal
or re-use of light fittings.
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: x
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
SMF Underside of metal roof
Insulation batts Glass fibre - Foil lined
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
SMF Throughout Pipework insulation
Glass fibre - Calico wrapped
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
SMF West wall Hot water service insulation
Glass fibre - Rheem
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xi
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Asbestos East wall Switchboard backing
Flat cement sheet -
Unpainted 3074 No Sample
Taken Assumed Positive
Photo 26 1 m2 Fair Low Non-Friable
Low November 2013
P3 Reason not Sampled: Electrical Hazard. Maintain in current
condition, label where suitable and reinspect as stipulated.
Material must be removed by licensed asbestos removal contractor
prior to demolition or refurbishment works likely to disturb the
material.
Asbestos East wall Switchboard Compressed tar switchboard -
Above main
isolator board
No Sample Taken
Assumed Positive
1 unit Good Low Non-Friable
Low November 2013
P4 Reason not Sampled: Electrical Hazard. Maintain in current
condition, label where suitable and reinspect as stipulated.
Material must be removed by licensed asbestos removal contractor
prior to demolition or refurbishment works likely to disturb the
material.
Asbestos East wall Switchboard Millboard - Internal lining
No Sample Taken
Assumed Positive
1 m2 Fair Low Friable Low November 2013
P3 Reason not Sampled: Electrical Hazard. Maintain in current
condition, label where suitable and reinspect as stipulated.
Material must be removed by licensed asbestos removal contractor
prior to demolition or refurbishment works likely to disturb the
material.
Asbestos Throughout Duct Gasket material - Flange joints
3075 No Sample
Taken Assumed Positive
Photo 28 10 units
Good Low Non-Friable
Low November 2013
P4 Reason not Sampled: Unable to access / locked. Maintain in
current condition, label where suitable and reinspect as
stipulated. Material must be removed by licensed asbestos removal
contractor prior to demolition or refurbishment works likely to
disturb the material.
Building: A; LEVEL 3; Plant Room 3
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xii
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
No access Reason: No safe footing Building: B; LEVEL 1; Room:
B1.05 No hazardous materials observed Building: B; LEVEL 1; Room:
B1.05.01 No hazardous materials observed Building: B; LEVEL 1;
Room: B1.05.02 No hazardous materials observed Building: B; LEVEL
1; Room: B1.05.03 No hazardous materials observed Building: B;
LEVEL 1; Room: B1.05.04 No hazardous materials observed Building:
B; LEVEL 1; Room: B1.05.05 No hazardous materials observed
Building: B; LEVEL 1; Room: B1.05.06 No hazardous materials
observed Building: B; LEVEL 1; Room: B1.06 No hazardous materials
observed Building: B; LEVEL 1; Room: B1.06.01 No hazardous
materials observed Building: B; LEVEL 1; Room: B1.06.02 No
hazardous materials observed Building: B; LEVEL 1; Room: B1.08 No
hazardous materials observed Building: B; LEVEL 1; Room: B1.09 No
hazardous materials observed Building: B; LEVEL 1; Room: B1.09.01
No hazardous materials observed Building: B; LEVEL 1; Room:
B1.10
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xiii
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
No hazardous materials observed Building: B; LEVEL 1; Room:
B1.11 No hazardous materials observed Building: B; LEVEL 1; Room:
B1.12 No access Reason: No keys available Building: B; LEVEL 1;
Room: B1.12.01 No hazardous materials observed Building: B; LEVEL
1; Room: B1.12.02 No access Reason: No keys available Building: B;
LEVEL 1; Room: B1.14 No hazardous materials observed Building: B;
LEVEL 1; Room: B1.15 No hazardous materials observed Building: B;
LEVEL 1; Room: B1.16 No hazardous materials observed Building: B;
LEVEL 1; Room: B1.17 No hazardous materials observed Building: B;
LEVEL 1; Room: B1.20
Lead Throughout Wall Undercoat - Pipework - white
3088 Positive Photo 36 P4 This item presents no immediate
risk.
Lead containing paintwork in good condition which is not a
friction or impact surface, is not likely to present a health
hazard unless disturbed by sanding or chemical or water damage.
Areas with minor damage should be over-painted with lead free paint
as part of ongoing maintenance works.
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xiv
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Asbestos Throughout Pipe Gasket material - 3089 - no
access to flange joints
No Sample Taken
Assumed Positive
Photo 37 1 unit Good Low Non-Friable
Low November 2013
P4 Reason not Sampled: Unable to access / locked. Maintain in
current condition, label where suitable and reinspect as
stipulated. Material must be removed by licensed asbestos removal
contractor prior to demolition or refurbishment works likely to
disturb the material.
