. GOVERNMENT OF INDIA MINISTRY OF RAIL WAYS RAILWAY BOARD No. 20 12/RSF/649/2/RP-II/RWF New Delhi, dt. 03'.08.12 The Chief Mechanical Engineer, Rail Wheel Factory, Bangalore - 560 064. The Controller of Stores, All India Railways & P/Units. Sub:- Minutes of the Quarterly WTA Meeting for the planning of items for the period II/2012-13 (July - September, 2012). Minutes of quarterly WTA meeting for the period II/2012-13 (July - September, 2012) held with the representatives of RWF and Zonal Railways/PUs in Rail Bhawan, New Delhi on 10.07.12 has been uploaded on Indian Railway's website www.indianrailways.gov.in. To access the Minutes kindly click on "Ministry of Railways. Then click on "Railway Board". Then click on "About Indian Railways" Tab. Then click on " Railway Board Directorates". Then click on "Stores". Then click on "Conferences I Meetings" to open the page containing the minutes of the meeting. Please ensure that the statement of requirements of WTA items for the Quarter III/20 12-13 (October - December, 12) should reach this office latest by 15.09.12 positively. The exact date and venue of the meeting would be advised later on. Encl.:- As above. WTA fctcH I ~ itoCf; Cffi" ~ -ti ()f d crt ~. . ev Misra) Director, Railway Stores (F) Railway Board. Copy of the Minutes of the meeting together with allocation statement is forwarded for infonnation and necessary action please. 1. The Chief Mechanical Engineers, All India Railways and Production Units. 2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi. 3. Mis Jessop & Co~Ltd., 21 & 22, Jessore Road, Kolkata - 700 028. 4. Mis Bharat Earth Movers Ltd., "BEML SOUDHA", 23/1, 4th Main, S.R. Nagar, Bangalore-560 027. 5. Mis Titagarh Wagons Ltd.,l13, Park Street, Kolkata -700016. 6. Mis Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office Complex, Lodhi Road, New Delhi-110 003. 7. Mis BESCO Ltd., Wagon Division, Baruipur Works, Railway Station, Baruipur, Eastern Railway, West Bengal. 8. AM(RS), AM(ME), Adv(L)/RS, EDRS(C), EDRS(P), EDME(Chg.), EDME(W), EDME (Tr.), EDEE(RS), DME(PU), DME(P)-l, DEE/G, DRS(W), DRS(M), DF(S)-l and RS(WT A) Branches of Railway Board. 9. CWM, Eastern Railway, Kancharapara. -
27
Embed
Rail Wheel Factory, Bangalore- 560 064. . ev Misra - Indian Railway
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
.GOVERNMENT OF INDIAMINISTRY OF RAIL WAYS
RAILWAY BOARD
No. 20 12/RSF/649/2/RP-II/RWF New Delhi, dt. 03'.08.12
The Chief Mechanical Engineer,Rail Wheel Factory, Bangalore - 560 064.
The Controller of Stores,All India Railways & P/Units.
Sub:- Minutes of the Quarterly WTA Meeting for the planning of items forthe period II/2012-13 (July - September, 2012).
Minutes of quarterly WTA meeting for the period II/2012-13 (July - September, 2012) held withthe representatives of RWF and Zonal Railways/PUs in Rail Bhawan, New Delhi on 10.07.12 has beenuploaded on Indian Railway's website www.indianrailways.gov.in. To access the Minutes kindly click on"Ministry of Railways. Then click on "Railway Board". Then click on "About Indian Railways"Tab. Then click on " Railway Board Directorates". Then click on "Stores". Then click on"Conferences I Meetings" to open the page containing the minutes of the meeting.
Please ensure that the statement of requirements of WTA items for the Quarter III/20 12-13(October - December, 12) should reach this office latest by 15.09.12 positively. The exact date and venueof the meeting would be advised later on.
Copy of the Minutes of the meeting together with allocation statement is forwarded for infonnation andnecessary action please.
