Radiological Work Controls HPT 001.116
42

Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Dec 18, 2015

Download

Documents

Owen Warren
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

RadiologicalWork

Controls

HPT 001.116

Page 2: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

TERMINAL OBJECTIVE Upon completion of this course, the

participants will demonstrate their knowledge and understanding of the information presented during RADCON Technician training by obtaining a score equal to or greater than 80% on a written examination. The information presented in this lesson plan may be part of an overall exam or be the only information for which the student is examined.

Page 3: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

ENABLING OBJECTIVES

Standards and conditions apply to all enabling objectives. They include under the examination ground rules, without the use of training materials or outside assistance, and utilizing information presented in this lesson plan. Upon completion of this lesson each participant will be able to:

Page 4: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

ENABLING OBJECTIVES

State the purpose of the ALARA Preplanning Report (APR).

Explain the necessity for a radiological pre-job briefing for the APR/RWP.

Determine when a waiver of the APR/RWP applies.

Identify the posting requirements in terms of radiation levels for high radiation areas, very high radiation areas and locked high radiation areas.

Page 5: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

ENABLING OBJECTIVES

Explain the controls for entry to containment at power.

Explain the administrative control of keys for entry into locked high radiation areas.

Explain the method of control of areas subject to varying dose rates.

Explain the workers responsibilities for entering high radiation, very high radiation and locked high radiation areas.

Page 6: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

ENABLING OBJECTIVES

Explain the RADCON specialists’ responsibilities for entering high radiation, very high radiation and locked high radiation areas.

State the actions and precautions to be taken during a resin transfer.

Determine the correct methods for ensuring diver protection from radiation hazards.

Page 7: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

ENABLING OBJECTIVES

State the precautions and steps to be taken during a steam generator entry including calculation of stay times.

Determine the correct steps to be taken when work is performed in the fuel transfer canal.

Page 8: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Introduction

Many of the tasks that a RADCON technician performs can be considered routine. This lesson will explain some of the precautions that a RADCON technician should take when performing specialized tasks. In these cases, additional human performance measures should be taken when performing these special tasks. The possibility for unnecessary exposure to radiation exists in all tasks the technician performs but it is greater when these specialized tasks are performed.

The technician should always use the 2 minute rule when performing any of these tasks. Peer checking may also prevent any unacceptable conditions from occurring.

Page 9: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

ALARA Preplanning Reports (APR) Obj. 1

The purpose of the APR is to ensure that ALARA considerations are included into a Radiation Work Permit (RWP) through the use of protective requirements and special instructions.

Required for each job where collective TEDE is expected to exceed 1 person-rem.

Page 10: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

ALARA Preplanning Reports (APR)

Pre-job planning is an integral part of a RWP.

Approval requirements vary from site to site in TVAN.

Page 11: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

ALARA Preplanning Reports (APR)Obj. 2

The responsible supervisors/work directors ensures all personnel are briefed on the applicable work procedure, RWP protective requirements and special instructions, radiological hazards and APR considerations prior to starting the work.

Page 12: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

ALARA Preplanning Reports (APR)Obj. 3

During an emergency, ALARA preplanning may be waived by the RADCON Shift Supervisor. This waiver shall be noted in the RADCON Log. After the emergency has been resolved, a waiver shall be completed and forwarded to the ALARA representative.

Page 13: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

ALARA Preplanning Reports (APR)

Areas in the plant/work area that have dose rates significantly lower than the work area shall be marked as an ALARA Zone. An ALARA Zone is a low dose waiting area. Workers should be encouraged to use these areas when there is a delay in work and exiting the area is not feasible.

Page 14: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

ALARA Preplanning Reports (APR)

ALARA pre-job planning shall be carried out to identify and minimize the hazards associated with jobs involving potentially significant radiological hazards identified for each job.

Page 15: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Posting Requirements Obj. 4

High Radiation Areas

≥ 100 mrem/hr but < 1000 mrem/hr at 30 cm.

Post as close to the source as possible.