SMF Throughout Pipework insulation
Glass fibre - Calico wrapped
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
SMF Throughout Boiler insulation Glass fibre - Hoval boiler
units
X 2 Positive P4 This material presents no immediate risk.
Synthetic mineral fibre materials should be handled with care
using appropriate personal protective equipment and in accordance
with the ASCC National Code of Practice for the Safe Use of
Synthetic Mineral Fibres [NOHSC:2006(1990)].
Building: B; LEVEL 1; Room: B1.21 No hazardous materials
observed Building: B; LEVEL 1; Room: B1.21.01 No hazardous
materials observed Building: B; LEVEL 1; Room: B1.21.02
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xv
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
No access Reason: No keys available Building: B; LEVEL 1; Room:
B1.21.03
SMF Throughout Pipework insulation
Glass fibre - Unwrapped
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: B; LEVEL 1; Room: B1.21.04 Asbestos Throughout Wall
Flat cement
sheet - Unpainted
Similar To 69310-22
Assumed Positive
2 m2 Good Low Non-Friable
Low November 2013
P4 Maintain in current condition, label where suitable and
reinspect as stipulated. Material must be removed by licensed
asbestos removal contractor prior to demolition or refurbishment
works likely to disturb the material.
Building: B; LEVEL 1; Room: B1.21.05 No hazardous materials
observed Building: B; LEVEL 1; Room: B1.22 No hazardous materials
observed Building: B; LEVEL 1; Room: B1.23 Asbestos Throughout
Infill panels Flat cement
sheet - Access to service void -
painted
Similar To 69310-22
Assumed Positive
2 m2 Fair Low Non-Friable
Low November 2013
P3 Maintain in current condition, label where suitable and
reinspect as stipulated. Material must be removed by licensed
asbestos removal contractor prior to demolition or refurbishment
works likely to disturb the material.
Building: B; LEVEL 1; Room: B1.23.01
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xvi
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
No hazardous materials observed Building: B; LEVEL 1; Room:
B1.25 No hazardous materials observed Building: B; LEVEL 1; Room:
B1.25.01 No hazardous materials observed Building: B; LEVEL 1;
Room: B1.26 No hazardous materials observed Building: B; LEVEL 1;
Room: B1.26.01 No hazardous materials observed Building: B; LEVEL
1; Room: B1.26.02 Asbestos Throughout Infill panels Flat cement
sheet - Unpainted
Similar To 69310-22
Assumed Positive
2 m2 Good Low Non-Friable
Low November 2013
P3 Maintain in current condition, label where suitable and
reinspect as stipulated. Material must be removed by licensed
asbestos removal contractor prior to demolition or refurbishment
works likely to disturb the material.
Building: B; LEVEL 1; Room: B1.27 Asbestos Throughout Infill
panels Flat cement
sheet - Access to service void -
unpainted
Similar To 69310-22
Assumed Positive
2 m2 Fair Low Non-Friable
Low November 2013
P3 Maintain in current condition, label where suitable and
reinspect as stipulated. Material must be removed by licensed
asbestos removal contractor prior to demolition or refurbishment
works likely to disturb the material.
