REKAPITULASI BIAYA TOTAL SATUAN KERJA : PENATAAN BANGUNAN DAN LINGKUNGAN PROVI PEKERJAAN : PENYUSUNAN RENCANA INDUK SISTEM PROTEK LOKASI : KABUPATEN SOLOK A PEKERJAAN STRUKTUR B PEKERJAAN ARSITEKTUR C PEKERJAAN GROUNDTANK D PEKERJAAN MEKANIKAL ELECTRICAL E PEKERJAAN HALAMAN JUMLAH PPN 10% TOTAL Dibulatkan Terbilang : Dua Miliar Delapan Ratus Tujuh Puluh Satu Juta Se Ratus Sem Sembilanratus Rupiah. ...... CV ... ......
57

RAB RISP Kosong

Feb 20, 2023

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RAB RISP Kosong

REKAPITULASI BIAYA TOTAL

SATUAN KERJA : PENATAAN BANGUNAN DAN LINGKUNGAN PROVINSI SUMBAR PEKERJAAN : PENYUSUNAN RENCANA INDUK SISTEM PROTEKSI KEBAKARAN LOKASI : KABUPATEN SOLOK

A PEKERJAAN STRUKTUR

B PEKERJAAN ARSITEKTUR

C PEKERJAAN GROUNDTANK

D PEKERJAAN MEKANIKAL ELECTRICAL

E PEKERJAAN HALAMAN

JUMLAH PPN 10%TOTALDibulatkanTerbilang : Dua Miliar Delapan Ratus Tujuh Puluh Satu Juta Se Ratus Sembilan Puluh Sembilan Ribu Sembilanratus Rupiah.

.............., ......................2012PENAWAR

PT/CV .............................

....

................................JABATAN

Page 2: RAB RISP Kosong

REKAPITULASI BIAYA TOTAL

: PENATAAN BANGUNAN DAN LINGKUNGAN PROVINSI SUMBAR : PENYUSUNAN RENCANA INDUK SISTEM PROTEKSI KEBAKARAN

Rp 1,440,116,896.27

Rp 619,221,081.80

Rp 160,086,526.44

Rp 147,871,400.00

Rp 242,885,908.46

Rp 2,610,181,812.98 Rp 261,018,181.30 Rp 2,871,199,994.28 Rp 2,871,199,900.00

Dua Miliar Delapan Ratus Tujuh Puluh Satu Juta Se Ratus Sembilan Puluh Sembilan Ribu Sembilanratus Rupiah.

.............., ......................2012PENAWAR

PT/CV .............................

....

................................JABATAN

Page 3: RAB RISP Kosong

REKAPITULASI BIAYA PEKERJAAN STRUKTURSATUAN KERJA : PENATAAN BANGUNAN DAN LINGKUNGAN PROVINSI SUMBAR PEKERJAAN : PENYUSUNAN RENCANA INDUK SISTEM PROTEKSI KEBAKARAN LOKASI : KABUPATEN SOLOK

LANTAI II PEKERJAAN PENDAHULUAN Rp.II PEKERJAAN BETON Rp.

LANTAI III PEKERJAAN BETON Rp.II RANGKA ATAP Rp.

TOTAL Rp.

.............., ......................2012PENAWARPT/

CV .................................

................................JABATAN

Page 4: RAB RISP Kosong

REKAPITULASI BIAYA PEKERJAAN STRUKTUR : PENATAAN BANGUNAN DAN LINGKUNGAN PROVINSI SUMBAR : PENYUSUNAN RENCANA INDUK SISTEM PROTEKSI KEBAKARAN

202,432,339.98 857,388,183.64 1,059,820,523.61

380,296,372.66 115,831,999.12 380,296,372.66

1,440,116,896.27

.............., ......................2012PENAWARPT/

CV .................................

................................JABATAN

Page 5: RAB RISP Kosong

RENCANA ANGGARAN BIAYA (RAB)SATUAN KERJA : PENATAAN BANGUNAN DAN LINGKUNGAN PROVINSI SUMBAR PEKERJAAN : PENYUSUNAN RENCANA INDUK SISTEM PROTEKSI KEBAKARAN LOKASI : KABUPATEN SOLOK

NO URAIAN VOLUME HARGA SATUAN (Rp)

A PEKERJAAN STRUKTURLANTAI I

I PEKERJAAN PENDAHULUAN1 Pendahuluan

a Papan Bouwplank 90.00 M1 Rp 55,767.20 2 Penggalian

a Galian Tanah Pondasi 96.03 M3 Rp 51,975.00 b Urugan Kembali 35.44 M3 Rp 17,325.00

