RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 1 of 35
Request for Quotation for
Overall Design, Development, Training, O&M and FMS for the Web Portal of
Rajasthan Renewable Energy Corporation Limited (RRECL)
[NIB No. F 4.3(95)/RISL/Tech/2013/4853 dated 31/07/2014]
Procuring Authority Managing Director, RISL, First Floor, C-Block, Yojana Bhawan, Tilak Marg, C-Scheme, Jaipur-302005 (Rajasthan)
Last Date & Time of Submission of Bid
Name of the Bidding Company/ Firm:
Contact Person(Authorised Bid Signatory):
Correspondence Address:
Mobile No. Telephone & Fax Nos.:
Website & E-Mail:
RajCOMP Info Services Limited (RISL) First Floor, Yojana Bhawan, C-Block, Tilak Marg, C-Scheme, Jaipur-302005 (Raj.)
Phone: 0141- 5103902 Fax: 0141-2228701 Web: http://risl.rajasthan.gov.in, Email: [email protected]
Page 2
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 2 of 35
TABLE OF CONTENTS
1. TABLE OF CONTENTS
2. INVITATION FOR BIDS (IFB) & NOTICE INVITING BIDS (NIB)
3. ELIGIBILITY CRITERIA
4. SCOPE OF WORK & ROLE OF STACKHOLDERS
5. PROJECT DELIVERABLES, MILESTONES & TIME SCHEDULE
6. INSTRUCTION TO BIDDERS (ITB)
7. GENERAL TERMS AND CONDITIONS OF TENDER & CONTRACT
8. SPECIAL TERMS AND CONDITIONS OF TENDER & CONTRACT
ANNEXURE-1: BIDDER’S AUTHORIZATION CERTIFICATE
ANNEXURE-2: SELF-DECLARATION
ANNEXURE-3: CERTIFICATE OF CONFORMITY/ NO DEVIATION
ANNEXURE-4: FINANCIAL BID COVER LETTER & FORMAT
ANNEXURE-5: BANK GUARANTEE FORMAT
ANNEXURE-6: MEMORANDUM OF APPEAL UNDER THE RTPP ACT, 2012
ANNEXURE-7: DETAILS OF SECURITY AUDIT OF WEBSITE/ WEB APPLICATION
Page 3
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 3 of 35
2. INVITATION FOR BIDS (IFB) & NOTICE INVITING BIDS (NIB)
Ref No.: F 4.3(95)/RISL/Tech/2013/4853 Dated: 31/7/2014
Unique BID No.: RISL/14/OCB/39
Name & Address of the Procuring Entity
Name: RajCOMP Info Services Limited (RISL) Address: First Floor, Yojana Bhawan, C-Block, Tilak Marg, C-
Scheme, Jaipur (Rajasthan)
Name & Address of the Project Officer In-charge (POIC)
Name: Rajesh Saini Designation: Manager, RISL Address: First Floor, Yojana Bhawan, C-Block, Tilak Marg, C-
Scheme, Jaipur (Rajasthan) Email: [email protected]
Subject Matter of Procurement Overall Design, Development, Training, O&M and FMS for the Web Portal of Rajasthan Renewable Energy Corporation Limited (RRECL)
Bid Procedure Single-stage: One envelop open competitive bid procedure Bid Evaluation Criteria (Selection Method)
Least Cost Based Selection (LCBS)-L1
Website for downloading Bidding Document, Corrigendum’s, Addendums etc.
Websites http://risl.rajasthan.gov.in and http://doitc.rajasthan.gov.in
Estimated Procurement Cost Rs. 16.50 Lacs
Manner, Place & End Date for the submission of Bids
Manner: By hand delivery, by courier or by post Place: First Floor, Yojana Bhawan, C-Block,
Tilak Marg, C-Scheme, Jaipur (Rajasthan) End Date: 08/08/2014 at 3:00 pm
Date/ Time/ Place of Financial Bid Opening
Date & Time: 08/08/2014 at 04:00 pm Place: First Floor, Yojana Bhawan, C-Block, Tilak Marg,
C-Scheme, Jaipur (Rajasthan) Bid Validity 90 days from the bid submission deadline Note: 1) The procuring entity reserves the complete right to cancel the bid process and reject any or all of
the bids. 2) No contractual obligation whatsoever shall arise from the bidding document/ bidding process
unless and until a formal contract is signed and executed between the procuring entity and the successful bidder.
3) Procurement entity disclaims any factual/ or other errors in the bidding document (the onus is purely on the individual bidders to verify such information) and the information provided therein are intended only to help the bidders to prepare a logical bid-proposal.
4) The provisions of RTPPA Act 2012 and Rules thereto shall be applicable for this procurement. Furthermore, in case of any inconsistency in any of the provisions of this bidding document with the RTPP Act 2012 and Rules thereto, the later shall prevail.
5) All terms, conditions, rules, regulations and any further amendments to such rules and regulations thereto, mentioned in the Rate Contract Document for Selection of Vendors for Website Development, Web Application Development and Facility Management Services for existing Website or Web Application for One year and Facility Management Services for newly developed Websites or Web Application for additional One year (2014), Reference No. F4.6(94)/RISL/Tech/2014/12424 dated 13-01-2014 and Rate Contract order no. No.F.4.6(94)/RISL/Tech/2014/2377, 2378, 2379, 2380, 2381, 2382 & 2383 dated 05.06.2014 for all the firms under the said Rate Contract with RISL shall prevail.
-sd-
Chairman & Managing Director, RISL
Page 4
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 4 of 35
3. ELIGIBILITY CRITERIA
a. As per the orders issued pertaining to Rate Contract Document for Selection of
Vendors for Website Development, Web Application Development and Facility
Management Services for existing Website or Web Application for One year
and Facility Management Services for newly developed Websites or Web
Application for additional One year (2014), Reference No.
F4.6(94)/RISL/Tech/2014/12424 dated 13-01-2014, following firms are in
Rate Contract with RISL.
S.
No.
Firm Rate Contract Order No.