1. The Chief Mechanical Engineers, All India Railways and Production Units.2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi.3. Mis Jessop & Co~Ltd., 21 & 22, Jessore Road, Kolkata - 700 028.4. Mis Bharat Earth Movers Ltd., "BEML SOUDHA", 23/1, 4thMain, S.R. Nagar, Bangalore-560
027.5. Mis Titagarh Wagons Ltd.,l13, Park Street, Kolkata -700016.6. Mis Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office Complex,
Lodhi Road, New Delhi-110 003.7. Mis BESCO Ltd., Wagon Division, Baruipur Works, Railway Station, Baruipur, Eastern Railway,
EDEE(RS), DME(PU), DME(P)-l, DEE/G, DRS(W), DRS(M), DF(S)-l and RS(WT A) Branchesof Railway Board.
9. CWM, Eastern Railway, Kancharapara.
-
RWF MINUTES
Present : AM/PU, ADV.(RS), ADV.RS(P), CAO/wPO/Patna, CME &COS/RWF, Bangalore, EDs & Directors of Stores Directorate & MechanicalDirectorate, COS/CMM/JAG Officers of Zonal Railways & Production units,SAG Officers of Mechanical Department of Zonal Railways & ProductionUnits, GM/WAP, SAIL/DSP.
RWFIBangalore
. Supply performance of RWF/Bangalore was commendable for 1st Quarter of2012-13. RWF supplied 53000 wheels & 26000axles in 1st Quarter.
. It was decided that RWF will produce 1000 loco wheels in 2ndQuarter andconcentrate on supply of loose wheels & axles in this quarter, RWF will beallotted 15000 BG chg. Wheels, 7000 BOXN wheels & 3000 EMU wheels inthis quarter.
. With the availability of forgings & forged axles from MSF and VISL, it hasbeen possible for RWF to increase production of axles. CME/RWF requestedfor additional allocation of BOX 'N' axles.
. Maintenance shutdown of Axle & Wheelshops are to be taken in 3rdquarter.
. EDME/Frt. Requested for the allotment of wheels needed or BLC Wagons(840 mm dia) to Northern Railway.
. Availability of HMS in RWF is to be monitored and ensured.
RWPIBELA
. 1000 BOX "N" wheels allotted in 1st quarter could not be supplied byRWP/BELA..
. During 2ndquarter CAO/WPO indicated that 4000 BOX "N" Wheels will besupplied.
. The Wheelset pressing capacity for BOXN wheel sets is available atRWF/Bangalore. Thus it would be difficult to maintain supply of only BOXNwheels from RWP/Bela when production ofBOXN wheels reaches more than35000/per annum in 2013-14. Thus RWP/Bela must explore possibility ofproducing BG Coaching Wheels.
. CAO/WPO requested zonal Railways to maintain supply of HMS toRWP/BELA.
DSP/SAIL
. DSP supplied only 10776 nos. wheels & 1143 nos. axles during 1st quarteragainst their annual commitment of 68000 wheels & 12000 axles.
. GM/DSP/SAIL assured that in 2nd quarter their supply performance willimprove and atleast 12000 wheels will be supplied in this quarter.
S.No. Item Supply Position1. WDG-4 loco wheels . 717 nos. received (DLW-400, SWR-
317). 561 nos. dispatched on 10.07.12. 685 nos. are yet to come
. 868 nos. are yet to come3. WAG-9 loco wheels . 839 nos. received (CLW-363,
NR-156, SCR-120, CR-200). 351 nos. dispatch on 10.07.12. 357 nos. are yet to come
-2-BG Coaching Wheels. Critical review of the requirement of BG coaching wheels is required to be
under taken by Railways as requirement projected by Railways is 70 to 80%higher in comparison to consumption during previous years.
. CWM/Matunga requested for additional allotment of BG Coaching wheels. Itwas advised to them that requirement should be supported with indents andsupply will be made as per quantity indented.
Imported WT A Items
. Supply of loco wheels against contract on Mis Bonatrans is as follows:
. Supply of WAP-5 loco wheels against contract on Mis KL W is as follow:
S.No.1.
Item Su I PositionWAP-5 loco wheels 221 nos. already reached at Kolkatta Port
CLW-161, NR-60Tender for 12054 nos. LHB coaching wheels has been decided, LOA hasbeen issued.Contract for 2997 nos. WDG-4 & 2523 nos. WAG-9 loco wheels has beenissued.For 172 nos. WAP-5 loco wheels LOA has been issued, contract is underIssue.Tender for 10000 nos. EMU wheels has opened on 07.06.12.Tender for 10000 nos. 's' profile Loco Wheels (conventional type) hasopened on 20.07.12. '
Tender for 10000 nos. BG Coaching Wheels is due to open on 7thSeptember,2012.
