Top Banner
RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL (SH67) – DESURI – GOMTI (SH16) ROAD DEVELOPMENT ON ANNUAITY MODEL
30

RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Dec 14, 2015

Download

Documents

Blanca Tirrell
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR

PRESENTATION ON PREPARATION OF DPR FOR

PALI(RAMASIYA) –SOMESAR - BUSI- NADOL (SH67) – DESURI – GOMTI (SH16) ROAD

DEVELOPMENT ON ANNUAITY MODEL

Page 2: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 2

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Page 3: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 3

NECESSITYNECESSITY

Improved connectivity Development of the surroundings A boost to tourist Golden Triangle of Rajasthan – Jodhpur to Udaipur Shorter connection for Jodhpur with Udaipur

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Page 4: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 4

LENGTH (Km)LENGTH (Km)

Total Length of main Link is 91.450 Km Details of Proposed Bypasses Given below,

S.No Village NameLength of Bypass

(m)

1 Sonai Maji 2225

2 Bussi 1875

3 Devli 2875

4 Kharda 970

5 Nadol 4800

6 Desuri 4800

Total (Km) 17.545

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Page 5: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 5

SCOPE Preparation of Detailed Project Report

- Site reconnaissance- Road Inventory- Pavement Condition - Soil Investigation- Topographical Survey- Improvement Proposal- Finalization of Bypass Alignment - Detailed Design of Geometrics, Pavement & Structures- Detailed design of Road Appurtenances- Preparation of BOQ- Calculation of Annuity

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Page 6: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 6

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

EXISTING WIDTH

ROAD SECTIONSLENGTH

(KM)EXISTING WIDTH REMARK

RAMASYA-DESURI(Km 0/0 - Km 64/100)

64.000

3.7M CARRIAGEWAY WITH GRAVEL

SHOULDER

Widen upto 2-Lane with Paved Shoulder

DESURI-GOMTI(Km 64/100 - Km 91/450)

27.3505.5M CARRIAGEWAY

WITH GRAVEL SHOULDER

Widen upto 2-Lane with Paved Shoulder

PRESENT STATUS

Page 7: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 7

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

SN Village Name Proposed Chainage (Km)

Start End

1 Hemawas 2+350 3+400

2 Sonai Maji 7+500 8+600

3 Gurnarkar 12+200

4 Sodawas 13+300 14+900

5 Tawali 17+900 190+00

6 Busi 21+100 23+000

7 Somesar 27+100 28+300

8 Dudhariya 29+300

9 Devli 38+800 40+200

10 Kharda 41+400 42+400

11 Nadol 47+000 49+600

12 Narlai 58+280 60+400

13 Dessuri 64+100 67200

14 Gomti 89+500 91+450

VILLAGES ENROUTE

PRESENT STATUS

Page 8: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 8

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

CEMENT CONCRETE ROAD

SN

Chainage

LengthType of

WideningWidening

SideRemarks

From To

1 7+820 7+980 160 Concentric Both CC Road

2 8+130 8+550 420 Concentric Both CC Road

3 13+570 13+830 260 Concentric Both CC Road

4 22+140 22+870 730 Concentric Both CC Road

5 48+105 48+594 489 Concentric Both CC Road

6 48+755 48+995 240 Concentric Both CC Road

PRESENT STATUS

Page 9: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 9

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

EXISTING CRUST

SN SHChainag

ePit No.

SidePavement Shoulder

PMCPMC Old

BM WBM GSB GSB Soil

1

67

30 1 R 25     65 420 270  

2 35 2 R 80     125 215 175  

3 55 3 L 25     80 380 280  

4 45 4 L 20   50 85 310 210  

5 40 5 L 25   30 65 385 320  

6 50 6 L 20   30+20 80 210 200  

PRESENT STATUS

Page 10: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 10

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

STRUCTURES

S No. Type Length Nos. Proposed

1 Causeway Up to 10m 10 Replaced

2 Causeway 10 to 20m 5 Replaced

3 Causeway 20 to 30m 9 Replaced

4 Causeway More than 30m 9 Replaced

S

No.

