Top Banner
RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015
17

RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

Jan 04, 2016

Download

Documents

Rosamund Watson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

RAILROAD COMMISSION OF TEXAS

Bruce WatermanT-4 and POPS

September 2015

Page 2: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

T-4 Pipeline Permitting Oversight and Safety Division

Page 3: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

• RRC Adopts changes to Pipeline Permit Rule 3.70• FIFO- ‘First In & First Out’• 15 Day Acceptance or Rejection Letter • 45 Day T-4 Process & T-4A Approval

Letter• T-4 Forms(Revised)• T-4C (Eliminated)

Presentation Overview

Page 5: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

New Adopted Rule Amendments

Page 6: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

Effective March 1, 2015:• Permit applications must include additional information:

–Requested classification

–Purpose of the pipeline or pipeline system» Common carrier

» Gas utility

» Private operator

New Adopted Rule Amendments

Page 7: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

• Permit applications must include sworn statement

– Operator’s factual basis supporting classification and purpose being sought

• If applicable,

– Documentation such as contract of tariff

– Other information requested by the Commission

• T-4 Permit may be revocable any time after a hearing

• Applicant must acknowledge eminent domain provisions in Texas Landowner’s Bill of Rights

New Adopted Rule Amendments

Page 8: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

T-4

F O

RM

Natural Gas

Private

INSTRUCTIONS - Form T-4

Page 9: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

T-4

F O

RM INSTRUCTIONS - Form T-4

10.83

Page 10: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

Guidance

for

Natural

Gas

Operators

/

Economic

Operators

Page 11: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

NON-

UTILITY

C E R

TI F I C A T E

00123

ABC Pipeline Company

Mark Smith

Page 12: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

THANK YOU

Contact Information

Permitting: Bruce Waterman Brent Mosby Kristi Schulz For questions, please call 512-463-7058

Email: [email protected]

Mapping: Lori Mireles - 512-463-7032 Colby Broadway - 512-524-6019

Email: [email protected]

Page 13: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

POPS

• https://webapps.rrc.state.tx.us/security/login.do

[email protected]

Page 14: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

POPS

Page 15: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

POPS

Page 16: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

POPS

Page 17: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.

POPS