.
.
.
.
.
.
No. Item Quantity Actual Supplies Variation TotalPlanned (April- June, (+) excess Supplies(April - June, 2012) (-) shortfall from April
WIWL-4955/R(vi) 840 mm dia wheels for 700 5790 -121 5790
CONCOR(vii) EMU/DMU Wheels to 4000 2264 -1736 2264
Drg. No. K-4004(vii) Wheels for BVZC 0 0 0 0
Wagons to Drg. No.W/WL-4747TOTAL WHEELS 26995 17757 -9238 17757
-3-. Tender for 4000 nos. MG Coaching wheels is due to open on 30th August,
2012.. Tender for 909 nos. Kolkatta Metro wheels has opened on 22.06.12.. DME/PU requested for early finalization of tenders for EMU and "8" shaped
wheels and early issue of BG Coaching & MG Coaching Wheels tenders.
Submission of Indents
. All the Railways and Production Units were advised to ensure to submit theirindents for the WTA items for contract Period 2014-15 by 31.07.12. In caserequirement is nil, same may also be confirmed in writing. Instructions forsubmission of indents, position of Buffer stock etc. were detailed in Board'sminutes of the WTA meeting held on 13.04.12 circulated vide Board's letterof even no. dated 03.05.12.
Other issues
. ICF & RCF were requested to use Cast EMU wheels for trail or coaches.
The position regarding supplies made by RWF during the previous quarter Le.April- June, 2012 was discussed. The same is tabulated as under:-
NO.WfWL-1660/R ER 1000 LLHEco.R 500 MCSNR 1000 500-JUDW
500-AMV400 ASR RSP
NER 600 GKPNFR 400 NBQNWR 700 400-J U
300-AIISR 1300 800-CW/PER
300-GOC200-LW/PER
SCR 1200 600-LGD600- TPTY
SER 1000 KGPSWR 600 400-UBL
200-AP400 UBL For BVZI
WR 400 350-PL50-BVP
600 CWM/PL For BEML wheelsets
WCR 500 BPLICF 1000RCF 2700Total 15000
3 840 dia wheel for ER 60 LLHCONCOR for BLC wagon NR 500 JUDW
NCR 250 JHSSCR 48 GTPLWR 50 BVPTotal 908
4 BG Loco Wheels /DSL CR 150 PRMono Block Rough ER 200 100-JMPmachined for WDM2, 1OO-KP AWDM3 and WAG 5 to SR 100 GOCDrg. No. DIWL-4948/RtoDrg. No. SER 250 KGP
CLW 200
DMW 200
Total 1100
5 MG Chg. Wheels to NER 150 IZNRDSO's Drg. NO.CG-K NFR 100 NBQ6099 Alt. latest (WAP-W-
NWR 50 BKN031)SR 100 GOC
WR 50 BVP
Total 450
6 EMU/DEMU Wheels to CR 300 MTNDrg. No. K-4004 ER 300 KPA
NR 200 100-GZB100-CB
SR 700 CW/PER
SER 200 KGP
WR 500 PL
ICF 800
Total 3000
TOTAL WHEELS 28208AXLES
1 BG DSL Loco axle to Drg. ER 29 KPANo.WIWL-4973/R Total 29
2 Axle for WDG-2 A (Axle CR 78 PRRT (with light wt. 5002 NR 40 CBFZ) to Drg. No. TPL-5868 NER 16 GKPAlt. 'b' part No. 11231622 SCR 10 TPTY
