Sheet1Dead Load Actual Design LoadsSecond And Third Floor
Structural DesignStructural DesignLoad (kpa)exterior walls (150 mm
thk CHB)2.28Assumptionceramic tile (20mm) on 25 mmmortar
bed1.1interior walls (150 mm thk CHB)2sanitary system0.2Aconstical
Fiberboard0.05CHB 4" plastered bothe face (Fullgrourt)=
2.84+2(0.24)3.32CHB 6" plastered bothe face (Fullgrourt)=
3.97+2(0.24)4.45Masonry Concrete (normal weight unit)21.2Wood stud
s (50x100), plastered two side0.96Frame and partitionWwal (6"
w/opening 1x4m)2.4deck metal, 20 gage0.12electical
system0.334.1slab thickness 140mm 0.1143X 242.7432Total wt.
=36.8432Roof Structural DesignLoad (KN-m)Utilities0.3Electrical
System0.3Masonry Concrete (normal weight unit)21.2Deck Metal, 20
gage0.12Terrazzo(38mm) directly on Slab 0.9122.83slab thickness
140mm 0.1143X 242.7432Total wt. =25.5732Live Load Actual Design
LoadStructural DesignLoad (KN-m)Live load for Restrooms2.4Live load
for Residential ( Basic Area)1.9Live load for Residential (Exterior
Balcony )2.9Roof design for Live Load1.9Load computation 2nd FLOOR
LIVE LOAD COMPUTATION
Slab
No.SLWtW(s)W(L)1142.90.96666666671.42211.52.90.96666666671.243112.90.96666666670.9743.541.92.21666666672.4851.53.51.90.951.3461.53.52.91.452.0473.27541.92.07416666672.4281.53.2751.90.951.3391.51.752.91.451.64101.43.51.90.88666666671.26113.541.92.21666666672.48121.52.52.91.451.91132.542.92.41666666673.15
2nd FLOOR DEAD LOAD COMPUTATIONwt=36.8432Slab
No.SLWtW(s)W(L)11436.843212.2818.04211.536.843212.2815.6931136.843212.2812.2843.5436.843242.9848.0251.53.536.843218.4225.9461.53.536.843218.4225.9473.275436.843240.2246.8581.53.27536.843218.4225.7091.51.7536.843218.4220.87101.43.536.843217.1924.41113.5436.843242.9848.02121.52.536.843218.4224.32132.5436.843230.7040.06
3RD FLOOR LIVE LOAD COMPUTATION
Slab
No.SLWtW(s)W(L)1142.90.96666666671.42211.52.90.96666666671.243111.90.63333333330.6343.542.93.38333333333.7851.53.51.90.951.3461.42.61.90.88666666671.2071.87541.91.18751.6581.53.52.91.452.0493.27541.92.07416666672.42101.53.2751.90.951.33111.21.561.90.760.92121.53.51.90.951.34131.753.51.91.10833333331.52141.52.51.90.951.25152.541.91.58333333332.07
3rd FLOOR DEAD LOAD COMPUTATIONwt =36.8432Slab
No.SLWtW(s)W(L)11436.843212.2818.04211.536.843212.2815.6931136.843212.2812.28`43.5436.843242.9848.0251.53.536.843218.4225.9461.875436.843223.0332.0171.53.536.843218.4225.9483.275436.843240.2246.8591.53.27536.843218.4225.70101.21.5636.843214.7417.75111.53.536.843218.4225.94121.753.536.843221.4929.55131.52.536.843218.4224.32142.5436.843230.7040.06
ROOF LIVE LOAD COMPUTATION
Slab
No.SLWtW(s)W(L)1141.90.630.93211.51.90.630.813111.90.630.6343.541.92.222.4851.53.51.90.951.3461.87541.91.191.6571.53.51.90.951.3483.27541.92.072.4291.53.2751.90.951.33101.21.561.90.760.92111.53.51.90.951.34121.753.51.91.111.52131.52.51.90.951.25142.541.91.582.07
ROOF DEAD LOAD COMPUTATIONwt =36.8432Slab
No.SLWtW(s)W(L)11436.843212.2818.04211.536.843212.2815.6931136.843212.2812.2843.5436.843242.9848.0251.53.536.843218.4225.9461.42.636.843217.1923.3071.875436.843223.0332.0181.53.536.843218.4225.9493.275436.843240.2246.85101.53.27536.843218.4225.70111.21.5636.843214.7417.75121.53.536.843218.4225.94131.753.536.843221.4929.55141.52.536.843218.4224.32152.5436.843230.7040.06DEAD
