Top Banner
~ ~ ~ ffust4\ ~ STEEL AUTHORITY OF INDIA LIMITED ~~~ RAW MATERIALS DIVISION i5I'1<'1,;fl 3flR<f) ~ BOLANI ORES MINES Letter 0.: BOM/E V/HD-2809 Date: 28/09/2016 To The Member Secretary, State Pollution Control Board, Paribesh Bhawan, A/118, ilkantha agar, Unit - VIII, Bhubaneshwar - 751 012, Oclisha Sub: Submission of Environment Statement for the year 2016-17 Dear Sir, Please find enclosed herewith the Annual Environment Statement of Bolani Ores Mines (5.10 sq. miles ML & 6.90 sq. miles ML) for the period of Apr'16 to Mar'17 in Form-Vas per the prescribed format of SPCB, Oclisha. The report also contains the updated status of environmental monitoring reports for air and water pertaining to the above period. Thanking you, Ends. : As Above YOill~:¥V Genera ManaY, Bolani Ores Mines / • , ,. ) "r ' 4~' " ;. ,~.. .'/ .'). .•: / ',:1 ~ •.•\j<;; (t'I'R) I General Manager (Mines) ~-31R~m-~-31~~ 0.AIL-RMD-Solani -e s ,. ;.,c~ ~ -758 C3i. <:,' ,;: ::.. •. ;'i- i ::;!ani-738 S37. !(e:c;;:I."r. o.r: ~ - Copy to: (1) Regional Officer, State Pollution Control Board, Keonjhar (2) Office Copy ~ ~ 3Ifq; ~. ~ if tlm41(i('[ ft<ft;;r-r. ifh;n;ft ~~. tfto - ~ - \s'iC::O~(g.~ - ~. ~ Steel Authority of India Ltd., Raw Materials Division, Bolani Ores Mines, PO. : Bolani - 758037, Dist. Keonjhar, Odisha ~ 1 Telephone: 06767 - 260211 (0)~ I Fax 06767 - 260172, Email : [email protected], Website: www.sail.co.in There's little bit of SAIL in everybody's life
13

RAW MATERIALS DIVISION i5I'1

Mar 26, 2018

Download

Documents

buidien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RAW MATERIALS DIVISION i5I'1

~ ~ ~ ffust4\ ~STEEL AUTHORITY OF INDIA LIMITED

~~~RAW MATERIALS DIVISIONi5I'1<'1,;fl 3flR<f) ~BOLANI ORES MINES

Letter 0.: BOM/E V/HD-2809 Date: 28/09/2016

ToThe Member Secretary,State Pollution Control Board,Paribesh Bhawan, A/118, ilkantha agar, Unit - VIII,Bhubaneshwar - 751 012, Oclisha

Sub: Submission of Environment Statement for the year 2016-17

Dear Sir,

Please find enclosed herewith the Annual Environment Statement of Bolani Ores Mines(5.10 sq. miles ML & 6.90 sq. miles ML) for the period of Apr'16 to Mar'17 in Form-Vas per theprescribed format of SPCB, Oclisha. The report also contains the updated status of environmentalmonitoring reports for air and water pertaining to the above period.

Thanking you,

Ends. : As Above

YOill~:¥VGenera ManaY,Bolani Ores Mines

/

• , ,. ) "r ' 4~' " ;. ,~.. .'/ . '). .•: / ',:1

~ •.•\j<;; (t'I'R) I General Manager (Mines)~-31R~m-~-31~~

0.AIL-RMD-Solani -e s ,. ;.,c~~ -758 C3i. <:,' ,;: ::..•. ;'i- i::;!ani-738 S37. !(e:c;;:I."r. o.r: ~ -

Copy to:

(1) Regional Officer, State Pollution Control Board, Keonjhar(2) Office Copy

~ ~ 3Ifq; ~. ~ if tlm41(i('[ ft<ft;;r-r. ifh;n;ft ~~. tfto - ~ - \s'iC::O~(g.~ - ~. ~

Steel Authority of India Ltd., Raw Materials Division, Bolani Ores Mines, PO. : Bolani - 758037, Dist. Keonjhar, Odisha~ 1 Telephone: 06767 - 260211 (0) ~ I Fax 06767 - 260172, Email : [email protected], Website: www.sail.co.in

There's little bit of SAIL in everybody's life

Page 2: RAW MATERIALS DIVISION i5I'1

ENVIRONMENTAL STATEMENT

Year : 2016-2017

BOLANI ORES MINES

STEEL AUTHORITY OF INDIA LIMITED RAW MATERIALS DIVISION BOLANI ORES MINES KHEONJHAR (DIST.) ODISHA – 758037

July, 2017

Page 3: RAW MATERIALS DIVISION i5I'1

Environmental Statement of Bolani Ores Mines, RMD, SAIL Page 1 of 12

FORM – V

Environmental Statement for the financial year ending 31st March 2017

PART – A

(i) Name and address of the owner/occupier of the industry operation or process.

