BAHAN DAN UPAHHARGA SATUANBAHAN MATERIAL, BAHAN MATERIAL
TERPASANG,UPAH TENAGA KERJA, UPAH TENAGA AHLI BERPENDIDIKAN S1 / S2
/ S3BERDASARKAN JURNAL HARGA SATUAN BAHAN DAN BANGUNAN, KONSTRUKSI
& INTERIORA.BAHAN MATERIAL / BAHAN MATERIAL TERPASANGNO.BAHAN /
MATERIALKODEHARGA SATUANSATUANKETERANGAN0.01234561.MATERIAL ALAM,
BATU BATAPasir Urug darat170,100.00mTanah Urug untuk halaman
jakarta42,656.00mPasir Pasang233,100.00mPasir Beton223,020.00mAbu
batu137,500.00mBatu Kali adukan 1 pc: 4 pasir376,935.00mBatu Belah
adukan 1 pc: 3 Psr436,373.00mG r a v e l278,500.00mBatu Pecah 5 - 7
cm171,250.00mBatu Pecah 3 - 5 cm182,000.00mBatu Pecah 2 - 3 cm
(Mesin)210,000.00mBatu Pecah 1 - 2 cm (Mesin)216,000.00mBatu Pecah
- 1 cm (Mesin)225,000.00mS i r t u162,000.00mBahan Agregat Base
Kelas A162,500.00mBahan Agregat Base Kelas B142,500.00mAgregat
Kasar185,000.00mAgregat Halus212,500.00mChipping ( kg )150.00KgBatu
bata merah press mesin425.00BhRooster Kerawangan 11 x 12 x 24
cm6,250.00BhRooster Kerawangan 11 x 22 x 22 cm5,000.00BhRooster
Beton 11 x 20 x 20 cm9,350.00BhBatu tempel kasar/marmo (hitam dan
kuning)125,000.00mBatu tempel halus (candi/hitam dan
palimanan)150,000.00mBatu sirih/alur (hitam dan
kuning)173,750.00mBatu alur andesit hitam250,000.00mBatu muka /
batu paras26,250.00mList batu andesit p = 40 cm, lebar = 5
cm181,250.00m'List batu candi p = 40 cm, lebar = 5 cm118,750.00m'B
a t a k o 10 x 20 x 40 cm6,250.00BhGlass Blok Kaca 20 x 20
cm20,800.00BhBeton cetak bergaris81,250.00mRumput
Lamur5,000.00mGebalan rumput4,100.00m2.S E M E NPortland Cement
:a.PC Gresik 50 kg1,180.00Kg59000b.PC Tiga Roda 50
kg1,060.00Kg53000d.PC Holcim 50 kg1,100.00Kg55000e.Filler
(semen)1,070.00Kg53500Semen Nat Warna13,100.00KgSemen
Putih3,750.00KgSemen Merah212,500.00mK a p u r228,750.00m3.BESI /
BAJA / MESHBesi Beton Polos10,126.00KgBesi Beton
Ulir10,126.00KgBesi Profil WF13,300.00KgBesi Profil
C11,500.00KgBesi Profil Siku11,500.00KgBesi Plat
Strip10,604.00KgKawat / Tali Beton12,000.00KgKawat
Harmonika11,000.00mKawat duri 10 kg6,000.00m'Kawat ayam
(ayakan)19,500.00mPaku biasa16,000.00KgPaku anti
karat22,500.00KgPaku kalsiboard25,000.00KgPaku Keling750.00BhSkrup
Asbes / paku pancing1,350.00BhSkrup/Kayu
Besi500.00BhDinabolt3,650.00BhAlat Bantu118,750.00SetWire
mesh10,300.00KgPagar baja ( BRC ) 240 x 120338,750.00mPagar baja (
BRC ) 240 x 150389,600.00m4.K A Y UKayu Bakar225,000.00mKayu
Meranti4,650,000.00mKayu Kruing7,010,000.00mKayu Jati
Lokal9,000,000.00mKayu Jati Papan26,250,000.00mKayu Jati
Usuk8,148,750.00mKayu Jati Reng6,240,000.00mKayu Jati Lokal :a.Kayu
Balok ( A1 )13,500,000.00mb.Kayu Balok ( A2 )18,750,000.00mc.Kayu
Balok ( A3 )23,134,400.00mKayu Jati Perhutani :a.Kayu Balok ( A1
)18,750,000.00mb.Kayu Balok ( A2 )22,500,000.00mc.Kayu Balok ( A3
)34,375,000.00mKayu Stoot lokal21,000.00BtgB a m b u
china3,428.00BtgTali ijuk18,750.00KgKayu Perancah3,125,000.00mKayu
kelapa / glugu3,375,000.00mKayu jawa3,400,000.00mBambu Anyam
(Gedek)22,500.00m5.PENUTUP ATAPGenting Glazur11,250.00BhGenting
Bubungan Glasur23,750.00BhAkhiran Genting Glasur37,500.00BhNok
Glazur 2 arah62,500.00BhNok Glazur 3 arah92,500.00BhNok Glazur 4
arah212,500.00BhGenting Lokal2,200.00BhGenting Bubungan
Lokal7,500.00BhGenting Kodokan (Gandusari)2,000.00BhGenting
Bubungan Gandusari7,500.00BhGenting Kodokan KW I
(Karangpilang)4,700.00BhGenting Bubungan
Karangpilang17,500.00BhGenting Mantili2,800.00BhGenting Bubungan
Mantili8,100.00BhGenting Beton Natural5,600.00BhGenting Beton
finish Cat8,100.00BhGenting Bubungan Beton18,750.00BhGenting
Kaca25,000.00BhGenting Metal ex. Multi Roof 0,77 m x 1
m117,500.00LbrGenting Metal ex Surya Roof 0,77 m x 0,80
m81,250.00LbrNok Stel Metal 90 cm62,500.00LbrAtap Sirap kayu Ulin T
= 4 mm P = 58 cm L = 8 cm2,750.00BhAtap Zincalume T = 0,30
mm43,750.00m2Atap Zincalume T = 0,35 mm69,250.00m2Atap Zincalume T
= 0,4 mm79,000.00m2Atap Zincalume T = 0,45 mm89,000.00m2Atap
Zincalume T = 0,5 mm98,750.00m2Seng Gelombang BJLS 30 ( 0,80 x 3,00
) m112,500.00LbrSeng Gelombang BJLS 20 ( 0,90 x 1,80 )
m62,500.00LbrBondex T = 0,75 mm lebar 1 m159,350.00m2Asbes
Gelombang 0,35 x 180 x 8058,100.00LbrAsbes Gelombang 0,35 x 240 x
8078,100.00LbrAsbes Gelombang 0,4 x 210 x 10385,000.00LbrAsbes
Gelombang 0,4 x 300 x 10391,250.00LbrAsbes Gelombang besar 0,5 x
240 x 105103,750.00LbrAsbes Gelombang besar 0,5 x 300 x
105131,250.00LbrNok Stel Gelombang Asbes37,500.00BhFiber Glass
Gelombang 0,80 x 3,00 m87,500.00LbrSeng Talang 0,90 M ( BJLS
0,30)41,000.00m'Seng Talang 0,60 M ( BJLS 0,30)27,000.00m'Talang
Karpet 0,90 M17,650.00m'Talang PVC U ( 4 m' )93,750.00LjAlumunium
foil single side10,000.00m2Alumunium foil double
side12,500.00m26.PENUTUP LANGIT-LANGITFiber semen rata ex Gresik
Superata Exl20,300.00Lbr(1,00 X 1,00) t = 3 mmKalsiboard 1,00 x
1,00 m ex Gresik18,000.00LbrKalsiboard 1,20 x 2,40 m ex
Gresik58,000.00LbrGypsum board 1,20 x 2,40 m ex
Jayaboard67,500.00LbrList kayu jati profil28,000.00m'List kayu
pelipit meranti7,500.00m'Papan GRC t = 9 mm lebar = 20
cm22,500.00m'Papan GRC t = 9 mm lebar = 30 cm27,500.00m'7.KAYU
LAPISMultipleks t = 9 mm (1,20 x 2,40 ) m126,000.00LbrMultipleks t
= 12 mm (1,20 x 2,40 ) m168,750.00LbrTripleks 3 mm ( 2,40 x 1,20 )
m53,100.00LbrTeaxwood t = 4 mm ( 2,40 x 1,20 )
m103,750.00LbrPlywood Besar t = 4 mm ( 2,40 x 1,20 )
m81,250.00Lbr8.K A C AKaca Bening 5 mm110,000.00mKaca Bening 3
mm102,500.00mKaca Rayband 5 mm arna bronze, blue,
green118,650.00mKaca Rayband 3 mm87,500.00mKaca Es 5
mm126,250.00mKaca Es 3 mm106,250.00mKaca Tempered 10
mm421,500.00m9.PENGGANTUNG, PENGUNCIEngsel Jendela
nylon13,000.00BhEngsel Pintu25,000.00BhKait / hak angin
kuningan21,250.00PsGrendel pintu kuningan 3"12,500.00BhGrendel
jendela kuningan15,600.00BhLock Set33,000.00BhHandle
pintu160,000.00BhPull Handle Besar240,000.00BhHandle
jendela15,600.00BhKerangka Nako109,350.00mKunci Tanam setara
"Yale"165,000.00SetKunci Tanam setara
"Beluci"187,500.00SetSealant37,500.00kalengRel pintu geser +
acc322,650.00unitDoor closer DKs HO- NA/BA248,750.00unitFloor
hinge781,250.00Set10.CAT MARKA JALANCat Thermoplastic28,750.00KgCat
Non Thermoplastic22,850.00KgGlassbed Pottes21,350.00Kg11.CAT KAYU /
BESI / TEMBOK / GENTINGCat Dempul / Plamir32,925.00KgCat
Meni58,074.00KgCat Dasar Minyak34,350.00KgCat watter
proofing52,500.00KgCoating batu alam75,000.00KgCat Kayu Halus
:a.Emco 1 kg59,350.00kalengb.Altek 1 kg52,500.00kalengLem
Kayu33,000.00KgMeni Besi (Flincote) 1 kg59,811.52kalengThinner /
Minyak Cat :a.Thinner A Biasa 1 kg26,000.00kalengb.Thinner A
Spesial 1 kg29,000.00kalengc.Thinner B 1 kg15,000.00kalengCat
Tembok :a.Decolith 5 kg87,500.00kalengb.Paragon 5
kg85,000.00kalengc.Catylac 5 kg110,000.00kalengd.Aries 5
kg56,250.00kalenge.Dulux exterior 2,5 ltr1,250,000.00kalengf.Cat
dasar exterior 2,5 ltr175,000.00kalengg.Cat exterior exs. Dana
Paint 2,5 ltr230,000.00kalengCat Genting :a.Sanlex standar 5
kg156,250.00kalengb.Sanlex khusus 5 kg221,850.00kalengKuas
besar16,675.00BhKuas kecil8,375.00BhS p i r t u s19,000.00LtrKertas
Gosok4,250.00LbrR e s i d u50,505.00LtrPolitur
dasar37,750.00LtrPolitur Jadi ex Impra68,750.00LtrVernish
Jadi49,898.00LtrBatu Apung23,100.00Kg12.KERAMIK, UBIN, PAVING
STONEList keramik (Kuku Macan) p = 10 cm1,250.00BhList keramik
dinding t = 10 cm21,250.00m'Step Nosing 10x2015,600.00BhPlint
keramik 10x4017,500.00BhUbin Keramik 20 x 20 Wafel76,000.00mUbin
Keramik 20 x 20 Polos84,000.00mUbin Keramik 20 x 25