1. AKAL Information System Limited No.F4.6(94)/RISL/Tech/2014/2380
dated 5/6/2014
2. Akiko Sherman Infotech No.F4.6(94)/RISL/Tech/2014/2379
dated 5/6/2014
3. CSS Techenergy Ltd. No.F4.6(94)/RISL/Tech/2014/2378
dated 5/6/2014
4. Cybersurf (India) Pvt. Ltd. No.F4.6(94)/RISL/Tech/2014/2377
dated 5/6/2014
5. Net Creative Mind Solution Private
Limited
No.F4.6(94)/RISL/Tech/2014/2382
dated 5/6/2014
6. Dev Information Technology
Private Limited
No.F4.6(94)/RISL/Tech/2014/2381
dated 5/6/2014
7. UTI Infrastructure Technology and
Services Ltd.
No.F4.6(94)/RISL/Tech/2014/2383
dated 5/6/2014
b. The technical evaluation of eligibility has already been carried out for the
above given bidders, and therefore, the decision of the same shall prevail.
c. Any additional requirement, if raised by a department, within the structure
and terms & conditions of the rate contract, shall be needed to be fulfilled by
all the bidders interested to participate in this RFQ.
Page 5
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 5 of 35
4. SCOPE OF WORK
4.1 Scope of Work:
As per the terms and conditions of the Rate Contract No. F4.6(94)/RISL/Tech/2014/12424
dated 13-01-2014, the scope of work shall be pertaining to the overall scope defined in the
RFQ document. The same shall be pertaining to the following:
i. Requirement Gathering
ii. Design, Coding & Testing
iii. Go-Live
iv. Security and Audit
v. Training
vi. Operations & Maintenance / Facility Management Services
Please refer to the Chapter 4 of Rate Contract document for detailed description of the
above given activities.
Selected Bidder shall adopt a phase wise approach in implementing the proposed system for
RRECL.
Modules of RRECL MIS Application are as follows.
Sr.
No
RRECL MIS Application
1. Registration of Power Producers
A On-line registration of the Solar power developers
B On-line registration for Installation of Biomass Power Project
C On-line registration for Installation of Wind Power Project
2. Subsidy Management
A Off Grid
B Roof Top
C Solar Water heating Systems
3. Accounting System
Page 6
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 6 of 35
The proposed main features of the web enabled application are RRECL are as follows:
Automatic e-Sanchar voice messages / SMS/Email to the applicant/beneficiary &
concerned Officers at every stage for acknowledgement/ clarification/ intimation /
status of the application/ sanction / payment release etc.
The services may be added in the service basket of e-Mitra for online payment or
payment deposit at e-Mitra/CSC kiosks.
There will be a provision of backlog data entry for all the existing records for pending
and disposed cases.
Monitoring of all the cases will be possible by the system (Login IDs and passwords at
different levels) and several required reports have to be generated.
All the users will be given a user management module with login option, forget
password etc. The application transaction will be according to the user roles.
Dashboard will be prepared for the overall view of the transactions for the Top Level
Officers.
Complete MIS reporting tool will be integral part of the application where reports can
be generated in the PDF Format or export in Excel Format.
The application will also generate letters in MS Word as per requirements.
The financial module will also be connected with this module.
4.1.1 Detailed Scope of Work
a) Registration of Power Producers
In RRECL the registration of the Power Producers is done under the following categories:
On-line registration of the Solar power developers
On-line registration for Installation of Biomass Power Project
On-line registration for Installation of Wind Power Project
The system will provide web enabled solution for online procedure to cater different types
of Solar/Wind/Biomass power developers, since from registration to commissioning of the
plant and refund of security deposit.
In this module all the interested power producers, who want to establish power plants for
generation of Renewable Energy in Rajasthan will register in the web application
themselves.
The work flow of the web application for On-line registration and process of the Solar
power developers:
Solar Power Developer submits online application request with attachments uploaded.
The Fee of Rs 50000/ MW may be deposited by any of the two ways:
Page 7
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 7 of 35
o e-Mitra kiosk
o online payment.
Registration will be completed after submission of detail of fee deposit.
RRECL observations communicated to developers.
When developer/firm actually interested, it’s Net Worth, land details & REC/Bid
checked
When all details are found ok then matter goes to Bid Evaluation Committee
After BEC, proposal goes to SLSC for In Principle approval
Within 1 month, firm has to submit, Power evacuation plan along with SD (5 L/MW) &
BG (20 L/MW)
After “In Principle” approval, firm gets ED/CD exemption
Recommendation to state Government u/s 68 of Electricity Act for laying of
transmission line
If firm is interested for Govt. land then recommendation of RRECL sent to concerned
District Collector
After approval from Revenue department Land allotment is done by District Collector.
Execution of Lease deed & possession of land by firm is done
The firm starts the Work at the site
Firm request for final approval
Final approval given by SLEC
When work is completed, firm requests for issue of connectivity/commissioning
RDPPC constitute committee for connectivity/commissioning
Constituted committee give commissioning certificate
Refund of security deposit to the developer
The work flow of the web application for Installation of Wind Power Project
Receives application along with Fee Rs 50000/- per MW from the wind developer
Registration of Project and allot the registration no
Received land details along with S.D. @ Rs. 1 Lacs per MW as security for allotment of
Govt. land.