Type Length Nos. Proposed

1 Pipe Culvert 0.600-1.20m Dia 38 4 Retain and 34 Reconstruction

2 Slab Culvert 0.5m to 2.0m 74 26 Retain and 48 Reconstruction

Causeway

Culverts

PRESENT STATUS

Page 11: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 11

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

SNo

Chainage (Km)

Existing Structure

Conditions RemarksType

Total Length (m)

Width (m)

1 58+550 Slab 6.0 6.0 Good Retain

2 63+165 Slab 6.0 7.5 Good Retain

3 281+172 Slab 28.0 7.7 Good Retain

4 285+732 Slab 12.6 11.3 Poor Replace

5 286+091 Slab 6.0 11.0 Poor Replace

6 286+225 Slab 12.2 7.6 Fair Retain

7 286+428 Slab 8.0 7.5 Poor Replace

8 286+577 Slab 7.4 22.0 Good Retain

9 287+742 Slab 7.0 15.5 Poor Replace

10 293+620 Slab 7.5 11.0 Poor Replace

11 296+068Arch Bridge

12.0 11.5 Poor Replace

Minor Bridges

PRESENT STATUS

Page 12: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 12

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Major Bridges

Sno.Chainage

(Km)

Existing StructureConditi

onsRemarks

TypeTotal Length

(m)Width (m)

1 70+040 Slab 88.4 8.3 Fair Retain

Major Bridge at Chainage 70+040 Minor Bridge at Chainage 281+172

PRESENT STATUS

Page 13: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 13

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Ch. Deflection MSA BM (Overlay) WMM DBM/BC

1.25 20 120 180 84

Proposed (Overlay) DBM BC PCC (<120) PCC (>120)

Th.(mm) 50 40 DBM WMM

New Crust CBR (Assumed) MSA Design Yr.

7% 20 20

New Crust Thicknesses

GSB WMM DBM BC

230 250 50 40

ESTIMATED OVERLAY

PROPOSED DEVELOPEMENT

Page 14: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 14

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

LIST OF REPLACED BRIDGES

S. no.

Existing Chainage

(Km)

Proposed Chainage

(Km)

Proposed Structure

Type Span (m)Total

Length (m)

Width (m)

1 285+732 72+470 Box Bridge 1.0 8.0 8.0 12.9

2 286+091 72+853 Box Bridge 1.0 6.0 6.0 12.9

3 286+428 73+214 Box Bridge 1.0 8.0 8.0 12.9

4 287+742 74+506 Box Bridge 1.0 8.0 8.0 12.9

5 293+620 80+375 Box Bridge 1.0 8.0 8.0 12.9

6 296+068 82+825 Box Bridge 2.0 6.0 12.0 12.9

PROPOSED DEVELOPEMENT

Page 15: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 15

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

S.No Village Name

Chainage Length of Bypass

RemarksFrom To

1 Sonai Maji 6+980 9+040 2225 Left

2 Bussi 21+480 23+550 1875 Right

3 Devli 38+050 40+960 2875 Right

4 Kharda 41+900 42+900 970 Left-Right

5 Nadol 46+375 51+930 4800 Left

6 Desuri 64+275 67+700 4800 Left

PROPOSED BYPASS

PROPOSED DEVELOPEMENT

Page 16: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 16

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Project Cost – 174 Cr. (Mainline 121 Cr. + Bypasses 29 Cr. + Str . 24 Cr.)

Construction Period – 2 Years

Concession Period – 20 Years

Annuity -

Page 17: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 17

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Page 18: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 18

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

RAILWAY CROSSING & ROB

A Broad Gauge Railway Track Crosses the Project Corridor at Chainage Km 28+555 near Somesar Village.

No ROB has been Proposed along this Road .

Page 19: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Page 20: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 20

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

DATE OF SUBMISSION OF DPR

Page 21: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer

LIKELY DATE OF START OF WORK

Page 21

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Page 22: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer

TAKE OFF

STARTING AT RAMASIYA, KM 29+000 TAKING OFF FROM NH14, KM 115+000

Page 22

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Page 23: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer

CANAL CROSSING REALIGNMENT PROPOSED ON RIGHT

Page 23

SHARP CURVE

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Page 24: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer

FIRST VILLAGE ON THE ALIGNMENT- HEMAWAS

EARTHEN BUND ON LEFT HABITATIONON RIGHT SIDE ONLY

Page 24

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Page 25: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer

BYPASS CANDIDATE – SONAI MAJI

CONJETION INSIDE EARTHEN BUND ON RIGHT

Page 25

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Page 26: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer

BYPASS CANDIDATE –VILLAGE SODAWAS

VILLAGE SODAWAS JUST FIT FOR 10M

Page 26

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Page 27: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer

BYPASS CANDIDATE – VILLAGE BUSSI

VILLAGE BUSSI – BYPASS CANDIDATE VILLAGE BUSSI – FROM INSIDE

Page 27

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Page 28: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer

DANGEROUS CURVE

Starting chainage at 69+000

End chainage at

77+000

Page 28

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Page 29: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footerINDEX MAP Page 29

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)

Page 30: RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL.

Here comes your footer Page 30

THANK YOU

PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)