Pek. Urugan Tanah Bawah Lantai 242.587958 M3Pek. Urugan Pasir Bawah Lantai 69.310845 M3Pek. Cor Lantai Kerja 1 : 3 : 5 69.310845 M3Pek.Pas. Lantai Keramik 30 x 30 1775.002 M3
1333.52543308.676742 0.5 135.295164316.9949579
2 1.41421356 2.82842712
0.35355339sudut = 19.4712206
451
HARGA SATUAN BAHAN & UPAH (HSBU)
PROYEK : PEMBANGUNAN RUANG KELAS BARU (RKB)
LOKASI : DESA TALONTAM, KAB. KUANTAN SINGINGI
No. U R A I A N SATUANHARGA UPAH/ BAHAN
(Rp)(1) (2) (3) (4)
UPAH ;1 P e k e r j a org/hr 51,660.00 2 Tukang batu org/hr 63,140.00 3 Tukang kayu org/hr 63,140.00 4 Tukang cat org/hr 63,140.00 5 Tukang besi org/hr 63,140.00 6 Kepala tukang org/hr 68,880.00 7 M a n d o r org/hr 68,880.00
BAHAN ;1 Zak 55,000.00 2 Batu Bata Uk. Bh 220.00 3 Batu Bata Uk. Bh 500.00 4 Pasir urug M3 70,400.00 5 Pasir Pasang M3 95,000.00 6 Pasir Cor M3 87,500.00 7 Kerikil M3 120,000.00 8 Besi Dia. 6 @ Panjang 6 Btg 8,000.00 9 Besi Dia. 10 @ Panjang 12 Btg 55,000.00
10 Besi Dia. 12 @ Panjang 12 Btg 115,000.00 11 Kawat Beton Kg 17,000.00 12 Paku Kayu 1" Kg 10,000.00 13 Paku Kayu 1½" Kg 15,000.00 14 Paku Kayu 2" Kg 17,000.00 15 Cat kayu dasar Kg 18,850.00 16 Cat dinding setara avian Kg 25,000.00 17 Cat dinding Weathershield Kg 77,504.00 18 Cat dasar Kg 10,000.00 19 Cat dasar alkali Kg 25,200.00 20 Plamur Kg 22,579.20 21 Amplas Lbr 5,000.00 22 Keramik Lantai 40x40 cm Bh 89,040.00 23 Keramik Dinding 20x25 ex Roman type W25535 Bh 67,500.00 24 Kloset Duduk Bh 750,000.00 25 Bak Fiber Kap. 1 M3 Bh 188,100.00 26 Keran Air Bh 183,150.00 27 Seal Tape Bh 55,000.00 28 Floor Drain Bh 192,500.00 29 Pipa Pvc tipe aw 3/4" M 20,000.00 30 Pipa Pvc tipe aw 3" M 20,000.00 31 Semen Warna Kg 83,000.00 32 Kayu Perancah (Begisting) M3 800,000.00 33 Kayu 2 x 20 M3 1,250,000.00 34 Kayu 4/6 M3 1,250,000.00 35 Multipleks 9 mm Lbr 102,500.00 36 Dolken Kayu Gelam Ø 8 - 10/4 m Btg 20,000.00
Semen Padang (Portland Cement) @ 50 Kg
No. U R A I A N SATUANHARGA UPAH/ BAHAN
(Rp)(1) (2) (3) (4)
37 Gypsum 9 MM (120 x 240) Lbr 65,000.00 38 Sekrup Kg 25,000.00 39 Scafolding (sewa) Unit 17,500.00
Pekanbaru, September 2006CV. ARYA TECHNO CONSULTANT
P e k e r j a 0.30 OH 51,660.00 15,498.00 M a n d o r 0.01 OH 68,880.00 688.80
16,186.80 BAHAN
Tanah Urug 1.20 71,500.00 85,800.00 85,800.00
JUMLAH 101,986.80
2 1 M3 Galian tanah biasa UPAH
P e k e r j a 0.735 OH 51,660.00 37,970.10 M a n d o r 0.073 OH 68,880.00 5,028.24
42,998.34 BAHAN
N/A - -
JUMLAH 42,998.34
3 1 M3 Urugan kembali bekas galianUPAH
