Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Sep 21, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

1

Nyan TunDeputy Managing Director

MyanmaOil and Gas EnterpriseMinistry of Electricity and Energy

22‐February‐2019 Ngapali Beach

Rakhine State Investment Fair - 2019

Page 2: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Content Introduction Oil and Gas

History of Exploration Potential of Hydrocarbon Bidding Round 2019

Electricity Current Situation of Electric Power Sector Opportunities of Electric Power Sector in Rakhine

State

Conclusion

2

Rakhine State Investment Fair - 2019

Page 3: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Introduction Western part of Myanmar (170,000 Km2) Early History of Oil Production about 1820

(Hand dug) Sediments of Bay of Bangel and

Myanmar Low prospect area to High for Biogeneis

gas Prospect of Thermogenic gas

Development in Electric Power Sector Opportunity investment both Energy

and Electricity.

3

Rakhine State Investment Fair - 2019

Page 4: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

4

IntroductionRakhine State Investment Fair - 2019

RakhineOffshore Basin

MoattamaOffshore Basin

TanintharyiOffshore Basin

Page 5: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Content Introduction Oil and Gas

History of Exploration Potential of Hydrocarbon Bidding Round 2019

Electricity Current Situation of Electric Power Sector Opportunities of Electric Power Sector in

Rakhine State

Conclusion

5

Rakhine State Investment Fair - 2019

Page 6: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

History Oil seeps on Cheduba and Ramree islands In 1820s, hand dug wells, production about 200

bopd(5000 wells with average depth of 60 m)

1969, Japan Development Co-opertion acquired 2D seismic in offshore Rakhine

Five wells drilled in 1975 at A1, A2, A3 and A4 Blocks

Essar acquired 3D in Block L in 2008 and drilled 2 wells in 2009

CNOOC acquired 2D seismic in Block M and drilled 2 wells in 2006/07 but relinquished all blocks after drilling

Daewoo discovered in 2003 in A1 Offshore Block Many companies has searched hydrocarbon using

extensive 3D seismic surveys. Late discovery in A6, AD-7 and AD-1

6

Rakhine State Investment Fair - 2019

1820

1969

2003

Present

Page 7: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

7

Potential of Hydrocarbon

Rakhine State Investment Fair - 2019

Page 8: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

.

Production

Blocks Operator Partner

A-1/A-3 Posco

Daewoo

OVL ,GAIL, KOGAS,

8

Potential of Hydrocarbon

Rakhine State Investment Fair - 2019

Page 9: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

9

Exploration

A-7 Woodside MPEP, Shell

AD-1/AD-6/ AD-8 CNPC Woodside

AD-7 Posco Daewoo Woodside

Potential of Hydrocarbon

Rakhine State Investment Fair - 2019

Page 10: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Study

Blocks Region Operator

A-4/AD-2 Rakhine Offshore BG (Shell)

A-5 Rakhine Offshore Chevron

AD-5 Rakhine Offshore Woodside

AD-3 Rakhine Offshore Ophir

/Unocal

10

Potential of Hydrocarbon

Rakhine State Investment Fair - 2019

Page 11: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Block AD-1: CNPC Company's Exploration Well Aung Shiddhi-1 on Natural Gas Discovery Map

Shiddhi-1AungShiddhi‐1

Page 12: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Tha Lin-1 B

Drilled Year − 2017Rig − DDKG2(Drill Ship)Drilled Depth − 3012 m (9925 ft)Target Sand − Pliocene (G-6.9 Sand)Testing Results −Bean Size Pressure (psi) Gas Flow Rate 48/64“ 4600 50 mmcfd

Block AD-7: Posco Daewoo Company's Appraisal Well Tha Lin-2 B on Natural Gas Discovery Map

