1 Nyan Tun Deputy Managing Director Myanma Oil and Gas Enterprise Ministry of Electricity and Energy 22‐February‐2019 Ngapali Beach Rakhine State Investment Fair - 2019
1
Nyan TunDeputy Managing Director
MyanmaOil and Gas EnterpriseMinistry of Electricity and Energy
22‐February‐2019 Ngapali Beach
Rakhine State Investment Fair - 2019
Content Introduction Oil and Gas
History of Exploration Potential of Hydrocarbon Bidding Round 2019
Electricity Current Situation of Electric Power Sector Opportunities of Electric Power Sector in Rakhine
State
Conclusion
2
Rakhine State Investment Fair - 2019
Introduction Western part of Myanmar (170,000 Km2) Early History of Oil Production about 1820
(Hand dug) Sediments of Bay of Bangel and
Myanmar Low prospect area to High for Biogeneis
gas Prospect of Thermogenic gas
Development in Electric Power Sector Opportunity investment both Energy
and Electricity.
3
Rakhine State Investment Fair - 2019
4
IntroductionRakhine State Investment Fair - 2019
RakhineOffshore Basin
MoattamaOffshore Basin
TanintharyiOffshore Basin
Content Introduction Oil and Gas
History of Exploration Potential of Hydrocarbon Bidding Round 2019
Electricity Current Situation of Electric Power Sector Opportunities of Electric Power Sector in
Rakhine State
Conclusion
5
Rakhine State Investment Fair - 2019
History Oil seeps on Cheduba and Ramree islands In 1820s, hand dug wells, production about 200
bopd(5000 wells with average depth of 60 m)
1969, Japan Development Co-opertion acquired 2D seismic in offshore Rakhine
Five wells drilled in 1975 at A1, A2, A3 and A4 Blocks
Essar acquired 3D in Block L in 2008 and drilled 2 wells in 2009
CNOOC acquired 2D seismic in Block M and drilled 2 wells in 2006/07 but relinquished all blocks after drilling
Daewoo discovered in 2003 in A1 Offshore Block Many companies has searched hydrocarbon using
extensive 3D seismic surveys. Late discovery in A6, AD-7 and AD-1
6
Rakhine State Investment Fair - 2019
1820
1969
2003
Present
7
Potential of Hydrocarbon
Rakhine State Investment Fair - 2019
.
Production
Blocks Operator Partner
A-1/A-3 Posco
Daewoo
OVL ,GAIL, KOGAS,
8
Potential of Hydrocarbon
Rakhine State Investment Fair - 2019
9
Exploration
A-7 Woodside MPEP, Shell
AD-1/AD-6/ AD-8 CNPC Woodside
AD-7 Posco Daewoo Woodside
Potential of Hydrocarbon
Rakhine State Investment Fair - 2019
Study
Blocks Region Operator
A-4/AD-2 Rakhine Offshore BG (Shell)
A-5 Rakhine Offshore Chevron
AD-5 Rakhine Offshore Woodside
AD-3 Rakhine Offshore Ophir
/Unocal
10
Potential of Hydrocarbon
Rakhine State Investment Fair - 2019
Block AD-1: CNPC Company's Exploration Well Aung Shiddhi-1 on Natural Gas Discovery Map
Shiddhi-1AungShiddhi‐1
Tha Lin-1 B
Drilled Year − 2017Rig − DDKG2(Drill Ship)Drilled Depth − 3012 m (9925 ft)Target Sand − Pliocene (G-6.9 Sand)Testing Results −Bean Size Pressure (psi) Gas Flow Rate 48/64“ 4600 50 mmcfd
Block AD-7: Posco Daewoo Company's Appraisal Well Tha Lin-2 B on Natural Gas Discovery Map