P e k e r j a 0.75 OH 51,660.00 38,745.00 M a n d o r 0.03 OH 68,880.00 1,722.00
40,467.00 BAHAN
N/A - -
JUMLAH 40,467.00
4 1 M3 Urugan pasir bawah pondasiUPAH
P e k e r j a 0.30 OH 51,660.00 15,498.00 M a n d o r 0.01 OH 68,880.00 688.80
16,186.80 BAHAN
Pasir Urug 1.2 70,400.00 84,480.00 84,480.00
JUMLAH 100,666.80
5 1 M3 Beton 1 : 3 : 5 Lantai KerjaUPAH
Tukang Batu 0.25 OH 63,140.00 15,785.00 Kepala Tukang 0.03 OH 68,880.00 1,722.00 P e k e r j a 1.65 OH 51,660.00 85,239.00 M a n d o r 0.08 OH 68,880.00 5,510.40
Tukang Besi 0.01 OH 63,140.00 441.98 P e k e r j a 0.01 OH 51,660.00 361.62 Kepala Tukang 0.0007 OH 68,880.00 48.22 M a n d o r 0.0003 OH 68,880.00 20.66
872.48 BAHAN
Besi beton U-24 1.05 Kg 16,500.00 17,325.00 Kawat Beton 0.02 Kg 17,000.00 255.00
17,580.00 PERALATAN
Peralatan Specer 1.00 Ls 1,000.00 1,000.00 1,000.00
JUMLAH 19,452.48
7 1 M2 Bekisiting Kolom PersegiUPAH
P e k e r j a 0.32 OH 51,660.00 16,531.20 M a n d o r 0.01 OH 68,880.00 413.28 Tukang Kayu 0.33 OH 63,140.00 20,836.20 Kepala Tukang 0.033 OH 68,880.00 2,273.04
40,053.72 BAHAN
Balok Kayu Bekisting 0.02 1,250,000.00 18,750.00
Papan Kayu Bekisting 0.04 1,250,000.00 50,000.00 Multipleks 9 mm 0.35 Lbr 102,500.00 35,875.00 Paku 0.40 Kg 17,000.00 6,800.00 Dolken Kayu Gelam Ø 8 - 10/4 m 2.00 Btg 20,000.00 40,000.00
151,425.00 JUMLAH 191,478.72
8 1 M2 Bekisiting BalokUPAH
P e k e r j a 0.32 OH 51,660.00 16,531.20 M a n d o r 0.01 OH 68,880.00 413.28 Tukang Kayu 0.33 OH 63,140.00 20,836.20 Kepala Tukang 0.033 OH 68,880.00 2,273.04
40,053.72 BAHAN
Balok Kayu Bekisting 0.02 M3 1,250,000.00 22,500.00 Papan Kayu Bekisting 0.04 M3 1,250,000.00 50,000.00 Multipleks 9 mm 0.35 Lbr 102,500.00 35,875.00 Paku 0.40 Kg 17,000.00 6,800.00 Dolken Kayu Gelam Ø 8 - 10/4 m 2.00 Btg 20,000.00 40,000.00
M3
M3
M3
M3
Last Printed :03/17/2016_07:51:28 11
DAFTAR ANALISA HARGA SATUAN
NO URAIAN PEKERJAAN KUANTITAS
(1) (2) (3) (4) (5)
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
155,175.00 JUMLAH 195,228.72
9 1 M2 Bekisiting Pelat LantaiUPAH
P e k e r j a 0.32 OH 51,660.00 16,531.20 M a n d o r 0.01 OH 68,880.00 413.28 Tukang Kayu 0.33 OH 63,140.00 20,836.20 Kepala Tukang 0.033 OH 68,880.00 2,273.04
40,053.72 BAHAN
Balok Kayu Bekisting 0.02 M3 1,250,000.00 18,750.00 Papan Kayu Bekisting 0.04 M3 1,250,000.00 50,000.00 Multipleks 9 mm 0.35 Lbr 102,500.00 35,875.00 Paku 0.40 Kg 17,000.00 6,800.00 Dolken Kayu Gelam Ø 8 - 10/4 m 6.00 Btg 20,000.00 120,000.00
231,425.00 JUMLAH 271,478.72
10 1 M2 Bekisiting TanggaUPAH