Polos140,000.00mUbin Keramik 20 x 25 Motif66,500.00mUbin Keramik 30
x 30 Polos ex Mulia144,000.00mUbin Keramik 30 x 30 Motif ex Asia
Tile66,500.00mUbin Keramik 40 x 40 Polos ex Mulia138,000.00mUbin
Keramik 40 x 40 Motif ex Platinium72,500.00mTegel Abu - Abu 20 x 20
cm25,000.00mMarmer Ujung Pandang :a.Marmer Brevia Premium / Marfil
Lokal160,250.00mb.Marmer cream malaga premium162,500.00mc.Marmer
cream malaga standart210,000.00mMarmer Tulung Agung :a.Warna putih
ex Tulungagung338,000.00mMarmer Import :a.Trevertine Romano Turkey
Sleb (Filled)825,000.00mb.Trevertine Romano Turkey Sleb
(unFilled)980,000.00mc.Bade Seba China 60XPJG
(Poles)980,000.00m'd.Bianco Sardo 60XPJG (Poles)393,750.00m'e.Black
Galaxy SS Super India 60-80XJPG (Poles)718,750.00m'f.Black Galaxy
India Slab (Poles)1,000,000.00mGranit :a.Granit Warna hitam / Hijau
ex Tulungagung344,500.00mGranito :a.Granito 30 x 30 cm
silver193,750.00mb.Granito 30 x 30 cm gold206,250.00mc.Granito 40 x
40 cm type Salsa unpolished237,500.00md.Granito 40 x 40 cm type
Salsa polished268,750.00me.Granito 40 x 40 cm type Palazzo Silver
polished281,250.00mf.Granito 40 x 40 cm type Palazzo Gold
polished303,750.00mg.Granito 40 x 40 cm type Rasello Silver
polished212,500.00mh.Granito 40 x 40 cm type Rasello Gold
polished231,250.00mi.Granito 60 x 60 cm type Salsa Ivory
polished275,000.00mj.Granito 60 x 60 cm type Salsa Butterstone
polished320,000.00mk.Granito 60 x 60 cm type Palazzo Silver
polished322,500.00ml.Granito 60 x 60 cm type Palazzo Gold
polished334,800.00mm.Granitile ex. Cina 60 x 60 cm
Polos115,000.00mPaving Stone :a.Paving Bata Abu-abu 8 cm kw I ( K -
400 )77,500.00mb.Paving Bata Abu-abu 8 cm kw II ( K - 150
)70,000.00mc.Paving Bata Abu-abu 6 cm kw I ( K - 300
)63,750.00md.Paving Bata Abu-abu 6 cm kw II ( K - 125
)56,250.00me.Paving segi 6 Abu-abu 8 cm kw I ( K - 400
)77,500.00mf.Paving segi 6 Abu-abu 8 cm kw II ( K - 150
)70,000.00mg.Paving segi 6 Abu-abu 6 cm kw I ( K - 300
)63,750.00mh.Paving segi 6 Abu-abu 6 cm kw II ( K - 125
)56,250.00mi.Paving Variasi Besar Abu-abu 6 cm kw I
(K-300)63,750.00mj.Paving Uskup Abu-abu 7 cm kw I73,750.00mKanstein
:a.Kanstein 20 x 10 x 40 cm40,800.00bjb.Kanstein 20 x 15 x 50 cm
Profil39,000.00bjc.Kanstein 35 x 15 x 50 cm
Profil45,600.00bjd.Kanstein 30 x 15 x 60 cm
Profil45,600.00bje.Kanstein Taman4,350.00bjBataco 10 x 20 x 40
cm6,250.00bjGrass block 10 x 36 x 53 cm22,500.00bj13.PIPA +
ACCESSORIESKnee GI 2"28,750.00BhTee GI 2"37,500.00BhPipa Besi 4"
Galvanis (6 m' t = 2 mm)645,750.00LjPipa Besi 3" Galvanis (6 m' t =
2 mm)489,950.00LjPipa Besi 2 " Galvanis (6 m' t = 2
mm)375,000.00LjPipa Besi 2" Galvanis (6 m' t = 2
mm)250,000.00LjPipa Besi 1" Galvanis (6 m' t = 2
mm)131,250.00LjPipa Besi " Galvanis (6 m' t = 2 mm)125,000.00LjPipa
PVC AW 4" ( 4 m' ) Maspion262,500.00LjPipa PVC AW 3" ( 4 m' )
Maspion187,500.00LjPipa PVC AW 2" ( 4 m' ) Maspion100,000.00LjPipa
PVC AW 1 " ( 4 m' ) Maspion68,750.00LjPipa PVC AW 1" ( 4 m' )
Maspion36,500.00LjPipa PVC AW " ( 4 m' ) Maspion29,350.00LjPipa PVC
D 6" ( 4 m' ) Maspion262,500.00LjPipa PVC D 4" ( 4 m' )
Maspion145,000.00LjPipa PVC D 3" ( 4 m' ) Maspion102,500.00LjPipa
PVC D 2" ( 4 m' ) Maspion68,750.00LjPipa PVC D 2" ( 4 m' )
Maspion50,000.00LjPipa PVC D 1" ( 4 m' ) Maspion41,250.00LjPipa PVC
D " ( 4 m' ) Maspion28,100.00Lj14.BETON BUIS1Beton Buis = 15 cm x
10022,275.00Bh2Beton Buis U = 15 cm x 10022,825.00Bh3Beton Buis =
20 cm x 10030,800.00Bh4Beton Buis U = 20 cm x 10022,825.00Bh5Beton
Buis = 30 cm x 10041,250.00Bh6Beton Buis U = 30 cm x
10025,162.50Bh7Beton Buis = 40 cm x 10065,450.00Bh8Beton Buis = 50
cm x 10096,800.00Bh9Beton Buis = 60 cm x 100115,500.00Bh10Beton
Buis = 60 cm x 50118,250.00Bh11Beton Buis = 80 cm x
100206,800.00Bh12Beton Buis = 80 cm x 50146,025.00Bh13Beton Buis =
100 cm x 100244,750.00Bh14Beton Buis = 100 cm x
50233,750.00Bh15.ASPAL, MINYAK DAN PELUMASAspal Drum pen
40/6011,300.00KgA s p a l11,000.00KgAspal Emulsi11,100.00KgMinyak
tanah industri/kerosin8,500.00LtrSolar Subsidi6,500.00LtrSolar Non
Subsidi12,450.00LtrBensin Subsidi6,500.00LtrBensin Non
Subsidi12,450.00LtrOlie ( Minyak Pelumas )30,850.00LtrGemuk /
Stenped24,700.00KgMinyak Bekisting4,600.00LtrL P G ( tabung 12 kg
)105,000.00Tabung16.SANITAIRBak cuci piring 60 x 90 cm ex
Metako243,750.00BhBak cuci ex Visa tebal281,250.00BhBak mandi fiber
glass kotak181,250.00BhBak mandi fiber glass sudut237,400.00BhFloor
Drain plastic12,500.00BhFloor Drain stainless
steel21,250.00BhClosed duduk (Ex TOTO) + watertank +
klep2,062,500.00UnitClosed duduk Ex INA +
accesoris1,125,000.00UnitClosed Jongkok Ex INA131,250.00BhClosed
Jongkok Ex TOTO231,250.00BhWastafel besar + acc (Ex
INA)350,000.00BhWastafel kecil + acc (Ex INA)259,350.00BhUrinoir Ex
TOTO1,875,000.00BhKran air logam32,500.00BhSeal
Tape3,100.00BhShower standar81,250.00BhTandon air 250 ltr ex
"Pura"531,250.00BhTandon air 320 ltr ex "Pura"593,750.00BhTandon
air 550 ltr ex "Pura"875,000.00BhTandon air 700 ltr ex
"Pura"937,500.00BhTandon air 1.200 ltr ex
"Pura"2,062,500.00BhTandon air 2.000 ltr ex
"Pura"2,875,000.00BhPintu KM/WC PVC 200 x 70 cm293,750.00UnitPintu
Alluminium KM/WC 185 x 65 cm275,000.00Unit17.PERALATAN LISTRIKLampu
TL 20 watt ex Phillips17,700.00BhLampu TL 40 watt ex
Phillips23,550.00BhLampu SL 14 watt ex Philips34,350.00BhLampu SL
18 watt ex Philips38,750.00BhLampu SL 23 watt ex
Philips42,500.00BhLampu Dop (bolamp) ex Phillips 40
watt7,500.00BhDownlight ex Philips 4"60,000.00BhDownlight ex
Philips 5"68,750.00BhDownlight ex Cina 4"34,350.00BhDownlight ex
Cina 5"38,750.00BhSaklar tunggal ex Brocco13,750.00BhSaklar ganda
ex Brocco19,350.00BhStop kontak17,000.00BhStop kontak
AC64,500.00BhStop kontak outlet TV50,000.00BhStop kontak outlet
telepon59,650.00BhExhaust fan kecil "Maspion"193,750.00BhExhaust
fan besar "Maspion"365,250.00BhLampu emergency250,000.00Bh18.BAHAN
/ MATERIAL TERPASANGAuning + rangka
hollow18.1300,000.00mPolycarbonat exs twinlite rangka
hollow18.2375,000.00mPolycarbonat exs twinlite rangka
stainless18.1503,750.00mKuda-kuda baja ringan dibawah 35 tebal 1,00
mma.bentang 6 meter175,000.00mb.bentang 6 meter s/d 8
meter187,500.00mc.bentang 8 meter s/d 10 meter200,000.00md.bentang
10 meter s/d 12 meter210,000.00me.bentang 12 meter s/d 14
meter223,100.00mf.bentang 14 meter s/d 16 meter232,800.00mg.bentang
16 meter s/d 18 meter250,000.00mh.bentang 18 meter257,200.00mPasang
reng usuk baja ringan116,000.00mKusen Alluminium 3" Putih ex
alexindo85,000.00m'Kusen Alluminium 3" Warna ex
alexindo93,750.00m'Kusen Alluminium 4" Putih ex
alexindo90,000.00m'Kusen Alluminium 4" Warna ex
alexindo97,500.00m'Kusen Alluminium 3" Putih ex
indall88,000.00m'Kusen Alluminium 3" Warna ex
indall100,000.00m'Kusen Alluminium 4" Putih ex
indall95,000.00m'Kusen Alluminium 4" Warna ex
indall102,700.00m'Jalusi aluminium487,500.00mAllumunium composite
panel 4 mm( exs. China) + Rangka578,350.00mPlafond rangka hollow
galvanis112,500.00mPlafond rangka hollow + penutup gypsum
9mm93,000.00mPlafond rangka hollow + penutup kalsiboard
3.5mm90,500.00mDaun pintu + acc Alpha/ATT lengkap
warna700,000.00mDaun pintu + acc Alpha/ATT lengkap
putih668,750.00mDaun jendela Kaca + acc Alpha/ATT lengkap
warna462,500.00mDaun jendela Kaca + acc Alpha/ATT lengkap
putih425,000.00mPintu kaca 1 cm + acc, lebar 1
m3,125,000.00UnitBeton sikat / batu sikat312,500.00mWatter proofing
membran100,000.00mPartisi rangka profil C +
penutup175,000.00mWallpaper71,250.00mPintu harmonika exs.