Developers submits Power Evacuation Plan along with write up and line diagram
Recommendation for allotment of Govt. land to the District Collector
Forwarding of power evacuation plan to RVPNL
Receipt of evacuation place from RVPNL
Recommendation to state Government u/s 68 of Electricity Act for laying of
transmission line
Arranging the in principle clearance from the State Level Screening Committee (SLSC)
& communicated to the developer
Page 8
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 8 of 35
Developer submits security amount @ Rs. 5 Lacs per MW within two months from the
date of in principle clearance
Arranging the Final approval from the State Level Empowered Committee (SLEC)
Execution of PPA/WBA with the RVPN/ Discoms of Rajasthan on the request of the
Developer/ Power Producers within the commissioning schedule
When work is completed, firm requests for issue of connectivity/commissioning
RDPPC constitute committee for connectivity/commissioning
Constituted committee give commissioning certificate
Commissioning of Project within the time Schedule
Recommendation for transmission/sub lease part of land to the Investor before or
after commissioning
Refund of security deposit to the developer
The work flow of the web application for Installation of Biomass Power Project
Receives application from Biomass Power Developer along with processing Fee & other
documents
Application registered & Application Registration Number allotted
Firm submits DPR & Biomass Agreement Report for the project
Project registered & Project Registration Number allotted
Firm deposits security deposit for the project
Firm’s request for allotment of Govt. land is recommended to District Collector in case
of Govt. land
Power evacuation Plan is recommended to RVPN
Firm arranges all other satisfactory clearances like use of water for the project from
WRD/CGWA airport authority of India etc
Approval u/s 68 of E.A. 2003 for lying of transmission line
Grid connectivity approval by RVPN
“In Principle Clearance” SLEC grants approval of the project on firm’s request
Recommendation for execution of PPA to RDPPC in case of sale of power to Discoms
When work is completed, firm requests for issue of connectivity/commissioning
RDPPC constitute committee for connectivity/commissioning
Constituted committee give commissioning certificate
Commissioning of the project
Refund of Securities
b) Subsidy Management of Off Grid, Roof Top and Solar Water heating systems
RRECL provides subsidy to three type of beneficiaries i.e. Off Grid (Below 1kw for
individuals), Roof top (for institutions, commercial organizations etc) and Solar water
Page 9
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 9 of 35
heating. This section will provide complete web based solution for the complete process
from application registration to subsidy payment to vendors.
All three types of subsidy schemes off grid, roof top and solar water heating will be
managed by the system.
Total process from submission of application by the beneficiary to release of subsidy to
the vendors/beneficiary, will be monitored online.
The work flow of the web application for Off Grid application
Beneficiary submit online application with Photograph & ID proof
The application is received in RRECL online
RRECL may allow or may Disallow with reasons
Registration Number will be generated
A detail of beneficiaries goes to selected vendors
Vendor selected by beneficiary under intimation to RRECL
Beneficiary, pay his share to vendor within some time limit
Information of the payment is sent to RRECL by Beneficiary
Vendor installs system at beneficiary’s premise
Information to RRECL & PO concerned on email/SMS
Joint inspection by PO & Vendor along with photograph of system
90 % subsidy payment will be made to vendor on receipt of documents duly verified
by RREC Officer
Complaints regarding the subsidy may be informed by beneficiary to vendors with
intimation to RRECL
Information to RRECL after completion of one month successful period for subsidy
payment (as applicable)
Subsidy released after satisfactory report
The work flow of the web application for Roof Top application
Beneficiary submit online application with Photograph & token amount (RTGS)
Information comes to RRECL
RRECL may allow or may Disallow with reasons
Registration No will be generated for allowed beneficiary
A detail of allowed beneficiaries goes to selected vendors
Vendor selected by beneficiary under intimation to RRECL
DPR is to be prepared by vendor within scheduled time period
DPR to be sent to beneficiary & RRECL
DPR forwarded by RRECL to MNRE for approval
Approval of DPR from MNRE
Page 10
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 10 of 35
Information to vendor & beneficiary by RRECL
If not approved by MNRE, token amount to be returned back
If approved then initial payment to be made to vendor (Token money by RRECL &
balance by beneficiary)
System installed by vendor. Intimation to RRECL & PO concern on email/SMS
Joint Inspection by PO & Vendor along with photo of system
After specified time period of successful running of project, second installment of
payment to be given to supplier
Complaints may be given by beneficiary to vendor with intimation to RRECL
Information to RRECL for subsidy payment by the supplier
Balance subsidy released after satisfactory report
The work flow of the web application for Solar Water heating application
Interested Beneficiary submit online application
Information comes to RRECL
Registration Number will be generated for beneficiary
A detail of beneficiary goes to selected MNRE empanelled vendors
Vendor selected by beneficiary under intimation to RRECL
Order given by beneficiary to vendor and Information to RRECL
Vendor installs SWH system at beneficiary’s Premise and consolidate proposals
submit to concerned project officer along with all documents
Information to RRECL & PO concern on email/SMS
Joint inspection by PO & Vendor with photograph of system
Online submission of beneficiary and SWH details on MNRE website Solar Win
Information to RRECL for subsidy payment
Subsidy released to beneficiary on receipt of subsidy amount from MNRE
Complaints may be informed to vendors with intimation to RRECL
c) Account Module:
The major function of the Accounts Section is related to allocation and monitoring of
budget to the various heads and offices related to the Corporation. All the
sanctions/payments made by the accounts section are automatically reflected on the
website and SMS/email sent to the concerned vendor/beneficiary. The expenditure
made by the various authorities and related offices is monitored on timely basis by this
section. This section handles purchase of raw material on demand of office. It also
conducts audits of the accounts of the related offices. The collection of the fees from the
Power Producers and payment of the subsidy to the vendors for the installation at
beneficiary locations.
Page 11
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 11 of 35
d) Existing Website:
A website is already developed for RRECL. The URL of the website is
http://www.rrecl.com/. The web application should integrate with the website. Many of
the reports for public will be display on the website. (Technology used: ASP Dot net with
MS SQL Server).
e) Safe to Host Certification:
System shall be “Safe to Host” Compliant i.e. application security features (under OWASP
guidelines) shall be audited by Third Party Auditor (TPA) & the cost shall be borne by
RISL. The efforts required to resolve any issues identified by TPA are included in the
application development scope. Bidder need to help to achieve the compliance &
ensures that the portal is Safe for Hosting in RSDC as Go Live.
f) Assistance to Third Party Auditor (TPA) appointed by RRECL:
RRECL may appoint Third Party Auditor (TPA) at its own cost to conduct the technical
review and audits of work performed by Selected Bidder. Selected Bidder shall provide
access of the systems as required by TPA for conducting the audits etc. Gaps/ issues
identified by the TPA will be decided mutually between RISL, RRECL and Selected Bidder
and shall further be taken up for resolution by Selected Bidder.
g) User Acceptance Testing (UAT):
The selected bidder shall properly test the RRECL MIS Application (Web MIS Application)
thoroughly and conduct unit and integration testing at his end before deploying the
RRECL MIS Application for UAT. Selected Bidder shall give a demonstration of different
module-wise functionalities developed RRECL Web MIS Application after deploying the
RRECL MIS Application at RSDC. RRECL shall conduct functional testing of RRECL MIS
Application once the functional demonstration of Web MIS Application is over.