DLW 145DMW 178Total 467
3 Axle rough turned for CLW 32WAP-4 Loco to Drg. Total 32NO.03/2/11/55
4 Axle driving rough turned DMW 56for WDM-3A Locos to Total 56Drg. No. DIWL-5058/RAlt. NIL
5 Axle rough machined for CR 42 22-BSLWDG-2 & WAG-7 to Drg. 20-PRNO.06/2/11/2 ER 22 KPA
NR 20 CB
WR 9 DHD
CLW 386
BHEL 150
Total 629
6 Axle assembly for WDP-4 NWR 4 Allwithout TM EMD pt. Total 4No.40088126 DLWNo.17230184
7 Axle rugh for WDS-6 to DLW 171Drg. No. TPL-2585 Total 171
8 Axles for WAG-9 & WAP- CLW 1487 (Rough machined) to CR 115 BSLCLW's Drg. No. 1209-01- ER 18 KPA011-002 Alt. Total 281
9 Axle rough GM Loco to CR 6 PREMD pt. No. 40077315
NR 6 CB(Geared) & DLW Part No.17230019 SCR 6 TPTY
SWR 30 UBL
Total 48
10 Axle (3 phase) for WAP-5 CR 12 BSLLoco to CLW Drg.NO.1210-01-311-025 CLW 38
Total 50
11 Axle for WDG-5 locos to DlW 37DlW's part No.
Total 3717230330
12 Axle rough machined for CR 58 BSlTAO-659 Hitachi type NR 85 GZBwheelset to Drg. No. SER 60 KGPSKEl-4516 WR 35 DHD
Total 238
TOTAL AXLES (1) TO 2042(12) IN NOS.TOTAL AXLES IN 3880EQUATED NOS.IX bv 1.9)=
13 BG EMU MTR Coach CR 50 MTNAxles to Drg. No. NR 45 GZBDC/EMU-M-0-1-005 Total 95
14 Axle for AC Motor Coach ER 28 HlRto Drg. NO.EMUlMC-1- Total 28025
15 EMU Axles for Motor ICF 300Coaches to Drg. No. NR 16 GZBAC/DC/EMU/B-02-002 SR 12 lW/PERAlt. A/2 item 1 (WAP-A- JESSOP 24 KPA087) Titagarh 24 KPA
BEMl 24Total 400
16 Axle for MEMU/DMC to RCF 60Drg. No.EMU/M-0-1-025
Total 60Alt. a
17 Axle rough turned for ICF 106Motor Coach to Drg. Total 106NO.MRB/DMC-0-2-004COl 1 Alt. Nil
TOTAL EMU AXLES IN 689NOS.TOTAL EMU AXLES IN 827EQUATED NOS. (X by1.2)=
18 BG EMU Axle to Drg. No. SR 70 CW/PERWlWl-4784/R
Total 70
19 EMU Axles for Trailor JESSOP 48 KPACoaches to Drg. No. Titagarh 48 KPAAC/DC/EMU/02/204-00 100/RWF-A-157 BEML 16 CB
ICF 300
SR 20 CW/PER
Total 432
20 Azxle rough turned for ICF 35Trailor Coach for Kolkatta Metro Rly. 25 KolkattaMetro to Drg. No. MRB-O-1-002 alt. 4/b Total 60
21 BG MEMU TC Axles to RCF 250Drg. No. WTAC3-0-2-303 NR 16 CBAIt.F SCR 4 GTPL
Total 270
22 Axel for BOX'N'/BCN SWR 48 UBLwagon to Drg. No.WD- WR 100 DHD92039/S-1 item-1, AIt.2 WCR 500 KTT
Total 648
23 BOX 'N' Axles to Drg. No. CR 45 PRW/WL-4901/R (WD- ER 200 100-JMP89025/SL-2) 50-HLR
TOTAL AXLES S.NOS. 773318 to 26 IN NOS.GRAND TOTAL AXLES 10464IN NOS.=GRAND TOTAL AXLES 12440IN EQUATEDUNITS=
I WHEELSETSI 1 16T BG Coaching W/sets BEML 400 Will be sent to HubliI for machining.
GOVERNMENT OF INDIAMINISTRY OF RAIL WAYS
RAILWAY BOARDNo. 2012/RSF/649/2/RP-II/DSP
1. Mis Steel Authority of India Ltd.,Central Marketing Organisation, S&RM Division,Ispat Bhawan, 40-Jawahar Lal Nehru Marg,Kolkata - 700 071.
2 The Controller of Stores,All India Railways & P/Units.
New Delhi, dt 03 .08.12
Sub:- Minutes of the Quarterly WTA Meeting for the planning of WTA items for theperiod II/2012-13 (July - September, 2012).
Minutes of quarterly WTA meeting for the period II/2012-13 (July - September, 2012) held withthe representatives of DSP in Rail Bhawan, New Delhi on 10.07.12 has been uploaded on IndianRailway's website www.indianrailways.gov.in. To access the Minutes kindly click on "Ministry ofRailways. Then click on "Railway Board". Then click on "About Indian Railways" Tab. Then clickon " Railway Board Directorates". Then click on "Stores". Then click on "Conferences I Meetings"to open the page containing the minutes of the meeting.