Building: B; LEVEL 1; Room: B1.28 No hazardous materials
observed Building: B; LEVEL 1; Room: B1.28.01
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xvii
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
SMF Throughout Ceiling tiles Glass fibre - Mineral fibre ceiling
tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: B; LEVEL 1; Room: B1.28.02 No hazardous materials
observed Building: B; LEVEL 1; Room: B1.29 No hazardous materials
observed Building: B; LEVEL 1; Room: B1.30 No hazardous materials
observed Building: B; LEVEL 1; Room: B1.31 No hazardous materials
observed Building: B; LEVEL 1; Room: B1.32 No hazardous materials
observed Building: B; LEVEL 1; Room: B1.34
SMF Throughout Ceiling tiles Glass fibre - Mineral fibre ceiling
tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xviii
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Building: B; LEVEL 1; Room: B1.35 SMF Throughout Ceiling tiles
Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: B; LEVEL 1; Room: B1.36 SMF Throughout Ceiling tiles
Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: B; LEVEL 1; Room: B1.37 SMF Throughout Ceiling tiles
Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xix
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Building: B; LEVEL 1; Room: B1.38 SMF Throughout Ceiling tiles
Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: B; LEVEL 1; Room: B1.39 SMF Throughout Ceiling tiles
Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: B; LEVEL 1; Room: B1.41 SMF Throughout Ceiling tiles
Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xx
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Building: B; LEVEL 1; Room: B1.42 SMF Throughout Ceiling tiles
Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: B; LEVEL 1; Room: B1.43 SMF Throughout Ceiling tiles
Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: B; LEVEL 1; Room: B1.44 SMF Throughout Ceiling tiles
Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxi
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Building: B; LEVEL 1; Room: B1.44.01 SMF Throughout Ceiling
tiles Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: B; LEVEL 1; Room: B1.45 SMF Throughout Ceiling tiles
Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: B; LEVEL 1; Room: B1.46 SMF Throughout Ceiling tiles
Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxii
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Building: B; LEVEL 1; Room: B1.46.01 SMF Throughout Ceiling
tiles Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: B; LEVEL 1; Room: B1.46.03 SMF Throughout Ceiling
tiles Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: B; LEVEL 1; Room: B1.46.04 SMF Throughout Ceiling
tiles Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxiii
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Building: B; LEVEL 1; Room: General SMF Throughout Ductwork
insulation Glass fibre - Throughout building, foil
wrapped
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: B; LEVEL 2; Room: B2.33 No hazardous materials
observed Building: B; LEVEL 2; Room: B2.34 No hazardous materials
observed Building: B; LEVEL 2; Room: B2.34.01 No hazardous
materials observed Building: B; LEVEL 2; Room: B2.34.02 No
hazardous materials observed Building: B; LEVEL 2; Room: B2.35 No
hazardous materials observed Building: B; LEVEL 2; Room: B2.37 No
access Reason: No keys available Building: B; LEVEL 2; Room: B2.38
No hazardous materials observed Building: B; LEVEL 2; Room:
B2.38.01 No hazardous materials observed Building: B; LEVEL 2;
Room: B2.38.02 No hazardous materials observed Building: B; LEVEL
2; Room: B2.39
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxiv
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
No hazardous materials observed Building: B; LEVEL 2; Room:
B2.40 No hazardous materials observed Building: B; LEVEL 2; Room:
B2.41 No hazardous materials observed Building: B; LEVEL 2; Room:
B2.42 No hazardous materials observed Building: B; LEVEL 2; Room:
B2.43 No hazardous materials observed Building: B; LEVEL 2; Room:
B2.43.01 No hazardous materials observed Building: B; LEVEL 2;
Room: B2.43.02 No hazardous materials observed Building: B; LEVEL
2; Room: B2.43.03 No hazardous materials observed Building: B;
LEVEL 2; Room: B2.43.04 No hazardous materials observed Building:
B; LEVEL 2; Room: B2.43.05 Asbestos Throughout Infill panels Flat
cement
sheet - Unpainted
Similar To 69310-22
Assumed Positive
2 m2 Good Low Non-Friable
Low November 2013
P4 Maintain in current condition, label where suitable and
reinspect as stipulated. Material must be removed by licensed
asbestos removal contractor prior to demolition or refurbishment
works likely to disturb the material.
Building: B; LEVEL 2; Room: B2.43.06 No access Reason: No keys
available Building: B; LEVEL 2; Room: B2.43.07 No hazardous
materials observed Building: B; LEVEL 2; Room: B2.44
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxv
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
No hazardous materials observed Building: B; LEVEL 2; Room:
B2.45 No hazardous materials observed Building: B; LEVEL 2; Room:
B2.46 No hazardous materials observed Building: B; LEVEL 2; Room:
B2.50 No hazardous materials observed Building: B; LEVEL 2; Room:
B2.51 No hazardous materials observed Building: B; LEVEL 2; Room:
B2.51.01 No hazardous materials observed Building: B; LEVEL 2;
Room: B2.52 No hazardous materials observed Building: B; LEVEL 2;
Room: B2.53 Asbestos Throughout Infill panels Flat cement
sheet - Unpainted
Similar To 69310-22
Assumed Positive
2 m2 Good Low Non-Friable
Low November 2013
P4 Maintain in current condition, label where suitable and
reinspect as stipulated. Material must be removed by licensed
asbestos removal contractor prior to demolition or refurbishment
works likely to disturb the material.