The selected bidder shall also be responsible for:
Preparation and submission of Test Strategy, UAT test cases and Test Results
Assist Purchaser in carrying out user acceptance of solution.
Rectifying the issues/ bugs reported in Web MIS Application during the UAT.
Final approval/user acceptance of the RRECL MIS Application and system shall be
given by RISL. This is the responsibility of the Selected Bidder to obtain the UAT
approval from the RISL.
Page 12
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 12 of 35
h) Proposed Security Architecture
Envisaged security architecture for the solution is provisioned as below:
User Level Security: Restricted areas of the application will only be accessible
through pre-defined user access rights. Users logging into application using
username and password and if required dual factor authentication can be
incorporated i.e. logging into system using biometric authentication along with
username & password.
Database Level Security: Other than built in database access logic in Software
Solution, provision to control direct access to database server by any unauthorized
user shall be done. Only authorized database administration users with assigned
privilege shall be allowed to access database.
Application Level Security: Application shall have Role based access, encryption of
user credentials and storing of user credentials for users. Application level security
controls should be provisioned in the application for following:
Prevent SQL Injection Vulnerabilities for attack on database
Prevent XSS Vulnerabilities to extract user name password
Secure Authentication and Session Management control functionality shall be
provided
Prevent Security Mis-configuration Vulnerabilities
Prevent Failure to Restrict URL Access Vulnerabilities (By providing
authentication and authorization for each sensitive page, use role-based
authentication and authorization and make authentication and authorization
policies configurable
Prevent invalidated Redirects and Forwards Vulnerabilities
Infrastructure Level Security: Application infrastructure will be hosted in a State
Data Center as provided by GoR.
4.1.2 Training
a) Training of staff is essential for ensuring that the software developed is actually put
to use. Hence, the selected bidder shall also ensure a proper hands-on training to the
designated end-users of RRECL on the Web MIS Application developed by it so as to
make them well conversant with the functionalities, features and processes built in
the RRECL Web MIS Application.
b) Training shall be conducted at Jaipur Office and may have multiple sessions as per the
need and requirement of the project/ application. Hence, Bidder shall conduct
Training Needs Analysis in the SRS of all the concerned staff and drawing up a
systematic training plan. The training duration should be sufficiently long for effecting
meaningful assimilation of training content by an average user. There should be
Page 13
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 13 of 35
sufficient number of trainers in every training session for conducting the training
program.
c) The content of the training plan and schedule shall be decided by RISL/RRECL and the
selected bidder later at an appropriate time period.
d) The requisite training infrastructure like training space, computers, projector with
screen, and connectivity to Server shall be provided by the RRECL.
e) The Bidder shall provide training material (role base), the language of training
material shall be in Hindi and English.
f) The Bidder shall ensure that all the training documentation in Hardcopy and Softcopy
is in place (user training, operation procedures, visual help-kit etc.).
g) Bidder shall bear all the expenses towards its resource person/ faculty.
h) Bidder shall submit details of each training session including Attendance Record (in
Hard Copy)
i) Indicative Training needs identified for RRECL before Go-live of phase are:
Sl.
No.
Description of Training No. of
employe
es to be
trained
approx.
Batc
h
Size
No. of
Batche
s
Estimated No. of
Training Session
per batch
including hands-
on training on
the application
1 Training on relevant/ all
application modules as
defined in Training Needs
Analysis before Go-Live
40 20 2 10
One Training sessions shall be of 4 hour each. Number of Batches or Number of
Sessions per batch may increase or decrease.
4.1.3 Operational Support Services - Web Application Support & Maintenance (FMS):
a) BIDDER shall provide Support and Maintenance (FMS) services for RRECL Web MIS
Application. The Support & Maintenance services shall start from Go-live of the
modules.
b) Selected bidder will deploy requisite number of resources to provide operational
support services for the developed MIS Application for RRECL. These operational
assistants may carry out day to day operations of the RRECL Web MIS Application for
a period of two year starting from the date of Go-live of integrated RRECL Web MIS
Application.
c) Managed Services during Support and Maintenance Period
i. Corrective Maintenance Services
The Bidder shall be responsible of troubleshooting of Web MIS Application
problems and rectification of the same.
Page 14
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 14 of 35
ii. RRECL Web MIS Application Support & Maintenance Services
Overall administration, operations, monitoring, maintenance of the deployed
RRECL Web MIS Application (Web MIS Application) and the Database to ensure
the desired uptime.
During Support & Maintenance (FMS) period RISL/RRECL may request Bidder,
to make necessary changes in the layout, colour schema, MIS reports format,
input forms layout etc. The Bidder shall be responsible to make these changes
at No extra cost to purchaser.
RRECL Web MIS Application (Web MIS Application) administration, support &
maintenance throughout the project period. The Bidder shall provide support
on following activities
o Minor changes in RRECL Web MIS Application on instruction of RRECL/
RISL
o Defect Fixing reported by RRECL/ RISL
o Support required to update Web Portal & Web Application
Maintain version control and archives of source code, and web site content
and database
iii. Support & Maintenance Reports
The Bidder shall have to submit certain key deliverables during Support and
Maintenance Period which are mentioned hereunder. However, in addition to
the reports/ deliverables as indicated below, Bidder shall prepare and submit
all other required information in the desirable format as notified by the
purchaser related to project.