Barricaded. Head high posting or swing gates for entrances.

Page 16: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Posting Requirements Obj. 4

Locked High Radiation Areas

> 1000 mrem/hr at 30 cm & < 500 rads at 1 meter in 1 hour.

Physically barricaded and locked.

Flashing light or guard required for areas that can not be locked.

Page 17: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Posting Requirements Obj. 4

Very High Radiation Areas

> 500 rads at 1 meter in 1 hour.

Physically barricaded and locked.

Flashing light or guard required for areas that can not be locked.

Page 18: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Entry to Containment at Power Obj. 5

Controls

Inside the polar crane wall (IPCW) and in the fan rooms, posted and treated as a locked high radiation area.

Outside the polar crane wall (OPCW) is posted as a high radiation area.

Double locked (RADCON has the keys).

Page 19: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Entry into Locked High Radiation Areas Obj. 6

All areas have different keys. Controlled by RADCON. Shift Manager

& RADCON Shift Supervisor have master key.

Key inventory process - sign in and out. Must verify each shift that all are locked.

Human Performance Error Prevention Tools:Self Checking Peer Checking

Keys

Page 20: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Signs and Barriers

Accessibility, room size and other variables will impact the way areas are posted.

Post as close as possible to the source. When in doubt, be conservative and discuss with your Shift Supervisor.

Placement

Page 21: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Signs and Barriers

Rope barrier

High Radiation Areas

Permanent barrier that blocks accessibility

Flashing Lights

Locked High Radiation Area

Page 22: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Signs and Barriers

Access requires plant management approval

SOS has master key.

Very High Radiation Areas

Page 23: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Control of Areas Subject to Varying Dose Rates Obj. 7

• Areas/systems of concern

Tanks - can change with tank level (will be marked).

Systems - can change with system operation (will be marked).

Page 24: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Control of Areas Subject to Varying Dose Rates Obj. 7

• Methods of Control

Continuous coverage

Electronic alarming dosimeter

Use of area radiation monitors in lower dose areas.

Page 25: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Workers Responsibilities to Comply with the RWP Obj 8

Check with RADCON prior to entry.

Pre job briefing by foreman.

Must have a bonafide need to enter.

High Radiation Areas

Page 26: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Workers Responsibilities to Comply with the RWP Obj 8

Check with RADCON prior to entry.

Pre job briefing by RADCON & foreman.

Must have a bonafide need to enter.

Locked High Radiation Areas

Page 27: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Workers Responsibilities to Comply with the RWP Obj 8

The responsibility for closing and locking the door is with the person who checks out the key.

RADCON ensures that all barriers are locked.

Continuous RADCON coverage is required.

Locked High Radiation Areas

Page 28: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Workers Responsibilities to Comply with the RWP Obj 8

Plant Manager approval for entry.

RADCON Manager approval for entry.

Check with RADCON prior to entry.

Pre job briefing by RADCON & foreman.

Very High Radiation Areas

Page 29: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Workers Responsibilities to Comply with the RWP Obj 8

Must have a bonafide need to enter.

The responsibility for closing and locking the door is with the person who checks out the key.

RADCON ensures that all barriers are locked.

High Radiation Areas

Page 30: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

RADCON Technicians Responsibilities Obj 9

High Radiation Areas

Locked High Radiation Areas

Very High Radiation Areas

Human Performance Error Prevention Tools:Self Checking Peer Checking and Two

Minute Rule (as time permits)

Page 31: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

RADCON Technicians Responsibilities Obj 9

RADCON personnel shall have the authority and responsibility to stop work or prevent the initiation of a job, test or work activity when, in their judgment, the radiological conditions warrant such an action or continued performance of the work would result in the violation of regulation, policy or plant procedures and such actions are consistent with plant safety. RADCON personnel shall immediately inform the Shift Manager and RADCON Superintendent of their actions.

Page 32: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Spent Resin Transfers Obj 10 Work activities will be restricted in affected areas until

the spent resin transfer is complete and surveys have been conducted to establish radiological conditions and controls.

