Molaga Capital Ltd c/o Martin Murphy, MMOS Engineers, Lane Business Park, Monahan Road, Cork 20 May 2019 Re: Design Submission for Strategic Housing Development at Rialto Student Accommodation, South Circular Road, Dublin (the “Development”) (the “Design Submission”) / 5475419949. Dear Martin, Many thanks for your recent Design Submission. We have reviewed your proposal for the connection(s) at the Development. Based on the information provided, which included the documents outlined in Appendix A to this letter, Irish Water has no objection to your proposals. This letter does not constitute an offer, in whole or in part, to provide a connection to any Irish Water infrastructure. Before you can connect to our network you must sign a connection agreement with Irish Water. This can be applied for by completing the connection application form at www.water.ie/connections. Irish Water’s current charges for water and wastewater connections are set out in the Water Charges Plan as approved by the Commission for Regulation of Utilities (CRU) (https://www.cru.ie/document_group/irish- waters-water-charges-plan-2018/). You the Customer (including any designers/contractors or other related parties appointed by you) is entirely responsible for the design and construction of all water and/or wastewater infrastructure within the Development which is necessary to facilitate connection(s) from the boundary of the Development to Irish Water’s network(s) (the “Self- Lay Works”), as reflected in your Design Submission. Acceptance of the Design Submission by Irish Water does not, in any way, render Irish Water liable for any elements of the design and/or construction of the Self-Lay Works. If you have any further questions, please contact your Irish Water Representative Name: James O’Sullivan Phone: 02252269 Email: [email protected]Yours sincerely, Maria O’Dwyer Connections and Developer Services
8
Embed
Re: Design Submission for Strategic Housing Development at ... NC... · Re: Design Submission for Strategic Housing Development at Rialto Student Accommodation, South Circular Road,
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Molaga Capital Ltd c/o Martin Murphy,
MMOS Engineers,
Lane Business Park,
Monahan Road,
Cork
20 May 2019
Re: Design Submission for Strategic Housing Development at Rialto Student
Accommodation, South Circular Road, Dublin (the “Development”) (the “Design
Submission”) / 5475419949.
Dear Martin,
Many thanks for your recent Design Submission.
We have reviewed your proposal for the connection(s) at the Development. Based on the
information provided, which included the documents outlined in Appendix A to this letter,
Irish Water has no objection to your proposals.
This letter does not constitute an offer, in whole or in part, to provide a connection to any
Irish Water infrastructure. Before you can connect to our network you must sign a
connection agreement with Irish Water. This can be applied for by completing the
connection application form at www.water.ie/connections. Irish Water’s current charges for
water and wastewater connections are set out in the Water Charges Plan as approved by
the Commission for Regulation of Utilities (CRU) (https://www.cru.ie/document_group/irish-
waters-water-charges-plan-2018/).
You the Customer (including any designers/contractors or other related parties appointed
by you) is entirely responsible for the design and construction of all water and/or
wastewater infrastructure within the Development which is necessary to facilitate
connection(s) from the boundary of the Development to Irish Water’s network(s) (the “Self-
Lay Works”), as reflected in your Design Submission. Acceptance of the Design
Submission by Irish Water does not, in any way, render Irish Water liable for any elements
of the design and/or construction of the Self-Lay Works.
If you have any further questions, please contact your Irish Water Representative
2. ALL DRAINAGE DETAILS TO BE SUBMITTED ANDAGREED WITH DUBLIN CITY COUNCIL PRIOR TOCOMMENCEMENT OF WORKS.
3. CONTRACTOR TO TRACE ALL SERVICES WITHIN SITEBOUNDARY TO ASCERTAIN OUTFALL LOCATIONS OFALL DRAIN RUNS & LOCATION OF ALL LIVE SERVICESPRIOR TO COMMENCEMENT OF SITE CLEARANCEWORKS.
4. CONTRACTOR TO AGREE ANY DIVERSIONS WHERENECESSARY WITH CONSULTANTS / LOCAL COUNCIL.
5. INVERT & COVER LEVELS ARE INDICATIVE ONLY.DRAIN RUNS & LEVELS ARE TO BE AGREED WITHDUBLIN CITY COUNCIL PRIOR TO COMMENCEMENTOF WORKS.
6. PIPES LAID IN ROADWAYS TO BE ENCASED IN150MM CONCRETE WHERE COVER TO PIPE IS LESSTHAN 1.2M. PIPES LAID IN OPEN SPACES TO BEENCASED IN 150MM CONCRETE WHERE COVER TOPIPE IS LESS THAN 0.9M.
