ANALISA HARGA SATUAN PEKERJAAN
KOMITE SEKOLAH 2007
A. ANALISA PENGUKURAN , PERSIAPAN & GALIAN TANAH
NO URAIAN PEKERJAAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6 7 8
A.011 1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 1M'
Pekerja 0.400 org 17,000.00 6,800.00 6,800.00
Mandor 0.040 org 31,000.00 1,240.00 1,240.00
Alat bantu 0.000 lot 35,000.00 0.00 0.00
Jumlah 8,040.00 8,040.00
A.012 1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 2M'
Pekerja 0.526 org 17,000.00 8,942.00 8,942.00
Mandor 0.052 org 31,000.00 1,612.00 1,612.00
Alat bantu 0.000 lot 35,000.00 0.00 0.00
Jumlah 10,554.00 10,554.00
A.015 1 M3 PEK. PEMBUANGAN DALAM RADIUS 150 M
Pekerja 0.516 org 17,000.00 8,772.00 8,772.00
Mandor 0.050 org 31,000.00 1,550.00 1,550.00
Alat bantu 0.000 lot 35,000.00 0.00 0.00
Jumlah 10,322.00 10,322.00
A.016 1 M3 PEK. URUGAN TANAH KEMBALI
Pekerja 0.192 org 17,000.00 3,264.00 3,264.00
Mandor 0.019 org 31,000.00 589.00 589.00
Alat bantu 0.000 lot 35,000.00 0.00 0.00
Jumlah 3,853.00 3,853.00
A.017 1 M3 URUGAN TANAH
Tanah urug 1.200 m3 30,700.00 36,840.00 36,840.00
Pekerja 0.300 org 17,000.00 5,100.00 5,100.00
Mandor 0.010 org 31,000.00 310.00 310.00
Jumlah 36,840.00 5,410.00 42,250.00
A.018 1 M3 PEMADATAN TANAH
Pekerja 0.500 org 17,000.00 8,500.00 8,500.00
Mandor 0.050 org 31,000.00 1,550.00 1,550.00
Jumlah 10,050.00 10,050.00
A.019 1 M3 URUGAN PASIR URUG
Pasir urug 1.200 m3 47,700.00 57,240.00 57,240.00
Pekerja 0.150 org 17,000.00 2,550.00 2,550.00
Mandor 0.010 org 31,000.00 310.00 310.00
Jumlah 57,240.00 2,860.00 60,100.00
B. ANALISA PERKERASAN & COR BETON
NO URAIAN PEKERJAAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
G.022 1 M' PEK. PAS NOK / CENGGER KAYU BANGKIRAI 2/15
Kayu bangkirai 0.003 m3 4,357,500.00 13,072.50 13,072.50
Paku 0.030 kg 10,200.00 306.00 306.00
Pekerja 0.042 org 17,000.00 714.00 714.00
Tukang batu 0.120 org 27,000.00 3,240.00 3,240.00
Kepala tukang 0.012 org 28,000.00 336.00 336.00
Mandor 0.002 org 31,000.00 62.00 62.00
Jumlah 13,378.50 4,352.00 17,730.50
83250
20700
DAFTAR HARGA SATUAN UPAH DAN BAHAN
KOMITE SEKOLAH 2007
NO URAIAN SATUAN HARGA SATUAN
( Rp )
1 2 3 4
A UPAH
1 Mandor Per hari 31,000.00
2 Kepala tukang Per hari 28,000.00
3 Tukang Per hari 27,000.00
4 Pekerja Per hari 17,000.00
B BAHAN
1 Batu kali m3 69,300.00
2 Batu pecah m3 116,000.00
3 Tanah pilihan m3 30,700.00
4 Pasir urug m3 47,700.00
5 Pasir pasang m3 85,300.00
6 Semen PC kg 800.00
7 Semen putih kg 1,500.00
8 Semen merah kg 1,500.00
9 Kawur Per m3 157,500.00
10 Batu bata Per bh 240.00
11 Genteng mantili lokal Per bh 700.00
12 Genteng plentong kebumen Per bh 925.00