When resin is transferred, affected systems and areas are locked or guarded and properly posted based on the anticipated radiological conditions as determined by RADCON and RADWASTE.

Post transfer surveys should be performed to ensure there are no hot spots remaining.

Human Performance Error Prevention Tools:Self Checking, Peer Checking and Two

Minute Rule (as time permits)

Page 33: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Diving Operations Obj 11Prior to diving operations, a detailed survey shall be

conducted in the work area and areas where the diver will be going including the descent area.

The survey should be conducted using two independent radiation monitoring devices.

If any operation is conducted that could cause the movement of contaminated particles or could cause significant changes in the dose rate, a new survey shall be conducted. Any surveys conducted after the start of the dive shall be reviewed with the diver(s).

Page 34: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Diving Operations Obj 11Surveys results shall be discussed with the

diver and all personnel involved with the dive as part of a pre-dive briefing. The diver shall also be cautioned not to pick up any blackened, battered or unidentified items (foreign material) since they could be irradiated. Irradiated objects shall be surveyed and then moved to safe storage by remote handling methods.

The diver shall be equipped with telemetric dosimetry. In addition, the diver should be tethered.

Page 35: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Diving Operations Obj 11The diver should be sprayed with clean

demineralized water prior to entering the pool to pre-soak the suit and equipment, thus minimizing contamination on the suit.

Shielding or physical barriers may be used to minimize exposure and mobility to non-surveyed areas.

Surveys of the water surface should be performed during the dive.

Page 36: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Diving Operations Obj 11The diver should be sprayed with clean

demineralized water when exiting the pool to minimize contamination spread.

Survey the diver after exiting the pool for hot particles.

If the tritium concentration exceeds 0.01 µCi/ml in the water, then a urinalysis bioassay should be performed on the diver(s) before the initial dive, at prescribed intervals during the dive and after the dive.

Page 37: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Steam Generator Entry Obj. 12 Telemetric dosimetry should be used when individuals

enter a steam generator. If it is not available, a stay time determination should be made. This is done prior to the entry and reevaluated after each entry.

Stay times may be determined using the following method:

Stay time (minutes) = __dose limit (mrem)___ x 60 minutes/hr

dose rate (mrem/hr)

Other methods may be utilized which incorporate TLD measurements.

Page 38: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Steam Generator Entry Obj. 12 Entries into steam generators should be documented Survey all material and debris removed from a steam

generator. Use remote handling tools to handle highly radioactive material.

CAUTION: Highly radioactive material may bepresent in the steam generator and cautionshould be used when removing or handling thismaterial.

Page 39: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Fuel Transfer Canal Entry Obj. 13

RADCON will provide coverage of all activities conducted in the transfer canal.

Prior to entry, a detailed survey of the work areas and traverse areas will be performed.

Any operation which could significantly affect the dose rates or require entry into areas not previously surveyed, RADCON must survey prior to work proceeding.

Survey results must be discussed with workers prior to entry.

Page 40: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

Fuel Transfer Canal Entry Obj. 13

Workers shall be cautioned not to pick up any blackened, battered or unidentified items (foreign material) since they could be irradiated.

Additional dosimetry (TLD location, extremity or multi-badging or remote monitoring) will be determined based on survey results.

The transfer canal should be covered while draining to prevent the spread of contamination particles. If this isn’t practical, other engineering controls should be used (use of HEPA units, frequent rinsing of canal walls, decontamination).

Page 41: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.

SummaryRADCON Specialists must be aware that specialized jobs call for extraordinary measures to ensure that the workers involved are protected from the harmful effects of ionizing radiation. The control of radiological work is paramount in ensuring that this occurs. Using the Human Performance tools as well as the skills acquired during training and the in-plant phase will help aid the Specialist in providing this protection..

Page 42: Radiological Work Controls HPT 001.116. TERMINAL OBJECTIVE n Upon completion of this course, the participants will demonstrate their knowledge and understanding.