analisaANALISA HARGA SATUAN PEKERJAANKOMITE SEKOLAH 2007A.
ANALISA PENGUKURAN , PERSIAPAN & GALIAN TANAHNOURAIAN
PEKERJAANKOEFSATHARGA SATHARGA BAHANHARGA UPAHJUMLAH( Rp )( Rp )(
Rp )( Rp )12345678A.0111 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN
1M'Pekerja0.400org17,000.006,800.006,800.00Mandor0.040org31,000.001,240.001,240.00Alat
bantu0.000lot35,000.000.000.00Jumlah8,040.008,040.00A.0121 M3 PEK.
GALIAN TANAH BIASA MAX. KEDALAMAN
2M'Pekerja0.526org17,000.008,942.008,942.00Mandor0.052org31,000.001,612.001,612.00Alat
bantu0.000lot35,000.000.000.00Jumlah10,554.0010,554.00A.0151 M3
PEK. PEMBUANGAN DALAM RADIUS 150
MPekerja0.516org17,000.008,772.008,772.00Mandor0.050org31,000.001,550.001,550.00Alat
bantu0.000lot35,000.000.000.00Jumlah10,322.0010,322.00A.0161 M3
PEK. URUGAN TANAH
KEMBALIPekerja0.192org17,000.003,264.003,264.00Mandor0.019org31,000.00589.00589.00Alat
bantu0.000lot35,000.000.000.00Jumlah3,853.003,853.00A.0171 M3
URUGAN TANAHTanah
urug1.200m330,700.0036,840.0036,840.00Pekerja0.300org17,000.005,100.005,100.00Mandor0.010org31,000.00310.00310.00Jumlah36,840.005,410.0042,250.00A.0181
M3 PEMADATAN
TANAHPekerja0.500org17,000.008,500.008,500.00Mandor0.050org31,000.001,550.001,550.00Jumlah10,050.0010,050.00A.0191
M3 URUGAN PASIR URUGPasir
urug1.200m347,700.0057,240.0057,240.00Pekerja0.150org17,000.002,550.002,550.00Mandor0.010org31,000.00310.00310.00Jumlah57,240.002,860.0060,100.00B.
ANALISA PERKERASAN & COR BETONNOURAIAN PEKERJAANKOEFSATHARGA
SATHARGA BAHANHARGA UPAHJUMLAH( Rp )( Rp )( Rp )( Rp
)12345678B.0011 M3 LANTAI KERJA/ BETON TUMBUK 1:3:5Semen
PC218.000kg800.00174,400.00174,400.00Pasir
beton0.520m3126,400.0065,728.0065,728.00Split
2/30.870m3116,000.00100,920.00100,920.00Pekerja1.650org17,000.0028,050.0028,050.00Tukang
batu0.250org27,000.006,750.006,750.00Kepala
tukang0.025org28,000.00700.00700.00Mandor0.080org31,000.002,480.002,480.00Jumlah341,048.0037,980.00379,028.00B.0021
M3 BETON BERTULANG 1:2:3Semen
PC340.000kg800.00272,000.00272,000.00Pasir
beton0.520m3126,400.0065,728.0065,728.00Split
2/30.780m3116,000.0090,480.0090,480.00Pekerja1.650org17,000.0028,050.0028,050.00Tukang
batu0.250org27,000.006,750.006,750.00Kepala
tukang0.025org28,000.00700.00700.00Mandor0.080org31,000.002,480.002,480.00Jumlah428,208.0037,980.00466,188.00B.0121
KG BESI BETON TERPASANG U-24Besi
beton1.050kg8,400.008,820.008,820.00Kawat
beton0.015kg9,700.00145.50145.50Pekerja0.040org17,000.00680.00680.00Tukang
batu0.015org27,000.00405.00405.00Kepala
tukang0.015org28,000.00420.00420.00Mandor0.008org31,000.00232.50232.50Alat
bantu0.020lot50,000.001,000.001,000.00Jumlah8,965.502,737.5011,703.00B.0141
M2 BEGESTING DENGAN PAPANKaso 5/7 (2 x pakai )
50%0.017m32,832,500.0024,076.2524,076.25Papan ( 2 x pakai )
50%0.024m31,035,000.0012,420.0012,420.00Paku0.400kg10,200.004,080.004,080.00Pekerja0.300org17,000.005,100.005,100.00Tukang
kayu0.150org27,000.004,050.004,050.00Kepala
tukang0.150org28,000.004,200.004,200.00Mandor0.050org31,000.001,550.001,550.00Jumlah40,576.2514,900.0055,476.25B.0211
KG PEKERJAAN BAJA IWFBesi
IWF1.100kg13,800.0015,180.0015,180.00Meni0.005kg9,700.0048.5048.50Minyak
cat0.003kg8,700.0026.1026.10Pekerja0.045org17,000.00765.00765.00Tukang
besi0.045org27,000.001,215.001,215.00Kepala
tukang0.015org28,000.00420.00420.00Mandor0.002org31,000.0062.0062.00Jumlah15,254.602,462.0017,716.6012345678B.0221
KG PEKERJAAN BESI SIKU / PROFILBesi
siku/profil1.100kg11,600.0012,760.0012,760.00Meni0.005kg9,700.0048.5048.50Minyak
cat0.003kg8,700.0026.1026.10Pekerja0.045org17,000.00765.00765.00Tukang
besi0.045org27,000.001,215.001,215.00Kepala
tukang0.015org28,000.00420.00420.00Mandor0.002org31,000.0062.0062.00Jumlah12,834.602,462.0015,296.60C.