P e k e r j a 0.32 OH 51,660.00 16,531.20 M a n d o r 0.01 OH 68,880.00 413.28 Tukang Kayu 0.33 OH 63,140.00 20,836.20 Kepala Tukang 0.033 OH 68,880.00 2,273.04
40,053.72 BAHAN
Balok Kayu Bekisting 0.03 M3 1,250,000.00 37,500.00 Papan Kayu Bekisting 0.02 M3 1,250,000.00 18,750.00 Multipleks 9 mm 0.35 Lbr 102,500.00 35,875.00 Paku 0.40 Kg 17,000.00 6,800.00 Dolken Kayu Gelam Ø 8 - 10/4 m 2.00 Btg 20,000.00 40,000.00
138,925.00 JUMLAH 178,978.72
11 Campuran Beton K-350 Slump 12 Cm +/- 2UPAH
Tukang Batu 0.25 OH 63,140.00 15,785.00 Kepala Tukang 0.03 OH 68,880.00 1,722.00 P e k e r j a 1.65 OH 51,660.00 85,239.00 M a n d o r 0.08 OH 68,880.00 5,510.40
Tukang Batu 0.25 OH 63,140.00 15,785.00 Kepala Tukang 0.03 OH 68,880.00 1,722.00 P e k e r j a 1.65 OH 51,660.00 85,239.00 M a n d o r 0.08 OH 68,880.00 5,510.40
Tukang Batu 0.35 OH 63,140.00 22,099.00 Kepala Tukang 0.04 OH 68,880.00 2,410.80 P e k e r j a 2.00 OH 51,660.00 103,320.00 M a n d o r 1.00 OH 68,880.00 68,880.00
14 1 M2 Pasangan Dinding Bata PC 1 : Psr. 2 (1/2 Bata)UPAH
P e k e r j a 0.32 OH 51,660.00 16,531.20 Tukang Batu 0.10 OH 63,140.00 6,314.00 Kepala Tukang 0.01 OH 68,880.00 688.80 M a n d o r 0.02 OH 68,880.00 1,033.20
24,567.20 BAHAN
Batu Bata Besar 70.00 Bh 500.00 35,000.00 Semen Padang (Portland Cement) @ 50 Kg 0.38 Zak 55,000.00 20,845.00 Pasir Pasang 0.04 M3 95,000.00 3,610.00
59,455.00 PERALATAN
Alat Bantu 1.00 Ls 2,100.56 2,100.56 2,100.56
JUMLAH 86,122.76
15 1 M2 Pasangan Dinding Bata PC 1 : Psr. 4 (1/2 Bata)UPAH
P e k e r j a 0.32 OH 51,660.00 16,531.20 Tukang Batu 0.10 OH 63,140.00 6,314.00 Kepala Tukang 0.01 OH 68,880.00 688.80 M a n d o r 0.02 OH 68,880.00 1,033.20
24,567.20 BAHAN
Last Printed :03/17/2016_07:51:28 13
DAFTAR ANALISA HARGA SATUAN
NO URAIAN PEKERJAAN KUANTITAS
(1) (2) (3) (4) (5)
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
Batu Bata Besar 70.00 Bh 500.00 35,000.00 Semen Padang (Portland Cement) @ 50 Kg 0.23 Zak 55,000.00 12,650.00 Pasir Pasang 0.04 M3 95,000.00 4,085.00
51,735.00 PERALATAN
Alat Bantu 1.00 Ls 1,907.56 1,907.56 1,907.56
JUMLAH 78,209.76
16 1 M3 Beton Kolom Praktis 11/11 82.64 UPAH
P e k e r j a 4.96 OH 51,660.00 256,165.29 Tukang Batu 1.65 OH 63,140.00 104,363.64 Tukang Kayu 1.65 OH 63,140.00 104,363.64 Tukang Besi 1.65 OH 63,140.00 104,363.64 Kepala Tukang 0.50 OH 68,880.00 34,155.37 M a n d o r 0.25 OH 68,880.00 17,077.69
620,489.26 BAHAN