The formats for all the reports shall be prepared by the Bidder and submitted
to the purchaser for approval. The reports submitted by the Bidder should
strictly be in the approved format only which, if required, may be revised from
time to time.
Sr.
N
o.
Activity Deliverable Frequency Time Frame
1. SLA Support
&
Maintenance
(FMS) (User)
Log reports of
problems
resolved,
unresolved and
escalated issues
duly signed by
RRECL
Weekly (Online
through email
etc.)
Weekly
Consolidated
Report on Calls
Quarterly
(In Hardcopy)
Within 1
Week of end
Page 15
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 15 of 35
Logged, Resolved
and Escalated
duly signed by
RRECL
of each
Quarter
iv. Change Request Management Services
The requirement for integration with existing and new application(s) shall be
finalized in consultation with RRECL/ RISL as and when these application(s)
become operational. The required integration shall be done through change
request management system.
4.2 Roles & Responsibilities (Stakeholder-Wise)
a) Monitoring of Contract: Contract shall be monitored jointly by RISL and RRECL from
time to time.
b) Responsibilities of RISL
The role of RISL in the successful implementation of the solution includes discharging the
following responsibilities:
Coordinate with other government agencies and RRECL
Conduct review meetings at regular intervals to monitor the progress of the
project.
Facilitate RRECL in providing functional requirement for SRS.
Review, provide feedback and approve the software design, implementation
approach, and other technical documents submitted by the selected bidder.
Co-ordinate with the RSDC Operator and other stakeholders of the project.
To oversee the proposed training plan
Recommendation of change requests to Contract Monitoring Committee with
the finalization of efforts estimation, cost estimation, milestone and payment
Review and approve the payments to the Selected Bidder as per SLA
Any other help/ assistance/ co-ordination required for the successful
implementation and operations of the work/ project
c) Responsibilities of RRECL: The roles and responsibilities of the RRECL shall be as
follows: -
To identify and appoint senior nodal officer(s) and nodal team for facilitating
the project execution
To coordinate with all the stack holders of the project.
To provide necessary support during requirement gathering, sharing of
manual templates and explain the functional requirements in detail to the
selected bidder
Page 16
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 16 of 35
Ensure and provide timely and required support to RISL in providing Sign off
to SRS document
Review functional aspects of the project and approve functional and training
document and ensure their timely project sign offs.
To do functional testing and required support to RISL in providing UAT sign-
off.
Provide the sufficient Internet connectivity for running this solution.
Provide Infrastructure including Computer, Connectivity for Operational
Services provided by bidder.
Bear the cost of integrating RRECL Web MIS Application with the Payment
Gateway
d) Responsibilities of System Integrator (Bidder): The detailed role & responsibilities
of Bidder has already been described in the scope of work of Chapter 4 of this RFP.
Page 17
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 17 of 35
5. PROJECT DELIVERABLES, MILESTONES & TIME SCHEDULE
a) In view of the volume and complexity of the Project, Selected Bidder is expected to carry
out all ground work for implementation including documentation, coordination with
RRECL and other stakeholders of the project, site survey etc. These reports or
deliverables are to be submitted timely by Selected Bidder to the RISL / RRECL to ensure
the timely and smooth execution of project. Certain key deliverables are identified for
each of the parts/stages, which are mentioned hereunder. However, Selected Bidder has
to prepare and submit any required information in form of Reports / excel sheet /
document desired by RISL related to RRECL other than defined hereunder in the table.
b) The time schedule for the development and implementation is 7 months. The milestones
and deliverables for the computerization of RRECL project are as follows:-
S.
No.
MILESTONES / Module
Name
DELIVERABLES
Time Schedule
T0=Work Order Date
1 Registration of Power
Producers Module
SRS Report & Web Application of
Module
T1 = T0 + 60 days
2 Subsidy Management
Module
SRS Report & Web Application of
Module
T2 = T1 + 60 days
3 (a) Accounting System
Module
SRS Report & Web Application of
Module
T3 = T2 + 90 days (b) Integration of three
modules & Go-Live
• SRS Report & Web Application of
Integrated Modules
• Software / Database Design Doc.
• RRECL Web MIS Application
• Training User Manuals
Support & Maintenance of RRECL Web MIS Application after Go-live
4 Support & Maintenance of
RRECL Modules for two
years after Go-live
• Satisfactory Performance
Certificate of RRECL for each
quarter
• Support & Maintenance reports
as per scope of work
2 Years
from the
date of Go-live
c) Training on RRECL Web MIS Application will be done on release of the Beta Version of
each Module
d) For each of the milestone, the timeline shall start from the next day of the completion of
the previous milestone.
e) It may also be noted that the time schedule for each milestone shown in the table above
would be enforced independently. Any delay in the approval of the deliverable(s)
submitted by the Bidder to RRECL shall not account for the delay on Bidder’s part.
f) The selected bidder has to design and implement a very detailed plan of implementation
that seeks to execute several activities in parallel, adopts critical path method and
Page 18
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 18 of 35
commits additional resources to activities falling behind schedule so as to keep up with
the overall deadline of implementation as mentioned above. The time specified for
delivery and other activities as mentioned in the table above shall be deemed to be the
essence of the contract and the selected bidder shall arrange supplies and provide the
required services within the specified period.
Page 19
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 19 of 35
c) Deliverables for Operational Support Services: Selected Bidder shall submit the
following report every quarter for operational support services
Sr.
N
o.
Activity Deliverable Frequency Time Frame
1. SLA Support
&
Maintenance
(FMS) (User)
Log reports of
problems
resolved,
unresolved and
escalated issues
duly signed by
RRECL
Weekly (Online
through email
etc.)
Weekly
Consolidated
Report on Calls
Logged, Resolved
and Escalated
duly signed by
RRECL
Quarterly
(In Hardcopy)
Within 1
Week of end
of each
Quarter
d) Project Duration
The expected Contract/ Project Period is Two (2 years) and Seven (7) months which
shall commence from the date of signing of Agreement till Completion of Two Years
of Support & Maintenance of RRECL Web MIS Application after Go-live of the
project.