Tha Lin-2

Page 13: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

• Since 2003 Shwe Discovery

• Low prospect to High

• Two Petroleum Systems, Pliocene/Pleistocene Biogenic Gas system

Eocene/Miocene - onshore/near-shore Oil system

• Biogeneic gas from Deep marine fan sediment

• Probable Thermogeneic gas from the older reservoir

• 13 to 47 Tcf gas estimated in Rakhine Basin

• 3D seismic acquisition made more understanding of the Rakhine Basin

13

Potential of Hydrocarbon

Rakhine State Investment Fair - 2019

Page 14: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

14

Bidding Round 2019Rakhine State Investment Fair - 2019

Page 15: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

15

Bidding Round 2019• More flexibility in term and condition of PSC

• Fixed amount of Signature Bonus based on area

• Reliable exploration commitment, win for both Contractor and host

• Efficient Exploration manner

•Cost Recovery Maximum up to 75% depending on water depth

• Clear Tender procedure

•Reasonable Fiscal Regime

Rakhine State Investment Fair - 2019

Page 16: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Content Introduction Energy

History of Exploration Potential of Hydrocarbon Bidding Round 2019

Electricity Ongoing Activities of Electric Power Sector Opportunities of Electric Power Sector in Rakhine

State

Conclusion

16

Rakhine State Investment Fair - 2019

Page 17: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Ongoing Activities of Electric Power Sector

17

Page 18: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Ongoing Hydro Power Projects

Sr. No

Project Name

Installed Capacit

y(MW)

Progress (%)

1MiddlePaunglaung

152 3.68

2 Shwe Li (3) 671 11.44

3 Deedoke 60 1.68

4 Upper Yeywa 280 34.75

5 Tha Htay 111 49.82

6 Upper Kengtawng 51 42.05

7 Upper Bluchaung 30.4 43.58

Total 1355.4

ShweLi(3)

Upper Yeywa

Upper Kengtawn

g

Deedoke

Upper Bluchaung

Middle Paunglaun

g

Tha Htay

Commissioning Hydro

Ongoing Hydro Power Projects

Commissioning Thermal

Ongoing Hydro Project

Feasibility Study Stage Hydro Power Projects

Sr. No

Project Name

Installed

Capacity

(MW)

UG (GWh)

1 Middle Yeywa 735 3427

2 Shwe Li (2) 520 2814

3Upper Thanlwin(kunlong)

1400 7142

Total 2520 13,383

Page 19: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

19

Ongoing Thermal Power Projects

Page 20: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Kan Kaung SS

Northern Grid (Waing Maw - Meikhtila) (573miles)

Meikhtila - Yangon (254 miles)Phayagyi SS

Kan Bauk SS

Hlaing Thaya SS

Mawlamyine SS

Southern Grid (Kan Bauk - Phayagyi)(25 miles)

Muse SS

Mong Yal SS

Loikaw SS

Eastern Grid (Muse – Phayagyi) (616 miles)

Meelaung Gyaing SS

Western Grid (Meelaung Gyaing –Yangon) (170 miles)

Nyaung Bingyi SS

Hinthada SS

Western Grid (Ta Mu - Yangon) (777 miles)

Waing Maw SS

Tamu SS

Ongoing Transmission Line Projects

Page 21: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

ကမး ထာငကးအမး

ြမပ

စစ တ ပါက တာ

ပ ားက နး

မငးြပား

ြမာကဦး

ရ သ တာင

ကျာက တာ

တာင ပလကဝ

ဘးသး တာင

မာင တာ

ကျာကြဖ

ရမး ဗ

မအ

မာန အာင

တာငကတ

သတ

ငပလ

ကျနတလ

မ ဒးက နး

Town in Sittwe District

Towns in Mrauk U District

Towns in Kyauk PhyuDistrict

Towns in Thandwe District

Towns in MaungdawDistrict

တပ တာင

Existing Electric Power Supply Condition in Rakhine State

စန

ြမငးလတ

ခ မာငးဆပ1. Area - 14,200 Sq-mil

2. Population - 3,188,807

Nos

3. Household - 459,772 Nos

4. Consumer - 94,369 Nos

5. District - 5 Nos

6. Township - 17 Nos

7. Town - 9 Nos

8. Electric Power Supply

office

- 29 Nos

Page 22: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Existing Electrified Condition in Rakhine State

5

Sr.No District

Nos of Towns Nos of VillagesElectrified

Remaining

ElectrifiedRemainingOn Grid

Off GridTotal On

Grid

Off GridTotalDiesel Solar Mini

HPP Diesel Solar Mini HPP

1 Sittwe 4 - - - 4 - 81 237 120 - 438 220 2 Mrauk U 5 - - - 5 - 61 180 114 21 376 557 3 Kyaukphyu 4 2 - - 6 - 106 215 297 1 619 221 4 Thandwe 5 1 - - 6 - 119 94 95 1 309 298 5 Maungdaw 2 3 - - 5 - 28 93 49 - 170 534