ANALISA PASANGAN BATU BELAH, DINDING DAN LANTAINOURAIAN
PEKERJAANKOEFSATHARGA SATHARGA BAHANHARGA UPAHJUMLAH( Rp )( Rp )(
Rp )( Rp )12345678C.0011 M3 PASANG AANSTAMPING BATU BELAHBatu
belah1.000m383,250.0083,250.0083,250.0083250Pasir
urug0.100m347,700.004,770.004,770.00Pekerja0.500org17,000.008,500.008,500.00Tukang
batu0.390org27,000.0010,530.0010,530.00Kepala
tukang0.039org28,000.001,092.001,092.00Mandor0.039org31,000.001,209.001,209.00Jumlah88,020.0021,331.00109,351.00C.0091
M3 PASANGAN BATU BELAH 1:3:10Batu
belah1.000m383,250.0083,250.0083,250.00Semen
PC61.000kg800.0048,800.0048,800.00Kapur0.147m3157,500.0023,152.5023,152.50Pasir
pasang0.492m385,300.0041,967.6041,967.60Pekerja1.500org17,000.0025,500.0025,500.00Tukang
batu0.600org27,000.0016,200.0016,200.00Kepala
tukang0.060org28,000.001,680.001,680.00Mandor0.075org31,000.002,325.002,325.00Jumlah197,170.1045,705.00242,875.10C.0111
M2 PAS LANTAI TEGEL ABU-ABU SPESI 1:3:10 TEBAL 2,5 CMTegel
Abu-Abu1.000m220,700.0020,700.0020,700.0020700Semen
PC4.094kg800.003,275.203,275.20Kawur0.010m3157,500.001,575.001,575.00Pasir
pasang0.033m385,300.002,814.902,814.90Pekerja0.500org17,000.008,500.008,500.00Tukang
batu0.250org27,000.006,750.006,750.00Kepala
tukang0.025org28,000.00700.00700.00Mandor0.025org31,000.00775.00775.00Jumlah28,365.1016,725.0045,090.10C.0231
M2 DINDING KERAMIK
20/25Keramik1.000m246,250.0046,250.0046,250.00Semen
PC9.300kg800.007,440.007,440.00Pasir
pasang0.018m385,300.001,535.401,535.40Semen
warna1.500kg1,500.002,250.002,250.00Pekerja0.600org17,000.0010,200.0010,200.00Tukang
batu0.100org27,000.002,700.002,700.00Kepala
tukang0.045org28,000.001,260.001,260.00Mandor0.030org31,000.00930.00930.00Jumlah57,475.4015,090.0072,565.40C.0251
M2 LANTAI KERAMIK
20/20Keramik1.000m237,500.0037,500.0037,500.00Semen
PC8.000kg800.006,400.006,400.00Pasir
pasang0.018m385,300.001,535.401,535.40Semen
warna1.500kg1,500.002,250.002,250.00Pekerja0.600org17,000.0010,200.0010,200.00Tukang
batu0.350org27,000.009,450.009,450.00Kepala
tukang0.035org28,000.00980.00980.00Mandor0.030org31,000.00930.00930.00Jumlah47,685.4021,560.0069,245.4012345678C.0261
M2 LANTAI KERAMIK
30/30Keramik1.000m233,750.0033,750.0033,750.00Semen
PC8.000kg800.006,400.006,400.00Pasir
pasang0.018m385,300.001,535.401,535.40Semen
warna1.500kg1,500.002,250.002,250.00Pekerja0.600org17,000.0010,200.0010,200.00Tukang
batu0.350org27,000.009,450.009,450.00Kepala
tukang0.035org28,000.00980.00980.00Mandor0.030org31,000.00930.00930.00Jumlah43,935.4021,560.0065,495.40C.0351
M2 PASANG PAVING SEGI ENAM tb. 6 CMPaving segi
enam1.000m222,000.0022,000.0022,000.00Pasir
pasang0.100m385,300.008,530.008,530.00Pekerja0.250org17,000.004,250.004,250.00Tukang
batu0.500org27,000.0013,500.0013,500.00Kepala
tukang0.050org28,000.001,400.001,400.00Mandor0.025org31,000.00775.00775.00Jumlah30,530.0019,925.0050,455.00D.
ANALISA PASANGAN BATU MERAH PLESTERAN DAN PENGECATANNOURAIAN
PEKERJAANKOEFSATHARGA SATHARGA BAHANHARGA UPAHJUMLAH( Rp )( Rp )(
Rp )( Rp )12345678D.0031 M2 PASANG BATA MERAH 1:3Bata
merah70.000bh260.0018,200.0018,200.00Semen
PC14.370kg800.0011,496.0011,496.00Pasir
pasang0.040m385,300.003,412.003,412.00Pekerja0.320org17,000.005,440.005,440.00Tukang
batu0.100org27,000.002,700.002,700.00Kepala
tukang0.010org28,000.00280.00280.00Mandor0.015org31,000.00465.00465.00Jumlah33,108.008,885.0041,993.00D.0061
M2 PASANG BATA MERAH 1:3:10Bata
merah70.000bh260.0018,200.0018,200.00Semen
PC4.500kg800.003,600.003,600.00Pasir
pasang0.050m385,300.004,265.004,265.00Kawur0.015m3157,500.002,362.502,362.50Pekerja0.320org17,000.005,440.005,440.00Tukang
batu0.100org27,000.002,700.002,700.00Kepala
tukang0.010org28,000.00280.00280.00Mandor0.015org31,000.00465.00465.00Jumlah28,427.508,885.0037,312.50D.00910
M' LIST DAN SPONENGANSemen PC0.800kg800.00640.00640.00Pasir
pasang0.002m385,300.00170.60170.60Pekerja0.700org17,000.0011,900.0011,900.00Tukang
batu0.350org27,000.009,450.009,450.00Kepala
tukang0.035org28,000.00980.00980.00Mandor0.035org31,000.001,085.001,085.00Jumlah810.6023,415.0024,225.601
m' list dan sponengan81.062,341.502,422.5612345678D.0101 M2
PLESTERAN DINDING 1:3 + ACIANSemen
PC6.480kg800.005,184.005,184.00Pasir
pasang0.019m385,300.001,620.701,620.70Pekerja0.200org17,000.003,400.003,400.00Tukang
batu0.150org27,000.004,050.004,050.00Kepala
tukang0.015org28,000.00420.00420.00Mandor0.010org31,000.00310.00310.00Jumlah6,804.708,180.0014,984.70D.0111
M2 PLESTERAN DINDING 1:3:10 + ACIANSemen
PC1.840kg800.001,472.001,472.00Kapur0.006m3157,500.00945.00945.00Pasir
pasang0.014m385,300.001,194.201,194.20Pekerja0.200org17,000.003,400.003,400.00Tukang
batu0.150org27,000.004,050.004,050.00Kepala
tukang0.015org28,000.00420.00420.00Mandor0.010org31,000.00310.00310.00Jumlah3,611.208,180.0011,791.20D.0121
M2 PENGECATAN DINDING 3XPlamir tembok0.100kg5,700.00570.00570.00Cat
dasar0.100kg13,800.001,380.001,380.00Cat
penutup0.260kg13,800.003,588.003,588.00Pekerja0.020org17,000.00340.00340.00Tukang
cat0.063org27,000.001,701.001,701.00Kepala
tukang0.006org28,000.00176.40176.40Mandor0.003org31,000.0077.5077.50Jumlah5,538.002,294.907,832.90D.0131
M2 PENGECATAN KAYU 3X BERIKUT MENIMeni
kayu0.167kg9,700.001,619.901,619.90Plamir
kayu0.083kg14,000.001,162.001,162.00Cat
kayu0.200kg33,600.006,720.006,720.00Amplas
kayu0.400lbr1,600.00640.00640.00Minyak cat
terpentin0.150ltr8,700.001,305.001,305.00Kwas
3"0.050bh4,600.00230.00230.00Pekerja0.200org17,000.003,400.003,400.00Tukang
cat0.300org27,000.008,100.008,100.00Kepala
tukang0.030org28,000.00840.00840.00Mandor0.010org31,000.00310.00310.00Jumlah11,676.9012,650.0024,326.90D.0141
M2 PENGECATAN BESI 3X BERIKUT MENIMeni
besi0.167kg9,700.001,619.901,619.90Cat
besi0.200kg33,600.006,720.006,720.00Amplas
besi0.400lbr1,600.00640.00640.00Minyak cat thiner
B0.150ltr8,700.001,305.001,305.00Kwas
3"0.050bh4,600.00230.00230.00Pekerja0.200org17,000.003,400.003,400.00Tukang
cat0.300org27,000.008,100.008,100.00Kepala
tukang0.030org28,000.00840.00840.00Mandor0.010org31,000.00310.00310.00Jumlah10,514.9012,650.0023,164.90E.