Please ensure that the statement of requirements of WTA items for the Quarter III/20 12-13(October - December, 2012) should reach this office latest by 15.09.12 positively. The exact date andvenue of the meeting would be advised later on.
Encl.:- As above.WT A 'Id cHI~ tocJi em em~Cl.\(1 -ti ('t cIG1 ~. ~
( Sanjeev Misra)Director, Railway Stores (F)
Railway Board.
Copy to:1. The Chief Mechanical Engineers, All Indian Railways/Production Units.2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi.3. GM (BBM & WAP), Mis SAIL/DSP, Durgapur-713203.4. The DGM lIC, WAP, Mis SAIL/DSP, Durgapur-713203.5. The Chief Marketing Manager, Mis SAIL/DSP, SCOPE MINAR (1ih floor), North Block, Laxmi
Nagar District Centre, Delhi - 110092.6. Shri Vinay Kumar, Dy.GM, Mis SAIL/DSP, SCOPE MINAR (20th floor), North Block, Laxmi
Nagar District Centre, Delhi - 110 092.7. GM(I), Mis RITES (ER), Quality Assurance Division, Central Station Building (Metro), 56, CR
Avenue, 3rdFloor, Kolkata -700012.8. S.I.E(M) Incharge, Inspection Wing, Mis RITES clo DSP, Durgapur-713203.9. Mis Jessop & Co. Ltd., 21 & 22, Jessore Road, Kolkata -700028.10. Mis Titagarh Wagons Ltd., 113, Park Street, Kolkata-700 016.11. Mis Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office Complex,
Lodhi Road, New Delhi-l10 00312. Mis BESCO Ltd., Wagon Division, Baruipur Works, Railway Station, Baruipur, Eastern Railway,
1000 BOX "N" wheels allotted in 1st quarter could not be supplied bRWP/BELA.. YD' ndUf1~g 2 quarter CAOIWPO indicated that 4000 BOX "N"
Wh 1.11 bsupplIed. ee s WI e
The Wheelset pressing capacity £ BOXNRWF/Bangalore. Thus it would be dif~~ult t . w~eelsets is available atwheels from RWP/Bela when production of ~ mamtam supply of only BOXN35000/per annum in 2013-14. Th RWP OXN wheels reaches more than
producing BG Coaching Wheels.us /Bela must explore possibility 01
CAO/WPO d .requeste zonal RaIlways to maintain supply ofHMS to RWP/BELA.
Banglore, EDs & Directors of 8'tRor~: Dtre~t<;:oduction units, SAG Officers of
COS/CMMlJAG Officers of Zona al ways P d f Units GM/WAP,Mechanical Department of Zonal Railways & ro uc Ion ,SAILIDSP.
RWF/Bangalore
Supply performance of RWF IBangalore was commendable for 1st Quarter of 20 12-
13. RWF supplied 53000 wheels & 26000 axles in 1st Quarter.It was decided that RWF will produce 1000 loco wheels in 2nd Quarter andconcentrate on supply of loose wheels & axles in this quarter, RWF will be allotted15000 BG chg. Wheels, 7000 BOXN wheels & 3000 EMU wheels in this quarter.With the availability of forgings & forged axles from MSF and VISL, it has beenpossible for RWF to increase production of axles. CME/RWF requested foradditional allocation of BOX 'N' axles.Maintenance shutdown of Axle & Wheelshops are to be taken in 3rdquarter.EDME/Frt. Requested for the allotment of wheels needed or BLC Wagons (840mm dia) to Northern Railway.Availability of HMS in RWF is to be monitored and ensured.
.
.
.
.
.
.
RWPIBELA
.
.
.
DS~ supplied only 10776 nos. wheels & 1143 .sttheIr annual commitment of68000 wheels & 12~~~ a~les durmg 1 quarter against
GM/DSP/SAIL assured that in 2nd . ax es.and atleast 12000 wheels will be su
PqpUIl~ed
e: thth
~Ir supply performance will improvem IS quarter.