: Bolani Ores Mines

P.O- Bolani,

Dist. : Keonjhar

Pin- 758037, Odisha

Agent : Shri Paresh Chandra Naik, General Manager (Mines)

Nominated Owner : Shri Kalyan Maity Director (Raw Materials & Logistics)

(ii) Industry category Primary - (STC code) Secondary - (SIC Code)

: Open Cast Iron Ore Mine

(iii) Production capacity : From 5.10 sq. miles ML

Permitted capacity : 12 MTPA

Total ROM : 5,681,642 T

Lumps : 2,079,640 T

Fines : 3,505,218 T

Total Finished product : 5,584,858 T

From 6.90 sq. miles ML

Mining activity not commenced in this ML.

(iv) Year of establishment : 1960

(v) Date of the last environmental statement submitted

: 26.09.2016

Page 4: RAW MATERIALS DIVISION i5I'1

Environmental Statement of Bolani Ores Mines, RMD, SAIL Page 2 of 12

PART – B

Water and Raw Material Consumption (1) Water consumption m3/day

Process 2881

Cooling 735 (including dust suppression)

Domestic 888

Name of Products Process water consumption per unit of product output

During the previous financial year (2015-16)

During the Current financial (2016-17)

(1) Washed Iron Ore 0.17 m3/Ton of ROM washed

0.42 m3/Ton. of ROM Washed

(2) Raw Material Consumption

Name of raw materials

Name of products

Process water consumption per unit of product output

During the previous financial year (2015-16)

During the Current financial (2016-17)

- - - -

This is an opencast mine producing iron ore. As such, no raw material from outside is

required for processing of iron ore. Run-of-Mine (ROM) from the mine is processed

to produce sized ore products. The ROM production during 2015-16 is 5.35 million

tonnes and during 2016-17 is 5.68 million tonnes.

Page 5: RAW MATERIALS DIVISION i5I'1

Environmental Statement of Bolani Ores Mines, RMD, SAIL Page 3 of 12

PART - C

Pollution discharged to environment / unit of output

a) Water Environment

Pollutants Quality of pollutants generated (mass/volume)

Concentrations of pollutants in discharges

Percentage of variation from prescribed standards with reason.

Standard

1. Process Effluent: The effluent generated from ore washing process is being treated in thickeners. The clear water from the thickeners is being recycled back and the under flow slurry is being discharged to the Tailings Pond. Though there is no direct discharge from the Tailing Pond, seepage from dam body is being discharged. The same is being monitored. The annual average quality of tailing dam seepage is follows:

(i) pH - 7.19 at 25OC 5.5 – 9.0 (ii) TSS - 5.80 mg/l 100 mg/l (iii) Oil & Grease - <1.40 mg/l 10 mg/l

2. Domestic Effluents : No Domestic effluents are discharged to Natural Streams. The

domestic effluent generated from the township is directed to Soak pits via intermediate septic tanks.

(i) pH - 5.5 – 9.0 (ii) TSS - 100 mg/l (iii) BOD - (iv) COD - (v) Oil & Grease -

Page 6: RAW MATERIALS DIVISION i5I'1

Environmental Statement of Bolani Ores Mines, RMD, SAIL Page 4 of 12

b) Air Environment This is an opencast mine and the air emissions are fugitive in nature mainly containing dust particles. The fugitive emissions are being controlled through various dust prevention and control measures. Hence, the quantity of air pollutants discharged in Kg/day cannot be ascertained. The annual average ambient air quality in and around the mines for the year 2016-17 is given below:

Unit : microgram/m3

Pollutants Quality of pollutants generated (mass/volume)

Concentrations of pollutants in discharges

(µg/m3)

Percentage of variation from prescribed standards with reason.