ANALISA PLITURAN, PLAFOND & LISPLANKNOURAIAN
PEKERJAANKOEFSATHARGA SATHARGA BAHANHARGA UPAHJUMLAH( Rp )( Rp )(
Rp )( Rp )12345678E.0021 M2 PAS. PLAFOND CALSIBOARD 4 MM BERIKUT
RANGKACalsiboard 4mm1.000m216,600.0016,600.0016,600.00Kaso-kaso
kruing 5/70.014m33,712,500.0051,975.0051,975.00Kayu kruing
5/100.004m33,712,500.0012,993.7512,993.75Paku0.220kg10,200.002,244.002,244.00Pekerja0.280org17,000.004,760.004,760.00Tukang
kayu0.400org27,000.0010,800.0010,800.00Kepala
tukang0.080org28,000.002,240.002,240.00Mandor0.014org31,000.00434.00434.00Jumlah83,812.7518,234.00102,046.75E.0031
M2 PAS. PLAFOND ETERNIT BERIKUT
RANGKAEternit1.000m26,700.006,700.006,700.00Kaso-kaso kruing
5/70.014m33,712,500.0051,975.0051,975.00Kayu kruing
5/100.004m33,712,500.0012,993.7512,993.75Paku0.220kg10,200.002,244.002,244.00Pekerja0.280org17,000.004,760.004,760.00Tukang
kayu0.400org27,000.0010,800.0010,800.00Kepala
tukang0.080org28,000.002,240.002,240.00Mandor0.014org31,000.00434.00434.00Jumlah73,912.7518,234.0092,146.75E.0051
M2 PAS. PLAFOND ETERNIT 4MM PENUTUP PADA RANGKAEternit
1x11.000m26,700.006,700.006,700.00Paku0.020kg10,200.00204.00204.00Pekerja0.047org17,000.00804.10804.10Tukang
kayu0.113org27,000.003,037.503,037.50Kepala
tukang0.010org28,000.00274.40274.40Mandor0.003org31,000.0093.0093.00Alat
bantu0.085lot25,000.002,125.002,125.00Jumlah6,904.006,334.0013,238.00E.0071
M' PEKERJAAN LISTPLANK KAYU JATI 3/20Kayu jati papan
20cm0.007m38,525,000.0061,380.0061,380.00Paku0.050kg10,200.00510.00510.00Pekerja0.100org17,000.001,700.001,700.00Tukang
kayu0.200org27,000.005,400.005,400.00Kepala
tukang0.025org28,000.00700.00700.00Mandor0.005org31,000.00155.00155.00Jumlah61,890.007,955.0069,845.00E.0091
M' PEKERJAAN LISTPLANK KAYU BENGKIRAI 3/20Kayu bengkirai papan
20cm0.007m34,357,500.0031,374.0031,374.00Paku0.050kg10,200.00510.00510.00Pekerja0.100org17,000.001,700.001,700.00Tukang
kayu0.200org27,000.005,400.005,400.00Kepala
tukang0.025org28,000.00700.00700.00Mandor0.005org31,000.00155.00155.00Jumlah31,884.007,955.0039,839.00F.
ANALISA KUZEN & DAUN PINTUNOURAIAN PEKERJAANKOEFSATHARGA
SATHARGA BAHANHARGA UPAHJUMLAH( Rp )( Rp )( Rp )( Rp
)12345678F.0021 M3 KUZEN KAYU JATI KWALITAS CATKayu jati kwalitas
cat
6/121.000m38,585,000.008,585,000.008,585,000.00Paku2.500kg10,200.0025,500.0025,500.00Lem
putih ( FOX
)1.000kg3,100.003,100.003,100.00Pekerja9.000org17,000.00153,000.00153,000.00Tukang
kayu27.000org27,000.00729,000.00729,000.00Kepala
tukang2.700org28,000.0075,600.0075,600.00Mandor0.900org31,000.0027,900.0027,900.00Jumlah8,613,600.00985,500.009,599,100.00F.0051
M2 DAUN PINTU PANIL KAYU JATIRangka kayu jati ( ram pintu
)0.035m38,585,000.00302,192.00302,192.00Lem putih ( FOX
)0.750kg3,100.002,325.002,325.00List kayu
profil4.000m'0.000.000.00Pekerja1.300org17,000.0022,100.0022,100.00Tukang
kayu4.300org27,000.00116,100.00116,100.00Kepala
tukang0.430org28,000.0012,040.0012,040.00Mandor0.130org31,000.004,030.004,030.00Jumlah304,517.00154,270.00458,787.00F.0091
M2 DAUN PINTU / JENDELA PANIL KACA RANGKA KAYU JATI TEBAL 3.5
CMKayu jati0.019m38,585,000.00163,115.00163,115.00Kaca tebal
5mm0.640m255,900.0035,776.0035,776.00Pekerja2.500org17,000.0042,500.0042,500.00Tukang
kayu7.500org27,000.00202,500.00202,500.00Kepala
tukang0.750org28,000.0021,000.0021,000.00Mandor0.125org31,000.003,875.003,875.00Jumlah198,891.00269,875.00468,766.00F.0111
M2 PASANG DINDING SKAT TRIPLEKS RANGKA KAYU KRUINGKayu
kruing0.024m33,712,500.0089,100.0089,100.00Paku0.500kg10,200.005,100.005,100.00Tripleks
t:6mm1.000m268,200.0068,200.0068,200.00Pekerja0.280org17,000.004,760.004,760.00Tukang
kayu0.800org27,000.0021,600.0021,600.00Kepala
tukang0.080org28,000.002,240.002,240.00Mandor0.014org31,000.00434.00434.00Jumlah162,400.0029,034.00191,434.00G.