It is responsibility of Bidder to scale up the Support and Maintenance team as and
when required to confirm smooth project execution throughout the duration.
Page 20
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 20 of 35
6. INSTRUCTION TO BIDDERS (ITB)
1) Format and Signing of Bids
The technical bid shall consist of the following documents: -
S. No. Documents Type Document Format
Documents
1. Bidder’s Authorization Certificate As per Annexure-1
2. Self-Declaration As per Annexure-2
3. Certificate Of Conformity/ No Deviation As per Annexure-3
4. Financial Bid – Covering Letter As per Annexure-4
5. Financial Bid – Format As per Annexure-3
Page 21
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 21 of 35
2) Opening of Bids
a) The sealed bid box shall be opened by the bid opening committee constituted by
the procuring entity at the time, date and place specified in the bidding document
in the presence of the bidders or their authorised representatives, who choose to
be present.
b) The bids shall be opened by the bids opening committee in the presence of the
bidders or their authorised representatives who choose to be present.
c) All envelopes shall be opened one at a time and the following details shall be read
out and recorded: -
a. the name of the bidder and whether there is a substitution or modification;
b. the bid prices (per lot if applicable);
c. the bid security, if required; and
d. any other details as the committee may consider appropriate.
After all the bids have been opened, they shall be initialled and dated on the first
page of the each bid by the members of the bids opening committee. All the
pages of the price schedule and letters, Bill of Quantities attached shall be
initialled and dated by the members of the committee. Key information such as
prices, delivery period, etc. shall be encircled and unfilled spaces in the bids shall
be marked and signed with date by the members of the committee. The original
and additional copies of the bid shall be marked accordingly. Alterations/
corrections/ additions/ over-writings shall be initialled legibly to make it clear
that such alteration, etc., were existing in the bid at the time of opening.
3) Selection Method:
The selection method is Least Cost Based Selection (LCBS or L1). Bidders have to
quote man-months efforts for different type of resources required for completing the
assignment as per Rate Contract with RISL.
4) Other Conditions related to Bidding Process etc. – All Other Conditions related to
bidding process shall be as per Chapter-5 (Instruction to Bidders (ITB))of “Final RFP of Rate
Contract for Website Development, Web Application Development and FMS of Website and
Web Application” (2014) (NIT No- F4.6(94)/RISL/Tech/2014/12424 Dated: 13-01-2014)
Page 22
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 22 of 35
7. GENERAL TERMS AND CONDITIONS OF TENDER & CONTRACT
All terms and conditions as per the Chapter 6 of the Rate Contract No. F4.6(94)/
RISL/ Tech/ 2014/12424 dated 13-01-2014 shall prevail.
Page 23
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 23 of 35
8. SPECIAL TERMS AND CONDITIONS OF TENDER & CONTRACT
Payment Terms and Schedule
a) Payment schedule – Payments to the bidder, after successful completion of the
target milestones (including specified project deliverables), would be made as
under:
S. No. Project Deliverable Due Payment after receipt of UAT from
RISL
Time
(A) Web Application Development for RRECL
1 Registration of Power Producers
Module
80% of the Module Cost Once
2 Subsidy Management Module 80% of the Module Cost Once
3 Accounting System Module &
Integration of three modules & Go-
Live
80% of the Module Cost Once
4 Remaining 20% of Web Application Development for RRECL in 4 equal instalments at the end of each Quarter along with FMS Payment of First Year
Four
(B) FMS of the Newly developed Web Application for Two Year
5 • Satisfactory Performance
Certificate of RRECL for each
quarter
• Support & Maintenance reports
as per scope of work
100% of the cost of FMS of the Newly developed Web Application for Two Year
8 equal Quarterly
instalments
b) All other terms and conditions as per the Chapter 7 of the Rate Contract No.
F4.6(94)/ RISL/ Tech/ 2014/12424 dated 13-01-2014 shall prevail.
Page 24
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 24 of 35
ANNEXURE-1: BIDDER’S AUTHORIZATION CERTIFICATE {to be filled by the bidder}
To,
{Procuring entity},
______________________________,
______________________________,
I/ We {Name/ Designation} hereby declare/ certify that {Name/ Designation} is hereby
authorized to sign relevant documents on behalf of the company/ firm in dealing with NIB
reference No. ______________________ dated _________. He/ She is also authorized to attend
meetings & submit technical & commercial information/ clarifications as may be required
by you in the course of processing the Bid. For the purpose of validation, his/ her verified
signatures are as under.
Thanking you,
Name of the Bidder: - Verified Signature:
Authorised Signatory: -
Seal of the Organization: -
Date:
Place:
Page 25
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 25 of 35
ANNEXURE-2: SELF-DECLARATION {to be filled by the bidder}
To,
{Procuring entity},
______________________________,
In response to the NIB Ref. No. _____________________________ dated ___________ for {Project Title},
as an Owner/ Partner/ Director/ Auth. Sign. of ____________________________________, I/ We
hereby declare that presently our Company/ firm _________________, at the time of bidding,: -
a) possess the necessary professional, technical, financial and managerial resources and
competence required by the Bidding Document issued by the Procuring Entity;
b) have fulfilled my/ our obligation to pay such of the taxes payable to the Union and the
State Government or any local authority as specified in the Bidding Document;
c) is having unblemished record and is not declared ineligible for corrupt & fraudulent
practices either indefinitely or for a particular period of time by any State/ Central
government/ PSU/ UT.
d) does not have any previous transgressions with any entity in India or any other country
during the last three years
e) does not have any debarment by any other procuring entity
f) is not insolvent in receivership, bankrupt or being wound up, not have its affairs
administered by a court or a judicial officer, not have its business activities suspended
and is not the subject of legal proceedings for any of the foregoing reasons;
g) does not have, and our directors and officers not have been convicted of any criminal
offence related to their professional conduct or the making of false statements or
misrepresentations as to their qualifications to enter into a procurement contract within
a period of three years preceding the commencement of the procurement process, or not
have been otherwise disqualified pursuant to debarment proceedings;
h) does not have a conflict of interest as mentioned in the bidding document which
materially affects the fair competition.
i) will comply with the code of integrity as specified in the bidding document.