13 Genteng kerpus lokal Per bh 2,500.00
14 Genteng kerpus kebumen Per bh 3,500.00
15 Kayu jati klas 1 Per m3 10,542,200.00
16 Kayu jati klas 2 Per m3 8,525,000.00
17 Kayu sengon untuk begesting Per m3 1,035,000.00
18 Kayu kruing Per m3 3,712,500.00
19 Kayu kanfer Per m3 4,095,000.00
20 Kayu bagkirai Per m3 4,357,500.00
21 Plipit kayu Per m' 2,500.00
22 List gypsum Per m' 9,000.00
23 Buis beton Ø20cm Per m' 12,250.00
24 Buis beton Ø50cm Per m' 40,400.00
25 Buis beton Ø80cm Per m' 124,100.00
26 Buis beton Ø100cm Per m' 186,100.00
27 Paving I tb 6cm Per m2 22,000.00
28 Paving I tb 8cm Per m2 25,000.00
29 Paving segi enam tb 6cm Per m2 22,000.00
30 Paving segi enam tb 8cm Per m2 25,000.00
31 Keramik dinding 20x20 Per m2 34,300.00
32 Keramik dinding 20x25 Per m2 46,250.00
33 Keramik lantai 20x20 Per m2 37,500.00
34 Keramik lantai 30x30 Per m2 33,750.00
35 Keramik lantai 40x40 Per m2 48,900.00
36 Tegel abu-abu 20x20 Per m2 19,295.00
37 Asbes gelombang besar Per lb 114,400.00
38 Asbes gelombang kecil Per lb 71,300.00
39 Kloset porselin jongkok INA Per bh 96,000.00
40 Bak air viber sudut 40 x 60 cm Per bh 300,000.00
41 Slot pintu merek kuda terbang Per bh 70,000.00
42 Engsel kupu-kupu besar Per bh 7,500.00
43 Engsel kupu-kupu kecil Per bh 6,500.00
1 2 3 4
44 Grendel ukuran besar Per bh 12,500.00
45 Grendel ukuran kecil Per bh 8,000.00
46 Kawat harmonika Per m2 32,000.00
47 Hak angin Per bh 5,000.00
48 Espanyolete Per bh 45,000.00
49 Spring knife Per bh 5,000.00
50 Cat tembok Per kg 13,800.00
51 Cat kayu / besi Per kg 33,600.00
52 Cat genteng Per kg 25,500.00
53 Plamir kayu Per kg 14,000.00
54 Plamir tembok Per kg 5,700.00
55 Meny Per kg 9,700.00
56 Teer Per kg 8,700.00
57 Minyak cat Per lt 8,700.00
58 Dempul Per kg 10,700.00
59 Amplas/ampril/kertas gosok Per lb 1,600.00
60 Bindrad Per kg 9,700.00
61 Baja gulungan ukuran ringan Per kg 8,400.00
62 Baja anyaman bronjongan Per kg 8,400.00
63 Baja (baut-baut) Per kg 13,800.00
64 Baja (paku jembatan) Per kg 13,800.00
65 Alat kerja (sekop, ikrak dll) Per unit 121,000.00
66 Besi beton Per kg 8,400.00
67 Besi siku Per kg 11,600.00
68 Besi kanal Per kg 13,800.00
69 Besi profil Per kg 13,800.00
70 Jendela nako ukuran 1m x 1m Per unit 166,700.00
71 Paku Per kg 10,200.00
72 Eternit Per m2 6,700.00
73 Gipsum Per m2 16,600.00
74 Harflek Per m2 11,500.00
75 Calsiboard Per m2 16,600.00
76 Kaca bening 3 mm Per m2 45,000.00
77 Kaca bening 5 mm Per m2 55,900.00
78 Kaca riband 5 mm Per m2 75,000.00
79 Kaca jeruk polos 3 mm Per m2 65,000.00
80 Kaca S 5 mm Per m2 65,000.00
81 Pipa galvanis diameter 3/4 Per m' 5,600.00
82 Pipa pralon PVC diameter 3" Per m' 15,000.00