Standard

(1) Karo Guest House i) PM2.5 - 44.3 60 ii) PM10 - 80.9 100 iii) SO2 - 6.8 80 iv) NO2 - 26.0 80

(2) Mount Club Guest House i) PM2.5 - 43.8 60 ii) PM10 - 82.0 100 iii) SO2 - 6.7 80 iv) NO2 - 26.4 80

(3) Near Canteen i) PM2.5 - 43.0 60 ii) PM10 - 82.5 100 iii) SO2 - 6.7 80 iv) NO2 - 25.9 80

(4) Near GM’s Office i) PM2.5 - 48.7 60 ii) PM10 - 89.3 100 iii) SO2 - 6.8 80 iv) NO2 - 27.6 80

Page 7: RAW MATERIALS DIVISION i5I'1

Environmental Statement of Bolani Ores Mines, RMD, SAIL Page 5 of 12

PART –D

Hazardous Wastes

Hazardous Wastes Total Quantity(kg)

During the previous Financial Year (2015-16)

During the current Financial Year (2016-17)

a) From Process

Burnt Oil – 21.84 KLtr

Oil Containing Wastes -1300 Kg

Burnt Oil – 20.58 KLtr

Oil Containing Wastes -1150 Kg

b) From Pollution Control facilities

1040 Kg slits from hazardous waste pits / oil catch trap

980 Kg slits from hazardous waste pits / oil catch trap

PART – E

Solid Wastes

Wastes Total Quantity(Tonnes)

During the previous Financial Year (2015-16)

During the current Financial Year (2016-17)

(a) From Process

(1) Overburden / rejects

(2) Ore washing slimes

24,68,589 T

85,605 T

24,76,875 T

93,554 T

(b) From Pollution Control facilities

NIL NIL

(c) (1) Quantity recycled or re- utilized within the unit

(2) Sold

(3) Disposal

Disposed Disposed

Page 8: RAW MATERIALS DIVISION i5I'1

Environmental Statement of Bolani Ores Mines, RMD, SAIL Page 6 of 12

PART –F

No Hazardous waste is generated from the mining process except used oil which is drained from Machineries / Equipment’s, at present used oil is sold out to the CPCB authorized recycler.

Description of Hazardous / Solid Waste

Temporary Disposal practice

Used Oil (Oil & Lubricants) a) Centrally placed disposal yard has been earmarked for collection. A shed and Concrete flooring have been provided at the site. 2 nos. of Oil collection systems are established, Oil is collected through pipe into barrels put on the concrete floor, sealed properly and kept at the Site.

b) 42KL of Burnt Oil had been Auctioned to authorized recycler conducted at our Headquarters situated in Kolkata vide Order no. HW-13/BOM/06.

Empty Oil barrels. Empty Oil drums collected from various departments are stacked on concrete floor within shed inside scrap yard.

Wastes Containing Oil e.g. filters / jutes, sludge etc.

3 nos of impervious Pits have been constructed at Bottom Garage, CBRS and Electrical Workshop for disposal of oil containing wastes. Ramky Enviro Engineers Ltd. has been awarded WO vide BIM/CC/15-16/WO-84/427 dt.11/02/2016 for disposal of waste containing filters and others.

Used batteries. Used batteries are shifted to the storage yard, as and when generated. From there these are sold by auction to authorized recyclers Same as above.

Overburden from mines. Mostly lateritic in nature, Overburden (OB) generated from mines is used in back filling the excavated quarry of F‐ area and Panposh; and in G & D – areas OB, is dumped in earmarked OB dumps. Tailings Tailings / Slime are discharged to designated Tailing pond within 6.90 sq. miles ML of Bolani Ores Mines.

E-Waste The E-waste report for the period ending 30.06.2017 is enclosed as Annexure-I

Page 9: RAW MATERIALS DIVISION i5I'1

Environmental Statement of Bolani Ores Mines, RMD, SAIL Page 7 of 12

PART – G

Impact of pollution control measures on conservation of natural resources and consequently on the cost of production.

1. Systematic and procedural mining operations are carried out. 2. Strict Blending Norms to cater to the needs of Steel Plants are in place. 3. Separate storage of Sub-grade Mineral for later utilization. 4. Controlled Blasting Techniques to effectively control the Ore fragmentation are

followed 5. Extensive Geological mapping and updating Resource/reserve charts by

conducting regular Exploration programmes. 6. Mineral Conservation Awareness classes are conducted on regular basis at Mines

Vocational Training Centre, Bolani. 7. Checkdams and Settling ponds are built across the nallah courses to mitigate the

silt flow. 8. Plantation had been undertaken within ML area for carbon sequestration, Soil

erosion control and to trap airborne dust.

Page 10: RAW MATERIALS DIVISION i5I'1

Environmental Statement of Bolani Ores Mines, RMD, SAIL Page 8 of 12

PART – H

Environmental Protection Measures undertaken for abatement of pollution.

SL. ISSUES POLLUTION ABATEMENT MEASURES

i. Top soil preservation & utilization

The top soil excavated till date in has been utilized for plantation in reclamation & rehabilitation of dumps. No Top soil is excavated in 2016-17.

ii. Reclamation of Mined out Land

Mineral Deposits have not been exhausted beyond the Cut-off point. Progressive Mine Closure/Back- filling has been taken up in F & Panposh Areas. The Back filled portion of the mines has already been reclaimed by plantation of 25000 saplings over the years with 75% survival rate. No Backfilling undertaken in 2016-17.

iii. OB/Fines Dump rehabilitation

Dormant G area OB dump has been rehabilitated by plantation of 1000 saplings on 0.4 Ha. area over dump benches in 2016-17.