Building: B; LEVEL 2; Room: General
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxvi
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
SMF Throughout Ductwork insulation
Glass fibre - Throughout building, foil
wrapped
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: B; LEVEL 3; Room: B3.01 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.02 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.03 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.04 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.05 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.06 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.06.01 No hazardous
materials observed Building: B; LEVEL 3; Room: B3.06.02 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.06.03
No hazardous materials observed Building: B; LEVEL 3; Room:
B3.06.04 No hazardous materials observed
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxvii
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Building: B; LEVEL 3; Room: B3.06.05 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.07 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.07.01 No hazardous
materials observed Building: B; LEVEL 3; Room: B3.07.02 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.11 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.12 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.13 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.14 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.15 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.16 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.17 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.18 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.20 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.21 No
hazardous materials observed
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxviii
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Building: B; LEVEL 3; Room: B3.22 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.23 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.25 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.26 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.27 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.28 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.29 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.29.01 No hazardous
materials observed Building: B; LEVEL 3; Room: B3.29.02 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.31 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.32 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.33 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.34 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.35 No
hazardous materials observed
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxix
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Building: B; LEVEL 3; Room: B3.36 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.37 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.40 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.41 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.44 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.45 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.46 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.47 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.48 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.49 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.49.01 No hazardous
materials observed Building: B; LEVEL 3; Room: B3.49.02 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.50 No
hazardous materials observed Building: B; LEVEL 3; Room: B3.50.01
No hazardous materials observed
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxx
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Building: B; LEVEL 3; Room: B3.50.02 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.51 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.51.01 No hazardous
materials observed Building: B; LEVEL 3; Room: B3.51.02 Asbestos
Throughout Infill panels Flat cement
sheet - Unpainted
Similar To 69310-22
Assumed Positive
2 m2 Good Low Non-Friable
Low November 2013
P4 Maintain in current condition, label where suitable and
reinspect as stipulated. Material must be removed by licensed
asbestos removal contractor prior to demolition or refurbishment
works likely to disturb the material.
Building: B; LEVEL 3; Room: B3.52 No hazardous materials
observed Building: B; LEVEL 3; Room: B3.52.01 No hazardous
materials observed Building: B; LEVEL 3; Room: B3.53 No hazardous
materials observed Building: B; LEVEL 3; Room: B3.53.01 Asbestos
Throughout Infill panels Flat cement
sheet - Unpainted
Similar To 69310-22
Assumed Positive
2 m2 Good Low Non-Friable
Low November 2013
P4 Maintain in current condition, label where suitable and
reinspect as stipulated. Material must be removed by licensed
asbestos removal contractor prior to demolition or refurbishment
works likely to disturb the material.
Building: B; LEVEL 3; Room: B3.54
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxxi
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
PCB Throughout Fluorescent light fitting
Capacitor - Approx. 10
fittings Assumed Positive
P4 This item presents no immediate risk. Capacitors containing
PCB material must be removed from light fittings and disposed of in
accordance with EPA requirements prior to disposal or re-use of
light fittings.
SMF Underside of metal roof
Insulation batts Glass fibre - Foil lined
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
SMF Throughout Pipework insulation
Glass fibre - Calico wrapped
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxxii
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
SMF West wall Hot water service insulation
Glass fibre - Rheem
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Asbestos East wall Switchboard backing
Flat cement sheet -
Unpainted 3074 No Sample
Taken Assumed Positive
1 m2 Fair Low Non-Friable
Low November 2013
P3 Reason not Sampled: Electrical Hazard. Maintain in current
condition, label where suitable and reinspect as stipulated.
Material must be removed by licensed asbestos removal contractor
prior to demolition or refurbishment works likely to disturb the
material.
Asbestos East wall Switchboard Compressed tar switchboard -
Above main
isolator board
No Sample Taken
Assumed Positive
1 unit Good Low Non-Friable
Low November 2013
P4 Reason not Sampled: Electrical Hazard. Maintain in current
condition, label where suitable and reinspect as stipulated.
Material must be removed by licensed asbestos removal contractor
prior to demolition or refurbishment works likely to disturb the
material.
Asbestos East wall Switchboard Millboard - Internal lining
No Sample Taken
Assumed Positive
1 m2 Fair Low Friable Low November 2013
P3 Reason not Sampled: Electrical Hazard. Maintain in current
condition, label where suitable and reinspect as stipulated.
Material must be removed by licensed asbestos removal contractor
prior to demolition or refurbishment works likely to disturb the
material.
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxxiii
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Asbestos Throughout Duct Gasket material - Flange joints
3075 No Sample
Taken Assumed Positive
10 units
Good Low Non-Friable
Low November 2013
P4 Reason not Sampled: Unable to access / locked. Maintain in
current condition, label where suitable and reinspect as
stipulated. Material must be removed by licensed asbestos removal
contractor prior to demolition or refurbishment works likely to
disturb the material.