83 Pipa pralon PVC diameter 2" Per m' 5,800.00
84 Pipa pralon PVC diameter 1" Per m' 2,100.00
85 Lem kayu (Fox) Per kg 3,100.00
86 Amplas besi Per m2 1,600.00
87 Vernis Per lt 8,700.00
88 Kuas 1" Per bh 1,700.00
89 Closet duduk Per bh 632,500.00
90 Urinoir Per bh 350,000.00
91 Wastafel Per bh 150,000.00
92 Bak teraso Per bh 250,000.00
93 Bak klip fiber Per bh 650,000.00
94 Bak cuci stainles steel 1 bak Per bh 200,000.00
95 Kran air 1/2" Per bh 17,500.00
96 Kran air 3/4" Per bh 22,000.00
97 Seal tip Per bh 1,100.00
1 2 3 4
98 Seng plat (90 x 180) Per m2 39,100.00
99 Walpaper Per m2 143,700.00
100 Perekat (lem) Per bh 11,500.00
101 Pintu almunium Per bh 172,500.00
102 Strip plat 3/4" Per m2 23,000.00
103 Strip plat 1" Per m2 25,800.00
104 Strip plat 1 1/4" Per m2 28,700.00
105 Talang seng t = 0.2 mm L = 60 Per m2 17,200.00
106 Talang seng t = 0.3 mm L = 60 Per m2 21,200.00
107 Tali ijuk Per kg 6,300.00
Sragen, 3 Juni 2007
Team Perencana
Arif Fajar, ST
REKAPUTULASI
PROGRAM : REHABILITASI SD/MI
KEGIATAN : REHABILITASI MI RODHOTUL SOLICHIN
LOKASI : KECAMATAN GEMOLONG
SUMBER DANA : DANA ALOKASI KHUSUS ( DAK )
TOTAL BIAYA : Rp 105,000,000.00
TAHUN ANGGARAN : 2 0 0 7
NO URAIANJUMLAH HARGA ( Rp ) TOTAL HARGA
BAHAN UPAH ( Rp )
1 2 3 4 5
A. REHABILITASI FISIK SEKOLAH
I GEDUNG SEKOLAH/RUANG KELAS #REF! #REF! #REF!
II SUMBER DAN SANITASI AIR BERSIH SERTA KM/WC #REF! #REF! #REF!
III MEBELAIR RUANG KELAS DAN LEMARI PERUSTAKAAN #REF! #REF! #REF!
IV RUMAH DINAS PEJAGA/GURU/KEPALA SEKOLAH #REF! #REF! #REF!
JUMLAH REHABILITASI FISIK SEKOLAH #REF! #REF! #REF!
B.
I#REF! #REF! #REF!
II
#REF! #REF! #REF!
III
#REF! #REF! #REF!
IV#REF! #REF! #REF!
#REF! #REF! #REF!
JUMLAH A+B #REF! #REF! #REF!
JUMLAH TOTAL #REF!
DIBULATKAN 168,094,000.00
TERBILANG " Seratus enam puluh juta sembilan puluh empat ribu rupiah"
Sragen, Mei 2007
Menyetujui,
Kepala Dinas Pekerjaan Umum Ketua Tim Perencana
Kabupaten Sragen
Ir. DARMAWAN MINTO BASUKI, MM.MT. ARIF FAJAR, ST
Pembina Utama Muda
NIP 110 033 077
Mengetahui,
Kepala Dinas Pendidikan dan Kebudayaan
Kabupaten Sragen
Drs. GATOT SUPADI, MBA.MM.
PENGADAAN SARANA PENDIDIKAN DAN SARANA PERPUSTAKAAN
ALAT PERAGA PENDIDIKAN (IPBA, KIT MATEMATIKA, IPS, BAHASA INDONESIA, KIT IPA, DAN KIT BAHASA INGGRIS
BUKU PENGAYAAN JENIS KETRAMPILAN, BUKU PENGAYAAN JENIS PENGETAHUAN (PANDUAN ANTI NARKOBA, SAINS, ATLAS PROVINSI + CD INTERAKTIF, BUKU BACAAN, SASTRA/BAHASA, BUKU BACAAN BUDI PEKERTI, DAN BUKU PANDUAN ICT)
BUKU REFERENSI ( FISIKA, PANDUAN OLIMPIADE IPA DAN MATEMATIKA, KAMUS BAHASA, DAN INSIKLOPEDI MATEMATIKA)
KOMPUTER, PRINTER, ACTIVE SPEAKER, CD INTERAKTIF DAN MESIN KETIK MANUAL.