Tha Lin-2
• Since 2003 Shwe Discovery
• Low prospect to High
• Two Petroleum Systems, Pliocene/Pleistocene Biogenic Gas system
Eocene/Miocene - onshore/near-shore Oil system
• Biogeneic gas from Deep marine fan sediment
• Probable Thermogeneic gas from the older reservoir
• 13 to 47 Tcf gas estimated in Rakhine Basin
• 3D seismic acquisition made more understanding of the Rakhine Basin
13
Potential of Hydrocarbon
Rakhine State Investment Fair - 2019
14
Bidding Round 2019Rakhine State Investment Fair - 2019
15
Bidding Round 2019• More flexibility in term and condition of PSC
• Fixed amount of Signature Bonus based on area
• Reliable exploration commitment, win for both Contractor and host
• Efficient Exploration manner
•Cost Recovery Maximum up to 75% depending on water depth
• Clear Tender procedure
•Reasonable Fiscal Regime
Rakhine State Investment Fair - 2019
Content Introduction Energy
History of Exploration Potential of Hydrocarbon Bidding Round 2019
Electricity Ongoing Activities of Electric Power Sector Opportunities of Electric Power Sector in Rakhine
State
Conclusion
16
Rakhine State Investment Fair - 2019
Ongoing Activities of Electric Power Sector
17
Ongoing Hydro Power Projects
Sr. No
Project Name
Installed Capacit
y(MW)
Progress (%)
1MiddlePaunglaung
152 3.68
2 Shwe Li (3) 671 11.44
3 Deedoke 60 1.68
4 Upper Yeywa 280 34.75
5 Tha Htay 111 49.82
6 Upper Kengtawng 51 42.05
7 Upper Bluchaung 30.4 43.58
Total 1355.4
ShweLi(3)
Upper Yeywa
Upper Kengtawn
g
Deedoke
Upper Bluchaung
Middle Paunglaun
g
Tha Htay
Commissioning Hydro
Ongoing Hydro Power Projects
Commissioning Thermal
Ongoing Hydro Project
Feasibility Study Stage Hydro Power Projects
Sr. No
Project Name
Installed
Capacity
(MW)
UG (GWh)
1 Middle Yeywa 735 3427
2 Shwe Li (2) 520 2814
3Upper Thanlwin(kunlong)
1400 7142
Total 2520 13,383
19
Ongoing Thermal Power Projects
Kan Kaung SS
Northern Grid (Waing Maw - Meikhtila) (573miles)
Meikhtila - Yangon (254 miles)Phayagyi SS
Kan Bauk SS
Hlaing Thaya SS
Mawlamyine SS
Southern Grid (Kan Bauk - Phayagyi)(25 miles)
Muse SS
Mong Yal SS
Loikaw SS
Eastern Grid (Muse – Phayagyi) (616 miles)
Meelaung Gyaing SS
Western Grid (Meelaung Gyaing –Yangon) (170 miles)
Nyaung Bingyi SS
Hinthada SS
Western Grid (Ta Mu - Yangon) (777 miles)
Waing Maw SS
Tamu SS
Ongoing Transmission Line Projects
ကမး ထာငကးအမး
ြမပ
စစ တ ပါက တာ
ပ ားက နး
မငးြပား
ြမာကဦး
ရ သ တာင
ကျာက တာ
တာင ပလကဝ
ဘးသး တာင
မာင တာ
ကျာကြဖ
ရမး ဗ
မအ
မာန အာင
တာငကတ
သတ
ငပလ
ကျနတလ
ဂ
မ ဒးက နး
Town in Sittwe District
Towns in Mrauk U District
Towns in Kyauk PhyuDistrict
Towns in Thandwe District
Towns in MaungdawDistrict
တပ တာင
Existing Electric Power Supply Condition in Rakhine State
စန
ြမငးလတ
ခ မာငးဆပ1. Area - 14,200 Sq-mil
2. Population - 3,188,807
Nos
3. Household - 459,772 Nos
4. Consumer - 94,369 Nos
5. District - 5 Nos
6. Township - 17 Nos
7. Town - 9 Nos
8. Electric Power Supply
office
- 29 Nos
Existing Electrified Condition in Rakhine State