ANALISA KUDA-KUDA, RANGKA ATAP & BUBUNGAN ATAPNOURAIAN
PEKERJAANKOEFSATHARGA SATHARGA BAHANHARGA UPAHJUMLAH( Rp )( Rp )(
Rp )( Rp )12345678G.0021 M3 KUDA-KUDA KAYU JATI BENTANG S/D 7 MKayu
balok1.000m38,525,000.008,525,000.008,525,000.00Paku0.800kg10,200.008,160.008,160.00Besi
strip15.000kg23,600.00354,000.00354,000.00Pekerja4.000org17,000.0068,000.0068,000.00Tukang
kayu12.000org27,000.00324,000.00324,000.00Kepala
tukang1.200org28,000.0033,600.0033,600.00Mandor0.200org31,000.006,200.006,200.00Jumlah8,887,160.00431,800.009,318,960.00G.0021
M3 KUDA-KUDA KAYUBANGKIRAI BENTANG S/D 7 MKayu
balok1.000m34,357,500.004,357,500.004,357,500.00Paku0.800kg10,200.008,160.008,160.00Besi
strip15.000kg23,600.00354,000.00354,000.00Pekerja4.000org17,000.0068,000.0068,000.00Tukang
kayu12.000org27,000.00324,000.00324,000.00Kepala
tukang1.200org28,000.0033,600.0033,600.00Mandor0.200org31,000.006,200.006,200.00Jumlah4,719,660.00431,800.005,151,460.00G.0081
M2 RANGKA ATAP GENTENG ( HANYA RANGKA )Kayu kaso 5/7
bengkirai0.017m34,357,500.0073,206.0073,206.00Reng kayu jati
2/30.002m38,525,000.0020,460.0020,460.00Paku 5 s/d 7
cm0.250kg10,200.002,550.002,550.00Pekerja0.150org17,000.002,550.002,550.00Tukang
kayu0.150org27,000.004,050.004,050.00Kepala
tukang0.010org28,000.00280.00280.00Mandor0.005org31,000.00155.00155.00Jumlah96,216.007,035.00103,251.00G.0111
M2 PENUTUP ATAP GENTENG PLENTONG KECIL KEBUMENGenteng plentong
kebumen25.000bh925.0023,125.0023,125.00Pekerja0.150org17,000.002,550.002,550.00Tukang
kayu0.075org27,000.002,025.002,025.00Kepala
tukang0.008org28,000.00224.00224.00Mandor0.008org31,000.00248.00248.00Jumlah23,125.005,047.0028,172.00G.0181
M' PEK. BUBUNGAN ATAP GENTENG KODOKGenteng
bubungan5.000bh2,500.0012,500.0012,500.00Semen
PC8.000kg800.006,400.006,400.00Pasir
pasang0.032m385,300.002,729.602,729.60Pekerja0.400org17,000.006,800.006,800.00Tukang
batu0.200org27,000.005,400.005,400.00Kepala
tukang0.020org28,000.00560.00560.00Mandor0.002org31,000.0062.0062.00Jumlah21,629.6012,822.0034,451.60G.0221
M' PEK. PAS NOK / CENGGER KAYU BANGKIRAI 2/15Kayu
bangkirai0.003m34,357,500.0013,072.5013,072.50Paku0.030kg10,200.00306.00306.00Pekerja0.042org17,000.00714.00714.00Tukang
batu0.120org27,000.003,240.003,240.00Kepala
tukang0.012org28,000.00336.00336.00Mandor0.002org31,000.0062.0062.00Jumlah13,378.504,352.0017,730.50
daftar hargaDAFTAR HARGA SATUAN UPAH DAN BAHANKOMITE SEKOLAH
2007NOURAIANSATUANHARGA SATUAN( Rp )1234AUPAH1MandorPer
hari31,000.002Kepala tukangPer hari28,000.003TukangPer
hari27,000.004PekerjaPer hari17,000.00BBAHAN1Batu
kalim369,300.002Batu pecahm3116,000.003Tanah
pilihanm330,700.004Pasir urugm347,700.005Pasir
pasangm385,300.006Semen PCkg800.007Semen putihkg1,500.008Semen
merahkg1,500.009KawurPer m3157,500.0010Batu bataPer
bh240.0011Genteng mantili lokalPer bh700.0012Genteng plentong
kebumenPer bh925.0013Genteng kerpus lokalPer bh2,500.0014Genteng
kerpus kebumenPer bh3,500.0015Kayu jati klas 1Per
m310,542,200.0016Kayu jati klas 2Per m38,525,000.0017Kayu sengon
untuk begestingPer m31,035,000.0018Kayu kruingPer
m33,712,500.0019Kayu kanferPer m34,095,000.0020Kayu bagkiraiPer
m34,357,500.0021Plipit kayuPer m'2,500.0022List gypsumPer
m'9,000.0023Buis beton 20cmPer m'12,250.0024Buis beton 50cmPer
m'40,400.0025Buis beton 80cmPer m'124,100.0026Buis beton 100cmPer
m'186,100.0027Paving I tb 6cmPer m222,000.0028Paving I tb 8cmPer
m225,000.0029Paving segi enam tb 6cmPer m222,000.0030Paving segi
enam tb 8cmPer m225,000.0031Keramik dinding 20x20Per
m234,300.0032Keramik dinding 20x25Per m246,250.0033Keramik lantai
20x20Per m237,500.0034Keramik lantai 30x30Per m233,750.0035Keramik
lantai 40x40Per m248,900.0036Tegel abu-abu 20x20Per
m219,295.0037Asbes gelombang besarPer lb114,400.0038Asbes gelombang
kecilPer lb71,300.0039Kloset porselin jongkok INAPer
bh96,000.0040Bak air viber sudut 40 x 60 cmPer bh300,000.0041Slot
pintu merek kuda terbangPer bh70,000.0042Engsel kupu-kupu besarPer
bh7,500.0043Engsel kupu-kupu kecilPer bh6,500.00123444Grendel
ukuran besarPer bh12,500.0045Grendel ukuran kecilPer
bh8,000.0046Kawat harmonikaPer m232,000.0047Hak anginPer
bh5,000.0048EspanyoletePer bh45,000.0049Spring knifePer
bh5,000.0050Cat tembokPer kg13,800.0051Cat kayu / besiPer