LOAD LADDER COMPUTATION
# of stepsV. Of stepW of conc.W of landingDead load1st
Floor100.9241.758412.55842nd Floor100.9241.758412.55843rd
Floor100.9241.758415.9184LIVE LOAD LADDER COMPUTATION
# of stepsA. StairsArea LoadW of landingLive Load w/o
landing
1st Floor106.63.51.758411.552nd Floor106.63.51.758411.553rd
Floor106.63.51.758411.55Earth Quake Dead Load ComputationStructural
DesignLoadW - slab =(197.721 x 2.7432)689.38128W - Beam =( 24 x
(0.25x0.45) x 197.721)533.8467W - Column =(24 x ( 0.4 x 0.4 x 3 ) x
14 ) 161.281384.50798WallsFire wall = 3.45 x 3 x 38.48235.4625Walls
with glass = 6.35 x 0.38 2.413Exterior walls = ( 2.8 x 0.75 x 3 x
11.05)162.56400.4355Roof WallsExtrior Walls = ( 2.8 x 0.75 x 1.2 x
60.98) 153.67W - slab =(197.721 x 3.36)689.38128W - Beam =( 24 x
(0.25x0.45) x 197.721)533.84671376.89798
Total Weight of 1st and 2nd floor=1784.94348Zone factor
z=0.4Siemic Source Type, A Distance from Seismic Source = 10kmSoil
Profile Type , ScI = 1.0 R = 8.5 W =1759.9022(2) + 1351.8567
=4871.66W=4946.78494h=9
Det. Structure period using method ACt= 0.0731T= Ct (hn)^3/4T=
0.0731(9)^3/4T= 0.3798
Near Source factor Na & NvNa=1.0Nv= 1.2Ca= 0.40 Na Ca=
0.40Cv= 0.56 NvCv= 0.672
Base ShearV=Cv I (W)RT=0.672(1)(4946.78494)0.3798(8.5)V=1014.08
KNnot exceed V= 2.5 Ca I
(W)R=2.5(0.40)(1)(4946.78494)8.5V=581.975Shall not be less than
V=0.11 Ca I W=0.11(0.40)(1) (4946.78494)V=217.6585`Shall not be
less than V=0.8 z Nv I(W)R=0.8(1.2)(1)(4846.78494)8.5V=558.696
Design Base Shear V =544.6525KN
weight floorDetails1st floor1784.94348V=581.9752nd
floor1784.94348W=4946.78494roof top1376.89798T=0.3798
Destribution of V Vertically
Ft=0.07 TVFt max=14.48 KNneed not exceedFt max=0.25 VFt
max=136.1631 KNIf T 0.75, Ft=0`
LevelWeight(W)KNHeight(h)mWh(KN-m)Wh/WhEH1EH2FxR1376.89798912392.081820.4355253.43465573710253.434731784.94348610709.660880.3764219.02689617520219.026921784.9434835354.830440.1882109.51344808760109.5134G00------------------0------=28456.573141.0000581.975
Distribution of Fx (Direct Shear)
Second FloorFrame# of Columntotal # of CWeightDirect
Shear(KN)A520109.513427.378B520109.513427.378C520109.513427.378D520109.513427.378E520109.513427.3781420109.513421.9032420109.513421.9033420109.513421.9034420109.513421.903Third
FloorFrame# of Columntotal # of CWeightDirect
Shear(KN)A520219.0354.757B520219.0354.757C520219.0354.757D520219.0354.757E520219.0354.7571420219.0343.8052420219.0343.8053420219.0343.8054420219.0343.805Roof
Top Frame# of Columntotal # of CWeightDirect
Shear(KN)A520253.4363.36B520253.4363.36C520253.4363.36D520253.4363.36E520253.4363.361420253.4350.692420253.4350.693420253.4350.694420253.4350.69
Live LoadLive Load Computation on Frame Frame AFrame BFrame
CslabW(s)W(L)W(s)W(L)W(s)W(L)178.6478.642.222.7428.169.298.169.292.582.942'3.2643.723.2643.722.582.9433.24.523.24.521.271.7943.844.863.844.861.521.9253.845.13.845.11.522.0263.23.693.23.691.271.4672.82.842.82.842.222.2582.843.182.843.182.252.5293.24.293.24.291.271.7
Dead loadDead Load Computation on Frame Frame AFrame BFrame
CslabW(s)W(L)W(s)W(L)W(s)W(L)114.3517.7114.3517.716.498.01216.7219.0416.7219.047.468.6138.211.598.211.593.715.2449.8412.449.8412.444.455.6359.8413.059.8413.054.455.9068.29.458.29.453.714.27714.3514.5514.3514.556.496.58814.5516.3214.5516.326.587.3898.2118.2113.714.97Frame