7. FOUL SEWER PIPE MATERIALS TO BEUNPLASTICISED PVC TO ISEN 1401:2012 OR TOCOMPLY WITH CL. 313 MATERIAL TYPES ASSPECIFIED IN THE IRISH WATER COP FOR WASTEWATER INFRASTRUCTURE.
8. CONTRACTOR TO ENSURE FULL COORDINATIONWITH ALL OTHER UNDERGROUND SERVICES PRIORTO COMMENCEMENT OF WORKS.
9. ALL MANHOLE COVERS (IN PAVED / PAVEMENTAREAS) TO BE ABLE TO ACCOMODATE FINISHES TOMATCH SURROUNDING AREA.
AutoCAD SHX Text
19.85
AutoCAD SHX Text
19.95
AutoCAD SHX Text
B1A
AutoCAD SHX Text
B1B
AutoCAD SHX Text
19.77
AutoCAD SHX Text
19.95
AutoCAD SHX Text
19.95
AutoCAD SHX Text
19.95
AutoCAD SHX Text
CAFE
AutoCAD SHX Text
19.95
AutoCAD SHX Text
CAFE
AutoCAD SHX Text
L5
AutoCAD SHX Text
19.95
AutoCAD SHX Text
19.95
AutoCAD SHX Text
19.95
AutoCAD SHX Text
A.O.V.
AutoCAD SHX Text
UP
AutoCAD SHX Text
18.87
AutoCAD SHX Text
19.95
AutoCAD SHX Text
19.95
AutoCAD SHX Text
A.O.V.
AutoCAD SHX Text
A.O.V.
AutoCAD SHX Text
A.O.V.
AutoCAD SHX Text
60'
AutoCAD SHX Text
60'
AutoCAD SHX Text
18.87
AutoCAD SHX Text
20.40
AutoCAD SHX Text
G
AutoCAD SHX Text
C MURPHY MATSON O'SULLIVAN [2017]
AutoCAD SHX Text
DO NOT SCALE - IF IN DOUBT ASK
AutoCAD SHX Text
A1
AutoCAD SHX Text
A1
AutoCAD SHX Text
A1
AutoCAD SHX Text
A1
AutoCAD SHX Text
FOUL DRAINAGE LAYOUT AT
AutoCAD SHX Text
AT GROUND FLOOR LEVEL 0
AutoCAD SHX Text
RIALTO STUDENT ACCOMMODATION
AutoCAD SHX Text
SOUTH CIRCULAR ROAD DUBLIN
AutoCAD SHX Text
MOLAGA CAPITAL Ltd.
AutoCAD SHX Text
1006
AutoCAD SHX Text
1:100 A1
AutoCAD SHX Text
18079
AutoCAD SHX Text
SHIPSEY BARRY ARCHITECTS
AutoCAD SHX Text
APRIL 18
AutoCAD SHX Text
DOS
AutoCAD SHX Text
A.R.
AutoCAD SHX Text
ISSUED FOR INFORMATION
AutoCAD SHX Text
16/10/18
AutoCAD SHX Text
01
AutoCAD SHX Text
02 08/11/18 REVISED AS PER ARCHITECTS REVISIONS A.R. DOS A.R. DOS A.R. DOS A.R. DOS
AutoCAD SHX Text
03 24/01/19 REVISED AS PER ARCHITECTS REVISIONS A.R. DOS A.R. DOS A.R. DOS A.R. DOS
1. ALL TYPICAL DETAILS AND SPECIFICATIONS OF PIPELINE,MANHOLES, GULLIES AND GENERAL DRAINAGEINFRASTRUCTURE TO COMPLY WITH IRISH WATERSTANDARD DETAIL REQUIREMENTS.
2. ALL LEVELS IN METRES ABOVE ORDNANCE DATUM.
3. ALL DRAINAGE DETAILS TO BE SUBMITTED AND AGREEDWITH DUBLIN CITY COUNCIL PRIOR TO COMMENCEMENTOF WORKS.
4. CONTRACTOR TO TRACE ALL SERVICES WITHIN SITEBOUNDARY TO ASCERTAIN OUTFALL LOCATIONS OF ALLDRAIN RUNS & LOCATION OF ALL LIVE SERVICES PRIOR TOCOMMENCEMENT OF SITE CLEARANCE WORKS.
