Top Banner
Location: Rancho Bernardo, California Situation: This high school’s HVAC system experienced consistent failures  as a result of water corrosion, poor installation and other unforeseen circumstances. The customer wanted these underground pipes rehabilitated without causing any destruction or disruption to the school’s normal operations. Date of Completion: March 2009 Solution: Nu Flow successfully rehabilitated more than 1,000 feet of the 2" and 6" glass pipes that are located beneath concrete sidewalks, courtyards and classroom buildings. Our unique blown-in epoxy coating is a long-term, non-invasive s olution that prevented any destruction or downtime for the high school.  Where life interact s with infras tructure. North America: 1-800-834-9597 | International: 1-905-433-5510 info@nuowtech.com | www.nuowtech.com p/n 342 v4 Rancho Bernardo High School: HV AC System Rehabilitation
2

Rancho Bernardo High School - Print Quality

Apr 06, 2018

Download

Documents

Nu Flow
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Rancho Bernardo High School - Print Quality

8/2/2019 Rancho Bernardo High School - Print Quality

http://slidepdf.com/reader/full/rancho-bernardo-high-school-print-quality 1/1