3 Pasang Pondasia Urugan Pasir 7.15 M3 Rp 138,019.20 b Lantai Kerja K. 100 6.87 M3 Rp 720,937.42 c 334.80 M' Rp 522,581.80 d Pondasi Plat Tangga 0.73 M3 Rp 3,936,578.05 e Aanstampang Batu Kali 1.12 M3 Rp 370,182.91 f Pondasi Batu Kali 1 : 4 1.79 M3 Rp 704,710.16 g Pondasi Plat Beton 1.43 M2 Rp 3,936,578.05 h Pondasi Batu Bata 1 : 2 5.41 M2 Rp 134,829.24

II PEKERJAN BETON a Beton Poor K.250 41.98 M3 Rp 3,396,453.40 b Sloof Beton 25/40 K.250 14.04 M3 Rp 4,681,988.24 c Kolom Beton 50/50 K.250 4.13 M3 Rp 5,854,283.56 d Kolom Beton 40/50 K. 250 26.40 M3 Rp 5,759,136.67 e Kolom Beton L 50.40.25 K.250 1.07 M3 Rp 5,889,567.14 f Kolom Beton 23/23 pada pintu Entrance 0.34 M3 Rp 6,808,421.79 g Kolom Praktis 13/13 K250 0.49 M3 Rp 6,962,607.59 h Balok Beton 25/40 K.250 13.37 M3 Rp 6,376,513.08 i Balok Beton 25/35 K.250 5.69 M3 Rp 8,117,374.55 j Balok Beton 20/30 K.250 0.18 M3 Rp 6,920,974.52 l Plat Beton Lantai II (t=12 cm) K.250 20.20 M3 Rp 6,364,211.70 m Plat Deck Beton 1.39 M3 Rp 6,364,211.70 n Plat Lisplank Beton 0.04 M3 Rp 4,255,712.26 o Plat Tangga Beton 3.56 M3 Rp 5,749,654.99 p Balok Latei Beton 13/20 K250 1.24 M3 Rp 5,742,410.06 q Plat Beton Bertulang Tebal 10 Cm 21.74 M3 Rp 7,497,393.79

LANTAI III PEKERJAN BETON

a Kolom Beton 50/50 K.250 3.00 M3 Rp 5,854,283.56 b Kolom Beton 40/50 K. 250 2.40 M3 Rp 5,759,136.67 c Kolom Beton30/40 K.250 10.08 M3 Rp 7,221,487.88 d Plat sirip Beton 8 cm 5.40 M3 Rp 6,883,579.26 e Plat Leuvel Beton K.250 2.20 M3 Rp 4,370,242.76 f Reng Balok Beton 25/40 K.250 13.69 M3 Rp 7,235,156.57 g Reng Balok Beton 13/20 K.250 0.25 M3 Rp 5,742,410.06 h Balok Latei Beton 13/20 K.175 1.93 M3 Rp 5,742,410.06 i Kolom beton 13/13 0.43 M3 Rp 6,962,607.59 j Plat sirip Beton 15 cm 0.54 M3 Rp 6,637,655.40 k Balok Konsol beton 25/30 2.49 M3 Rp 7,235,156.57 l Plat deck beton (Talang Air Beton ) 10.62 M3 Rp 4,370,242.76 m Balok Beton 25/30 3.77 M3 Rp 7,235,156.57 n Lisplank Beton 4.59 M3 Rp 4,255,712.26

Pondasi Bor Pile ø 40 cm

Page 6: RAB RISP Kosong

NO URAIAN VOLUME HARGA SATUAN (Rp)

I RANGKA ATAP1 1 Kuda-Kuda / Rangka atap

a Mengerjakan Rangka Atap Baja Ringan 344.56 M2 Rp 180,685.15 b Pasang Papan Lisplank Papan Profil 78.80 M1 Rp 61,552.05 c Pasang Keil Got 8.35 M1 Rp 61,552.05 2 Pasang Atapa Pasang Atap Genteng Metal 352.80 M2 Rp 113,031.67 b Pasang Perabung Genteng 61.50 m1 Rp 91,704.53 c pasang Talang air tegak Pvc D 4 " 84.00 m1 Rp 32,065.00

Page 7: RAB RISP Kosong

RENCANA ANGGARAN BIAYA (RAB)

TOTAL (Rp)

Tiang

Rp 5,019,047.55

Rp 4,991,263.20 Rp 614,032.65

Rp 986,837.28 Rp 4,952,840.10 Rp 174,960,387.67 Rp 2,873,701.98 Rp 414,604.86 Rp 1,261,431.19 Rp 5,629,306.61 Rp 728,886.89 Rp 202,432,339.98

Rp 142,569,528.09 Rp 65,735,114.85 Rp 24,178,191.10 Rp 152,041,208.13 Rp 6,316,560.76 Rp 2,314,863.41 Rp 3,388,840.37 Rp 85,253,979.86 Rp 46,187,861.20 Rp 1,245,775.41 Rp 128,557,076.37 Rp 8,846,254.26 Rp 170,228.49 Rp 20,468,771.76 Rp 7,120,588.47 Rp 162,993,341.09 Rp 857,388,183.64