kg33,600.0052Cat gentengPer kg25,500.0053Plamir kayuPer
kg14,000.0054Plamir tembokPer kg5,700.0055MenyPer
kg9,700.0056TeerPer kg8,700.0057Minyak catPer lt8,700.0058DempulPer
kg10,700.0059Amplas/ampril/kertas gosokPer lb1,600.0060BindradPer
kg9,700.0061Baja gulungan ukuran ringanPer kg8,400.0062Baja anyaman
bronjonganPer kg8,400.0063Baja (baut-baut)Per kg13,800.0064Baja
(paku jembatan)Per kg13,800.0065Alat kerja (sekop, ikrak dll)Per
unit121,000.0066Besi betonPer kg8,400.0067Besi sikuPer
kg11,600.0068Besi kanalPer kg13,800.0069Besi profilPer
kg13,800.0070Jendela nako ukuran 1m x 1mPer unit166,700.0071PakuPer
kg10,200.0072EternitPer m26,700.0073GipsumPer
m216,600.0074HarflekPer m211,500.0075CalsiboardPer
m216,600.0076Kaca bening 3 mmPer m245,000.0077Kaca bening 5 mmPer
m255,900.0078Kaca riband 5 mmPer m275,000.0079Kaca jeruk polos 3
mmPer m265,000.0080Kaca S 5 mmPer m265,000.0081Pipa galvanis
diameter 3/4Per m'5,600.0082Pipa pralon PVC diameter 3"Per
m'15,000.0083Pipa pralon PVC diameter 2"Per m'5,800.0084Pipa pralon
PVC diameter 1"Per m'2,100.0085Lem kayu (Fox)Per kg3,100.0086Amplas
besiPer m21,600.0087VernisPer lt8,700.0088Kuas 1"Per
bh1,700.0089Closet dudukPer bh632,500.0090UrinoirPer
bh350,000.0091WastafelPer bh150,000.0092Bak terasoPer
bh250,000.0093Bak klip fiberPer bh650,000.0094Bak cuci stainles
steel 1 bakPer bh200,000.0095Kran air 1/2"Per bh17,500.0096Kran air
3/4"Per bh22,000.0097Seal tipPer bh1,100.00123498Seng plat (90 x
180)Per m239,100.0099WalpaperPer m2143,700.00100Perekat (lem)Per
bh11,500.00101Pintu almuniumPer bh172,500.00102Strip plat 3/4"Per
m223,000.00103Strip plat 1"Per m225,800.00104Strip plat 1 1/4"Per
m228,700.00105Talang seng t = 0.2 mm L = 60Per m217,200.00106Talang
seng t = 0.3 mm L = 60Per m221,200.00107Tali ijukPer
kg6,300.00Sragen, 3 Juni 2007Team PerencanaArif Fajar, ST
rekapREKAPUTULASIPROGRAM: REHABILITASI SD/MIKEGIATAN:
REHABILITASI MI RODHOTUL SOLICHINLOKASI: KECAMATAN GEMOLONGSUMBER
DANA: DANA ALOKASI KHUSUS ( DAK )TOTAL BIAYA: Rp
105,000,000.00TAHUN ANGGARAN: 2 0 0 7NOURAIANJUMLAH HARGA ( Rp
)TOTAL HARGABAHANUPAH( Rp )12345A.REHABILITASI FISIK SEKOLAHIGEDUNG
SEKOLAH/RUANG KELAS0.000.000.00IISUMBER DAN SANITASI AIR BERSIH
SERTA KM/WC0.000.000.00IIIMEBELAIR RUANG KELAS DAN LEMARI
PERUSTAKAAN0.000.000.00IVRUMAH DINAS PEJAGA/GURU/KEPALA
SEKOLAH0.000.000.00JUMLAH REHABILITASI FISIK
SEKOLAH0.000.000.00B.PENGADAAN SARANA PENDIDIKAN DAN SARANA
PERPUSTAKAANIALAT PERAGA PENDIDIKAN (IPBA, KIT MATEMATIKA, IPS,
BAHASA INDONESIA, KIT IPA, DAN KIT BAHASA INGGRIS0.000.000.00IIBUKU
PENGAYAAN JENIS KETRAMPILAN, BUKU PENGAYAAN JENIS PENGETAHUAN
(PANDUAN ANTI NARKOBA, SAINS, ATLAS PROVINSI + CD INTERAKTIF, BUKU
BACAAN, SASTRA/BAHASA, BUKU BACAAN BUDI PEKERTI, DAN BUKU PANDUAN
ICT)0.000.000.00IIIBUKU REFERENSI ( FISIKA, PANDUAN OLIMPIADE IPA
DAN MATEMATIKA, KAMUS BAHASA, DAN INSIKLOPEDI
MATEMATIKA)0.000.000.00IVKOMPUTER, PRINTER, ACTIVE SPEAKER, CD
INTERAKTIF DAN MESIN KETIK MANUAL.0.000.000.00JUMLAH PENGADAAN
SARANA PENDIDIKAN DAN SARANA PERPUSTAKAAN0.000.000.00JUMLAH
A+B0.000.000.00JUMLAH TOTAL0.00DIBULATKAN168,094,000.00TERBILANG "
Seratus enam puluh juta sembilan puluh empat ribu rupiah"Sragen,
Mei 2007Menyetujui,Kepala Dinas Pekerjaan UmumKetua Tim
PerencanaKabupaten SragenIr. DARMAWAN MINTO BASUKI, MM.MT.ARIF
FAJAR, STPembina Utama MudaNIP 110 033 077Mengetahui,Kepala Dinas
Pendidikan dan KebudayaanKabupaten SragenDrs. GATOT SUPADI,
MBA.MM.Pembina Utama MudaNIP 131 039 907
rabHAL: RENCANA ANGGARAN BIAYALAMPIRAN: HARGA SATUAN PEKERJAAN,
GAMBAR DANPERHITUNGAN VOLUMEPROGRAM: REHABILITASI SD/MIKEGIATAN:
REHABILITASI SDN GILIREJO 5LOKASI: KECAMATAN MIRITOTAL BIAYA: Rp
105,000,000.00TAHUN ANGGARAN: 2 0 0 7NOMACAM
PEKERJAANANALISAVOLUMEHARGA SATUANTOTAL HARGA123456IREHABILITASI
FISIK SEKOLAHAREHABILITASI GEDUNG SEKOLAH/RUANG KELAS1PEKERJAAN
PERSIAPANaUitzet dan
bouwplankTaksirLs200,000.00200,000.00bSteigerwerkTaksirLs340,000.00340,000.00cAdministrasi
dan dokumentasiTaksirLs250,000.00250,000.00dBongkaran bangunan
lamaTaksirLs1,660,000.001,660,000.00Jumlah Sub Pekerjaan
Persiapan2,450,000.002PEKERJAAN TANAHa.Pek. Galian
tanahA.0110.00m38,040.000.00b.Pek. Urugan tanah
kembaliA.0160.00m33,853.000.00c.Pek. Urugan
pasirA.0190.00m360,100.000.00d.Pek.