Jombang843,750.00mRollingdoor434,350.00mPagar hollow 4 cm jarak 6
cm437,500.00mRailling Tangga Stainless734,500.00mCat melamin- daun
pintu doof37,500.00m- daun pintu gloss33,750.00m- daun kusen / daun
jendela doof14,250.00m'- daun kusen / daun jendela
gloss54,750.00m'Cat duko- daun pintu doof433,750.00m- daun pintu
gloss396,250.00m- daun kusen / daun jendela doof93,750.00m'- daun
kusen / daun jendela gloss87,500.00m'Cat motif marmer / serat kayu-
dinding218,750.00m- listplank112,500.00m'- pilar318,750.00m'Cat
dekoratif- dinding683,750.00m- plafound81,250.00m-
listplank65,600.00m'List gypsum lebar 7 cm13,000.00m'List gypsum
lebar 12 cm16,000.00m'List gypsum lebar 15 cm23,150.00m'Kaca Patri
/ stain timah1,214,600.00mKaca Patri / stain timah
triple1,518,250.00mKaca Stain Kuningan Triple2,025,000.00mKaca
Painting 5 mm437,500.00mKaca Gravir Warna 5 mm562,500.00mKaca
Gravir Polos 5 mm625,000.00mSewa sklafolding43,750.00set/bulanSewa
bor pile6,250.00jamPasang Instalasi Listrika.Pas instalasi listrik
indoor + fitting110,000.00TtkKbl NYA 2x2,5 mm2 (non saklar/stop
kontak)b.Pas titik stop kontak (reguler) Kbl NYA (2) 2,5
mm283,750.00Ttkc.Pasang titik stop kontak
(khusus/laboratorium)106,250.00TtkKbl NYA (3) 2,5 mm2d.Pasang titik
stop kontak AC Kbl NYA (3) 4 mm290,000.00TtkMobilisasi peralatan
dan testing pekerjaan Hotmixa.Mobilisasi peralatan
hotmix1,950,000.00LsNO.BAHAN / MATERIALKODEHARGA
SATUANSATUANKETERANGANb.Testing pekerjaan
hotmix70,000.00Ttk123456BETON K225800,000.00m^3B.UPAH TENAGA
KERJANO.U R A I A NKODEHARGA SATUANSATUANHARIAN
(OH)abcdef1.Pekerja(L01)10,000.00Jam70,000.002.Tukang(L02)10,714.29Jam75,000.003.M
a n d o
r(L03)12,142.86Jam85,000.004.Operator(L04)7,457.14Jam52,200.005.Pembantu
Operator(L05)6,214.29Jam43,500.006.Sopir /
Driver(L06)6,835.71Jam47,850.007.Pembantu Sopir /
Driver(L07)6,214.29Jam43,500.008.Mekanik(L08)7,457.14Jam52,200.009.Pembantu
Mekanik(L09)6,835.71Jam47,850.0010.Kepala
Tukang(L10)11,428.57Jam80,000.00Asumsi : lama kerja dalam 1 hari
adalah 7 jam efektif
ANALISA HARGA SATUANANALISA HARGA SAT KEGIATAN KONSTRUKSITAHUN
ANGGARAN 2014A.Analisa Biaya Konstruksi Pekerjaan Persiapan dan
Tanah1.1 m' Sewa pagar sementara dari seng gelombang, tinggi 2
meterKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBambu 10 - 12
cmBtg1.00003,428.003,428.00PCKg2.50001,180.002,950.00Seng gelombang
bjls 20Lbr0.750062,500.0046,875.00Pasir
betonm0.0050223,020.001,115.10Batu pecah 2 -
3m0.0090210,000.001,890.00Kayu Lokal
5/7m0.01053,400,000.0035,700.00Paku
biasaKg0.060016,000.00960.002TENAGATukang
kayuOh0.200075,000.0015,000.00PekerjaOh0.400070,000.0028,000.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.020085,000.001,700.0092,918.10Diasumsikan
Pemakaian bahan sebesar 25
%23,229.5346,300.0069,529.53DIBULATKAN69,500.002.1 m' Pengukuran
dan pemasangan bouwplankKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu Lokal
5/7m0.00393,400,000.0013,260.00Paku
biasaKg0.020016,000.00320.00Kayu papan
2/20m0.00423,400,000.0014,280.002TENAGATukang
kayuOh0.100075,000.007,500.00PekerjaOh0.100070,000.007,000.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0027,860.0015,725.0043,585.00DIBULATKAN43,550.002.a1
M2 Membersihkan Lapangan dan PerataanKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)2TENAGAPekerjaOh0.100070,000.007,000.00MandorOh0.050085,000.004,250.000.0011,250.0011,250.00DIBULATKAN11,250.003.Pembuatan
kisdam tinggi 1 m tebal 0,6 mKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBambu 10 - 12
cmbtg1.00003,428.003,428.00Gedegm2.000022,500.0045,000.00Kawat ikat
betonkg0.150012,000.001,800.002TENAGAPekerjaOh0.300070,000.0021,000.00Kepala
tukangOh0.033080,000.002,640.00MandorOh0.020085,000.001,700.0050,228.0025,340.0075,568.00DIBULATKAN75,550.004.1
m Bongkaran beton bertulangKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh6.667070,000.00466,690.00MandorOh0.333085,000.0028,305.000.0494,995.00494,995.00DIBULATKAN494,950.005.1
m Bongkaran pasangan batu kaliKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh2.048070,000.00143,360.00MandorOh0.205085,000.0017,425.000.0160,785.00160,785.00DIBULATKAN160,750.006.1
m Bongkaran dinding tembok batu bataKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh2.000070,000.00140,000.00MandorOh0.100085,000.008,500.000.0148,500.00148,500.00DIBULATKAN148,500.007.1
m Menurunkan genting, genting dipakai
lagiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.020070,000.001,400.00MandorOh0.010085,000.00850.000.02,250.002,250.00DIBULATKAN2,250.008.1
m Menurunkan genting, genting tidak dipakai
lagiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.010070,000.00700.00MandorOh0.005085,000.00425.000.01,125.001,125.00DIBULATKAN1,100.009.1
m Menurunkan/membongkar rangka penutup atap (usuk+reng), bongkaran
dipakai lagiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGATukangOh0.025075,000.001,875.00PekerjaOh0.100070,000.007,000.00Kepala
tukangOh0.002580,000.00200.00MandorOh0.050085,000.004,250.000.013,325.0013,325.00DIBULATKAN13,300.0010.1
m Menurunkan/membongkar rangka penutup atap (usuk+reng), bongkaran
tidak dipakai lagiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.100070,000.007,000.00MandorOh0.050085,000.004,250.000.011,250.0011,250.00DIBULATKAN11,250.0011.1
m Menurunkan/membongkar kayu ( kuda - kuda ), bongkaran dipakai
lagiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGATukangOh4.000075,000.00300,000.00PekerjaOh2.666770,000.00186,669.00Kepala
tukangOh0.400080,000.0032,000.00MandorOh0.133385,000.0011,330.500.0529,999.50529,999.50DIBULATKAN529,950.0012.1
m Menurunkan/membongkar kayu ( kuda - kuda ), bongkaran tidak
dipakai lagiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGATukangOh4.000075,000.00300,000.00Kepala
tukangOh0.400080,000.0032,000.000.0332,000.00332,000.00DIBULATKAN332,000.0013.1
m Pembuatan stegger bambu untuk andangKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBambu 6 - 8 cm/600
cmBtg1.00003,428.003,428.00Tali
ijukKg0.250018,750.004,687.502TENAGATukang
kayuOh0.017075,000.001,275.00PekerjaOh0.250070,000.0017,500.00Kepala
tukangOh0.002080,000.00160.00MandorOh0.013085,000.001,105.008,115.5020,040.0028,155.50DIBULATKAN28,150.00141
m Galian tanah biasa sedalam 1 meterKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.750070,000.0052,500.00MandorOh0.025085,000.002,125.000.054,625.0054,625.00DIBULATKAN54,600.0015.1
m Galian tanah biasa sedalam 2 meterKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.900070,000.0063,000.00MandorOh0.045085,000.003,825.000.066,825.0066,825.00DIBULATKAN66,800.0016.1
m Galian tanah biasa sedalam 3 meterKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh1.050070,000.0073,500.00MandorOh0.067085,000.005,695.000.079,195.0079,195.00DIBULATKAN79,150.0017.1
m Galian tanah keras sedalam 1 meterKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh1.000070,000.0070,000.00MandorOh0.032085,000.002,720.000.072,720.0072,720.00DIBULATKAN72,700.0018.1
m Galian tanah lumpur sedalam 1 meterKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh1.200070,000.0084,000.00MandorOh0.045085,000.003,825.000.087,825.0087,825.00DIBULATKAN87,800.0019.1
m' Pembuatan lubang strous pile diameter
20Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.150070,000.0010,500.00MandorOh0.015085,000.001,275.002PERALATANSewa
bor
pileJam1.20006,250.007,500.007,500.0011,775.0019,275.00DIBULATKAN19,250.0020.1
m' Pembuatan lubang strous pile diameter
25Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.200070,000.0014,000.00MandorOh0.020085,000.001,700.002PERALATANSewa
bor
pileJam1.20006,250.007,500.007,500.0015,700.0023,200.00DIBULATKAN23,200.0021.1
m' Pembuatan lubang strous pile diameter
30Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.250070,000.0017,500.00MandorOh0.025085,000.002,125.002PERALATANSewa
bor
pileJam1.20006,250.007,500.007,500.0019,625.0027,125.00DIBULATKAN27,100.00221
m Urugan kembaliKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1TENAGAPekerjaOh0.250070,000.0017,500.00MandorOh0.008385,000.00708.330.018,208.3318,208.33DIBULATKAN18,200.00231
m Urugan pasir dengan penyiramanKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPasir
urugm1.2000170,100.00204,120.002TENAGAPekerjaOh0.300070,000.0021,000.00MandorOh0.010085,000.00850.00204,120.0021,850.00225,970.00DIBULATKAN225,950.0023.a1
m Urugan abu batuKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANAbu
Batum1.2000137,500.00165,000.002TENAGAPekerjaOh0.300070,000.0021,000.00MandorOh0.010085,000.00850.00165,000.0021,850.00186,850.00DIBULATKAN186,850.00241
m Urugan tanah dipadatkan dengan tenaga
buruhKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANTanah
urugm1.200042,656.0051,187.202TENAGAPekerjaOh0.800070,000.0056,000.00MandorOh0.060085,000.005,100.0051,187.2061,100.00112,287.20DIBULATKAN112,250.0025.1
m Urugan tanah dipadatkan dengan alat
(mekanis)Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANTanah
urugm1.200042,656.0051,187.202TENAGAPekerjaOh0.006770,000.00469.00MandorOh0.000985,000.0076.503ALATAlat
bantuLs1.0000831.35831.35Water
Tankerjam0.0141270,050.003,807.71Vibratory
rollerjam0.0574417,450.0023,961.6351,187.2029,146.1980,333.39DIBULATKAN80,300.0026.1
m Tanam rumput lamurKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANRumput
Lamurm1.00005,000.005,000.002TENAGAPekerjaOh0.144070,000.0010,080.00MandorOh0.010085,000.00850.005,000.0010,930.0015,930.00DIBULATKAN15,900.00B.Analisa
Biaya Kontruksi Pekerjaan Pondasi Batu Kali1.1 m Pasang pondasi
batu kali, 1 PC : 4 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu belah 15/20
cmm1.2000436,373.00523,647.60PCKg163.00001,180.00192,340.00Pasir
pasangm0.5200233,100.00121,212.002TENAGAPekerjaOh1.500070,000.00105,000.00Tukang
batuOh0.750075,000.0056,250.00Kepala
tukangOh0.075080,000.006,000.00MandorOh0.075085,000.006,375.00837,199.60173,625.001,010,824.60DIBULATKAN1,010,800.0021
m Pasang pondasi batu kali, 1 PC : 6 PsKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu belah 15/20
cmm1.2000436,373.00523,647.60PCKg117.00001,180.00138,060.00Pasir
pasangm0.5610233,100.00130,769.102TENAGAPekerjaOh1.500070,000.00105,000.00Tukang
batuOh0.750075,000.0056,250.00Kepala
tukangOh0.075080,000.006,000.00MandorOh0.075085,000.006,375.00792,476.70173,625.00966,101.70DIBULATKAN966,100.003.1
m Pasang pondasi batu kali, 1 PC : 3 Kp : 10
PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu belah 15/20
cmm1.2000436,373.00523,647.60PCKg61.00001,180.0071,980.00Kapur
pasangm0.1470228,750.0033,626.25Pasir
pasangm0.4920233,100.00114,685.202TENAGAPekerjaOh1.500070,000.00105,000.00Tukang
batuOh0.750075,000.0056,250.00Kepala
tukangOh0.075080,000.006,000.00MandorOh0.075085,000.006,375.00743,939.05173,625.00917,564.05DIBULATKAN917,550.0041
m Pasang pondasi batu kosong /
anstampengKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu belah 15/20
cmm1.2000436,373.00523,647.60Pasir
urugm0.4320170,100.0073,483.202TENAGAPekerjaOh0.780070,000.0054,600.00Tukang
batuOh0.390075,000.0029,250.00Kepala
tukangOh0.039080,000.003,120.00MandorOh0.039085,000.003,315.00597,130.8090,285.00687,415.80DIBULATKAN687,400.005.1
m Pembangunan penempatan bronjong termasuk penyediaan batu dan
kawat bronjongKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu belah 15/20
cmm1.0000436,373.00436,373.00Kawat anyaman 3
mmkg8.333311,000.0091,666.672TENAGAPekerjaOh2.033370,000.00142,333.33TukangOh0.666775,000.0050,000.00MandorOh0.051785,000.004,391.67528,039.67196,725.00724,764.67DIBULATKAN724,750.00C.Analisa
Biaya Kontruksi Pekerjaan Pasangan Dinding1.1 m Pasangan batu bata
tebal 1 bata, 1 PC : 3 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu
bataBh140.0000425.0059,500.00PCKg32.95001,180.0038,881.00Pasir
pasangm0.0910233,100.0021,212.102TENAGAPekerjaOh0.600070,000.0042,000.00Tukang
batuOh0.200075,000.0015,000.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.030085,000.002,550.00119,593.1061,150.00180,743.10DIBULATKAN180,700.0021
m Pasangan batu bata tebal 1 bata, 1 PC : 6
PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu
bataBh140.0000425.0059,500.00PCKg18.50001,180.0021,830.00Pasir
pasangm0.1220233,100.0028,438.202TENAGAPekerjaOh0.600070,000.0042,000.00Tukang
batuOh0.200075,000.0015,000.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.030085,000.002,550.00109,768.2061,150.00170,918.20DIBULATKAN170,900.003.1
m Pasangan batu bata tebal 1 bata, 1 PC : 3 Kp : 10
PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu
bataBh140.0000425.0059,500.00PCKg10.08001,180.0011,894.40Pasir
pasangm0.0925233,100.0021,561.75Kapur
pasangm0.0275228,750.006,290.632TENAGAPekerjaOh0.600070,000.0042,000.00Tukang
batuOh0.200075,000.0015,000.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.030085,000.002,550.0099,246.7861,150.00160,396.78DIBULATKAN160,350.004.1
m Pasangan batu bata tebal bata, 1 PC : 3
PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu
bataBh70.0000425.0029,750.00PCKg14.37001,180.0016,956.60Pasir
pasangm0.0400233,100.009,324.002TENAGAPekerjaOh0.300070,000.0021,000.00Tukang
batuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.0056,030.6030,575.0086,605.60DIBULATKAN86,600.005.1
m Pasangan batu bata tebal bata, 1 PC : 6
PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu
bataBh70.0000425.0029,750.00PCKg8.32001,180.009,817.60Pasir
pasangm0.0490233,100.0011,421.902TENAGAPekerjaOh0.300070,000.0021,000.00Tukang
batuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.0050,989.5030,575.0081,564.50DIBULATKAN81,550.006.1
m Pasangan batu bata tebal bata, 1 PC : 3 Kp : 10
PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu
bataBh70.0000425.0029,750.00PCKg4.50001,180.005,310.00Kapur
pasangm0.0150228,750.003,431.25Pasir
pasangm0.0500233,100.0011,655.002TENAGAPekerjaOh0.300070,000.0021,000.00Tukang
batuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.0050,146.2530,575.0080,721.25DIBULATKAN80,700.007.1
m Pasangan batu bata, 1 PC : 3 PsKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu
bataBh560.0000425.00238,000.00PCKg114.96001,180.00135,652.80Pasir
pasangm0.3200233,100.0074,592.002TENAGAPekerjaOh2.560070,000.00179,200.00Tukang
batuOh0.800075,000.0060,000.00Kepala
tukangOh0.080080,000.006,400.00MandorOh0.120085,000.0010,200.00448,244.80255,800.00704,044.80DIBULATKAN704,000.008.1
m Pasangan batu bata, 1 PC : 6 PsKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatu
bataBh560.0000425.00238,000.00PCKg66.56001,180.0078,540.80Pasir
pasangm0.3920233,100.0091,375.202TENAGAPekerjaOh2.560070,000.00179,200.00Tukang
batuOh0.800075,000.0060,000.00Kepala
tukangOh0.080080,000.006,400.00MandorOh0.120085,000.0010,200.00407,916.00255,800.00663,716.00DIBULATKAN663,700.009.1
m Pasang dinding roster / terawang 11 x 12 x
24Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANRoster / terawang 11 x 12 x
24Bh30.00006,250.00187,500.00PCKg14.00001,180.0016,520.00Pasir
pasangm0.0320233,100.007,459.202TENAGAPekerjaOh0.300070,000.0021,000.00Tukang
batuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.00211,479.2030,575.00242,054.20DIBULATKAN242,050.0010.1
m Pasang dinding roster / terawang 11 x 22 x
22Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANRoster / terawang 11 x 22 x
22Bh18.00005,000.0090,000.00PCKg8.60221,180.0010,150.54Pasir
pasangm0.0203233,100.004,737.192TENAGAPekerjaOh0.300070,000.0021,000.00Tukang
batuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.00104,887.7330,575.00135,462.73DIBULATKAN135,450.0011.1
m Pasang dinding roster beton 11 x 20 x
20Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANRoster beton 11 x 20 x
20Bh25.00009,350.00233,750.00PCKg14.33691,180.0016,917.56Pasir
pasangm0.0282233,100.006,579.442TENAGAPekerjaOh0.300070,000.0021,000.00Tukang
batuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.00257,247.0030,575.00287,822.00DIBULATKAN287,800.0012.1
m Pasang dinding batako 10 x 20 x 40Kode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBatako 10 x 20 x
40Bh12.50006,250.0078,125.00PCKg5.00001,180.005,900.00Pasir
pasangm0.0410233,100.009,557.102TENAGAPekerjaOh0.300070,000.0021,000.00Tukang
batuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.0093,582.1030,575.00124,157.10DIBULATKAN124,150.0013.1
m Pasang glass blockKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGlass
blockBh25.000020,800.00520,000.00PCKg5.00001,180.005,900.002TENAGAPekerjaOh0.300070,000.0021,000.00Tukang
batuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.00525,900.0030,575.00556,475.00DIBULATKAN556,450.00D.Analisa
Biaya Konstruksi Pekerjaan Plesteran1.1 m Plesteran 1 PC : 3 Ps
tebal 20 mmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg10.36801,180.0012,234.24Pasir
pasangm0.0310233,100.007,226.102TENAGAPekerjaOh0.260070,000.0018,200.00Tukang
batuOh0.200075,000.0015,000.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.013085,000.001,105.0019,460.3435,905.0055,365.34DIBULATKAN55,350.002.1
m Plesteran 1 PC : 6 Ps tebal 20 mmKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg5.88801,180.006,947.84Pasir
pasangm0.0360233,100.008,391.602TENAGAPekerjaOh0.260070,000.0018,200.00Tukang
batuOh0.200075,000.0015,000.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.013085,000.001,105.0015,339.4435,905.0051,244.44DIBULATKAN51,200.003.1
m Berapen 1 PC : 5 Ps tebal 15 mmKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg5.18401,180.006,117.12Pasir
pasangm0.0260233,100.006,060.602TENAGAPekerjaOh0.150070,000.0010,500.00Tukang
batuOh0.075075,000.005,625.00Kepala
tukangOh0.008080,000.00640.00MandorOh0.008085,000.00680.0012,177.7217,445.0029,622.72DIBULATKAN29,600.004.1
m Plesteran beton 1 PC : 3 Ps tebal 15
mmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg7.77601,180.009,175.68Pasir
pasangm0.0230233,100.005,361.302TENAGAPekerjaOh0.300070,000.0021,000.00Tukang
batuOh0.150075,000.0011,250.00Kepala
tukangOh0.015080,000.001,200.00MandorOh0.015085,000.001,275.0014,536.9834,725.0049,261.98DIBULATKAN49,250.005.1
m' Plesteran skoning ( benangan ) 1 PC : 2
PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg0.50001,180.00590.00Pasir
pasangm0.0130233,100.003,030.302TENAGAPekerjaOh0.080070,000.005,600.00Tukang
batuOh0.040075,000.003,000.00Kepala
tukangOh0.040080,000.003,200.00MandorOh0.004085,000.00340.003,620.3012,140.0015,760.30DIBULATKAN15,750.006.1
m Plesteran ciprat 1 PC : 2 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg4.32001,180.005,097.60Pasir
pasangm0.0060233,100.001,398.602TENAGAPekerjaOh0.300070,000.0021,000.00Tukang
batuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.015085,000.001,275.006,496.2030,575.0037,071.20DIBULATKAN37,050.007.1
m Siar 1 PC : 2 PsKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg4.32001,180.005,097.60Pasir
pasangm0.0160233,100.003,729.602TENAGAPekerjaOh0.150070,000.0010,500.00Tukang
batuOh0.075075,000.005,625.00Kepala
tukangOh0.008080,000.00640.00MandorOh0.008085,000.00680.008,827.2017,445.0026,272.20DIBULATKAN26,250.00E.Analisa
Biaya Konstruksi Pekerjaan Kayu1.1 m Pasang kusen pintu dan jendela
kayu jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati balok
A2m1.100018,750,000.0020,625,000.00Pakukg1.250016,000.0020,000.00Lem
kayukg1.000033,000.0033,000.002TENAGAPekerjaOh7.000070,000.00490,000.00Tukang
kayuOh21.000075,000.001,575,000.00Kepala
tukangOh2.100080,000.00168,000.00MandorOh0.350085,000.0029,750.0020,678,000.002,262,750.0022,940,750.00DIBULATKAN22,940,750.002.1
m Pasang kusen pintu dan jendela kayu Jati
LokalKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu Jati
Lokalm1.20009,000,000.0010,800,000.00Pakukg1.250016,000.0020,000.00Lem
kayukg1.000033,000.0033,000.002TENAGAPekerjaOh6.000070,000.00420,000.00Tukang
kayuOh18.000075,000.001,350,000.00Kepala
tukangOh1.800080,000.00144,000.00MandorOh0.300085,000.0025,500.0010,853,000.001,939,500.0012,792,500.00DIBULATKAN12,792,500.003.1
m Pasang kusen pintu dan jendela kayu
kruingKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruing
balokm1.20007,010,000.008,412,000.00Pakukg1.250016,000.0020,000.00Lem
kayukg1.000033,000.0033,000.002TENAGAPekerjaOh6.000070,000.00420,000.00Tukang
kayuOh18.000075,000.001,350,000.00Kepala
tukangOh1.800080,000.00144,000.00MandorOh0.300085,000.0025,500.008,465,000.001,939,500.0010,404,500.00DIBULATKAN10,404,500.004.1
m Pasang pintu panel kayu jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati
A2m0.040018,750,000.00750,000.00Lem
kayukg0.500033,000.0016,500.002TENAGAPekerjaOh1.000070,000.0070,000.00Tukang
kayuOh3.000075,000.00225,000.00Kepala
tukangOh0.300080,000.0024,000.00MandorOh0.050085,000.004,250.00766,500.00323,250.001,089,750.00DIBULATKAN1,089,750.005.1
m Pasang pintu panel kayu Jati LokalKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
kamperm0.04009,000,000.00360,000.00Lem
kayukg0.500033,000.0016,500.002TENAGAPekerjaOh1.000070,000.0070,000.00Tukang
kayuOh3.000075,000.00225,000.00Kepala
tukangOh0.300080,000.0024,000.00MandorOh0.050085,000.004,250.00376,500.00323,250.00699,750.00DIBULATKAN699,750.006.1
m Pasang pintu dan jendela kaca kayu
jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati
A2m0.024018,750,000.00450,000.00Lem
kayukg0.300033,000.009,900.002TENAGAPekerjaOh0.800070,000.0056,000.00Tukang
kayuOh2.400075,000.00180,000.00Kepala
tukangOh0.240080,000.0019,200.00MandorOh0.040085,000.003,400.00459,900.00258,600.00718,500.00DIBULATKAN718,500.007.1
m Pasang pintu dan jendela kaca kayu Jati
LokalKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu Jati
Lokalm0.02409,000,000.00216,000.00Lem
kayukg0.300033,000.009,900.002TENAGAPekerjaOh0.800070,000.0056,000.00Tukang
kayuOh2.400075,000.00180,000.00Kepala
tukangOh0.240080,000.0019,200.00MandorOh0.040085,000.003,400.00225,900.00258,600.00484,500.00DIBULATKAN484,500.008.1
m Pasang pintu dan jendela kaca kayu
kruingKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
kruingm0.02407,010,000.00168,240.00Lem
kayukg0.300033,000.009,900.002TENAGAPekerjaOh0.800070,000.0056,000.00Tukang
kayuOh2.400075,000.00180,000.00Kepala
tukangOh0.240080,000.0019,200.00MandorOh0.040085,000.003,400.00178,140.00258,600.00436,740.00DIBULATKAN436,700.009.1
m Pasang pintu dan jendela jalusi kayu
jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati
A2m0.064018,750,000.001,200,000.00Lem
kayukg0.500033,000.0016,500.002TENAGAPekerjaOh1.000070,000.0070,000.00Tukang
kayuOh3.000075,000.00225,000.00Kepala
tukangOh0.300080,000.0024,000.00MandorOh0.050085,000.004,250.001,216,500.00323,250.001,539,750.00DIBULATKAN1,539,750.0010.1
m Pasang pintu dan jendela jalusi kayu
kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
kamperm0.06409,000,000.00576,000.00Lem
kayukg0.500033,000.0016,500.002TENAGAPekerjaOh1.000070,000.0070,000.00Tukang
kayuOh3.000075,000.00225,000.00Kepala
tukangOh0.300080,000.0024,000.00MandorOh0.050085,000.004,250.00592,500.00323,250.00915,750.00DIBULATKAN915,750.0011.1
m Pasang pintu plywood rangkap, rangka kayu
jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati
papanm0.025626,250,000.00672,000.00Paku
biasaKg0.030016,000.00480.00Lem
kayuLtr0.500033,000.0016,500.00Plywood t = 4
mmLbr1.000081,250.0081,250.002TENAGAPekerjaOh0.800070,000.0056,000.00Tukang
kayuOh2.400075,000.00180,000.00Kepala
tukangOh0.240080,000.0019,200.00MandorOh0.040085,000.003,400.00770,230.00258,600.001,028,830.00DIBULATKAN1,028,800.0012.1
m Pasang pintu plywood rangkap, rangka kayu
kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