JUMLAH PENGADAAN SARANA PENDIDIKAN DAN SARANA PERPUSTAKAAN
Pembina Utama Muda
NIP 131 039 907
HAL : RENCANA ANGGARAN BIAYA
LAMPIRAN : HARGA SATUAN PEKERJAAN, GAMBAR DAN
PERHITUNGAN VOLUME
PROGRAM : REHABILITASI SD/MI
KEGIATAN : REHABILITASI SD NEGERI SOKO 1
LOKASI : KECAMATAN MIRI
TOTAL BIAYA : Rp. 70,000,000.00
TAHUN ANGGARAN : 2 0 0 7
NO MACAM PEKERJAAN ANALISA VOLUME TOTAL HARGA
1 2 3 4 5 6
I REHABILITASI FISIK SEKOLAH
A REHABILITASI GEDUNG SEKOLAH/RUANG KELAS
1 PEKERJAAN PERSIAPAN
a Uitzet dan bouwplank Taksir Ls 300,000.00 300,000.00
b Steigerwerk Taksir Ls 360,000.00 360,000.00
c Administrasi dan dokumentasi Taksir Ls 250,000.00 250,000.00
d Bongkaran bangunan lama Taksir Ls 1,000,000.00 1,000,000.00
Jumlah Sub Pekerjaan Persiapan 1,910,000.00
2 PEKERJAAN TANAH
a. Pek. Galian tanah A.011 0.00 m3 8,040.00 0.00
b. Pek. Urugan tanah kembali A.016 0.00 m3 3,853.00 0.00
c. Pek. Urugan pasir A.019 0.00 m3 60,100.00 0.00
d. Pek. Pondasi A.019 0.00 m3 60,100.00 0.00
Sub Total Pekerjaan Tanah 0.00
3 PEKERJAAN BETON
a Cor rabat beton 1:3:5 B.001 0.00 m3 379,028.00 0.00
b Cor beton bertulang 1:2:3 B.002 0.00 m3 466,188.00 0.00
c Pembesian U 24 B.012 0.00 kg 11,703.00 0.00
d Begesting B.014 0.00 m2 55,476.25 0.00
Jumlah Sub Pekerjaan Beton 0.00
4 PEK. PASANGAN DAN PLESTERAN
a Pas. Bata merah 1:3:10 D.006 11.04 m2 37,312.50 411,795.68
b Plesteran 1:3:10 D.011 37.52 m2 11,791.20 442,450.16
c List dan sponengan D.009 99.01 m' 2,422.56 239,863.96
Jumlah Sub Pekerjaan Pasangan dan Plesteran 1,094,109.80
5 PEKERJAAN LANTAI
a Pas. Lantai keramik 30x30 C.026 132.66 m2 65,495.40 8,688,619.76
Jumlah Sub Pekerjaan Lantai 8,688,619.76
6 PEK. PINTU DAN JENDELA
a. Pek. Kuzen pintu, Jendela, dan BV 6/12 kayu jati kwalitas cat F.002 0.72 m3 9,599,100.00 6,865,336.22
b. Pas. Daun pintu panil kayu jati kayu jati tb 3.5 cm F.004 7.53 m2 458,787.00 3,452,574.04
c. Pas. Daun Pintu panil kayu jati kayu jati tb 3.5 cm Taksir 508,787.00 0.00
lapis Alumunium bagian dalam
d. Pas. Daun jendela panil kayu jati kaca bening 5mm F.009 3.38 m2 468,766.00 1,582,929.03
e. Kaca bening 5 mm Taksir 0.844 m3 65,000.00 54,873.00
Jumlah Sub Pekerjaan Pintu & Jendela 11,955,712.29