computation
Live Load computation (LONGTITUDINAL) Frame A (Left Side)Frame B
(Mid-Span)Frame C (Mid-Span)Frame C (Right Side)Beam LoadBeam
LoadBeamBeam LoadBeam Load2nd Floor2nd Floor2nd Floor2nd
Floor"2-3"7"2-3"11.86"2-3"7.66"2-3"2.8"3-4"8.16"3-4"13.26"3-4"8.28"3-4"2.84"4-5"8.16"4-5"13.26"4-5"8.28"4-5"2.84"5-6"3.264"5-6"8.364"5-6"5.1"5-6"1.6"6-73.2"6-76.4"6-76.4"6-73.23rd
Floor3rd Floor3rd Floor3rd
Floor"1-2"3.2"1-2"6.4"1-2"6.4"1-2"3.2"2-3"7"2-3"11.86"2-3"7.66"2-3"2.8"3-4"8.16"3-4"13.26"3-4"8.28"3-4"2.84"4-5"8.16"4-5"13.26"4-5"8.28"4-5"2.84"5-6"3.264"5-6"8.364"5-6"5.1"5-6"1.6"6-73.2"6-76.4"6-76.4"6-73.2Roof
TopRoof TopnhgRoof
Top"1-2"1.27"1-2"2.54"1-2"2.54"1-2"1.27"2-3"2.22"2-3"4.14"2-3"4.14"2-3"2.22"3-4"2.58"3-4"4.60"3-4"4.54"3-4"2.52"4-5"2.58"4-5"4.60"4-5"4.54"4-5"2.52"5-6"2.58"5-6"4.60"5-6"2.02"5-6"1.6"6-71.27"6-72.54"6-72.54"6-71.27
Dead Load computation (LONGDITUDINAL) Frame A Frame B Frame C
Frame DBeam LoadBeam LoadBeam LoadBeam Load2nd Floor2nd Floor2nd
Floor2nd
Floor"2-3"18.28"2-3"23.52"2-3"23.52"2-3"18.28"3-4"19.28"3-4"24.78"3-4"24.61"3-4"19.11"4-5"19.28"4-5"24.78"4-5"17.17"4-5"19.11"5-6"19.28"5-6"24.78"5-6"17.74"5-6"12.24"6-710.59"6-719.14"6-719.14"6-710.593rd
Floor3rd Floor3rd Floor3rd
Floor"1-2"10.59"1-2"19.14"1-2"19.14"1-2"10.59"2-3"18.28"2-3"23.52"2-3"23.52"2-3"18.28"3-4"19.28"3-4"24.78"3-4"24.61"3-4"19.11"4-5"19.28"4-5"24.78"4-5"17.17"4-5"19.11"5-6"19.28"5-6"24.78"5-6"17.74"5-6"12.24"6-710.59"6-719.14"6-719.14"6-710.59Roof
TopRoof TopRoof TopRoof
Top"1-2"3.33"1-2"6.66"1-2"6.66"1-2"3.33"2-3"5.82"2-3"10.87"2-3"10.87"2-3"5.82"3-4"6.79"3-4"12.09"3-4"11.92"3-4"6.62"4-5"6.79"4-5"12.09"4-5"11.92"4-5"6.62"5-6"6.79"5-6"12.09"5-6"12.44"5-6"7.14"6-73.33"6-76.66"6-76.66"6-73.33
Live Load computation (TRANSVERS) Frame AFrame BFrame CFrame D
Frame EBeamLoadBeamLoadBeamLoadBeamLoadBeamLoad2nd Floor2nd
Floor2nd Floor2nd Floor2nd
Floor"1-2"13.14"1-2"17.93"1-2"18.58"1-2"13.01"1-2"8.24"2-3"7.53"2-3"7.68"2-3"7.68"2-3"7.68"2-3"7.48"3-4"7.13"3-4"6.02"3-4"6.36"3-4"9.3909"3-4"9.08253rd
Floor3rd Floor3rd Floor3rd Floor3rd
Floor"1-2"13.14"1-2"17.93"1-2"18.58"1-2"13.01"1-2"8.24"2-3"7.53"2-3"7.68"2-3"7.68"2-3"7.68"2-3"7.48"3-4"7.13"3-4"6.02"3-4"6.36"3-4"9.3909"3-4"9.0825Roof
TopRoof TopRoof TopRoof TopRoof
Top"1-2"5.68"1-2"5.88"1-2"5.88"1-2"5.88"1-2"4.73"2-3"2.98"2-3"3.04"2-3"3.04"2-3"3.04"2-3"2.98"3-4"3.95"3-4"4.5"3-4"4.5"3-4"3.43"3-4"2.59
Dead Load computation (TRANVERS) Frame A (Left Side)Frame B
(Mid-Span 1)Frame C (Mid-Span 2)Frame D (Mid-Span 3)Frame E (Right
Side)BeamLoadBeamLoadBeamLoadBeamLoad2nd Floor2nd Floor2nd Floor2nd
Floor2nd
FloorBeamLoad"1-2"24.48"1-2"27.72"1-2"28.28"1-2"28.28"1-2"25.14"2-3"20.36"2-3"20.52"2-3"20.52"2-3"20.52"2-3"20.36"3-4"23"3-4"24.5"3-4"24.5"3-4"14.39"3-4"11.773rd
Floor3rd Floor3rd Floor3rd Floor3rd
Floor"1-2"24.48"1-2"27.72"1-2"28.28"1-2"28.28"1-2"25.14"2-3"20.36"2-3"20.52"2-3"20.52"2-3"20.52"2-3"20.36"3-4"23"3-4"24.5"3-4"24.5"3-4"14.39"3-4"11.77Roof
TopRoof TopRoof TopRoof TopRoof
Top"1-2"12.06"1-2"14.91"1-2"14.91"1-2"14.91"1-2"12.61"2-3"7.82"2-3"7.98"2-3"7.98"2-3"7.98"2-3"7.98"3-4"10.36"3-4"11.8"3-4"11.8"3-4"13.04"3-4"11.6
Sheet2
Sheet3
Sheet4