5. CONTRACTOR TO AGREE ANY DIVERSIONS WHERENECESSARY WITH CONSULTANTS / LOCAL COUNCIL.
6. INVERT & COVER LEVELS ARE INDICATIVE ONLY. DRAINRUNS & LEVELS ARE TO BE AGREED WITH DUBLIN CITYCOUNCIL PRIOR TO COMMENCEMENT OF WORKS ANDSUBJECT TO SITE SURVEY.
7. PIPES LAID IN ROADWAYS TO BE ENCASED IN 150MMCONCRETE WHERE COVER TO PIPE IS LESS THAN 1.2M.PIPES LAID IN OPEN SPACES TO BE ENCASED IN 150MMCONCRETE WHERE COVER TO PIPE IS LESS THAN 0.9M.
8. ATTENUATION SYSTEM DESIGN FOR 1 IN 100 YEAR STORMEVENT +20% FOR CLIMATE CHANGE.
9. RW OUTLETS AND AJ`S TO BE PROVIDED IN ACCORDANCEWITH DOWNPIPE LOCATIONS INDICATED ON ARCHITECTSDRAWING.
10. CONTRACTOR TO ENSURE FULL COORDINATION WITH ALLOTHER UNDERGROUND SERVICES PRIOR TOCOMMENCEMENT OF WORKS.
11. ALL MANHOLE COVERS (IN PAVED / PAVEMENT AREAS) TOBE ABLE TO ACCOMMODATE FINISHES TO MATCHSURROUNDING AREA.
12. RW OUTLETS, AJ, GULLY (AND MANHOLE) LOCATIONS ARESUBJECT TO APPROVAL PRIOR TO INSTALLATION. MINIMUM1 NO GULLY REQUIRED FOR EVERY 200M3 HARD STANDINGMIN.
1. ALL TYPICAL DETAILS AND SPECIFICATIONS OFPIPELINE, MANHOLES, GULLIES AND GENERALDRAINAGE INFRASTRUCTURE TO COMPLY WITH IRISHWATER STANDARD DETAIL REQUIREMENTS.
2. ALL LEVELS IN METRES ABOVE ORDNANCE DATUM.
3. ALL WATERMAIN DETAILS TO BE SUBMITTED ANDAGREED WITH IRISH WATER & DUBLIN CITY COUNCILPRIOR TO COMMENCEMENT OF WORKS.
4. CONTRACTOR TO TRACE ALL SERVICES WITHIN SITEBOUNDARY TO ASCERTAIN OUTFALL LOCATIONS OFALL DRAIN RUNS & LOCATION OF ALL LIVE SERVICESPRIOR TO COMMENCEMENT OF SITE CLEARANCEWORKS.
5. CONTRACTOR TO AGREE ANY DIVERSIONS WHERENECESSARY WITH CONSULTANTS / LOCAL COUNTYCOUNCIL.
6. WATERMAINS SHALL BE EITHER DUCTILE IRON (DI)OR POLYETHYLENE (PE), WITH PE80 OR PE100RATING (MDPE,HDPE OR HPPE)
7. WATER SUPPLY TO BE METERED. LOCATION OFWATER METER TO BE TO THE AGREEMENT OF IRISHWATER & DUBLIN CITY COUNCIL WATER SERVICESDIVISION. REFER TO IRISH WATER INFRASTRUCTURE STANDARDDETAILS FOR WATERMETER CHAMBER & DETAILS(STD-W-26 & 26A). REFER TO IW COP FOR WATER INFRASTRUCTURE CL.315 FOR DETAILS ON WATER METER TO BEPROVIDED.
8. UPON COMPLETION OF THE DEVELOPMENT THECONTRACTOR/DEVELOPER SHALL COMMISSION AWATER AUDIT AND LEAKAGE SURVEY OF THE WATERDISTRIBUTION SYSTEM WHICH SHALL BE SUBMITTEDTO THE PLANNING AUTHORITY FOR CONSIDERATIONWITHIN THREE MONTHS OF THE COMPLETION OFTHE DEVELOPMENT.
9. THE HYDRANT LOCATIONS CURRENTLY SHOWN AREFOR INDICATIVE PURPOSES ONLY. A MORE DETAILEDASSESSMENT WILL BE CARRIED OUT AT THE NEXTDESIGN STAGE TO DETERMINE EXACT LOCATIONS OFHYDRANTS.
AutoCAD SHX Text
19.85
AutoCAD SHX Text
19.95
AutoCAD SHX Text
B1A
AutoCAD SHX Text
B1B
AutoCAD SHX Text
19.77
AutoCAD SHX Text
19.95
AutoCAD SHX Text
19.95
AutoCAD SHX Text
19.95
AutoCAD SHX Text
CAFE
AutoCAD SHX Text
19.95
AutoCAD SHX Text
CAFE
AutoCAD SHX Text
L5
AutoCAD SHX Text
19.95
AutoCAD SHX Text
19.95
AutoCAD SHX Text
19.95
AutoCAD SHX Text
A.O.V.