Building: B; LEVEL 3; Room: B3.55 No hazardous materials
observed Building: B; LEVEL 3; Room: External Asbestos Throughout
Wall Construction
joint mastic - Throughout
building
69310-29 Negative
Building: C; LEVEL 1; Room: C1.01 Asbestos Throughout Floor
covering Rigid vinyl tiles -
Light brown Similar To 69310-38
Assumed Negative
Building: C; LEVEL 1; Room: C1.01.01 Asbestos Throughout Floor
covering Rigid vinyl tiles -
Light brown Similar To 69310-38
Assumed Negative
Building: C; LEVEL 1; Room: C1.02 Asbestos Throughout Floor
covering Rigid vinyl tiles -
Light brown Similar To 69310-38
Assumed Negative
Building: C; LEVEL 1; Room: C1.03 Asbestos Throughout Floor
covering Rigid vinyl tiles -
Light brown Similar To 69310-38
Assumed Negative
Building: C; LEVEL 1; Room: C1.04 Asbestos Throughout Floor
covering Rigid vinyl tiles -
Light brown Similar To 69310-38
Assumed Negative
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxxiv
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
SMF Throughout Pipework insulation
Glass fibre - Foil wrapped
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
SMF Throughout Hot water service insulation
Glass fibre - Vulcan unit
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: C; LEVEL 1; Room: C1.05 No hazardous materials
observed Building: C; LEVEL 1; Room: C1.06
SMF Throughout Ceiling tiles Glass fibre - Mineral fibre ceiling
tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxxv
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Building: C; LEVEL 1; Room: C1.06.01 No hazardous materials
observed Building: C; LEVEL 1; Room: C1.06.02 Asbestos Throughout
Floor covering Rigid vinyl tiles -
Light brown Similar To 69310-38
Assumed Negative
Building: C; LEVEL 1; Room: C1.07 SMF Throughout Ceiling tiles
Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: C; LEVEL 1; Room: C1.08 SMF Throughout Ceiling tiles
Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: C; LEVEL 1; Room: C1.08.01
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxxvi
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
SMF Throughout Ceiling tiles Glass fibre - Mineral fibre ceiling
tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: C; LEVEL 1; Room: C1.08.02 SMF Throughout Ceiling
tiles Glass fibre -
Mineral fibre ceiling tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: C; LEVEL 1; Room: C1.08.03 Asbestos External &
internal Ceiling Flat cement
sheet - White Similar To 69310-37
Assumed Negative
Asbestos External & internal
Wall Flat cement sheet - White
69310-37 Negative
Building: C; LEVEL 1; Room: C1.08.04 No hazardous materials
observed Building: C; LEVEL 1; Room: C1.09 No hazardous materials
observed Building: C; LEVEL 1; Room: C1.10 No hazardous materials
observed
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxxvii
Hazard Specific Location Feature Material Sample No. Item
Status
Photo No. Size of ACM
Condition Disturbance Potential
Friability Risk Level Re-inspect Date
Priority Recommendation
Building: C; LEVEL 1; Room: C1.11 No hazardous materials
observed Building: C; LEVEL 1; Room: C1.12 No hazardous materials
observed Building: C; LEVEL 1; Room: C1.13 No hazardous materials
observed Building: C; LEVEL 1; Room: C1.13.01 No hazardous
materials observed Building: C; LEVEL 1; Room: C1.13.02 No
hazardous materials observed Building: C; LEVEL 1; Room: C1.14 No
hazardous materials observed Building: C; LEVEL 1; Room: C1.15 No
hazardous materials observed Building: C; LEVEL 1; Room: C1.16
SMF Throughout Ceiling tiles Glass fibre - Mineral fibre ceiling
tiles
Positive P4 This material presents no immediate risk. Synthetic
mineral fibre materials should be handled with care using
appropriate personal protective equipment and in accordance with
the ASCC National Code of Practice for the Safe Use of Synthetic
Mineral Fibres [NOHSC:2006(1990)].
Building: C; LEVEL 1; Room: C1.16.01 Asbestos Throughout Floor
covering Rigid vinyl tiles -
Light brown Similar To 69310-38
Assumed Negative
Building: C; LEVEL 1; Room: C1.17
-
Asbestos Containing Materials (ACM) Register Site Name:
Warrnambool Campus Site Address: Sherwood Park, Princess Highway,
Warrnambool, VIC Survey Date: 17/11/2008
69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan
Buckingham Page: xxxviii
Hazard Specific Location