Toal 20 6 - - 26 - 395 819 675 23 1912 1830

Sr.No Ditrict Nos of Household Electrified Remaining Electrified %

1 Sittwe 109,256 26,627 82,629 24.37 2 Mrauk U 145,987 18,138 127,489 12.42 3 Kyaukphyu 101,776 20,552 81,224 20.19 4 Thandwe 83,593 25,989 57,604 31.09 5 Maungdaw 19,160 4,742 14,418 24.75

Total 459,772 96,048 363,724 20.89

Page 23: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Transmission Line and Sub-Station @ Rakhine State

7

Sr.No Name Comissioning Electrified Area1 66kV Taunggap‐Ma Ei Transmision (46.4 miles)

12.6.2016 Households (2259)2 66/11 kV Ma Ei Sub Station (5 MVA)2 66 kV Athote‐ Gwa Transmision (56.4 miles)

30.6.2017 Households (3396)4 66/11 kV Gwa Sub Station (5 MVA)5 66 kV Mrauk U‐Minbya Transmission (17.28 miles)

19.2.2017 Households (3983)6 66/11 kV Minbya Sub Station (5 MVA)7 66/33 kV Minbya Sub Station (10 MVA)8 66 kV Ponnagyun ‐ Yathedaung (22.4 miles)

26.3.2018 Households (3421)9 66/11 kV Yathedaung Sub Station (5 MVA)10 66 kV Kyauk Phyu ‐Made Transmission (14 miles)

25.3.2018 Households (657)11 66/11 kV Made Sub Station (40 MVA)

12 66 kV Yathedaung ‐ Butheetaung Transmission (33.15miles) 30.10.2018 Households (2059)

13 66/11 kV Butheetaung Sub Station (10 MVA)14 66 kV Zin Chaung In Out Transmission (0.6 miles)

2.12.2018 Households (420)15 66/11 kV Zin Chaung Sub Station (5 MVA)16 66 kV Butheetaung‐Maungdaw Transmission (9.1miles)

22.12.2018 Households (2621)17 66/11 kV Maungdaw Sub Station (5 MVA)18 33 kV Minbya‐Myebon Transmission (27.3 miles)

1.10.2017 Households (1942)19 33/11 kV Myebon Sub Station (5 MVA)20 33 kV Minbya‐Pauktaw Transmission (22.5 miles)

2.10.2017 Households (1703)17 33/11 kV Pauktaw Sub Station (5 MVA)18 33 kV Ann‐Kan Taung Gyi Transmission (31.5 miles)

1.12.2017 Households (707)19 33/11 kV Kan Daung Gyi Sub Station (5 MVA)20 33 kV Ann‐Tat Taung Transmission (28.25 miles)

1.12.2017 Households (971)21 33/11 kV Tat Taung Sub Station (5 MVA)

Page 24: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

66 kV Yathedaung - Butheetaung Transmission Line & Butheetaung Sub Station

2266 kV Butheetaung - Maungdaw Transmission Line & Maungdaw Sub Station

Page 25: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

ဘးသးတာင၆၆/၁၁ေဗ(၅)အမဗအ

မာငော၆၆/၁၁ကဗ

(၅)အမဗအ

ရ သောင၆၆/၁၁ကဗ

(၅)အမဗ အ

မဒ၆၆/၁၁ေဗ

၄၀အမဗအ

• 230kV Sub 

Station

• 132kV Sub 

Station

• 66kV Sub 

Station

• Hydro Plant

• Gas Power Plant

• Ongoing HPP

• Planned HPP

Planned and

Existing

Power

System in

Rakhine

State

1.Manaung

2.Kyeintali

3.Taung Pyo

4. Sanel24/7 electrified by National Grid from Zin Chaung 66kV SS very

soon

Existing 6hr a day generate with Diesel generators (500kVA)Planned with Solar for future

Existing 4hr a day generate with Diesel generators (150kW)

Existing 4hr a day generate with Diesel generators (500kW)24/7 electrified by National Grid very soon