PondasiA.0190.00m360,100.000.00Sub Total Pekerjaan
Tanah0.003PEKERJAAN BETONaCor rabat beton
1:3:5B.0010.00m3379,028.000.00bCor beton bertulang
1:2:3B.0020.00m3466,188.000.00cPembesian U
24B.0120.00kg11,703.000.00dBegestingB.0140.00m255,476.250.00Jumlah
Sub Pekerjaan Beton0.004PEK. PASANGAN DAN PLESTERANaPas. Bata merah
1:3:10D.0060.00m237,312.500.00bPlesteran
1:3:10D.0110.00m211,791.200.00cList dan
sponenganD.0090.00m'2,422.560.00Jumlah Sub Pekerjaan Pasangan dan
Plesteran0.005PEKERJAAN LANTAIaPas. Lantai keramik
30x30C.026168.00m265,495.4011,003,227.20Jumlah Sub Pekerjaan
Lantai11,003,227.206PEK. PINTU DAN JENDELAa.Pek. Kuzen pintu,
Jendela, dan BV 6/12 kayu jati kwalitas
catF.0020.06m39,599,100.00534,378.83b.Pas. Daun pintu panil kayu
jati kayu jati tb 3.5 cmF.0042.57m2458,787.001,177,284.14c.Pas.
Daun Pintu panil kayu jati kayu jati tb 3.5
cmTaksir508,787.000.00lapis Alumunium bagian dalamd.Pas. Daun
jendela panil kayu jati kaca bening
5mmF.00910.66m2468,766.004,996,108.03e.Kaca bening 5
mmTaksir0.000m365,000.000.00Jumlah Sub Pekerjaan Pintu &
Jendela6,707,771.007PEKERJAAN PLAFONDa.Pasang Plafon Kalsiboard
Penggantung KruingE.001112.56m292,146.7510,372,038.18c.Pas List
Gygsum 10 cmTaksir60.30m'13,000.00783,900.00Jumlah Pekerjaan
Plafon11,155,938.188PEKERJAAN PENGGANTUNGaPas. Slot
pintuTaksir5.00bh72,500.00362,500.00bPas. Engsel kupu-kupu 4" untuk
pintuTaksir16.00bh17,500.00280,000.00cPas. Engsel kupu-kupu 3"
untuk jendelaTaksir0.00bh17,500.000.00dPas. Sping
knaifeTaksir0.00bh20,000.000.00ePas.
LamskarTaksir0.00bh22,500.000.00fPas. Tarikan
jendelaTaksir0.00bh15,000.000.00Jumlah Sub Pekerjaan
Penggantung642,500.009PEKERJAAN ATAPa.Pas. Kuda - kuda kacal C (
hanya pasang )B.0220.00kg2,462.000.00c.Pas. Strip Plat sambungan
dan baut kuda-kudaB.022185.81kg15,296.602,842,184.76d.Pas. Kuda -
kuda dobel siku ( hanya pasang
)B.0221,238.68kg2,462.003,049,626.22f.Pas. Kuda-kuda Kayu jati
8/12G,0020.00m39,318,960.000.00g.Pas. Nok, gording,murplat kayu
jati 6/12G.0021.75m39,318,960.0016,282,086.91h.Pas. Usuk kruing
5/7, reng jati 2/3G.008312.00m2103,251.0032,214,312.00j.Pas.
Genteng plentong kebumenG.011312.00m228,172.008,789,664.00k.Pas.
Genteng kerpus kodokG.01426.00m'34,451.60895,741.60l.Pas. Lisplank
kayu jati 2/20E.0070.00m'69,845.000.00m.Pas. Cengger Kayu
2/15G.01826.00m'17,730.50460,993.00Jumlah Sub Pekerjaan
Atap64,534,608.5010PEKERJAAN CATaCat
tembokD.012533.17m27,832.904,176,264.16b.Cat
PlafondD.012112.56m27,832.90881,671.22c.Cat
kayuD.01362.51m224,326.901,520,572.35Jumlah Sub Pekerjaan
Cat6,578,507.7311PEKERJAAN ELEKTRIKALaPas. Instalasi titik
lampuTaksir18.00titik70,000.001,260,000.00bPas. Lampu TL 20
wattTaksir15.00bh30,000.00450,000.00cPas. Lampu pijar 20
wattTaksir3.00bh20,000.0060,000.00dPas. Saklar
gandaTaksir4.00bh22,500.0090,000.00ePas. Stop
kontakTaksir3.00bh22,500.0067,500.00fPas. MCB &
BOXTaksir0.00unit70,000.000.00Jumlah Sub Pekerjaan
Elektrikal1,927,500.0012PEKERJAAN SANITASIa.Pas. Closed jongkok
INATaksir0.00bh85,068.000.00b.Pas. Wastafel INA Lengkap dengan
AksesorisTaksir0.00bh175,008.000.00c.Pas. Kran 1/2"
MorseTaksir0.00bh17,350.500.00d.Pas. Instalasi Air
BersihTaksir0.00unit400,000.000.00e.Pas. Instalasi Air
KotorTaksir0.00unit400,000.000.00f.Pas. Saringan Air
KotorTaksir0.00unit12,500.000.00g.Pas. Saluran U 20
cmTaksir0.00m'17,500.000.00Jumlah Pekerjaan Sanitasi0.00JUMLAH
PEKERJAAN PENGADAAN/REHABILITASI GEDUNG SEKOLAH / RUANG
KELAS105,000,052.60DIBULATKAN105,000,000.00
harga satuanDAFTAR HARGA SATUAN PEKERJAANKOMITE SEKOLAH MI
RODHOTUL SOLICHIN GEMOLONGTAHUN 2007NOURAIANSATUANANALISAJUMLAH
HARGA ( Rp )TOTALBAHANUPAH( Rp )1234567APENGUKURAN, PERSIAPAN &
GALIAN1Pek. Galian tanah biasa kedalaman max.
1m'm3A.0118,040.008,040.002Pek. Galian tanah biasa kedalaman max.
