NUCLEAR POWER CORPORATION OF INDIA LTD. (A Government of India Enterprise) RAJASTHAN ATOMIC POWER STATION RR SITE, RAWATBHATA A TRAINING REPORT PERIOD: - 13 JUNE, 2011, TO 27 JULY , 2011 PREPARED BY : HITESH KUMAWAT III rd YR., B. TECH. ELECTRONICS INST.&CONTROL ENGINEERING JAGNNATH GUPTA INSTITUTE OF ENGINEERING&TECHNOLOGY, JAIPUR GUIDED BY : Mr. A. P. JAIN,SO/E, NTC RR SITE SUBMITTED TO: Mr. S. DAYAL, SO/F, NTC RR SITE
15

RAPS

Dec 26, 2014

Download

Education

HITESH Kumawat

 
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RAPS

NUCLEAR POWER CORPORATION OF INDIA LTD.

(A Government of India Enterprise)RAJASTHAN ATOMIC POWER STATION

RR SITE, RAWATBHATA

A TRAINING REPORT

PERIOD: - 13 JUNE, 2011, TO 27 JULY , 2011

PREPARED BY : HITESH KUMAWATIII rd YR., B. TECH.ELECTRONICS INST.&CONTROL ENGINEERINGJAGNNATH GUPTA INSTITUTE OF ENGINEERING&TECHNOLOGY, JAIPUR

GUIDED BY : Mr. A. P. JAIN,SO/E, NTCRR SITE

SUBMITTED TO: Mr. S. DAYAL, SO/F, NTCRR SITE

Page 2: RAPS

1. RAPS: - RAPS station is situated on the right bank of RANA PRATAP SAGAR lake formed between two dams GANDHI SAGAR dam upstream station is 64 kms from RAWATBHATA. As a part main thrust of developing reactor of PHWR designs, the second nuclear power station was taken up as a joint indo- Canadian venture. The Canadian furnished the nuclear design and also for construction, installation &commissioning activates. For second unit of Rajasthan, manufacture of components was taken up in India. And the import contents reduced considerably. Moreover, Canadian withdrew in 1974; Indian engineers did balanced designed and commissioning of the unit two. RAPS -3&4 has completed in 1999. At the RAPS-5&6 (2x220 MWE) are also complete and RAPP-7&8 are in under construction.

RAPS is Located in Rajasthan atRawatbhata…...

IN OPERATION

UNDERCONSTRUCTION

KUDANKULAM

NARORA

RAWATBHATA

KAKRAPAR

TARAPUR

KAIGA

KALPAKKAM

Page 3: RAPS

RAPS-1&2

RAPS-3&4

Page 4: RAPS
Page 5: RAPS

FUEL:- The fuel bundle consists of 19 cylindrical fuel elements of 493.3 mm length, held together by welding the element to end plates at both ends. The element is arranged in concentric rings of 1, 6 and 12 elements in different rings. Each element contains a 481.18 mm long stack of sintered natural UO2 pellets in thin zircaloy-2/4 clad coated with 5 to 9 micro-meter thick graphite on inside diameter with end caps welded at both ends.

Page 6: RAPS

In RAPS reactors natural uranium used as fuel and hereby Heavy water as moderator and coolent. A 220 MWe unit basically consists of 306 nos. of horizontal pressure tubes assemblies, which are housed in a stainless steel structure, calandria & supported at either end by massive stainless structure called End Shields. Heavy water moderator in inside the calandria surrounds the pressure tubes assemblies containing natural uranium fuel bundles.

Page 7: RAPS

TAPS:- India’s first commercial power plant comprising of two boiling water reactors (BWRS) each of 160MWE completed 31 years of safe operation. TAPS has 4 units in which unit1&2 provide electricity & unit3&4 (540x2mwe) are in under construction. A new era in outage management has been opened up by reducing refueling outage of TAPS unit 1 to 41 days. Unit 2 made a new record of 209 days of continuous operation.

Page 8: RAPS

MAPS: -MAPS has generated 33229 MUs since the commencement of commercial operation of the two units in jan.1984 & March 1986 respectively. MAPS have two units 1&2.

Page 9: RAPS

NAPS: - The two units of NAPS with a capacity of 220 MWE each were connected to the grid in Jan 1991 & Jul 1992. The plant has generated 23291 million units since the starts of its commercial operation. NAPS-1generated 1555.749MUs with a CF of 80.73% NAPS 2 generated 1487.98MUs with a CF of 77.21%

Page 10: RAPS

KAPS: -The two units of KAPS (kakrapar) of 220MWE each, located near Surat (Gujrat) have generated over 17992MUs since the beginning of their commercial operation in may1993& sept1995 respectively.

Page 11: RAPS

KGS: - The two unit of Kaiga generating station each of 220 MWE are located at Kaiga in the Uttar Kannad district of Karnataka. The power station has generated 1856Mus since their commercial operation. The 3&4 unit (2x220Mwe) of Kaiga Station are in under construction.

KAIGA-1/2KGS-1&2

KUDANKULAM: - The project is an Indo-Russian joint venture for construction of a nuclear power station comprising of 2 units each of 1000Mwe pressurized water reactor at Kudankulam , Nellaikattbonman dist. in Tamil Nadu the detained project report was signed between NPCIL & Russian org. ATOMSROYAEXPORT, MOSCOW in July 1998. The DPR including preliminary safety analysis report (PSAR) have been submitted and under active multistage review by Atomic Energy Regulatory Board (AERB), for the issue of constitution license for implementation of the main plant.

Page 12: RAPS

KAPS 2x 220 MweCriticality 3.9.92 / 8.1.95Sync 24.11.92/ 30.3.95Commercial 6.5.93 / 01.9.95

NAPS ( PHWR) 2x 220 Mwe

Criticality -12.3.89/ 24.10.91Synchronization –29.07.89/ 5.1.92Commercial -01.1.91/30.6.92

PLANTS UNDER OPERATION

TAPS ( BWR) 2x 160 MWe

Criticality -1.2.69/ 28.2.69Synchronisation -1.4.69/ 5.5.69Commercial -28.10.69

RAPS- 1 150 MWeRAPS- 2, 200 RAPS -3 , 220RAPS-4 , 220

Criticality 11.8.72 / 8.10.80Synchronisation 30.11.72/ 1.11.80Commercial 16.12.73 / 1.4.81 / 1.6.00

MAPS 2x 170 MweCriticality 02.7.83 / 12.8.85Synchronisation 23.7.83 / 20.9.85Commercial 27.1.84 / 21.3.86

TOTAL INSTALLED TOTAL INSTALLED CAPACITYCAPACITY2720 MW(e)2720 MW(e)

KAIGA 2x 220 MweCriticality 26.9.00 / 24.9.99 Synchronisation 12.10.00/ 2.12.99Commercial / 16.3.00

Page 13: RAPS
Page 14: RAPS

STATION First Unit Second UnitTAPS-1&2 160 108TAPS-3&4 532 425RAPS-1&2 S/D 212RAPS-3&4 222 206RAPS-5&6 237 237MAPS-1&2 S/D 150NAPS-1&2 121 100KAPS-1&2 224 219KGS-1&2 158 157KGS-3&4 S/D 192

NA : Not Available USU : Under Start Up S/D : Shutdown CCR : Coolant Channel Replacement

Generation Status of NPCIL Operating Stations

Total Generation of NPCIL : 3660

Page 15: RAPS

THANK YOU