AutoCAD SHX Text
UP
AutoCAD SHX Text
18.87
AutoCAD SHX Text
19.95
AutoCAD SHX Text
19.95
AutoCAD SHX Text
A.O.V.
AutoCAD SHX Text
A.O.V.
AutoCAD SHX Text
A.O.V.
AutoCAD SHX Text
60'
AutoCAD SHX Text
60'
AutoCAD SHX Text
18.87
AutoCAD SHX Text
G
AutoCAD SHX Text
20.05
AutoCAD SHX Text
20.09
AutoCAD SHX Text
19.94
AutoCAD SHX Text
19.59
AutoCAD SHX Text
19.59
AutoCAD SHX Text
23.48
AutoCAD SHX Text
TOP OF WALL
AutoCAD SHX Text
24.58
AutoCAD SHX Text
TOP OF WALL
AutoCAD SHX Text
19.95
AutoCAD SHX Text
19.82
AutoCAD SHX Text
19.76
AutoCAD SHX Text
19.99
AutoCAD SHX Text
20.14
AutoCAD SHX Text
20.23
AutoCAD SHX Text
19.65
AutoCAD SHX Text
19.65
AutoCAD SHX Text
19.59
AutoCAD SHX Text
19.85
AutoCAD SHX Text
19.84
AutoCAD SHX Text
19.93
AutoCAD SHX Text
20.13
AutoCAD SHX Text
20.17
AutoCAD SHX Text
20.19
AutoCAD SHX Text
19.43
AutoCAD SHX Text
19.58
AutoCAD SHX Text
PHONE BOX
AutoCAD SHX Text
TEC
AutoCAD SHX Text
19.59
AutoCAD SHX Text
19.37
AutoCAD SHX Text
19.35
AutoCAD SHX Text
19.50
AutoCAD SHX Text
19.52
AutoCAD SHX Text
19.48
AutoCAD SHX Text
19.46
AutoCAD SHX Text
ESB
AutoCAD SHX Text
EAVES
AutoCAD SHX Text
25.89
AutoCAD SHX Text
24.97
AutoCAD SHX Text
EAVES
AutoCAD SHX Text
25.87
AutoCAD SHX Text
EAVES
AutoCAD SHX Text
FH
AutoCAD SHX Text
19.38
AutoCAD SHX Text
19.32
AutoCAD SHX Text
19.36
AutoCAD SHX Text
19.44
AutoCAD SHX Text
19.54
AutoCAD SHX Text
19.80
AutoCAD SHX Text
19.68
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
19.44
AutoCAD SHX Text
19.46
AutoCAD SHX Text
19.45
AutoCAD SHX Text
19.44
AutoCAD SHX Text
19.44
AutoCAD SHX Text
LS
AutoCAD SHX Text
19.50
AutoCAD SHX Text
19.53
AutoCAD SHX Text
19.52
AutoCAD SHX Text
19.55
AutoCAD SHX Text
28.20
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
SC
AutoCAD SHX Text
SV
AutoCAD SHX Text
SV
AutoCAD SHX Text
TE
AutoCAD SHX Text
28.64
AutoCAD SHX Text
TOP OF CHIMNEY
AutoCAD SHX Text
28.82
AutoCAD SHX Text
TOP OF CHIMNEY
AutoCAD SHX Text
19.55
AutoCAD SHX Text
19.51
AutoCAD SHX Text
19.50
AutoCAD SHX Text
19.67
AutoCAD SHX Text
19.60
AutoCAD SHX Text
19.54
AutoCAD SHX Text
19.65
AutoCAD SHX Text
19.61
AutoCAD SHX Text
19.63
AutoCAD SHX Text
19.61
AutoCAD SHX Text
19.39
AutoCAD SHX Text
19.40
AutoCAD SHX Text
19.40
AutoCAD SHX Text
19.41
AutoCAD SHX Text
19.37
AutoCAD SHX Text
19.38
AutoCAD SHX Text
19.40
AutoCAD SHX Text
19.40
AutoCAD SHX Text
19.39
AutoCAD SHX Text
19.40
AutoCAD SHX Text
KERB
AutoCAD SHX Text
EDGE OF PAVING
AutoCAD SHX Text
CONC. PATH
AutoCAD SHX Text
KERB
AutoCAD SHX Text
EDGE OF PAVING
AutoCAD SHX Text
CONC. PATH