Page 26
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 26 of 35
If this declaration is found to be incorrect then without prejudice to any other action that
may be taken as per the provisions of the applicable Act and Rules thereto prescribed by
GoR, my/ our security may be forfeited in full and our bid, to the extent accepted, may be
cancelled.
Thanking you,
Name of the Bidder: -
Authorised Signatory: -
Seal of the Organization: -
Date:
Place:
Page 27
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 27 of 35
ANNEXURE-3: CERTIFICATE OF CONFORMITY/ NO DEVIATION
{to be filled by the bidder}
To,
{Procuring Entity},
______________________________,
CERTIFICATE
This is to certify that, the services which I/ We shall supply if I/ We am/ are awarded with
the work, are in conformity with the minimum specifications of the bidding document and
that there are no deviations of any kind from the requirement specifications.
Also, I/ we have thoroughly read the bidding document and by signing this certificate, we
hereby submit our token of unconditional acceptance to all the terms & conditions of the
bidding document without any deviations.
I/ We also certify that the price I/ we have quoted is inclusive of all the cost factors
involved in the end-to-end implementation and execution of the project, to meet the desired
Standards set out in the bidding Document.
Thanking you,
Name of the Bidder: -
Authorised Signatory: -
Seal of the Organization: -
Date:
Place:
Page 28
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 28 of 35
ANNEXURE-4: FINANCIAL BID COVER LETTER & FORMAT
COVER LETTER {to be submitted by the bidder on his Letter head}
To,
{Procuring Entity},
______________________________,
Reference: NIB No. :___________________________________ Dated:__________
Dear Sir,
We, the undersigned bidder, Having read & examined in detail, the Bidding Document, the
receipt of which is hereby duly acknowledged, I/ we, the undersigned, offer to supply/
work as mentioned in the Scope of the work, Service Level Standards & in conformity with
the said bidding document for the same.
I / We undertake that the prices are in conformity with the specifications prescribed. The
quote/ price are inclusive of all cost likely to be incurred for executing this work. The prices
are inclusive of all type of govt. taxes/duties.
I / We undertake, if our bid is accepted, to deliver the services in accordance with the
delivery schedule specified in the schedule of Requirements.
I/ We hereby declare that in case the contract is awarded to us, we shall submit the contract
performance guarantee as prescribed in the bidding document.
I / We agree to abide by this bid for a period of _____ days after the last date fixed for bid
submission and it shall remain binding upon us and may be accepted at any time before the
expiry of that period.
Until a formal contract is prepared and executed, this bid, together with your written
acceptance thereof and your notification of award shall constitute a binding Contract
between us.
Page 29
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 29 of 35
I/ We hereby declare that our bid is made in good faith, without collusion or fraud and the
information contained in the bid is true and correct to the best of our knowledge and belief.
We understand that you are not bound to accept the lowest or any bid you may receive.
We agree to all the terms & conditions as mentioned in the bidding document and submit
that we have not submitted any deviations in this regard.
Date:
Authorized Signatory
Name:
Designation:
Page 30
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Financial Bid Format
FORMAT FOR MAN-MONTH EFFORT
Scope of Work
Resources/Team Members
Man Month Rate including all taxes, levies and duties excluding Service Tax
No. of Man Month Effort
Total (Amount) (Rs.)
(1) (2) (3) (4) (5)= (3)*(4)
I Web Application Development for RRECL
(a) Registration of Power Producers Module Team Leader
<<As per Rate Contract>>
Web Designer Senior Developer/DBA Developer (b) Subsidy Management Module Team Leader
<<As per Rate Contract>>
Web Designer Senior Developer/ DBA Developer (c) Accounting System Module & Integration of modules Team Leader
<<As per Rate Contract>>
Web Designer Senior Developer/ DBA Developer
Total of Web Application Development for RRECL
II
FMS of the Newly developed Web Application for Two Year
Developer <<As per Rate Contract>>
Grand Total ( I + II)
Service Tax shall be paid at prevailing rates
Page 31
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 31 of 35
ANNEXURE-5: BANK GUARANTEE FORMAT {to be submitted by the bidder’s bank}
BANK GUARANTEE FORMAT – PERFORMANCE SECURITY (PBG)
(To be stamped in accordance with Stamp Act and on a Stamp Paper purchased from
Rajasthan State only and to be issued by a Nationalised/ Scheduled bank having its
branch at Jaipur and payable at par at Jaipur, Rajasthan)
To,
The Managing Director,
RajCOMP Info Services Limited (RISL),
First Floor, Yojana Bhawan, C-Block, Tilak Marg, C-Scheme, Jaipur-302005 (Raj).
1. In consideration of the Rajcomp Info Services Ltd. (hereinafter called "RISL") having
agreed to exempt M/s ..........................(hereinafter called "the said Contractor(s)" from
the demand, under the terms and conditions of an Order No..................................dated
..................... for the work .................(hereinafter called "the said Agreement") of Security
Deposit for the due fulfilment by the said Contractor (s) of the terms and conditions
contained in the said Agreement, on production of a Bank Guarantee for
Rs...................(rupees ........................................only), we ...................(indicate the name of the
Bank), (hereinafter referred to as "the Bank") at the request of
..................Contractor(s) do hereby undertake to pay to the RISL an amount not
exceeding Rs...................(Rupees..................................only) on demand.
2. We................. (Indicate the name of Bank), do hereby undertake to pay Rs....................
(Rupees............................only), the amounts due and payable under this guarantee
without any demur or delay, merely on a demand from the RISL. Any such demand
made on the bank by the RISL shall be conclusive as regards the amount due and
payable by the Bank under this guarantee. The Bank Guarantee shall be completely
at the disposal of the RISL and We....................... (Indicate the name of Bank), bound
ourselves with all directions given by RISL regarding this Bank Guarantee. However,
our liability under this guarantee shall be restricted to an amount not exceeding
Rs...................... (Rupees....................only).