###

Rp 17,562,850.68 Rp 13,821,928.01 Rp 72,792,597.80 Rp 37,171,327.99 Rp 9,614,534.08 Rp 99,013,117.72 Rp 1,435,602.52 Rp 11,082,851.42 Rp 2,993,921.26 Rp 3,584,333.92 Rp 18,015,539.87 Rp 46,411,978.16 Rp 27,262,069.97 Rp 19,533,719.26

Page 8: RAB RISP Kosong

TOTAL (Rp)

Rp 380,296,372.66

Rp 62,256,875.71 Rp 4,850,301.79 Rp 513,959.64

Rp 39,877,573.68 Rp 5,639,828.29 Rp 2,693,460.00 Rp 115,831,999.12

Page 9: RAB RISP Kosong

NO URAIAN SAT HARGA SATUAN (Rp)

IV. DAFTAR PEKERJAAN STRUKTUR1 Papan Bouwplank M1 Rp 55,767.20 2 Galian Tanah Pondasi M3 Rp 51,975.00 3 Urugan Kembali M3 Rp 17,325.00 4 Urugan Pasir M3 Rp 138,019.20 5 Lantai Kerja K. 100 M3 Rp 720,937.42 6 Pondasi Bor Pile ø 40 cm M' Rp 522,581.80 7 Pondasi Plat Tangga M3 Rp 3,936,578.05 8 Aanstampang Batu Kali M3 Rp 370,182.91 9 Pondasi Batu Kali 1 : 4 M3 Rp 704,710.16 10 Pondasi Plat Beton M2 Rp 3,936,578.05 11 Pondasi Batu Bata 1 : 2 M2 Rp 134,829.24 12 Beton Poor K.250 M3 Rp 3,396,453.40 13 Sloof Beton 25/40 K.250 M3 Rp 4,681,988.24 14 Kolom Beton 50/50 K.250 M3 Rp 5,854,283.56 15 Kolom Beton 40/50 K. 250 M3 Rp 5,759,136.67 16 Kolom Beton L 50.40.25 K.250 M3 Rp 5,889,567.14 17 Kolom Beton 23/23 pada pintu Entrance M3 Rp 6,808,421.79 18 Kolom Praktis 13/13 K250 M3 Rp 6,962,607.59 19 Balok Beton 25/40 K.250 M3 Rp 6,376,513.08 20 Balok Beton 25/35 K.250 M3 Rp 8,117,374.55 21 Balok Beton 20/30 K.250 M3 Rp 6,920,974.52 22 Plat Beton Lantai II (t=12 cm) K.250 M3 Rp 6,364,211.70 23 Plat Deck Beton M3 Rp 6,364,211.70 24 Plat Lisplank Beton M3 Rp 4,255,712.26 25 Plat Tangga Beton M3 Rp 5,749,654.99 26 Balok Latei Beton 13/20 K250 M3 Rp 5,742,410.06 27 Plat Beton Bertulang Tebal 10 Cm M3 Rp 7,497,393.79 28 Kolom Beton30/40 K.250 M3 Rp 7,221,487.88 29 Plat sirip Beton 8 cm M3 Rp 6,883,579.26 30 Plat Leuvel Beton K.250 M3 Rp 4,370,242.76 31 Reng Balok Beton 25/40 K.250 M3 Rp 7,235,156.57 32 Reng Balok Beton 13/20 K.250 M3 Rp 5,742,410.06 33 Balok Latei Beton 13/20 K.175 M3 Rp 5,742,410.06 34 Plat sirip Beton 15 cm M3 Rp 6,637,655.40 35 Balok Konsol beton 25/30 M3 Rp 7,235,156.57 36 Plat deck beton (Talang Air Beton ) M3 Rp 4,370,242.76 37 Balok Beton 25/30 M3 Rp 7,235,156.57 38 Lisplank Beton M3 Rp 4,255,712.26 39 Mengerjakan Rangka Atap Baja Ringan M2 Rp 180,685.15 40 Pasang Papan Lisplank Papan Profil M1 Rp 61,552.05 41 Pasang Keil Got M1 Rp 61,552.05 42 Pasang Atap Genteng Metal M2 Rp 113,031.67 43 Pasang Perabung Genteng m1 Rp 91,704.53 44 pasang Talang air tegak Pvc D 4 " m1 Rp 32,065.00

Page 10: RAB RISP Kosong

REKAPITULASI BIAYA PEKERJAAN ARSITEKTURSATUAN KERJA : PENATAAN BANGUNAN DAN LINGKUNGAN PROVINSI SUMBAR PEKERJAAN : PENYUSUNAN RENCANA INDUK SISTEM PROTEKSI KEBAKARAN LOKASI : KABUPATEN SOLOK