AutoCAD SHX Text
KERB
AutoCAD SHX Text
BLOCK WALL
AutoCAD SHX Text
BARRIER
AutoCAD SHX Text
BINS
AutoCAD SHX Text
BINS
AutoCAD SHX Text
19.72
AutoCAD SHX Text
AJ
AutoCAD SHX Text
22.52
AutoCAD SHX Text
ARCH
AutoCAD SHX Text
22.55
AutoCAD SHX Text
ARCH
AutoCAD SHX Text
19.74
AutoCAD SHX Text
19.70
AutoCAD SHX Text
19.60
AutoCAD SHX Text
19.61
AutoCAD SHX Text
23.94
AutoCAD SHX Text
EAVES
AutoCAD SHX Text
25.76
AutoCAD SHX Text
EAVES
AutoCAD SHX Text
26.00
AutoCAD SHX Text
EAVES
AutoCAD SHX Text
24.98
AutoCAD SHX Text
EAVES
AutoCAD SHX Text
FH
AutoCAD SHX Text
19.42
AutoCAD SHX Text
20.30
AutoCAD SHX Text
GV
AutoCAD SHX Text
20.53
AutoCAD SHX Text
IC
AutoCAD SHX Text
19.49
AutoCAD SHX Text
19.45
AutoCAD SHX Text
19.55
AutoCAD SHX Text
19.49
AutoCAD SHX Text
19.42
AutoCAD SHX Text
19.63
AutoCAD SHX Text
19.69
AutoCAD SHX Text
25.01
AutoCAD SHX Text
PARAPET
AutoCAD SHX Text
25.24
AutoCAD SHX Text
PARAPET
AutoCAD SHX Text
25.28
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
27.47
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
20.37
AutoCAD SHX Text
24.19
AutoCAD SHX Text
TOP OF WALL
AutoCAD SHX Text
20.21
AutoCAD SHX Text
TOP OF WALL
AutoCAD SHX Text
20.22
AutoCAD SHX Text
TOP OF WALL
AutoCAD SHX Text
20.53
AutoCAD SHX Text
19.57
AutoCAD SHX Text
19.59
AutoCAD SHX Text
19.59
AutoCAD SHX Text
19.65
AutoCAD SHX Text
19.58
AutoCAD SHX Text
19.56
AutoCAD SHX Text
19.53
AutoCAD SHX Text
19.56
AutoCAD SHX Text
19.57
AutoCAD SHX Text
STONE WALL
AutoCAD SHX Text
AREA INACCESSIBLE
AutoCAD SHX Text
STONE WALL & RAILINGS
AutoCAD SHX Text
STONE WALL & RAILINGS
AutoCAD SHX Text
C MURPHY MATSON O'SULLIVAN [2017]
AutoCAD SHX Text
DO NOT SCALE - IF IN DOUBT ASK
AutoCAD SHX Text
A1
AutoCAD SHX Text
A1
AutoCAD SHX Text
A1
AutoCAD SHX Text
A1
AutoCAD SHX Text
WATERMAIN LAYOUT AT
AutoCAD SHX Text
AT GROUND FLOOR LEVEL 0
AutoCAD SHX Text
RIALTO STUDENT ACCOMMODATION,
AutoCAD SHX Text
SOUTH CIRCULAR ROAD, DUBLIN
AutoCAD SHX Text
MOLAGA CAPITAL Ltd.
AutoCAD SHX Text
1008
AutoCAD SHX Text
1:100 A1
AutoCAD SHX Text
18079
AutoCAD SHX Text
SHIPSEY BARRY ARCHITECTS
AutoCAD SHX Text
JAN 18
AutoCAD SHX Text
DOS
AutoCAD SHX Text
A.R.
AutoCAD SHX Text
ISSUED FOR INFORMATION
AutoCAD SHX Text
24/01/19
AutoCAD SHX Text
01
AutoCAD SHX Text
02 20/03/19 RESPONSE TO IW QUERIES
AutoCAD SHX Text
A.R. DOS
AutoCAD SHX Text
03 16/04/19 REVISED TO IW/DCC COMMENTS
AutoCAD SHX Text
A.R. DOS
AutoCAD SHX Text
04 17/05/19 MINOR ALTERATIONS TO IW COMMENTS
AutoCAD SHX Text
A.R. DOS
AutoCAD SHX Text
05 17/05/19 FURTHER MINOR ALTERATIONS TO IW COMMENTS