Page 32
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 32 of 35
3. We.......................(indicate the name of Bank), undertake to pay to the RISL any money
so demanded notwithstanding any dispute or disputes raised by the contractor(s) in
any suit or proceeding pending before any Court or Tribunal or Arbitrator etc.
relating thereto, our liability under these presents being absolute, unequivocal and
unconditional.
4. We.....................(indicate the name of Bank) further agree that the performance
guarantee herein contained shall remain in full force and effective up to <DATE> and
that it shall continue to be enforceable for above specified period till all the dues of
RISL under or by virtue of the said Agreement have been fully paid and its claims
satisfied or discharged or till the RISL certifies that the terms and conditions of the
said Agreement have been fully and properly carried out by the said Contractor(s)
and accordingly discharges this guarantee.
5. We ...........................(indicate the name of Bank) further agree with the RISL that the
RISL shall have the fullest liberty without our consent and without affecting in any
manner our obligations hereunder to vary any of the terms and conditions of the
said Agreement or to extend time of performance by the said Contractor(s) from
time to time or to postpone for any time or from time to time any of the powers
exercisable by the RISL against the said Contractor(s) and to forbear or enforce any
of the terms and conditions relating to the said Agreement and we shall not be
relieved from our liability by reason of any such variation, or extension being
granted to the said Contractor(s) or for any forbearance, act or omission on the part
of the RISL or any indulgence by the RISL to the said Contractor(s) or by any such
matter or thing whatsoever which would but for this provision, have effect of so
relieving us.
6. The liability of us ............................. (indicate the name of Bank), under this guarantee
will not be discharged due to the change in the constitution of the Bank or the
contractor(s).
7. We .............................. (indicate the name of Bank), lastly undertake not to revoke this
guarantee except with the previous consent of the RISL in writing.
Page 33
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 33 of 35
8. This performance Guarantee shall remain valid and in full effect, until it is decided to
be discharged by the RISL. Notwithstanding anything mentioned above, our liability
against this guarantee is restricted to Rs........................... (Rupees..............................only).
9. It shall not be necessary for the RISL to proceed against the contractor before
proceeding against the Bank and the guarantee herein contained shall be
enforceable against the Bank notwithstanding any security which the RISL may have
obtained or obtain from the contractor.
10. We .............................. (indicate the name of Bank) verify that we have a branch at
Jaipur. We undertake that this Bank Guarantee shall be payable at any of its branch
at Jaipur. If the last day of expiry of Bank Guarantee happens to be a holiday of the
Bank, the Bank Guarantee shall expire on the close of the next working day.
11. We hereby confirm that we have the power(s) to issue this guarantee in your favor
under the memorandum and articles of Association/constitution of our bank and the
undersigned is/are the recipient of authority by express delegation of power(s) and
has/have full power(s) to execute this guarantee for the power of attorney issued by
the bank.
Dated..........................day of....................For and on behalf of the <Bank> (indicate the Bank)
Signature
(Name & Designation)
Bank's Seal
The above performance Guarantee is accepted by the RISL
For and on behalf of the RISL
Page 34
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 34 of 35
ANNEXURE-6: MEMORANDUM OF APPEAL UNDER THE RTPP ACT, 2012
Appeal No ………of ……………
Before the ………………………… (First/ Second Appellate Authority)
1. Particulars of appellant:
a. Name of the appellant: <please specify>
b. Official address, if any: <please specify>
c. Residential address: <please specify>
2. Name and address of the respondent(s):
a. <please specify>
b. <please specify>
c. <please specify>
3. Number and date of the order appealed against and name and designation of the
officer/ authority who passed the order (enclose copy), or a statement of a decision,
action or omission of the procuring entity in contravention to the provisions of the
Act by which the appellant is aggrieved: <please specify>
4. If the Appellant proposes to be represented by a representative, the name and postal
address of the representative: <please specify>
5. Number of affidavits and documents enclosed with the appeal: <please specify>
6. Grounds of appeal (supported by an affidavit): <please specify>
7. Prayer: <please specify>
Place …………………………………….
Date ……………………………………
Appellant's Signature
Page 35
RFQ: Design, Development, Training, and FMS for the Web Portal of RRECL
Page 35 of 35
ANNEXURE-7: DETAILS OF SECURITY AUDIT OF WEBSITE/ WEB APPLICATION
Service/ Audit Type, Methodology & Deliverable
1) Application Security Assessment
Methodology: Different website testing techniques are employed to unearth
application security vulnerabilities, weaknesses and concerns related to
Authentication, Authorization, Session Management, Input/output
Validation, Processing Errors, Information Leakage, Denial of Service etc.
Typical issues which may be discovered in an application security audit
include Cross-site scripting, Broken ACLs/Weak passwords, Weak session
management, Buffer overflows, Forceful browsing, CGI-BIN manipulation,
Form/hidden field manipulation, Command injection, Insecure use of
cryptography, Cookie poisoning, SQL injection, Server mis-configurations,
Well-known platform vulnerabilities, Errors triggering sensitive information
leak etc. For web applications OWASP (Open Web Application Security
Project) guidelines is used for the assessment. All the assessment is carried
out using both state-of-the-art tools and manual testing methods.
2) System Performance Testing/ Monitoring
Methodology: Today’s business systems have changed dramatically at the
advent of multi-tier architecture. Organization’s need to support 3 or more tiers
involving, network infrastructure, web servers, application servers, databases,
etc. Troubleshooting and to find out the root causes of the performance
problems is the basic scope of this test. State of the art tools should be used to
monitor and analyse the network traffic/ performance issues.
To pin-point which tier is causing problems by inserting unacceptable latencies
for the end users. Isolation of the fault to the application, system or network
further speeds resolution and minimizes finger pointing among support groups
and vendors.