1m'm3A.01210,554.0010,554.003Pek. Pembuangan Dalam Radius 150
mm3A.01510,322.0010,322.004Pek. Urugan Tanah
Kembalim3A.0163,853.003,853.005Urugan
tanahm3A.01736,840.005,410.0042,250.006Pemadatan
Tanahm3A.0180.0010,050.0010,050.007Urugan Pasir
Urugm3A.01957,240.002,860.0060,100.00BPERKERASAN & COR
BETON1Pek. Lantai Kerja / Beton Tumbuk
1:3:5m3B.001341,048.0037,980.00379,028.002Pek. Beton Bertulang
1:2:3m3B.002428,208.0037,980.00466,188.003Pek. Besi Beton Terpasang
U-24kgB.0128,965.502,737.5011,703.004Pek. Begesting Dengan
Papanm2B.01440,576.2514,900.0055,476.255Pekerjaan Baja
IWFkgB.02115,254.602,462.0017,716.606Pekerjaan Besi Siku /
ProfilkgB.02212,834.602,462.0015,296.60CPASANGAN BATU BELAH,
DINDING DAN LANTAI1Pas. Aanstamping Batu
Belahm3C.00188,020.0021,331.00109,351.002Pas. Batu belah
1:3:10m3C.009197,170.1045,705.00242,875.103Pasang Lantai Tegel
Abu-abu spesi 1:3:10 Tebal 2,5
cmm2C.01128,365.1016,725.0045,090.104Pas. Dinding Keramik
20/25m2C.02357,475.4015,090.0072,565.405Pas. Lantai Keramik
20/20m2C.02547,685.4021,560.0069,245.406Pas. Lantai Keramik
30/30m2C.02643,935.4021,560.0065,495.407Pas. Paving Segi Enam tb: 6
cmm2C.03530,530.0019,925.0050,455.00DPASANGAN BATU MERAH, PLESTERAN
& CAT1Pas. Bata Merah 1:3m2D.00333,108.008,885.0041,993.002Pas.
Bata Merah 1:3:10m2D.00628,427.508,885.0037,312.503List dan
Sponenganm'D.00981.062,341.502,422.564Plesteran dinding 1:3 +
Acianm2D.0106,804.708,180.0014,984.705Plesteran Dinding 1:3:10 +
Acianm2D.0113,611.208,180.0011,791.206Pengecatan Dinding
3xm2D.0125,538.002,294.907,832.907Pengecatan Kayu 3x Berikut
Menim2D.01311,676.9012,650.0024,326.908Pengecatan Besi 3x Berikut
Menim2D.01410,514.9012,650.0023,164.90EPELITURAN, PLAFOND &
LISPLANK1Pas. Plafond Calsiboard 4mm Berikut
Rangkam2E.00283,812.7518,234.00102,046.752Pas. Plafond Eternit
Berikut Rangkam2E.00373,912.7518,234.0092,146.753Pas. Plafond
Eternit Penutup Pada Rangkam2E.0056,904.006,334.0013,238.004Pek.
Listplank Kayu Jati 3/20m'E.00761,890.007,955.0069,845.005Pek.
Listplank Kayu Bengkirai
3/20m'E.00831,884.007,955.0039,839.00FKUZEN & DAUN PINTU1Kusen
Kayu Jati Kualitas
Catm3F.0028,613,600.00985,500.009,599,100.002Daun Pintu Panil Kayu
Jatim2F.004304,517.00154,270.00458,787.003Daun Pintu / Jendela
Panil Kaca Rangka Kayu Jati
t:3.5cmm2F.009198,891.00269,875.00468,766.004Pek. Dinding Sekat
Tripleks Rangka Kayu
Kruingm2F.010162,400.0029,034.00191,434.00GKUDA-KUDA, RANGKA ATAP
& BUBUNGAN1Kuda-Kuda Kayu Jati Bentang s/d 7
mm3G.0028,887,160.00431,800.009,318,960.002Kuda-Kuda Kayu Bengkirai
Bentang s/d 7 mm3G.0034,719,660.00431,800.005,151,460.003Rangka
Atap Genteng ( Hanya Rangka
)m2G.00896,216.007,035.00103,251.004Penutup Atap Genteng Plentong
Kecil Kebumenm2G.01123,125.005,047.0028,172.005Pek. Bubungan Atap
Genteng Kodokm'G.01821,629.6012,822.0034,451.606Pek. cengger Kayu
Bengkirai 2/15m'G.02213,378.504,352.0017,730.50
Volume 7x8LUAS UKURAN ( 7 X 8 ) JUMLAH 3 LOKAL, PANJANG TERAS
1,8 M', KUDA-KUDA KAYU SUDUT
30NoUraianJumlahLebarPanjangTinggiberatkoefisienLuasVolumeSatIIPEKERJAAN
TANAHaGalian0.80076.0000.70042.560m30%0.0bUrugan Tanah
Kembali76.0000.17513.300m30%0.0urugan Tanah 30
CM37.0008.0000.30050.400m30%0.011.80026.0000.30014.040m30%0.0JMH
VOL URUGAN TNH KEMBALI77.740m30.0cUrugan Pasir ( 5 cm
)0.80076.0000.0503.040m30%0.0cUrugan Pasir u/.
Keramik8.80026.0000.05011.440m30%0.0JUMLAH VOL.URUGAN
PASIR14.480M30.0dPondasi76.0000.35026.600m30%0.0IIIPEKERJAAN
BETONaRabat beton 7 cm kelas37.0008.0000.07011.760m30%0.0Rabat
beton 7 cm teras11.80026.0000.0703.276m30%0.0JUMLAH VOL RABAT
BETON15.0360.0bKolom Kelas120.1200.1504.0000.864m30%0.0Kolom
Teras100.1500.1502.6000.585m30%0.0Balok
Ikat10.05024.0000.2500.300m30%0.0Balok
Konsul200.1202.3000.1500.828m30%0.0kolom peninggian tembok 1
m300.1200.1501.0000.540m30%0.0JUMLAH VOLUME
KOLOM3.117m30.0CPembesian Kolom
Kelas120.1200.1504.000125.000108.000kg0%0.0Pembesian Kolom
Teras100.1500.1502.600125.00073.125kg0%0.0Pembesian Balok
Ikat10.05024.0000.250125.00037.500kg0%0.0Pembesian Konsul
depan100.1202.3000.150125.00051.750kg0%0.0Pembesian konsul
belakang100.1201.7000.150125.00038.250kg0%0.0Pembesian peninggian
tembok 1 m125.0000.54067.500kg0%0.0JUMLAH VOLUME
PEMBESIAN376.125kg0.0dBekesting Kolom
Kelas240.2004.0000.019.200m20%0.0Bekesting Kolom
teras400.2002.6000.020.800m20%0.00.00.0Bekesting Balok
Ikat20.50024.00024.000m20%0.010.05024.0001.200m20%0.00.0m20.00.00.0Bekesting
Balok Konsul depan100.4202.3009.660m20%0.0Bekesting Balok Konsul