S.No. Item Supply Position1. WDG-4 loco wheels . 717 nos. received (DLW-400, SWR-
317).. 561 nos. dispatched on 10.07.12. 685 nos. are yet to come
2. WDP-4 loco wheels . 2456 nos. received (DLW-1821,NWR-65, SWR-470, WR-200, NFR-200)
. 572 nos. dispatched on 10.07.12
. 868 nos. are yet to come3. WAG-9 loco wheels . 839 nos. received (CLW-363,
NR-156, SCR-120, CR-200). 351 nos. dispatch on 10.07.12. 357 nos. are yet to come
S.No. Item Supply Position1. WAP-5 loco wheels 221 nos. already reached at Kolkatta Port
(CLW-161, NR-60)
-2-
BG Coaching Wheels
. Critical review of the requirement of BG coaching wheels is required to be undertaken by Railways as requirement projected by Railways is 70 to 80% higher incomparison to consumption during previous years.
· CWM/Matunga requested for additional allotment of BG Coaching wheels. It wasadvised to them that requirement should be supported with indents and supply willbe made as per quantity indented.
Imported WT A Items
. Supply of loco wheels against contract on Mis Bonatrans is as follows:
. Supply ofW AP-5 loco wheels against contract on Mis KLW is as follow:
. Tender for 12054 nos. LHB coaching wheels has been decided, LOA has beenissued.
. Contract for 2997 nos. WDG-4 & 2523 nos. WAG-9 loco wheels has been issued.
. For 172 nos. WAP-5 loco wheels LOA has been issued, contract is under issue.
. Tender for 10000 nos. EMU wheels has opened on 07.06.12.
. Tender for 10000 nos. 's' profile Loco Wheels (conventional type) has opened on20.07.12.
. Tender for 10000 nos. BG Coaching Wheels is due to open on 7th September,2012.
S.Nos. Item Quantity Actual Variation TotalPlanned Supplies (+) excess Supplies(April - (April - (-)shortfall from April,
June, 2012) June, 2012) - June,2012
A ASSEMBLEDWHEEL SETS
(i) 16TBO Coaching 300 39 -261 39Wheelsets
B LOOSEWHEELS
(i) BO Chg. Wheels 4950 2676 -2274 2676W/WL-1660/R
(ii) BO Loco Wheels 6120 3919 -2201 3919W/WL-4948/R
(iii) BO Loco Wheels 4030 1914 -2116 1914"S" Shaped
. Tender for 4000 nos. MG Coaching wheels is due to open on 30th August, 2012.
. Tender for 909 nos. Kolkatta Metro wheels has opened on 22.06.12.
. DME/PU requested for early finalization of tenders for EMU and "S" shapedwheels and early issue of BG Coaching & MG Coaching Wheels tenders.
Submission of Indents
. All the Railways and Production Units were advised to ensure to submit theirindents for the WTA items for contract Period 2014-15 by 31.07.12. In caserequirement is nil, same may also be confirmed in writing. Instructions forsubmission of indents, position of Buffer stock etc. were detailed in Board'sminutes of the WTA meeting held on 13.04.12 circulated vide Board's letter ofeven no. dated 03.05.12.
Other issues
. ICF & RCF were requested to use Cast EMU wheels for trailor coaches.
The position regarding supplies made by Mis SAIL/DSP during the previousquarter i.e. April - June, 2012 was discussed. The same is tabulated as under:-
SUPPLIES DURING APRIL -JUNE. 2012
C LOOSE AXLES(i) 16T BG Coaching 2070 1104 -966 1104
The detailed supply position (Railway wise/Consignee wise) IS gIVen III theenclosed Annexure-I.
The item-wise planning for July - September, 2012 is shown in Annexure - II.
I ANNEXURE -IPosition regarding quantities planned vis a - vis actual supplies made by MIs SAILIDSP during the 1stQuarter (April - June, 2012).S.NOS. DRAWING & RLY./CONSIGNEE QTY.PLANNED QTY. SUPPLIED VARIATION
4 BG Loco Wheels "S" ER 200 100-KPAShaped to Drg. No. DIWL- 100-JMP5060/R SER 200 KGP
WR 200 DHDCLW 200DLW 240DMW 200TOTAL 1240
5 BG Loco Wheels "S" NR 84 CBShaped to Drg. No. SWR 200 UBL17230251 "c" DLW 400
TOTAL 6846 EMUIDEMU Wheels to CR 150 MTN
Drg. No. K-4004 ER 150 HLR
NR 100 GZB
NWR 50 All
SR 400 CW/PER
SCR 135 LGD
SER 100 KGP
WR 300 PL
ICF 400
RCF 360
JESSOP 72 KPA
TOTAL 2217TOTAL WHEELS 14251WHEELSETS
1 Complete Wheelsets RCF 300(Forced) TOTAL 300
--.-------
GOVERNMENT OF INDIAMINISTRY OF RAILWAYS
RAILWAY BOARD
No.2012/RSF/649/2/RP-II/BELA New Delhi, dt. 03.08.12
The CAO/WP,Ministry of Railways,CHAMBER BHAWAN,1st Floor, J.C. Road,Patna-800 001
Sub:- Minutes of the Quarterly WTA Meeting for the planning of items forthe period II/2012-13 (July - September, 2012).