Papan Kayu Bekisting 0.17 M3 1,250,000.00 206,611.57 Paku 0.83 Kg 17,000.00 14,049.59 Besi beton U-24 247.93 Kg 16,500.00 4,090,909.09 Kawat Beton 37.19 Kg 17,000.00 632,231.40 Semen Padang (Portland Cement) @ 50 Kg 6.61 Zak 55,000.00 363,636.36 Pasir Cor 0.50 Zak 87,500.00 43,388.43 Kerikil 0.74 Zak 120,000.00 89,256.20
5,440,082.64 PERALATAN
Alat Bantu 1.00 Ls 7,500.00 7,500.00 7,500.00
JUMLAH 6,068,071.90
17 1 M3 Beton Kolom Praktis 10/15 66.67 UPAH
P e k e r j a 4.00 OH 51,660.00 206,640.00 Tukang Batu 1.33 OH 63,140.00 84,186.67 Tukang Kayu 1.33 OH 63,140.00 84,186.67 Tukang Besi 1.33 OH 63,140.00 84,186.67 Kepala Tukang 0.40 OH 68,880.00 27,552.00 M a n d o r 0.20 OH 68,880.00 13,776.00
500,528.00 BAHAN
Papan Kayu Bekisting 0.13 M3 1,250,000.00 166,666.67 Paku 0.67 Kg 17,000.00 11,333.33 Besi beton U-24 200.00 Kg 16,500.00 3,300,000.00 Kawat Beton 30.00 Kg 17,000.00 510,000.00 Semen Padang (Portland Cement) @ 50 Kg 5.33 Zak 55,000.00 293,333.33 Pasir Cor 0.40 Zak 87,500.00 35,000.00 Kerikil 0.60 Zak 120,000.00 72,000.00
4,388,333.33 PERALATAN
Last Printed :03/17/2016_07:51:28 14
DAFTAR ANALISA HARGA SATUAN
NO URAIAN PEKERJAAN KUANTITAS
(1) (2) (3) (4) (5)
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
Alat Bantu 1.00 Ls 7,500.00 7,500.00 7,500.00
JUMLAH 4,896,361.33
18 1 M2 Plesteran + Acian PC 1 : Psr.2. T. 25 mmUPAH
P e k e r j a 0.30 OH 51,660.00 15,498.00 Tukang Batu 0.20 OH 63,140.00 12,628.00 Kepala Tukang 0.02 OH 68,880.00 1,377.60 M a n d o r 0.01 OH 68,880.00 895.44
19 1 M2 Plesteran + Acian PC 1 : Psr.4 T. 25 mmUPAH
P e k e r j a 0.30 OH 51,660.00 15,498.00 Tukang Batu 0.20 OH 63,140.00 12,628.00 Kepala Tukang 0.02 OH 68,880.00 1,377.60 M a n d o r 0.01 OH 68,880.00 895.44
P e k e r j a 0.62 OH 51,660.00 32,029.20 Tukang Batu 0.35 OH 63,140.00 22,099.00 Kepala Tukang 0.04 OH 68,880.00 2,410.80 M a n d o r 0.04 OH 68,880.00 2,686.32
59,225.32 BAHAN
Keramik Lantai 40x40 cm 1.05 M2 89,040.00 93,670.08 Semen Padang (Portland Cement) @ 50 Kg 0.23 Zak 55,000.00 12,540.00 Pasir Pasang 0.04 M3 95,000.00 3,990.00 Semen Warna 1.50 Kg 83,000.00 124,500.00
P e k e r j a 0.62 OH 51,660.00 32,029.20 Tukang Batu 0.35 OH 63,140.00 22,099.00 Kepala Tukang 0.04 OH 68,880.00 2,410.80 M a n d o r 0.04 OH 68,880.00 2,686.32
59,225.32 BAHAN
Keramik Lantai 40x40 cm 1.05 M2 89,040.00 93,670.08 Semen Padang (Portland Cement) @ 50 Kg 0.23 Zak 55,000.00 12,540.00 Pasir Pasang 0.04 M3 95,000.00 3,990.00 Semen Warna 1.50 Kg 83,000.00 124,500.00
234,700.08 PERALATAN
Alat Bantu 1.00 Ls 2,939.25 2,939.25 2,939.25
JUMLAH 296,864.65
22 1 M1 Skirting keramik Tile 10/30-40 UPAH