kamperm0.02569,000,000.00230,400.00Paku
biasaKg0.030016,000.00480.00Lem
kayuLtr0.500033,000.0016,500.00Plywood t = 4
mmLbr1.000081,250.0081,250.002TENAGAPekerjaOh0.800070,000.0056,000.00Tukang
kayuOh2.400075,000.00180,000.00Kepala
tukangOh0.240080,000.0019,200.00MandorOh0.040085,000.003,400.00328,630.00258,600.00587,230.00DIBULATKAN587,200.0013.1
m Pasang pintu plywood rangkap, rangka kayu
kruingKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
kruingm0.02567,010,000.00179,456.00Paku
biasaKg0.030016,000.00480.00Lem
kayuLtr0.500033,000.0016,500.00Plywood t = 4
mmLbr1.000081,250.0081,250.002TENAGAPekerjaOh0.800070,000.0056,000.00Tukang
kayuOh2.400075,000.00180,000.00Kepala
tukangOh0.240080,000.0019,200.00MandorOh0.040085,000.003,400.00277,686.00258,600.00536,286.00DIBULATKAN536,250.0014.1
m Pasang pintu teakwood rangkap, rangka kayu
jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati A
2m0.025018,750,000.00468,750.00Paku biasaKg0.030016,000.00480.00Lem
kayuLtr0.300033,000.009,900.00Teakwood t = 4
mmLbr1.0000103,750.00103,750.002TENAGAPekerjaOh0.800070,000.0056,000.00Tukang
kayuOh2.400075,000.00180,000.00Kepala
tukangOh0.240080,000.0019,200.00MandorOh0.040085,000.003,400.00582,880.00258,600.00841,480.00DIBULATKAN841,450.0015.1
m Pasang pintu teakwood rangkap, rangka kayu
kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
kamperm0.02509,000,000.00225,000.00Paku
biasaKg0.030016,000.00480.00Lem
kayuLtr0.300033,000.009,900.00Teakwood t = 4
mmLbr1.0000103,750.00103,750.002TENAGAPekerjaOh0.800070,000.0056,000.00Tukang
kayuOh2.400075,000.00180,000.00Kepala
tukangOh0.240080,000.0019,200.00MandorOh0.040085,000.003,400.00339,130.00258,600.00597,730.00DIBULATKAN597,700.0016.1
m Pasang konstruksi kuda-kuda kayu jatiKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati, balok A
2m1.100018,750,000.0020,625,000.00Besi
stripKg15.000010,604.00159,060.00Paku
biasaKg5.600016,000.0089,600.002TENAGAPekerjaOh4.000070,000.00280,000.00Tukang
kayuOh12.000075,000.00900,000.00Kepala
tukangOh1.200080,000.0096,000.00MandorOh0.200085,000.0017,000.0020,873,660.001,293,000.0022,166,660.00DIBULATKAN22,166,650.0017.1
m Pasang konstruksi kuda-kuda kayu
kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
kamperm1.10009,000,000.009,900,000.00Besi
stripKg15.000010,604.00159,060.00Paku
biasaKg5.600016,000.0089,600.002TENAGAPekerjaOh4.000070,000.00280,000.00Tukang
kayuOh12.000075,000.00900,000.00Kepala
tukangOh1.200080,000.0096,000.00MandorOh0.200085,000.0017,000.0010,148,660.001,293,000.0011,441,660.00DIBULATKAN11,441,650.0018.1
m Pasang konstruksi kuda-kuda kayu
kruingKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
kruingm1.10007,010,000.007,711,000.00Besi
stripKg15.000010,604.00159,060.00Paku
biasaKg5.600016,000.0089,600.002TENAGAPekerjaOh4.000070,000.00280,000.00Tukang
kayuOh12.000075,000.00900,000.00Kepala
tukangOh1.200080,000.0096,000.00MandorOh0.200085,000.0017,000.007,959,660.001,293,000.009,252,660.00DIBULATKAN9,252,650.0019.1
m Pasang kaso jati 5/7 + reng jati genteng
kodokKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati usuk
5/7m0.00808,148,750.0065,190.00Kayu jati reng
2/3m0.00306,240,000.0018,720.00Paku
biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang
kayuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0086,310.0015,725.00102,035.00DIBULATKAN102,000.0020.1
m Pasang kaso kamper 5/7+ reng jati genteng
kodokKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamper
5/7m0.00809,000,000.0072,000.00Kayu jati reng
2/3m0.00306,240,000.0018,720.00Paku
biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang
kayuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0093,120.0015,725.00108,845.00DIBULATKAN108,800.0021.1
m Pasang kaso kruing 5/7 + reng jati genteng
kodokKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruing
5/7m0.00807,010,000.0056,080.00Kayu jati reng
2/3m0.00306,240,000.0018,720.00Paku
biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang
kayuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0077,200.0015,725.0092,925.00DIBULATKAN92,900.0022.1
m Pasang kaso jati 4/6 + reng jati genteng
kodokKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati usuk
4/6m0.00608,148,750.0048,892.50Kayu jati reng
2/3m0.00306,240,000.0018,720.00Paku
biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang
kayuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0070,012.5015,725.0085,737.50DIBULATKAN85,700.0023.1
m Pasang kaso kamper 4/6 + reng jati genteng
kodokKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamper
4/6m0.00609,000,000.0054,000.00Kayu jati reng
2/3m0.00306,240,000.0018,720.00Paku
biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang
kayuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0075,120.0015,725.0090,845.00DIBULATKAN90,800.0024.1
m Pasang kaso kruing 4/6 + reng jati genteng
kodokKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruing
4/6m0.00607,010,000.0042,060.00Kayu jati reng
2/3m0.00306,240,000.0018,720.00Paku
biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang
kayuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0063,180.0015,725.0078,905.00DIBULATKAN78,900.0025.1
m Pasang kaso jati 5/7+ reng jati genteng beton /
keramikKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati usuk
5/7m0.00808,148,750.0065,190.00Kayu jati reng
3/5m0.00606,240,000.0037,440.00Paku
biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang
kayuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.00105,030.0015,725.00120,755.00DIBULATKAN120,750.0026.1
m Pasang kaso kamper 5/7+ reng jati genteng beton /
keramikKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamper
5/7m0.00809,000,000.0072,000.00Kayu jati reng
3/5m0.00606,240,000.0037,440.00Paku
biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang
kayuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.00111,840.0015,725.00127,565.00DIBULATKAN127,550.0027.1
m Pasang kaso kruing 5/7 + reng jati genteng beton /
keramikKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruing
5/7m0.00807,010,000.0056,080.00Kayu jati reng
3/5m0.00606,240,000.0037,440.00Paku
biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang
kayuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0095,920.0015,725.00111,645.00DIBULATKAN111,600.0028.1
m Pasang rangka langit-langit 1 x 1 m + balok hanger, kayu
JatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu Jati usuk 5/7, balok hanger
8/10m0.01208,148,750.0097,785.00Cat
meniKg0.220058,074.0012,776.28Paku
biasaKg0.100016,000.001,600.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang
kayuOh0.250075,000.0018,750.00Kepala
tukangOh0.025080,000.002,000.00MandorOh0.075085,000.006,375.00112,161.2837,625.00149,786.28DIBULATKAN149,750.0029.1
m Pasang rangka langit-langit 1 x 1 m + balok hanger, kayu
kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamper 5/7, balok hanger
8/10m0.01209,000,000.00108,000.00Cat
meniKg0.220058,074.0012,776.28Paku
biasaKg0.100016,000.001,600.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang
kayuOh0.250075,000.0018,750.00Kepala
tukangOh0.025080,000.002,000.00MandorOh0.075085,000.006,375.00122,376.2837,625.00160,001.28DIBULATKAN160,000.0030.1
m Pasang rangka langit-langit 1 x 1 m + balok hanger, kayu
kruingKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruing 5/7, balok hanger
8/10m0.01207,010,000.0084,120.00Cat
meniKg0.220058,074.0012,776.28Paku
biasaKg0.100016,000.001,600.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang
kayuOh0.250075,000.0018,750.00Kepala
tukangOh0.025080,000.002,000.00MandorOh0.075085,000.006,375.0098,496.2837,625.00136,121.28DIBULATKAN136,100.0031.1
m Pasang rangka langit-langit 60 x 120 cm + balok hanger, kayu
jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati usuk 5/7, balok hanger
8/10m0.01408,148,750.00114,082.50Cat
meniKg0.275058,074.0015,970.35Paku
biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang
kayuOh0.300075,000.0022,500.00Kepala
tukangOh0.030080,000.002,400.00MandorOh0.010085,000.00850.00132,452.8539,750.00172,202.85DIBULATKAN172,200.0032.1
m Pasang rangka langit-langit 60 x 120 cm + balok hanger, kayu
kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamper 5/7, balok hanger
8/10m0.01409,000,000.00126,000.00Cat
meniKg0.275058,074.0015,970.35Paku
biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang
kayuOh0.300075,000.0022,500.00Kepala
tukangOh0.030080,000.002,400.00MandorOh0.010085,000.00850.00144,370.3539,750.00184,120.35DIBULATKAN184,100.0033.1
m Pasang rangka langit-langit 60 x 120 cm + balok hanger, kayu
kruingKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruing 5/7, balok hanger
8/10m0.01407,010,000.0098,140.00Cat
meniKg0.275058,074.0015,970.35Paku
biasaKg0.150016,000.002,400.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang
kayuOh0.300075,000.0022,500.00Kepala
tukangOh0.030080,000.002,400.00MandorOh0.010085,000.00850.00116,510.3539,750.00156,260.35DIBULATKAN156,250.0034.1
m' Pasang lisplang uk. 3 x 25 cm, kayu
jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati
papanm0.009026,250,000.00236,250.00Paku
biasaKg0.050016,000.00800.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang
kayuOh0.200075,000.0015,000.00Kepala
tukangOh0.025080,000.002,000.00MandorOh0.005085,000.00425.00237,050.0024,425.00261,475.00DIBULATKAN261,450.0035.1
m' Pasang listplang uk. 3 x 25 cm, kayu
kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
kamperm0.00909,000,000.0081,000.00Paku
biasaKg0.050016,000.00800.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang
kayuOh0.200075,000.0015,000.00Kepala
tukangOh0.025080,000.002,000.00MandorOh0.005085,000.00425.0081,800.0024,425.00106,225.00DIBULATKAN106,200.0036.1
m' Pasang listplang uk. 3 x 30 cm, kayu
jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati
papanm0.011026,250,000.00288,750.00Paku
biasaKg0.050016,000.00800.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang
kayuOh0.200075,000.0015,000.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.005085,000.00425.00289,550.0024,025.00313,575.00DIBULATKAN313,550.0037.1
m' Pasang listplang uk. 3 x 30 cm, kayu
kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
kamperm0.01109,000,000.0099,000.00Paku
biasaKg0.050016,000.00800.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang
kayuOh0.200075,000.0015,000.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.005085,000.00425.0099,800.0024,025.00123,825.00DIBULATKAN123,800.0038.1
m' Pasang listplang uk. 2 x 3 x 25 cm, kayu
jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati
papanm0.018026,250,000.00472,500.00Paku
biasaKg0.060016,000.00960.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang
kayuOh0.250075,000.0018,750.00Kepala
tukangOh0.025080,000.002,000.00MandorOh0.075085,000.006,375.00473,460.0037,625.00511,085.00DIBULATKAN511,050.0039.1
m' Pasang listplang uk. 2 x 3 x 25 cm, kayu
kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
kamperm0.01809,000,000.00162,000.00Paku
biasaKg0.060016,000.00960.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang
kayuOh0.250075,000.0018,750.00Kepala
tukangOh0.025080,000.002,000.00MandorOh0.075085,000.006,375.00162,960.0037,625.00200,585.00DIBULATKAN200,550.0040.1
m' Pasang listplang GRC t = 9 mm, lebar 20
cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPapan GRC 9 mm lebar 20
cmm'1.050022,500.0023,625.00Reng pengaku 3/5
kruingm0.00157,010,000.0010,515.00Paku
biasaKg0.050016,000.00800.002TENAGAPekerjaOh0.110070,000.007,700.00Tukang
kayuOh0.220075,000.0016,500.00Kepala
tukangOh0.022080,000.001,760.00MandorOh0.005085,000.00425.0034,940.0026,385.0061,325.00DIBULATKAN61,300.0041.1