5
Sr.No District
Nos of Towns Nos of VillagesElectrified
Remaining
ElectrifiedRemainingOn Grid
Off GridTotal On
Grid
Off GridTotalDiesel Solar Mini
HPP Diesel Solar Mini HPP
1 Sittwe 4 - - - 4 - 81 237 120 - 438 220 2 Mrauk U 5 - - - 5 - 61 180 114 21 376 557 3 Kyaukphyu 4 2 - - 6 - 106 215 297 1 619 221 4 Thandwe 5 1 - - 6 - 119 94 95 1 309 298 5 Maungdaw 2 3 - - 5 - 28 93 49 - 170 534
Toal 20 6 - - 26 - 395 819 675 23 1912 1830
Sr.No Ditrict Nos of Household Electrified Remaining Electrified %
1 Sittwe 109,256 26,627 82,629 24.37 2 Mrauk U 145,987 18,138 127,489 12.42 3 Kyaukphyu 101,776 20,552 81,224 20.19 4 Thandwe 83,593 25,989 57,604 31.09 5 Maungdaw 19,160 4,742 14,418 24.75
Total 459,772 96,048 363,724 20.89
Transmission Line and Sub-Station @ Rakhine State
7
Sr.No Name Comissioning Electrified Area1 66kV Taunggap‐Ma Ei Transmision (46.4 miles)
12.6.2016 Households (2259)2 66/11 kV Ma Ei Sub Station (5 MVA)2 66 kV Athote‐ Gwa Transmision (56.4 miles)
30.6.2017 Households (3396)4 66/11 kV Gwa Sub Station (5 MVA)5 66 kV Mrauk U‐Minbya Transmission (17.28 miles)
19.2.2017 Households (3983)6 66/11 kV Minbya Sub Station (5 MVA)7 66/33 kV Minbya Sub Station (10 MVA)8 66 kV Ponnagyun ‐ Yathedaung (22.4 miles)
26.3.2018 Households (3421)9 66/11 kV Yathedaung Sub Station (5 MVA)10 66 kV Kyauk Phyu ‐Made Transmission (14 miles)
25.3.2018 Households (657)11 66/11 kV Made Sub Station (40 MVA)
12 66 kV Yathedaung ‐ Butheetaung Transmission (33.15miles) 30.10.2018 Households (2059)
13 66/11 kV Butheetaung Sub Station (10 MVA)14 66 kV Zin Chaung In Out Transmission (0.6 miles)
2.12.2018 Households (420)15 66/11 kV Zin Chaung Sub Station (5 MVA)16 66 kV Butheetaung‐Maungdaw Transmission (9.1miles)
22.12.2018 Households (2621)17 66/11 kV Maungdaw Sub Station (5 MVA)18 33 kV Minbya‐Myebon Transmission (27.3 miles)
1.10.2017 Households (1942)19 33/11 kV Myebon Sub Station (5 MVA)20 33 kV Minbya‐Pauktaw Transmission (22.5 miles)
2.10.2017 Households (1703)17 33/11 kV Pauktaw Sub Station (5 MVA)18 33 kV Ann‐Kan Taung Gyi Transmission (31.5 miles)
1.12.2017 Households (707)19 33/11 kV Kan Daung Gyi Sub Station (5 MVA)20 33 kV Ann‐Tat Taung Transmission (28.25 miles)
1.12.2017 Households (971)21 33/11 kV Tat Taung Sub Station (5 MVA)
66 kV Yathedaung - Butheetaung Transmission Line & Butheetaung Sub Station
2266 kV Butheetaung - Maungdaw Transmission Line & Maungdaw Sub Station
ဘးသးတာင၆၆/၁၁ေဗ(၅)အမဗအ
မာငော၆၆/၁၁ကဗ
(၅)အမဗအ
ရ သောင၆၆/၁၁ကဗ
(၅)အမဗ အ
မဒ၆၆/၁၁ေဗ
၄၀အမဗအ
• 230kV Sub
Station
• 132kV Sub
Station
• 66kV Sub
Station
• Hydro Plant
• Gas Power Plant
• Ongoing HPP
• Planned HPP
Planned and
Existing
Power
System in
Rakhine
State
1.Manaung
2.Kyeintali
3.Taung Pyo
4. Sanel24/7 electrified by National Grid from Zin Chaung 66kV SS very
soon
Existing 6hr a day generate with Diesel generators (500kVA)Planned with Solar for future
Existing 4hr a day generate with Diesel generators (150kW)