P e k e r j a 0.09 OH 51,660.00 4,649.40 Tukang Batu 0.09 OH 63,140.00 5,682.60 Kepala Tukang 0.01 OH 68,880.00 619.92 M a n d o r 0.00 OH 68,880.00 309.96
23 1 M2 Pasangan Dinding Keramik 20/25 type W25535UPAH
P e k e r j a 0.62 OH 51,660.00 32,029.20 Tukang Batu 0.45 OH 63,140.00 28,413.00 Kepala Tukang 0.05 OH 68,880.00 3,099.60 M a n d o r 0.03 OH 68,880.00 2,066.40
65,608.20 BAHAN
Keramik Dinding 20x25 ex Roman type W25535 1.00 M2 67,500.00 67,500.00 Semen Padang (Portland Cement) @ 50 Kg 0.19 Zak 55,000.00 10,230.00 Pasir Pasang 0.02 M3 95,000.00 1,710.00 Semen Warna 1.50 Kg 83,000.00 124,500.00
Last Printed :03/17/2016_07:51:28 16
DAFTAR ANALISA HARGA SATUAN
NO URAIAN PEKERJAAN KUANTITAS
(1) (2) (3) (4) (5)
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
203,940.00 PERALATAN
Alat Bantu 1.00 Ls 2,695.48 2,695.48 2,695.48
JUMLAH 272,243.68
24 1 m2 / Pengecatan dinding dalam UPAH
P e k e r j a 0.02 OH 51,660.00 1,033.20 Tukang Cat 0.06 OH 63,140.00 3,977.82 Kepala Tukang 0.01 OH 68,880.00 433.94 M a n d o r 0.00 OH 68,880.00 172.20
5,617.16 BAHAN
Plamur 0.10 kg 22,579.20 2,257.92 Cat dasar 0.10 kg 10,000.00 1,000.00 Cat dinding setara avian 0.26 kg 25,000.00 6,500.00
9,757.92 JUMLAH 15,375.08
25 1 m2 / Pengecatan dinding luar UPAH
P e k e r j a 0.02 OH 51,660.00 1,033.20 Tukang Cat 0.06 OH 63,140.00 3,977.82 Kepala Tukang 0.01 OH 68,880.00 433.94 M a n d o r 0.00 OH 68,880.00 172.20
5,617.16 BAHAN
Plamur 0.10 kg 22,579.20 2,257.92 Cat dasar Alkali 0.10 kg 25,200.00 2,520.00 Cat dinding Weathershield 0.26 kg 77,504.00 20,151.04 Amplas 0.25 lbr 5,000.00
Terbilang : Dua Milyard Seratus Tujuh Puluh Delapan Juta Delapan Ribu Rupiah.
PEKANBARU, 2008
KONSULTAN MANAJEMEN & CIVIL WORK
SONDRA RAHARJA, ST
ENGINEERING ESTIMATE
ENGINEERING ESTIMATE (EE)
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN :
PEMBANGUNAN FASILITAS PENDIDIKAN MDA AT-THAHA
PEKERJAAN :
PEMBANGUNAN GEDUNG 22 RUANG KELAS BARU
6110002,178,008,000.00 <= angka
2 <= jumlah desimalb <="b" atau "saja"dua milyard seratus tujuh puluh delapan juta delapan ribu Dua milyard seratus tujuh puluh delapan juta delapan ribu 2,178,008,000 (2,178,008,000)Dua milyard seratus tujuh puluh delapan juta delapan ribu (2,178,008,000)
2178008000 000 Dua Milyard Seratus Tujuh Puluh Delapan Juta Delapan Ribu Rupiah.10000/100
2,178,008,000 Nama Range yang ada :2 2 NUMBER A1
178 78 NUMTEXT A1..A58 8 TEXT A50 0 \T B9
2 2178 88 80 0
0 01 700 00 0
dua milyard delapan ribu seratus tujuh puluh delapan