m' Pasang listplang GRC t = 9 mm, lebar 30
cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPapan GRC 9 mm lebar 30
cmm'1.050027,500.0028,875.00Reng pengaku 3/5
kruingm0.00157,010,000.0010,515.00Paku
biasaKg0.050016,000.00800.002TENAGAPekerjaOh0.110070,000.007,700.00Tukang
kayuOh0.220075,000.0016,500.00Kepala
tukangOh0.022080,000.001,760.00MandorOh0.005085,000.00425.0040,190.0026,385.0066,575.00DIBULATKAN66,550.0042.1
m' Pasang listplang GRC t = 9 mm, rangkap 30/15
cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPapan GRC 9 mm lebar 20
cmm'1.000022,500.0022,500.00Papan GRC 9 mm lebar 30
cmm'1.000027,500.0027,500.00Reng pengaku 3/5
kruingm0.00157,010,000.0010,515.00Paku
biasaKg0.050016,000.00800.002TENAGAPekerjaOh0.110070,000.007,700.00Tukang
kayuOh0.220075,000.0016,500.00Kepala
tukangOh0.022080,000.001,760.00MandorOh0.005085,000.00425.0061,315.0026,385.0087,700.00DIBULATKAN87,700.0043.1
m Pasang dinding pemisah teaxwood rangkap, rangka kayu
jatiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati balok
8/10m0.019518,750,000.00365,625.00Kayu jati papan
2/8m0.007026,250,000.00183,750.00Paku
biasaKg0.100016,000.001,600.00Lem
kayuLtr0.560033,000.0018,480.00Teaxwood t = 4
mmLbr1.0000103,750.00103,750.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang
kayuOh0.600075,000.0045,000.00Kepala
tukangOh0.060080,000.004,800.00MandorOh0.010085,000.00850.00673,205.0064,650.00737,855.00DIBULATKAN737,850.0044.1
m Pasang dinding pemisah teaxwood rangkap, rangka kayu
kamperKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kamper balok
8/10m0.01959,000,000.00175,500.00Kayu kamper papan
2/8m0.00709,000,000.0063,000.00Paku
biasaKg0.100016,000.001,600.00Lem
kayuLtr0.560033,000.0018,480.00Teaxwood t = 4
mmLbr1.0000103,750.00103,750.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang
kayuOh0.600075,000.0045,000.00Kepala
tukangOh0.060080,000.004,800.00MandorOh0.010085,000.00850.00362,330.0064,650.00426,980.00DIBULATKAN426,950.0045.1
m Pasang dinding pemisah teaxwood rangkap, rangka kayu
kruingKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu kruing balok
8/10m0.01957,010,000.00136,695.00Kayu kruing papan
2/8m0.00707,010,000.0049,070.00Paku
biasaKg0.100016,000.001,600.00Lem
kayuLtr0.560033,000.0018,480.00Teaxwood t = 4
mmLbr1.0000103,750.00103,750.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang
kayuOh0.600075,000.0045,000.00Kepala
tukangOh0.060080,000.004,800.00MandorOh0.010085,000.00850.00309,595.0064,650.00374,245.00DIBULATKAN374,200.0046.1
m' Pasang list plafond kayu jati profilKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu jati
profilm'1.050028,000.0029,400.00Cat
kayukg0.016759,350.00991.152TENAGAPekerjaOh0.021070,000.001,470.00Tukang
kayuOh0.021075,000.001,575.00Kepala
tukangOh0.002080,000.00160.00MandorOh0.001085,000.0085.0030,391.153,290.0033,681.15DIBULATKAN33,650.0047.1
m' Pasang list plafond kayu pelipit
merantiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu pelipit
merantim'1.05007,500.007,875.00Cat
kayukg0.016759,350.00991.152TENAGAPekerjaOh0.021070,000.001,470.00Tukang
kayuOh0.021075,000.001,575.00Kepala
tukangOh0.002080,000.00160.00MandorOh0.001085,000.0085.008,866.153,290.0012,156.15DIBULATKAN12,150.00F.Analisa
Biaya Konstruksi Pekerjaan Beton1.1 m Membuat lantai kerja beton
Mutu K 100Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg230.00001,180.00271,400.00Pasir
betonm0.6300223,020.00140,502.60Batu pecah 2 -
3m0.7600210,000.00159,600.002TENAGAPekerjaOh1.200070,000.0084,000.00Tukang
BatuOh0.200075,000.0015,000.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.060085,000.005,100.00571,502.60105,700.00677,202.60DIBULATKAN677,200.0021
m Beton rabatKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg230.00001,180.00271,400.00Pasir
betonm0.6300223,020.00140,502.60Batu pecah 2 -
3m0.7600210,000.00159,600.002TENAGAPekerjaOh1.200070,000.0084,000.00TukangOh0.200075,000.0015,000.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.060085,000.005,100.00571,502.60105,700.00677,202.601
m Beton rabat tebal 5 cm5 / 100
x677,202.6033,860.13Dibulatkan33,850.001 m Beton rabat tebal 7 cm7
/ 100 x677,202.6047,404.18Dibulatkan47,400.003.1 m Membuat beton
bertulang praktis Mutu K 175Kode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg326.00001,180.00384,680.00Pasir
betonm0.5400223,020.00120,430.80Batu pecah 2 -
3m0.7600210,000.00159,600.002TENAGAPekerjaOh1.650070,000.00115,500.00Tukang
BatuOh0.276075,000.0020,700.00Kepala
tukangOh0.028080,000.002,240.00MandorOh0.083085,000.007,055.00664,710.80145,495.00810,205.80DIBULATKAN810,200.004.1
m Membuat beton dengan mutu K 225Kode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg371.00001,180.00437,780.00Pasir
betonm0.4980223,020.00111,063.96Batu pecah 2 -
3m0.7760210,000.00162,960.002TENAGAPekerjaOh1.650070,000.00115,500.00Tukang
BatuOh0.275075,000.0020,625.00Kepala
tukangOh0.028080,000.002,240.00MandorOh0.083085,000.007,055.00711,803.96145,420.00857,223.96DIBULATKAN857,200.0051
m Membuat beton dengan mutu K 250Kode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg384.00001,180.00453,120.00Pasir
betonm0.4910223,020.00109,502.82Batu pecah 2 -
3m0.7400210,000.00155,400.002TENAGAPekerjaOh1.650070,000.00115,500.00Tukang
BatuOh0.275075,000.0020,625.00Kepala
tukangOh0.028080,000.002,240.00MandorOh0.083085,000.007,055.00718,022.82145,420.00863,442.82DIBULATKAN863,400.0061
m Membuat beton dengan mutu K 275Kode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg406.00001,180.00479,080.00Pasir
betonm0.4880223,020.00108,833.76Batu pecah 2 -
3m0.7600210,000.00159,600.002TENAGAPekerjaOh1.650070,000.00115,500.00Tukang
batuOh0.275075,000.0020,625.00Kepala
tukangOh0.028080,000.002,240.00MandorOh0.083085,000.007,055.00747,513.76145,420.00892,933.76DIBULATKAN892,900.00100071
m Membuat beton dengan mutu K 350Kode:1350NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH
TOTAL0.7407407407(Rp)BAHANUPAH(Rp)1BAHANPCKg448.00001,180.00528,640.00Pasir
betonm0.6670223,020.00148,754.34Batu pecah 2 -
3m0.7400210,000.00155,400.002TENAGAPekerjaOh2.100070,000.00147,000.00Tukang
batuOh0.350075,000.0026,250.00Kepala
tukangOh0.035080,000.002,800.00MandorOh0.105085,000.008,925.00832,794.34184,975.001,017,769.34DIBULATKAN1,017,750.0081
kg Pembesian dengan besi polos atau besi
ulirKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBesi beton
(polos/ulir)Kg1.050010,126.0010,632.30Kawat
betonKg0.015012,000.00180.002TENAGAPekerjaOh0.007070,000.00490.00Tukang
besiOh0.007075,000.00525.00Kepala
tukangOh0.000780,000.0056.00MandorOh0.000385,000.0025.5010,812.301,096.5011,908.80DIBULATKAN11,900.0091
m Pasang bekisting untuk pondasi 4x
PakaiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
lokalm0.01003,400,000.0034,000.00Paku
biasaKg0.075016,000.001,200.00Minyak
bekistingLtr0.02504,600.00115.002TENAGAPekerjaOh0.130070,000.009,100.000.5200Tukang
kayuOh0.065075,000.004,875.000.2600Kepala
tukangOh0.006580,000.00520.000.0260MandorOh0.006585,000.00552.500.026035,315.0015,047.5050,362.50DIBULATKAN50,350.00101
m Pasang bekisting untuk sloof + struktur praktis 4x
PakaiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
lokalm0.01133,400,000.0038,250.000.0450Paku
biasaKg0.075016,000.001,200.000.3000Minyak
bekistingLtr0.02504,600.00115.000.10002TENAGAPekerjaOh0.130070,000.009,100.000.5200Tukang
kayuOh0.065075,000.004,875.000.2600Kepala
tukangOh0.006580,000.00520.000.0260MandorOh0.006585,000.00552.500.026039,565.0015,047.5054,612.50DIBULATKAN54,600.00111
m Pasang bekisting untuk kolom 3x PakaiKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
lokalm0.01333,400,000.0045,333.330.0400Paku
biasaKg0.133316,000.002,133.330.4000Minyak
bekistingLtr0.06674,600.00306.670.2000Balok kayu
lokalm0.00503,400,000.0017,000.000.0150Multipleks tebal 9
mmLbr0.1167126,000.0014,700.000.3500Kayu
stootBtg0.666721,000.0014,000.002.00002TENAGAPekerjaOh0.220070,000.0015,400.000.6600Tukang
kayuOh0.110075,000.008,250.000.3300Kepala
tukangOh0.011080,000.00880.000.0330MandorOh0.011085,000.00935.000.033093,473.3325,465.00118,938.33DIBULATKAN118,900.00121
m Pasang bekisting untuk balok 3x PakaiKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
lokalm0.01333,400,000.0045,333.330.0400Paku
biasaKg0.133316,000.002,133.330.4000Minyak
bekistingLtr0.06674,600.00306.670.2000Balok kayu
lokalm0.00603,400,000.0020,400.000.0180Multipleks tebal 9
mmLbr0.1167126,000.0014,700.000.3500Kayu
stootBtg0.666721,000.0014,000.002.00002TENAGAPekerjaOh0.220070,000.0015,400.000.6600Tukang
kayuOh0.110075,000.008,250.000.3300Kepala
tukangOh0.011080,000.00880.000.0330MandorOh0.011085,000.00935.000.033096,873.3325,465.00122,338.33DIBULATKAN122,300.00131
m Pasang bekisting untuk lantai 3x PakaiKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
lokalm0.01003,400,000.0034,000.000.0400Paku
biasaKg0.100016,000.001,600.000.4000Minyak
bekistingLtr0.05004,600.00230.000.2000Balok kayu
lokalm0.00383,400,000.0012,750.000.0150Multipleks tebal 9
mmLbr0.0875126,000.0011,025.000.3500Kayu
stootBtg1.500021,000.0031,500.006.00002TENAGAPekerjaOh0.165070,000.0011,550.000.6600Tukang
kayuOh0.082575,000.006,187.500.3300Kepala
tukangOh0.008380,000.00660.000.0330MandorOh0.008385,000.00701.250.033091,105.0019,098.75110,203.75DIBULATKAN110,200.00141
m Pasang bekisting untuk plat tutup
saluranKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
lokalm0.01003,400,000.0034,000.00Paku
biasaKg0.400016,000.006,400.002TENAGAPekerjaOh0.320070,000.0022,400.00Tukang
kayuOh0.330075,000.0024,750.00Kepala
tukangOh0.033080,000.002,640.00MandorOh0.006085,000.00510.0040,400.0050,300.0090,700.00DIBULATKAN90,700.00151
m Pasang bekisting untuk plat tutup gorong -
gorongKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
lokalm0.04003,400,000.00136,000.00Paku
biasaKg0.400016,000.006,400.00Balok kayu
lokalm0.01803,400,000.0061,200.002TENAGAPekerjaOh0.320070,000.0022,400.00Tukang
kayuOh0.330075,000.0024,750.00Kepala
tukangOh0.033080,000.002,640.00MandorOh0.006085,000.00510.00203,600.0050,300.00253,900.00DIBULATKAN253,900.00161
m Pasang bekisting untuk tangga 3x PakaiKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKayu
lokalm0.01003,400,000.0034,000.000.0300Paku
biasaKg0.133316,000.002,133.330.4000Minyak
bekistingLtr0.05004,600.00230.000.1500Balok kayu
lokalm0.00503,400,000.0017,000.000.0150Multipleks tebal 9
mmLbr0.1167126,000.0014,700.000.3500Kayu
stootBtg0.666721,000.0014,000.002.00002TENAGAPekerjaOh0.220070,000.0015,400.000.6600Tukang
kayuOh0.110075,000.008,250.000.3300Kepala
tukangOh0.011080,000.00880.000.0330MandorOh0.011085,000.00935.000.033082,063.3325,465.00107,528.33DIBULATKAN107,500.00171
m Membuat kolom praktis 15/15Kode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang
praktism1.0000664,710.80664,710.80Besi polos 4 10, 6 - 200
mmKg233.275710,812.302,522,247.21Bekisting
praktism7.260039,565.00287,241.902TENAGABeton bertulang 1 : 2 :
3m1.0000145,495.00145,495.00Besi polos 4 10, 6 - 200
mmKg240.85001,096.50264,092.03Bekisting
praktism7.260015,047.50109,244.853,474,199.91518,831.883,993,031.79DIBULATKAN3,993,000.00181
m Membuat beton ring balok praktis 11/15Kode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang
praktism1.0000664,710.80664,710.80Besi polos 4 10, 6 - 200
mmKg165.622010,812.301,790,754.75Bekisting
praktism7.270039,565.00287,637.552TENAGABeton bertulang 1 : 2 :
3m1.0000145,495.00145,495.00Besi polos 4 10, 6 - 200
mmKg165.62201,096.50181,604.52Bekisting
praktism7.270015,047.50109,395.332,743,103.10436,494.853,179,597.95DIBULATKAN3,179,550.00191
m Membuat beton ring balok praktis 15/60Kode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang
praktism1.0000664,710.80664,710.80Besi polos 4 10, 6 - 200
mmKg295.201610,812.303,191,807.78Bekisting
praktism7.270039,565.00287,637.552TENAGABeton bertulang 1 : 2 :
3m1.0000145,495.00145,495.00Besi polos 4 10, 6 - 200
mmKg295.20161,096.50323,688.51Bekisting
praktism7.270015,047.50109,395.334,144,156.13578,578.834,722,734.96DIBULATKAN4,722,700.00201
m Membuat beton ring balok praktis 15/40Kode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang
praktism1.0000664,710.80664,710.80Besi polos 4 10, 6 - 200
mmKg365.537010,812.303,952,295.71Bekisting
praktism7.270039,565.00287,637.552TENAGABeton bertulang 1 : 2 :
3m1.0000145,495.00145,495.00Besi polos 4 10, 6 - 200
mmKg365.53701,096.50400,811.32Bekisting
praktism7.270015,047.50109,395.334,904,644.06655,701.655,560,345.70DIBULATKAN5,560,300.00211
m Membuat beton ring balok praktis 15/30Kode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang
praktism1.0000664,710.80664,710.80Besi polos 4 10, 6 - 200
mmKg230.785310,812.302,495,320.26Bekisting
praktism7.270039,565.00287,637.552TENAGABeton bertulang 1 : 2 :
3m1.0000145,495.00145,495.00Besi polos 4 10, 6 - 200
mmKg230.78531,096.50253,056.12Bekisting
praktism7.270015,047.50109,395.333,447,668.61507,946.443,955,615.05DIBULATKAN3,955,600.00221
m Membuat beton ring balok praktis 20/30Kode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang
praktism1.0000664,710.80664,710.80Besi polos 4 10, 6 - 200
mmKg238.053310,812.302,573,904.06Bekisting
praktism7.270039,565.00287,637.552TENAGABeton bertulang 1 : 2 :
3m1.0000145,495.00145,495.00Besi polos 4 10, 6 - 200
mmKg238.05331,096.50261,025.48Bekisting
praktism7.270015,047.50109,395.333,526,252.41515,915.814,042,168.21DIBULATKAN4,042,150.00231
m Membuat beton ring balok praktis 15/25Kode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang
praktism1.0000664,710.80664,710.80Besi polos 4 10, 6 - 200
mmKg265.355710,812.302,869,105.80Bekisting
praktism7.270039,565.00287,637.552TENAGABeton bertulang 1 : 2 :
3m1.0000145,495.00145,495.00Besi polos 4 10, 6 - 200
mmKg265.35571,096.50290,962.56Bekisting
praktism7.270015,047.50109,395.333,821,454.15545,852.894,367,307.03DIBULATKAN4,367,300.00241
m Membuat beton sloof praktis 15/20Kode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang
praktism1.0000664,710.80664,710.80Besi polos 4 10, 6 - 200
mmKg107.270010,812.301,159,835.42Bekisting
praktism5.330039,565.00210,881.452TENAGABeton bertulang 1 : 2 :
3m1.0000145,495.00145,495.00Besi polos 4 10, 6 - 200
mmKg107.27001,096.50117,621.56Bekisting
praktism5.330015,047.5080,203.182,035,427.67343,319.732,378,747.40DIBULATKAN2,378,700.00251
m Membuat beton straus 20 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang
praktism1.0000664,710.80664,710.80Besi polos 5 10, 6 - 150
mmKg126.220010,812.301,364,728.512TENAGABeton bertulang 1 : 2 :
3m1.0000145,495.00145,495.00Besi polos 5 10, 6 - 150
mmKg126.22001,096.50138,400.232,029,439.31283,895.232,313,334.54DIBULATKAN2,313,300.00261
m Membuat beton straus 25 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang
praktism1.0000664,710.80664,710.80Besi polos 6 10, 6 - 150
mmKg98.330010,812.301,063,173.462TENAGABeton bertulang 1 : 2 :
3m1.0000145,495.00145,495.00Besi polos 6 10, 6 - 150
mmKg98.33001,096.50107,818.851,727,884.26253,313.851,981,198.10DIBULATKAN1,981,150.00271
m Membuat beton straus 30 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang
praktism1.0000664,710.80664,710.80Besi polos 7 10, 6 - 150
mmKg80.670010,812.30872,228.242TENAGABeton bertulang 1 : 2 :
3m1.0000145,495.00145,495.00Besi polos 7 10, 6 - 150
mmKg80.67001,096.5088,454.661,536,939.04233,949.661,770,888.70DIBULATKAN1,770,850.00281
m Membuat beton Plat Beton Saluran T 10
cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang K
225m1.0000800,000.00800,000.00Pembesian Plat Beton 10-150,
10-150Kg202.070010,812.302,184,841.46Pekerjaan
Begestingm2.500090,700.00226,750.003,211,591.463,211,591.46DIBULATKAN3,211,550.00291
m Membuat Beton Kolom 15/40 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang K
225m1.0000800,000.00800,000.00Pembesian 812,
8-150Kg186.409410,812.302,015,514.36Pekerjaan Begesting
2xm9.166739,565.00362,679.173,178,193.523,178,193.52DIBULATKAN3,178,150.00301
m Membuat Beton Kolom 20/40 cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton bertulang K
225m1.0000800,000.00800,000.00Pembesian 812,
8-150Kg113.107210,812.301,222,948.98Pekerjaan Begesting
2xm5.000039,565.00197,825.002,220,773.982,220,773.98DIBULATKAN2,220,750.00311
m Pasang Paving BlokKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPavingstonk abu2 Kw II 8 cm
(K 150)m1.050070,000.0073,500.00Pasir
urugm0.0250170,100.004,252.50Pavingstonk abu2 Kw II 6 cm (K
125)m1.050056,250.0059,062.50Pasir
urugm0.0250170,100.004,252.50Pavingstonk abu2 Kw I 8 cm (K
400)m1.050077,500.0081,375.00Pasir
urugm0.0250170,100.004,252.50Pavingstonk abu2 Kw I 6 cm (K
300)m1.050063,750.0066,937.50Pasir
urugm0.0250170,100.004,252.502TENAGAMandorOh0.003085,000.00255.00Kepala
tukangOh0.010080,000.00800.00TukangOh0.150075,000.0011,250.00PekerjaOh0.025070,000.001,750.00Jumlah
Bahan + Upah ( Paving Kw II 8 cm
)77,752.5014,055.0091,807.50Dibulatkan91,800.00Jumlah Bahan + Upah
( Paving Kw II 6 cm
)63,315.0014,055.0077,370.00Dibulatkan77,350.00Jumlah Bahan + Upah
( Paving Kw I 8 cm
)85,627.5014,055.0099,682.50Dibulatkan99,650.00Jumlah Bahan + Upah
( Paving Kw I 6 cm
)71,190.0014,055.0085,245.00Dibulatkan85,200.00321 m' Pasang
kansteinKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPCKg5.00001,180.005,900.00Pasir
pasangm0.0010233,100.00233.10Kanstein 20 x 15 x 50
cmBj2.000039,000.0078,000.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang
batuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.001085,000.0085.0084,133.1022,385.00106,518.10DIBULATKAN106,500.00331
m Pasang grass block uk. 10 x 36 x 53 cmKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGrass block 10 x
36 x 53 cmBj5.250022,500.00118,125.00Pasir
urugm0.0250170,100.004,252.502TENAGAPekerjaOh0.025070,000.001,750.00Tukang
batuOh0.150075,000.0011,250.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.003085,000.00255.00122,377.5014,055.00136,432.50DIBULATKAN136,400.00GAnalisa
Biaya Konstruksi Pekerjaan Penutup Atap1.1 m Pasang atap genteng
lokalKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng
lokalBh30.00002,200.0066,000.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang
kayuOh0.075075,000.005,625.00Kepala
tukangOh0.008080,000.00640.00MandorOh0.008085,000.00680.0066,000.0017,445.0083,445.00DIBULATKAN83,400.002.1
m Pasang atap genteng kodokan
(Gandusari)Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng kodok
(Gandusari)Bh25.00002,000.0050,000.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang
kayuOh0.075075,000.005,625.00Kepala
tukangOh0.008080,000.00640.00MandorOh0.008085,000.00680.0050,000.0017,445.0067,445.00DIBULATKAN67,400.0031
m Pasang atap genteng kodokan KW I
(Karangpilang)Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng kodok
(Karangpilang)Bh25.00004,700.00117,500.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang
kayuOh0.075075,000.005,625.00Kepala
tukangOh0.008080,000.00640.00MandorOh0.008085,000.00680.00117,500.0017,445.00134,945.00DIBULATKAN134,900.004.1
m Pasang atap genteng keramik/glazurKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng
keramik/glazurBh14.500011,250.00163,125.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang
kayuOh0.060075,000.004,500.00Kepala
tukangOh0.006080,000.00480.00MandorOh0.008085,000.00680.00163,125.0016,160.00179,285.00DIBULATKAN179,250.005.1
m Pasang atap genteng MantiliKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng
MantiliBh20.00002,800.0056,000.002TENAGAPekerjaOh0.150070,000.0010,500.00Tukang
kayuOh0.075075,000.005,625.00Kepala
tukangOh0.008080,000.00640.00MandorOh0.008085,000.00680.0056,000.0017,445.0073,445.00DIBULATKAN73,400.006.1
m Pasang atap genteng betonKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng
betonBh10.50005,600.0058,800.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang
kayuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.010085,000.00850.0058,800.0023,150.0081,950.00DIBULATKAN81,950.006.b1
m' Pasang kembali genteng lamaKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)2TENAGAPekerjaOh0.150070,000.0010,500.00Tukang
kayuOh0.075075,000.005,625.00Kepala
tukangOh0.008080,000.00640.00MandorOh0.008085,000.00680.000.0017,445.0017,445.00DIBULATKAN17,400.007.1
m' Pasang atap genteng bubungan lokalKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng bubungan
lokalBh5.00007,500.0037,500.00PCKg8.00001,180.009,440.00Pasir
pasangm0.0320233,100.007,459.202TENAGAPekerjaOh0.400070,000.0028,000.00Tukang
kayuOh0.200075,000.0015,000.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.020085,000.001,700.0054,399.2046,300.00100,699.20DIBULATKAN100,650.008.1
m' Pasang atap genteng bubungan
GandusariKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng bubungan
GandusariBh3.50007,500.0026,250.00PCKg8.00001,180.009,440.00Pasir
pasangm0.0320233,100.007,459.202TENAGAPekerjaOh0.400070,000.0028,000.00Tukang
kayuOh0.200075,000.0015,000.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.020085,000.001,700.0043,149.2046,300.0089,449.20DIBULATKAN89,400.009.1
m' Pasang atap genteng bubungan
KarangpilangKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng bubungan
KarangpilangBh4.000017,500.0070,000.00PCKg8.00001,180.009,440.00Pasir
pasangm0.0320233,100.007,459.202TENAGAPekerjaOh0.400070,000.0028,000.00Tukang
kayuOh0.200075,000.0015,000.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.020085,000.001,700.0086,899.2046,300.00133,199.20DIBULATKAN133,150.0010.1
m' Pasang atap genteng bubungan keramik /
glasurKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng bubungan
keramik/glasurBh4.000023,750.0095,000.00PCKg8.00001,180.009,440.00Pasir
pasangm0.0320233,100.007,459.202TENAGAPekerjaOh0.400070,000.0028,000.00Tukang
kayuOh0.200075,000.0015,000.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.020085,000.001,700.00111,899.2046,300.00158,199.20DIBULATKAN158,150.0011.1
m' Pasang atap genteng bubungan MantiliKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng bubungan
MantiliBh3.50008,100.0028,350.00PCKg8.00001,180.009,440.00Pasir
pasangm0.0320233,100.007,459.202TENAGAPekerjaOh0.400070,000.0028,000.00Tukang
kayuOh0.200075,000.0015,000.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.020085,000.001,700.0045,249.2046,300.0091,549.20DIBULATKAN91,500.0012.1
m' Pasang atap genteng bubungan betonKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng bubungan
betonBh3.500018,750.0065,625.00PCKg10.80001,180.0012,744.00Pasir
pasangm0.0320233,100.007,459.202TENAGAPekerjaOh0.400070,000.0028,000.00Tukang
kayuOh0.200075,000.0015,000.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.020085,000.001,700.0085,828.2046,300.00132,128.20DIBULATKAN132,100.0013.1
m Pasang atap asbes gelombang 0,4 x 300 x
103Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANAsbes gelombang 0,4 x 300 x
103Lbr0.350091,250.0031,937.50Paku
pancingBh6.00001,350.008,100.002TENAGAPekerjaOh0.140070,000.009,800.00Tukang
kayuOh0.070075,000.005,250.00Kepala
tukangOh0.007080,000.00560.00MandorOh0.007085,000.00595.0040,037.5016,205.0056,242.50DIBULATKAN56,200.0014.1
m Pasang atap asbes gelombang 0,35 x 240 x
80Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANAsbes gelombang 0,35 x 240 x
80Lbr0.650078,100.0050,765.00Paku
pancingBh6.00001,350.008,100.002TENAGAPekerjaOh0.140070,000.009,800.00Tukang
kayuOh0.070075,000.005,250.00Kepala
tukangOh0.007080,000.00560.00MandorOh0.007085,000.00595.0058,865.0016,205.0075,070.00DIBULATKAN75,050.0015.1