Page 26: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Region1Region

2

Region3

Power Supply Area Expansion Plan

Phase 1 Phase 2 Phase 3

Item At Present Phase 1 Phase 2 Phase 3

Generation Method Fuel Diesel PV  +  ESS  +  Fuel Diesel

Generation Time 6H 24H

Generation Capacity 1,250kW 500kW 2,500kW 4,000kW

Power Consumption / day 1,500kWh 2,000kWh 10,000kWh 16,000kWh

1634 Household 4938 Household 7850 Household

Region 1 onlyBenerficiary: 1,634 

households

Region1

Region2

Region3

Region 1 +2Benerficiary: 1,634 households+ 4,938 

households

Region1

Region2

Region3

Region 1 +2+3Benerficiary: 1,634 households+ 4,938 

households+ 7,850 

households

PV 500kW+ ESS 2,000kWh

PV 2,500kW+ ESS 10,000kWh

PV 4,000kW+ ESS 16,000kWh

PV 500kW+ESS 2000kWh

8 X

Ongoing Activities for Manaung Island Electrification Project

26

Page 27: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

KyaukPhyu Gas Turbine & Conbined Cycle

230kV Taunggap‐Ma I –Kyauk Phyu (110 mile)

Kyauk Phyu GTCC Project

27

• Investor - Supreme Trading Company Limited နင Sinohydro Coporation

• System - Independent Power Producer

• Starting Date - 30-1-2018

• Commissioning - 30-6-2021

• Activities - Design Works Finished, Preparatory Agreement Finished

- Geological Investigation Finished, Foundation Works Started

Page 28: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

28

Sr.No Yearly

Electrified 

Household

Percentage

Remarks

1. 2018‐2019 5,438,916 50% (43.3%)existing

2. 2020‐2021 5,982,808 55%

3. 2025‐2026 8,158,374 75%

4. 2030‐2031 10,877,832 100%

Plan for Electric Power Sector

50.2%47.2%

2.2% 0.3%

Hydro N G Coal R E

5,855MW24,165GWh

2018-2019

34.0%

41.6%

2.0%0.4%

21.9%

Hydro N G Coal R E LNG

7,959 MW36,029 GWh

2020-2021

32.5%

25.6%

1.3%

0.3%

40.4%

Hydro N G Coal R E LNG

10,448 MW55,288 GWh

2025-2026

Page 29: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Opportunities of Electric Power Sector @ Rakhine State

29

Page 30: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Hydropower SectorOpportunities of Electric Power Business @ Rakhine StateHydropower Sector

Project Name LemroHydropower ProjectLocation 20 miles North East of Mrauk U in Palawa

Township, Chin State

Installed Capacity 622 MW (4 x 155.6)

Average Annual Generation 2447 GWh

Project Layout No. Works Description Feactures Unit

1 Catchment Area 2521 Sq.mile

2 RCC Main Dam height 500 ft

3 Gated Spillway 5 x 121 ft

4 Headrace Tunnel (Ø x L) 37.7 x 2 x 1805 ft

5 Penstock (Ø x L) 29.5 x656 ft

6 Powerhouse (L x B) 420 x 170.6 ft

7 Turbine & Generator 

Francis TurbineNew Project 30

Page 31: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

Hydropower SectorOpportunities of Electric Power Business @ Rakhine StateHydropower Sector

Project Name Saing Din Hydropower ProjectLocation 50 miles North of Sittwe Town and 10 miles East 

of Buthidaung Town in Rakine State

Installed Capacity 46.7 MW (2 x 23.35)

Average Annual Generation 281 GWhProject Layout

New Project

Powerhouse

CVC Dam

Spillway

Penstock

Tailrace

No.Works Description Feactures Unit

1 Catchment Area 354 Sq.mile

2 Concrete Dam height 230 ft

3 Gated Spillway width 3 x 39.5 ft

4 Power Intake (W x H) 26 x 23 ft

5 Penstock (Ø x L) 13 x 361 ft

6 Powerhouse (L x B) 108 x 190 ft

7 Turbine & Generator

Francis Turbine 31

Page 32: Rakhine State Investment Fair - 2019 · Location 20 miles North East of Mrauk U in Palawa Township, Chin State Installed Capacity 622 MW (4 x 155.6) Average Annual Generation 2447

32