RADON MIGRATION STUDY O RADON MIGRATION STUDY O N N SINGLE SINGLE - - LAYER COVERAGE LAYER COVERAGE PROCESS OF PROCESS OF URANIUM ENHANCING URANIUM ENHANCING TAILING TAILING S S POND POND Andras Varhegyi, Andras Varhegyi, Norbert Kavasi Norbert Kavasi , , Tetsuo Ishikawa Tetsuo Ishikawa October 19 October 19 , 2010 , 2010 35 35 th th ARPS Conference Challenges for a New Decade ARPS Conference Challenges for a New Decade Adelaide Adelaide , , AUSTRALIA AUSTRALIA
17
Embed
Radon migration study of the single layer coverage of the uranium enrichment tailing pond- kavasi
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
RADON MIGRATION STUDY ORADON MIGRATION STUDY ONN
SINGLESINGLE-- LAYER COVERAGE LAYER COVERAGE PROCESS OF PROCESS OF
Uranium mining in HungaryUranium mining in Hungary
19531953--
Investiagtion of uranium ore in The Investiagtion of uranium ore in The West Mecsek Mountain (Pecs)West Mecsek Mountain (Pecs)
19571957--
Exploitation of Uranium ore, transport Exploitation of Uranium ore, transport to Soviet union. to Soviet union. During the 40 years During the 40 years operation operation period period approximately 46 approximately 46 million t of million t of
rock has been mined rock has been mined out out resulted in resulted in app. 19 million t barren app. 19 million t barren rocks. rocks.
19671967--
Set up chemical separation factorySet up chemical separation factoryAltogether 25.8 million t uranium ore Altogether 25.8 million t uranium ore were chemically treatedwere chemically treated
19921992--
Commence the recultivation processCommence the recultivation process19971997--
Shut down the uranium mining and Shut down the uranium mining and
processingprocessing20082008--
Recultivation was accomplishedRecultivation was accomplished
Characters of tailings pondCharacters of tailings pond
Facility piece: 2Facility piece: 2Area: 163 haArea: 163 ha
The calculated thickness of single layer covering for 0.74 Bq/m2The calculated thickness of single layer covering for 0.74 Bq/m2s s exhalation rate limit:exhalation rate limit:
most optimistic circumstances:most optimistic circumstances:
most wrong circumstances:most wrong circumstances:
1.5 m1.5 m
Some Results of the Calculation I.Some Results of the Calculation I.Influence of Ra content of tailing s on the exhalation rateInfluence of Ra content of tailing s on the exhalation rate
Influence of Moisture content on the exhalation rateInfluence of Moisture content on the exhalation rate
Some Results of the Calculation II.Some Results of the Calculation II.
Influence of compaction on the exhalation rateInfluence of compaction on the exhalation rate
Some Results of the Calculation II.Some Results of the Calculation II.
Results after the covering process I. Results after the covering process I.
Rn concentration in pore after the covering processRn concentration in pore after the covering process
Results after the covering process II. Exhalation rate after the covering processExhalation rate after the covering process
ConclusionsConclusionsAccording to the model calculation, observable that the incremenAccording to the model calculation, observable that the increment of the Ra t of the Ra concentration in the tailings is less, the exsiccation of the coconcentration in the tailings is less, the exsiccation of the covering layer is vering layer is significantly while the exsiccation of tailings and covering laysignificantly while the exsiccation of tailings and covering layer is extremely er is extremely significantly could increase the exhalation rate of radon concensignificantly could increase the exhalation rate of radon concentration. tration. Compacting the covering layer as decreasing the porosity as it wCompacting the covering layer as decreasing the porosity as it was expected as expected decreased the exhalation rate is mark able.decreased the exhalation rate is mark able.
Tailings with average Ra content 4.5 kBq/kg and exhalation ratTailings with average Ra content 4.5 kBq/kg and exhalation rate 4e 4--10 10 Bq/m2s requires 1.5 m single layer coverage to fulfill the 0.7Bq/m2s requires 1.5 m single layer coverage to fulfill the 0.74 Bq/m2s (dose 4 Bq/m2s (dose limit 1 mSv/year).limit 1 mSv/year).
Using multilayer covering landscape recultivation, water reserUsing multilayer covering landscape recultivation, water reservoir voir protection, erosion and dust spreading protection are also resoprotection, erosion and dust spreading protection are also resolvable.lvable.
Some Pictures about the remediation workSome Pictures about the remediation work
Covering processCovering process
Grass:- 200 kg mixed grass seeds / ha
Bushes or trees:- 21 species
- 8 000 pieces / ha (1-2 years old)- distance between the rows: 2,5 m
- distance in the rows: 0,5 mChemical fertilizer:
- N 120 kg / ha- P2 O5 100 kg / ha- K2 O 170 kg / ha
Biological Biological remediationremediation
2001 2003 2006
Tailings pond No. I. and II. Tailings pond No. I. and II. ––landscape from the airlandscape from the air