belakang100.4201.7007.140m20%0.0bekistng peninggian tembok
1m600.2001.00012.000m20%0.0JMLH VOLUME
BEKESTING94.000m20.0IVPEKERJAAN PASANGANaPasang
BataDepan38.0003.50059.754m20%0.0Belakang00.00.00.00.0m2Samping00.00.00.0m2Gunungan00.00.00.0m259.754m20.0abatu
bata u/ peninggian 1 m'Depan +
Belakang21.00024.00048.000m20%0.0Gunungan124.2000.70035.280m20%0.083.280m20.0JUMLAH
VOLUME PAS. BATA143.034m20.0bPlesteran
KelasDepan68.0003.500119.508m20%0.0Belakang00.00.00.0Samping00.00.00.00.0Gunungan00.00.00.00.0119.508m20%0.0bPlesteran
teras : Kolom depan00.00.00.0Konsul depan00.00.00.0Konsul
belakang00.00.00.0Balok Ikat00.00.00.00.0m2bPlesteran Peninggian 1
m'41.00024.00096.000m20%0.0244.2000.70070.560m20%0.0166.560m20.0JUMLAH
VOLUME PLESTERAN286.0680.0cskonengan1. Pojok
Dinding4.0004.0008.000m'0%0.02. Pintu
utama2.6302.6301.3202.0003.00039.480m'0%0.03. Jendela
Depan2.0402.0401.1301.1302.0006.00076.080m'0%0.04. Pintu
Penghubung2.6302.6300.9202.0002.00024.720m'0%0.05. Balok
Ikat24.0004.00096.000m'0%0.06.Kolom
Teras2.6004.00010.000104.000m'0%0.07. Konsul
depan2.3002.3000.12010.00047.200m'0%0.08. konsul
belakang1.7001.7000.12010.00035.200m'0%0.09. Sponengan
Boven1.7801.7800.9200.9202.0009.00097.200m'0%0.0JMLH VOLUME
SPONENGAN527.880m'0.0VLANTAIaLantai ( Keramik
30x30)Kelas37.0008.000168.000100%168.000Teras11.80024.00043.2000%0.0JUMLAH
VOLUME LANTAI211.200m2168.000VIPEKERJAAN
KUSENaJENDELABelakang00.00.00.00.0Depan
6/1260.06010.6400.1200.460m30%0.0Depan
krepyak60.0200.6400.1209.0000.083m30%0.00.5430.0Belakang00.00.00.00.0m30.543m30.00.0aKusen
Pintu30.0607.8100.1200.169m333%0.056aKusen Pintu
Penghubung20.0606.7800.1200.098m30%0.0aboven90.1204.1800.0600.271m30%0.0JUMLAH
VOLUME KUSEN JEND,PNTU,BV1.0800.056Daun
Pintu31.2002.1607.776m233%2.566Daun Pintu
Penghubung20.8002.1603.456m20%0.0JMLH VOLUME DAUN
PINTU11.2322.566dDaun JendelaBelakang00.00.00.00.0depan dan
partisi120.6000.60014.977100%10.658Belakang00.00.00.0JUMLAH VOLUME
DAUN JENDELA KACA14.977m210.658eBlok Kaca
Bening60.6100.6102.233m20%0.00.0fKolom
Kayu100.1000.1002.6000.260m30%0.0VIIPEKERJAAN
PLAFONDaPlafonDalam38.0007.000168.000m267%112.560depan126.0001.80046.800m20%0.0belakang126.0001.50039.000m20%0.0Samping212.0001.00024.000m20%0.0JMLH
VOLUME PLAFOND277.800m2112.560cLis
PlafonDalam38.0008.0007.0007.00090.000m267%60.300depan126.00026.0001.8001.80055.600m20%0.0belakang126.00026.0001.5001.50055.000m20%0.0Samping212.00012.0000.00.048.000m20%0.0JMLH
VOLUME LIST PLAFOND248.600m260.300VIIIPEKERJAAN PENGANTUNGaSlot
Pintu55bh100%5.000bEngsel Kupu2 4"1616bh100%16.000cEngsel Kupu2
3"2424bh0%0.0dSpring Knife1212bh0%0.0eLamskar2424bh0%0.0fTarikan
Jendela1212bh0%0.0IXPEKERJAAN ATAPaKuda-kuda Canal C > 30( 2
C.125.50.20)657.1604.5101,546.750Kg0%0.0cPlat Landas +
Baut6206.4500.150185.805Kg100%185.805dKuda-kuda Besi Siku > 30(
2 L.60.60.6)630.1605.420980.803Kg100%980.803( 2
L.40.40.4)617.7602.420257.875Kg100%257.875JML VOLUME KUDA2
SIKU1,238.678kg1,238.678fKuda-kuda 8/12 kayu
jati60.08022.2000.1201.279m30%0.060.0607.0000.1200.302m30%0.0fKolom
Kayu100.1000.1002.6000.260m30%0.0JUMLAH VOLUME KUDA21.841m30.0gNOK
8/1210.12026.0000.0800.250100%0.250Gording
8/1240.12026.0000.0800.998100%0.998Murplat
8/1220.12026.0000.0800.499100%0.499JUMLAH VOL
NOK,GORDING.MPL1.747M31.747Usuk 5/7 & Reng
2/315.80026.000150.800M2100%150.80016.20026.000161.200M2100%161.200JUMLAH
VOL URUK & RENG312.000312.000jLuas
Genteng12.00026.000312.000M2100%312.000kKerpus126.00026.000M'100%26.000Lisplang10.076.00076.000M'0%0.0Papan
Riter10.026.0000.026.000m1100%26.000XPEKERJAAN CATaCAT TEMBOK------
KELASDepan68.0003.500119.508100%119.508Belakang68.0003.500153.262100%153.262Samping87.0003.500196.000100%196.000Gunungan87.0002.30064.400100%64.400533.170m2533.170aCAT
TEMBOK------ TERASKolom100.6002.60015.6000%0.0Konsul
Depan100.4202.3009.6600%0.0Belakang100.4201.7007.1400%0.0Balok
Ikat10.60024.00014.4000%0.046.800m20.0JUMLAH CAT
TEMBOK579.970533.170bCat
PlafonDalam38.0007.000168.00067%112.560Depan126.0001.80046.8000%0.0Belakang126.0001.50039.0000%0.0Samping212.00024.0000%0.0JUMLAH
CAT PLAFOND277.800m2112.560cCat
Lisplang176.0000.20015.200m20%0.0cCat Kusen & daun
pintu23.2134.8008.2532.52515.5526.91252.615m2100%52.615Cat
Boven9.891m2100%9.891JUMLAH CAT KAYU77.70662.506XIPEKERJAAN
ELEKTRIKALaPenerangan1818bh100%18.000bTL 20 Watt1515bh100%15.000cL.
Pijar 20 Watt33bh100%3.000dSaklar Ganda44bh100%4.000eStop
Kontak33bh100%3.000fBox M CB11bh0%0.0