Existing 4hr a day generate with Diesel generators (500kW)24/7 electrified by National Grid very soon
Region1Region
2
Region3
Power Supply Area Expansion Plan
Phase 1 Phase 2 Phase 3
Item At Present Phase 1 Phase 2 Phase 3
Generation Method Fuel Diesel PV + ESS + Fuel Diesel
Generation Time 6H 24H
Generation Capacity 1,250kW 500kW 2,500kW 4,000kW
Power Consumption / day 1,500kWh 2,000kWh 10,000kWh 16,000kWh
1634 Household 4938 Household 7850 Household
Region 1 onlyBenerficiary: 1,634
households
Region1
Region2
Region3
Region 1 +2Benerficiary: 1,634 households+ 4,938
households
Region1
Region2
Region3
Region 1 +2+3Benerficiary: 1,634 households+ 4,938
households+ 7,850
households
PV 500kW+ ESS 2,000kWh
PV 2,500kW+ ESS 10,000kWh
PV 4,000kW+ ESS 16,000kWh
PV 500kW+ESS 2000kWh
8 X
Ongoing Activities for Manaung Island Electrification Project
26
KyaukPhyu Gas Turbine & Conbined Cycle
230kV Taunggap‐Ma I –Kyauk Phyu (110 mile)
Kyauk Phyu GTCC Project
27
• Investor - Supreme Trading Company Limited နင Sinohydro Coporation
• System - Independent Power Producer
• Starting Date - 30-1-2018
• Commissioning - 30-6-2021
• Activities - Design Works Finished, Preparatory Agreement Finished
- Geological Investigation Finished, Foundation Works Started
28
Sr.No Yearly
Electrified
Household
Percentage
Remarks
1. 2018‐2019 5,438,916 50% (43.3%)existing
2. 2020‐2021 5,982,808 55%
3. 2025‐2026 8,158,374 75%
4. 2030‐2031 10,877,832 100%
Plan for Electric Power Sector
50.2%47.2%
2.2% 0.3%
Hydro N G Coal R E
5,855MW24,165GWh
2018-2019
34.0%
41.6%
2.0%0.4%
21.9%
Hydro N G Coal R E LNG
7,959 MW36,029 GWh
2020-2021
32.5%
25.6%
1.3%
0.3%
40.4%
Hydro N G Coal R E LNG
10,448 MW55,288 GWh
2025-2026
Opportunities of Electric Power Sector @ Rakhine State
29
Hydropower SectorOpportunities of Electric Power Business @ Rakhine StateHydropower Sector
Project Name LemroHydropower ProjectLocation 20 miles North East of Mrauk U in Palawa
Township, Chin State
Installed Capacity 622 MW (4 x 155.6)
Average Annual Generation 2447 GWh
Project Layout No. Works Description Feactures Unit
1 Catchment Area 2521 Sq.mile
2 RCC Main Dam height 500 ft
3 Gated Spillway 5 x 121 ft
4 Headrace Tunnel (Ø x L) 37.7 x 2 x 1805 ft
5 Penstock (Ø x L) 29.5 x656 ft
6 Powerhouse (L x B) 420 x 170.6 ft
7 Turbine & Generator
Francis TurbineNew Project 30
Hydropower SectorOpportunities of Electric Power Business @ Rakhine StateHydropower Sector
Project Name Saing Din Hydropower ProjectLocation 50 miles North of Sittwe Town and 10 miles East
of Buthidaung Town in Rakine State
Installed Capacity 46.7 MW (2 x 23.35)
Average Annual Generation 281 GWhProject Layout
New Project
Powerhouse
CVC Dam
Spillway
Penstock
Tailrace
No.Works Description Feactures Unit
1 Catchment Area 354 Sq.mile
2 Concrete Dam height 230 ft
3 Gated Spillway width 3 x 39.5 ft
4 Power Intake (W x H) 26 x 23 ft
5 Penstock (Ø x L) 13 x 361 ft
6 Powerhouse (L x B) 108 x 190 ft
7 Turbine & Generator
Francis Turbine 31
32