iv. Management of Run off from Dump areas

(i) Repairs including Extension of the Retaining wall at Panposh Area had been taken up at a cost of Rs.8.38 lakhs.

(ii) Retaining wall has been erected near Primary Stock Pile at a cost of Rs.52,322.69.

(iii) RCC retaining wall has been constructed encompassing the New Fines Stockpile at F-2 Conveyor at a cost of Rs.2.39 lakhs.

(iv) Dry Boulder retaining Wall along the broken area and waste dump at G-Area has been constructed at a cost of Rs.12.70 lakhs.

(v) Desilting of Panposh Nallah had been takenup from mount Club to railway siding culvert, Engg Cell, Check Dam & Petrol Pump Check dam for Monsoon preparation at a cost of Rs.2.84 lakhs.

(vi) Drain in front of time office and main check gate area of BOM has been cleared at a cost of Rs. 22,400.00.

Page 11: RAW MATERIALS DIVISION i5I'1

Environmental Statement of Bolani Ores Mines, RMD, SAIL Page 9 of 12

SL. ISSUES POLLUTION ABATEMENT MEASURES

v. Afforestation activities 25000 saplings have been planted over 10 Ha. of Degraded forest Lands within the ML in 2016-17.

vi. Air quality Management i. Dust suppression measures such as spraying of water in haul roads and feed hopper at Hill Top Plant.

ii. All the Drill machines have been equipped with water injection systems.

iii. Pre-wetting of blasting site is being practiced to control blasting emissions.

iv. Bag Filter at Secondary crushing plant. v. Dry Fog dust suppression at 600 TPH plant. vi. Covered conveyor gallery. vii. Fixed water sprinklers are installed at 600TPH

stock Yard, along road near 600TPH plant and on Panposh haul road.

vi. Water Quality Management

i. 40% of water used in Ore Processing is recirculated into system by 02(two) Thickeners.

ii. 02(two) flow meters are installed to regulate water usage for industrial purposes.

iii. 3 nos. of ETPs (Oil and Grease catch traps) have been provided at mechanical workshops and equipment washing junctions to collect and treat workshop effluent.

iv. Boulder soling of existing check dam for rain water harvesting near magazine area of BOM at a cost of Rs.4.30 lakhs.

v. Hume-pipe Culvert near G-area had been extended at a cost of Rs.5.85 Lakhs.

vii. Hazardous Waste management

a) Facilities provided for temporary storage of hazardous wastes for centralized auction. Oil contaminated wastes disposed in impervious pits and Oil and grease catch traps have been provided at vehicle maintenance areas to prevent oil and grease pollution.

b) 200 drums of Used Oil has been sold to Authorized Recycler vide Lot no.: HW-13/BOM/06 in 2016-17

c) Ramky Enviro Engineers Ltd. has been awarded WO vide BIM/CC/15-16/WO-84/427 dt.11/02/2016 for disposal of waste containing filters and others.

Page 12: RAW MATERIALS DIVISION i5I'1

Environmental Statement of Bolani Ores Mines, RMD, SAIL Page 10 of 12

SL. ISSUES POLLUTION ABATEMENT MEASURES

viii. Noise (i) Provision of ear plugs to workers posted at high noise level sites.

(ii) Regular maintenance of HEMMs. (iii) Plantation has been done around Washing plant,

Loading plant and Mining areas to act as Noise Barriers

(iv) Audiometric tests of all the employees conducted as a part of Personal Medical Examination (PME) indicates no abnormality.

ix. Ground Vibration (i) Use of SMS (slurry) explosives, (ii) Use of delay detonator (iii) Blasting only for loosening of the strata and

explosive charge shall be reduced to avoid fly rocks.

(iv) Restricting number of blast holes at any point of time to control ground vibration

(v) Blast vibration monitoring is carriedout by expert agency at regular interval.

x. Forest Fire Prevention 04 nos. of workers have been engaged for Forest fire prevention by fire line creation and maintenance by deweeding exotic species during the months of Mar’17-June’17 at a cost of Rs.2.74 lakhs.

xi. Environmental Monitoring

Environmental monitoring is being conducted by M/s S.K.Mitra, a NABL accredited laboratory, in conformance with the stipulations in EC and CTO. 04(four) nos. of CAAQMS stations have been installed at a cost of Rs. 1.75(approx.) crores as per the directives of MS, SPCB

xii. Scientific Studies Technical Feasibility study for installation of STP for the treatment of domestic effluents generated from township area of Bolani Ores Mines, had been prepared by Civil Dept. of IIT Kharagpur

xiii. Wild Life conservation Till date Rs.91.28 lakhs have been expended for implementation of the Conservation measures within Leasehold area as specified in SSWCP and Rs.568.22 lakhs have been deposited with Divisional Forest Office, Keonjhar for implementation of the Conservation measures within impact zone of BOM.

Page 13: RAW MATERIALS DIVISION i5I'1