m' Pasang nok stel gelombang asbesKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANNok stel gelombang
asbesLbr2.100037,500.0078,750.00Paku
sekrupBh6.00001,350.008,100.002TENAGAPekerjaOh0.084070,000.005,880.00Tukang
kayuOh0.125075,000.009,375.00Kepala
tukangOh0.013080,000.001,040.00MandorOh0.004085,000.00340.0086,850.0016,635.00103,485.00DIBULATKAN103,450.0016.1
m Pasang atap fiber gelombang ( 0,8 x 3,0 m
)Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANFiber
gelombangm0.450087,500.0039,375.00Paku
pancingBh6.00001,350.008,100.002TENAGAPekerjaOh0.140070,000.009,800.00Tukang
kayuOh0.070075,000.005,250.00Kepala
tukangOh0.007080,000.00560.00MandorOh0.007085,000.00595.0047,475.0016,205.0063,680.00DIBULATKAN63,650.0017.1
m Pasang atap genteng metal ex. Multi Roof 0,77 m x 1
mKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANGenteng metal Multi Roof 0,77m x
1mLbr1.3000117,500.00152,750.00Paku anti
karatKg0.200022,500.004,500.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang
kayuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.001085,000.0085.00157,250.0022,385.00179,635.00DIBULATKAN179,600.0018.1
m Pasang atap atap zincalume tbl. 0,5 mmKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANMetal atap
zincalume tbl. 0,5 mmm21.333098,750.00131,633.75Paku
sekrupBh6.00001,350.008,100.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang
kayuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.001085,000.0085.00139,733.7522,385.00162,118.75DIBULATKAN162,100.0019.1
m' Pasang nok genteng metalKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANNok stel
metalBh1.100062,500.0068,750.00Paku anti
karatKg0.050022,500.001,125.002TENAGAPekerjaOh0.250070,000.0017,500.00Tukang
kayuOh0.150075,000.0011,250.00Kepala
tukangOh0.015080,000.001,200.00MandorOh0.013085,000.001,105.0069,875.0031,055.00100,930.00DIBULATKAN100,900.0020.1
m Pasang atap seng gelombang BJLS 0,30Kode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANSeng gelombang
BJLS
0,30Lbr0.4500112,500.0050,625.00PakuKg0.020016,000.00320.002TENAGAPekerjaOh0.120070,000.008,400.00Tukang
kayuOh0.060075,000.004,500.00Kepala
tukangOh0.006080,000.00480.00MandorOh0.006085,000.00510.0050,945.0013,890.0064,835.00DIBULATKAN64,800.0021.1
m Pasang atap sirapKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANAtap
sirapBh60.00002,750.00165,000.00Paku
biasaKg0.200016,000.003,200.002TENAGAPekerjaOh0.166070,000.0011,620.00Tukang
kayuOh0.250075,000.0018,750.00Kepala
tukangOh0.025080,000.002,000.00MandorOh0.008085,000.00680.00168,200.0033,050.00201,250.00DIBULATKAN201,250.0022.1
m Pasang nok sirapKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANSeng talang 0,60 M ( BJLS
0,30)Lbr0.400027,000.0010,800.00Paku
biasaKg0.110016,000.001,760.00Papan kayu
merantim0.00404,650,000.0018,600.002TENAGAPekerjaOh0.125070,000.008,750.00Tukang
kayuOh0.250075,000.0018,750.00Kepala
tukangOh0.025080,000.002,000.00MandorOh0.006085,000.00510.0031,160.0030,010.0061,170.00DIBULATKAN61,150.00HAnalisa
Biaya Konstruksi Pekerjaan Langit-Langit1.1 m Langit-langit fiber
semen rataKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANFiber semen rata t = 3
mmLbr1.100020,300.0022,330.00PakuKg0.010016,000.00160.002TENAGAPekerjaOh0.030070,000.002,100.00Tukang
kayuOh0.070075,000.005,250.00Kepala
tukangOh0.007080,000.00560.00MandorOh0.004085,000.00340.0022,490.008,250.0030,740.00DIBULATKAN30,700.002.1
m Langit-langit kalsiboard ukuran 1,20 x 2,40
mKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKalsiboard ukuran 1,20 x 2,40
mLbr0.364058,000.0021,112.00Paku
kalsiboardKg0.010025,000.00250.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang
kayuOh0.050075,000.003,750.00Kepala
tukangOh0.005080,000.00400.00MandorOh0.005085,000.00425.0021,362.0011,575.0032,937.00DIBULATKAN32,900.003.1
m Langit-langit kalsiboard ukuran 1 x 1
mKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKalsiboard ukuran 1 x 1
mLbr1.100018,000.0019,800.00Paku
kalsiboardKg0.010025,000.00250.002TENAGAPekerjaOh0.030070,000.002,100.00Tukang
kayuOh0.070075,000.005,250.00Kepala
tukangOh0.007080,000.00560.00MandorOh0.001585,000.00127.5020,050.008,037.5028,087.50DIBULATKAN28,050.0041
m Langit-langit gypsum board 1,20 x 2,40
mKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANGypsum board 1,20 x 2,40
mLbr0.364067,500.0024,570.00Paku
kalsiboardKg0.010025,000.00250.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang
kayuOh0.050075,000.003,750.00Kepala
tukangOh0.005080,000.00400.00MandorOh0.005085,000.00425.0024,820.0011,575.0036,395.00DIBULATKAN36,350.0051
m List Langit-langit gypsum 12 cmKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANList Gypsum 12
cmLbr1.050016,000.0016,800.00Paku
kalsiboardKg0.150025,000.003,750.002TENAGAPekerjaOh0.060070,000.004,200.00Tukang
kayuOh0.060075,000.004,500.00Kepala
tukangOh0.006080,000.00480.00MandorOh0.003085,000.00255.0020,550.009,435.0029,985.00DIBULATKAN29,950.00IAnalisa
Biaya Konstruksi Pekerjaan Pipa dan Sanitasi1.Memasang 1 buah
kloset duduk + accKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANKloset duduk +
acesoriesUnit1.00002,062,500.002,062,500.002TENAGAPekerjaOh0.330070,000.0023,100.00Tukang
batuOh1.100075,000.0082,500.00Kepala
tukangOh0.001080,000.0080.00MandorOh0.160085,000.0013,600.002,062,500.00119,280.002,181,780.00DIBULATKAN2,181,750.002.Memasang
1 buah kloset jongkok porselen ex INAKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKloset
jongkokBh1.0000131,250.00131,250.00PCKg6.00001,180.007,080.00Pasir
pasangm0.0100233,100.002,331.002TENAGAPekerjaOh0.200070,000.0014,000.00Tukang
batuOh1.100075,000.0082,500.00Kepala
tukangOh0.110080,000.008,800.00MandorOh0.010085,000.00850.00140,661.00106,150.00246,811.00DIBULATKAN246,800.003.Memasang
1 buah wastafel besar ex INA + accKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANWastafel besar +
accBh1.0000350,000.00350,000.00PCKg6.00001,180.007,080.00Pasir
pasangm0.0100233,100.002,331.002TENAGAPekerjaOh0.100070,000.007,000.00Tukang
batuOh1.100075,000.0082,500.00Kepala
tukangOh0.110080,000.008,800.00MandorOh0.010085,000.00850.00359,411.0099,150.00458,561.00DIBULATKAN458,550.004.Memasang
1 buah bak cuci piring 60 x 90 cm ex
MetakoKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBak cuci piring 60 x 90
cmBh1.0000243,750.00243,750.002TENAGAPekerjaOh0.030070,000.002,100.00Tukang
batuOh0.300075,000.0022,500.00Kepala
tukangOh0.030080,000.002,400.00MandorOh0.001585,000.00127.50243,750.0027,127.50270,877.50DIBULATKAN270,850.005.Memasang
1 buah kran air logam diameter " atau "Kode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKran
airBh1.000032,500.0032,500.00Seal
tapeBh0.02503,100.0077.502TENAGAPekerjaOh0.010070,000.00700.00Tukang
batuOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0032,577.509,425.0042,002.50DIBULATKAN42,000.006Memasang
1 buah floor drain stainlessteelKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANFloor drain
stainlessteelBh1.000021,250.0021,250.002TENAGAPekerjaOh0.010070,000.00700.00TukangOh0.100075,000.007,500.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.005085,000.00425.0021,250.009,425.0030,675.00DIBULATKAN30,650.007Memasang
1 m' pipa galvanis "Kode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPipa galvanis
"m'1.050020,833.3321,875.00Accessories ( 35 % harga pipa
)Hrg0.350020,833.337,291.672TENAGAPekerjaOh0.054070,000.003,780.00TukangOh0.090075,000.006,750.00Kepala
tukangOh0.009080,000.00720.00MandorOh0.027085,000.002,295.0029,166.6713,545.0042,711.67DIBULATKAN42,700.008.Memasang
1 m' pipa PVC AW "Kode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANPipa PVC AW
"m'1.05007,337.507,704.38Accessories ( 35 % harga pipa
)Hrg0.35007,337.502,568.132TENAGAPekerjaOh0.036070,000.002,520.00TukangOh0.060075,000.004,500.00Kepala
tukangOh0.006080,000.00480.00MandorOh0.001885,000.00153.0010,272.507,653.0017,925.50DIBULATKAN17,900.009.Memasang
1 m' pipa PVC klas D 4"Kode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPipa PVC klas D
4"m'1.050036,250.0038,062.50Accessories ( 35 % harga pipa
)Hrg0.350036,250.0012,687.502TENAGAPekerjaOh0.081070,000.005,670.00TukangOh0.135075,000.0010,125.00Kepala
tukangOh0.001480,000.00108.00MandorOh0.041085,000.003,485.0050,750.0019,388.0070,138.00DIBULATKAN70,100.0010.Memasang
1 m' pipa PVC klas D 6"Kode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANPipa PVC klas D
6"m'1.050065,625.0068,906.25Accessories ( 35 % harga pipa
)Hrg0.350065,625.0022,968.752TENAGAPekerjaOh0.081070,000.005,670.00TukangOh0.135075,000.0010,125.00Kepala
tukangOh0.001480,000.00108.00MandorOh0.041085,000.003,485.0091,875.0019,388.00111,263.00DIBULATKAN111,250.0011.1
m' Pasang gorong-gorong U 30 cm x 100 cmKode:NOURAIANSATINDEKSHARGA
SATJUMLAH (Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton buis U = 30
cm x 100
cmBh1.000025,162.5025,162.502TENAGAPekerjaOh0.150070,000.0010,500.00Tukang
batuOh0.050075,000.003,750.00Kepala
tukangOh0.010080,000.00800.00MandorOh0.007085,000.00595.0025,162.5015,645.0040,807.50DIBULATKAN40,800.0012.1
m' Pasang gorong-gorong O , 30 cm x 100
cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton buis O , 30 cm x 100
cmBh1.000041,250.0041,250.002TENAGAPekerjaOh0.300070,000.0021,000.00Tukang
batuOh0.100075,000.007,500.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.014085,000.001,190.0041,250.0031,290.0072,540.00DIBULATKAN72,500.0013.1
m' Pasang gorong-gorong O , 40 cm x 100
cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton buis O , 40 cm x 100
cmBh1.000065,450.0065,450.002TENAGAPekerjaOh0.300070,000.0021,000.00Tukang
batuOh0.100075,000.007,500.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.014085,000.001,190.0065,450.0031,290.0096,740.00DIBULATKAN96,700.0014.1
m' Pasang gorong-gorong O , 50 cm x 100
cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton buis O , 50 cm x 100
cmBh1.000096,800.0096,800.002TENAGAPekerjaOh0.300070,000.0021,000.00Tukang
batuOh0.100075,000.007,500.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.014085,000.001,190.0096,800.0031,290.00128,090.00DIBULATKAN128,050.0015.1
m' Pasang gorong-gorong O , 60 cm x 100
cmKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBeton buis O , 60 cm x 100
cmBh1.0000115,500.00115,500.002TENAGAPekerjaOh0.300070,000.0021,000.00Tukang
batuOh0.100075,000.007,500.00Kepala
tukangOh0.020080,000.001,600.00MandorOh0.014085,000.001,190.00115,500.0031,290.00146,790.00DIBULATKAN146,750.00JAnalisa
Biaya Konstruksi Pekerjaan Besi dan Allumunium1.1 Kg Pasang rangka
atap bajaKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBesi profil
WF/SikuKg1.100013,300.0014,630.00Meni besi
(flincotk)Kg0.080059,811.524,784.92Besi profil C
(Cannal)Kg1.100011,500.0012,650.00Meni besi
(flincotk)Kg0.080059,811.524,784.922TENAGATukang
besiOh0.006070,000.00420.00PekerjaOh0.060075,000.004,500.00Kepala
tukangOh0.006080,000.00480.00MandorOh0.000385,000.0025.50Jumlah
bahan profil
WF/Siku19,414.925,425.5024,840.42Dibulatkan24,800.00Jumlah bahan
profil C (Cannal)17,434.925,425.5022,860.42Dibulatkan22,850.002.1 m
Pasang teralis besiKode:NOURAIANSATINDEKSHARGA SATJUMLAH (Rp)JUMLAH
TOTAL(Rp)BAHANUPAH(Rp)1BAHANBesi strip 2 cm x 3
mmkg6.177010,604.0065,500.912TENAGATukang
besiOh1.670070,000.00116,900.00PekerjaOh1.670075,000.00125,250.00Kepala
tukangOh0.167080,000.0013,360.00MandorOh0.083085,000.007,055.0065,500.91262,565.00328,065.91DIBULATKAN328,050.003.1
m Pasang kawat harmonikaKode:NOURAIANSATINDEKSHARGA SATJUMLAH
(Rp)JUMLAH TOTAL(Rp)BAHANUPAH(Rp)1BAHANKawat
harmonikam1.100011,000.0012,100.00Paku
biasaKg0.020016,000.00320.00Kayu papan
kamperm0.00189,000,000.0016,200.002TENAGAPekerjaOh0.