Minutes of quarterly WTA meeting for the period II/2012-13 (July - September,2012) held with the representatives of RWF and Zonal Railways/PUs in Rail Bhawan,New Delhi on 10.07.12 has been uploaded on Indian Railway's websitewww.indianrailways.gov.in. To access the Minutes kindly click on "Ministry ofRailways. Then click on "Railway Board". Then click on "About Indian Railways"Tab. Then click on " Railway Board Directorates". Then click on "Stores". Thenclick on "Conferences / Meetings" to open the page containing the minutes of themeeting.
Please ensure that the statement of requirements of WTA items for the QuarterIII/2012-13 (October - December, 12) should reach this office latest by 15.09.12positively. The exact date and venue of the meeting would be advised later on.
Encl.:- As above.WTA ~cHJ~ ~ em ~ tt('tdGi ~.
(S 'eev Misra)Director, Railway Stores (F)
Railway Board.1. The Chief Mechanical Engineers, ER, NCR, NFR, SCR & WCR.2. The Controller of Stores, ER, NCR, NFR, SCR & WCR.3. The Comptroller & Auditor General ofIndia, Room No.222, Rail Bhawan, New
EDME(W), EDME (Tr.), EDEE(RS), DME(PU), DME(P)-l, DEE/G, DRS(W),DRS(M), DF(S)-l and RS(WTA) Branches of Railway Board.
RWPIBELA
Present : AM/PU, ADV.(RS), ADV.RS(P), CAO/WPO/Patna, CME &COSIRWF, Bangalore, EDs & Directors of Stores Directorate & MechanicalDirectorate, COS/CMM/JAG Officers of Zonal Railways & Production units,SAG Officers of Mechanical Department of Zonal Railways & ProductionUnits, GM/WAP, SAILIDSP.
RWFIBangalore
. Supply performance of RWF/Bangalore was commendable for 1st Quarter of2012-13. RWF supplied 53000 wheels & 26000axles in 1st Quarter.
. It was decided that RWF will produce 1000 loco wheels in 2ndQuarter andconcentrate on supply of loose wheels & axles in this quarter, RWF will beallotted 15000 BG chg. Wheels, 7000 BOXN wheels & 3000 EMU wheels inthis quarter. .
. With the availability of forgings & forged axles from MSF and VISL, it hasbeen possible for RWF to increase production of axles. CME/R WF requestedfor additional allocation of BOX 'N' axles.
. Maintenance shutdown of Axle & Wheelshops are to be taken in 3rdquarter.
. EDME/Frt. Requested for the allotment of wheels needed or BLC Wagons(840 mm dia) to Northern Railway.
. Availability of HMS in RWF is to be monitored and ensured.
RWPIBELA
. 1000 BOX "N" wheels allotted in 1st quarter could not be supplied byRWP/BELA..
. During 2nd quarter CAO/WPO indicated that 4000 BOX "N" Wheels will besupplied.
. The Wheelset pressing capacity for BOXN wheel sets is available atRWF/Bangalore. Thus it would be difficult to maintain supply of only BOXNwheels from RWP/Bela when production ofBOXN wheels reaches more than35000/per annum in 2013-14. Thus RWP/Bela must explore possibility ofproducing BG Coaching Wheels.
. CAO/WPO requested zonal Railways to maintain supply of HMS toRWP/BELA.
DSP/SAIL
. DSP supplied only 10776 nos. wheels & 1143 nos. axles during 1stquarteragainst their annual commitment of 68000 wheels & 12000 axles.
. GM/DSP/SAIL assured that in 2nd quarter their supply performance willimprove and atleast 12000 wheels will be supplied in this quarter.