LANTAI I Rp.I PEKERJAN DINDING Rp.II PEKERJAAN PLAFOND Rp.III PEKERJAAN PLESTERAN Rp.IV PEKERJAAN LANTAI Rp.V PEKERJAAN PINTU JENDELA Rp.VI PEKERJAAN PENGECATAN Rp.VII PEKERJAAN PERLENGKAPAN DALAM Rp.VIII PEKERJAAN PERLENGKAPAN LUAR

LANTAI II Rp.I PEKERJAN BETON / DINDING Rp.II PEKERJAAN PLAFOND Rp.III PEKERJAAN PLESTERAN Rp.IV PEKERJAAN LANTAI Rp.VI PEKERJAAN PINTU JENDELA Rp.VII PEKERJAAN PENGECATAN Rp.VIII PEKERJAAN PERLENGKAPAN DALAM Rp.

TOTAL Rp.

.............., ......................2012PENAWARPT/

CV .................................

................................JABATAN

Page 11: RAB RISP Kosong

REKAPITULASI BIAYA PEKERJAAN ARSITEKTUR : PENATAAN BANGUNAN DAN LINGKUNGAN PROVINSI SUMBAR : PENYUSUNAN RENCANA INDUK SISTEM PROTEKSI KEBAKARAN

197,099,806.91 31,669,643.74 3,653,154.30 76,865,357.68 32,960,733.57 8,050,990.13 31,345,010.03 12,554,917.46

422,121,274.89 114,641,061.36 50,574,127.40 101,960,112.97 45,341,123.73 47,810,550.17 43,679,844.06 18,114,455.18

619,221,081.80

.............., ......................2012PENAWAR

PT/CV .............................

....

................................JABATAN

Page 12: RAB RISP Kosong

RENCANA ANGGARAN BIAYA (RAB)SATUAN KERJA : PENATAAN BANGUNAN DAN LINGKUNGAN PROVINSI SUMBAR PEKERJAAN : PENYUSUNAN RENCANA INDUK SISTEM PROTEKSI KEBAKARANLOKASI : KABUPATEN SOLOK

NO URAIAN VOLUME HARGA SATUAN (Rp)

B PEKERJAAN ARSITEKTURLANTAI I

I PEKERJAN DINDING 1 Kozen

a Pasang Kozen Aluminium 4 " 35.30 M1 Rp 127,780.40 b Pasang Kozen kayu Kelas II 0.08 M3 Rp 5,714,247.83 c Meni Kayu 1.57 M2 Rp 35,000.00

3 Dinding bataa Pasang Dinding Bata 1 : 2 28.01 M2 Rp 134,829.24 b Pasang Dinding Bata 1 : 4 152.17 M2 Rp 125,760.73 c Pasang Dinding Batu Kerawang Merah 20 x 20 11.55 M2 Rp 321,805.99

II PEKERJAAN PLAFOND1 Rangka Plafond

a Kerangka Plafond Hollow 16.50 M2 Rp 106,154.10 2 Pasang Plafond

a Pas. Plafond GRC 9 mm 16.50 M2 Rp 66,508.64 b Pas. List Profil Gypsum 10 x 10 cm 26.00 M1 Rp 30,931.51

III PEKERJAAN PLESTERANa Plesteran 1:2 47.94 M2 Rp 45,872.90 b Plesteran 1:4 304.33 M2 Rp 41,083.15 c Afwerking Beton 615.13 M2 Rp 88,403.04 d Finishing Lubang Ventilasi 1.11 M2 Rp 45,872.90 e Pas. Dinding Keramik 20 x 25 cm (KM/WC) 14.10 M2 Rp 194,314.41 f Pasang Turap Keramik Ornamen 10 x 20 cm 0.94 M2 Rp 257,958.46 g Pasang Keramik Kristal pada Dinding Tembok depan 7.50 M2 Rp 257,958.46 h Pasang Acp + ragka Besi Hollow 40 x 40 dekat Pint 5.80 m2 Rp 306,154.10

dekat Pintu Enterencei Pasang Les profil 3 x 5 cm Pada dinding tembok 10.40 M1 Rp 100,000.00

IV PEKERJAAN LANTAI1 Urugan di Bawah Lantai

a Urugan Tanah 9.31 M3 Rp 142,663.40 b Urugan Pasir 29.22 M3 Rp 138,019.20

2 Pasang Lantaia Beton Cor K. 100 3.38 M3 Rp 720,937.42 b Lantai Keramik 40 x 40 cm 64.88 M2 Rp 198,673.22 c Lantai Keramik 20 x 20 cm pada KM/WC 2.81 M2 Rp 202,609.51 d Pas Bon- Bon Keramik 17.80 M' Rp 22,000.00 e Pas Plesteran +Aci 171.70 M2 Rp 65,890.90

V PEKERJAAN PINTU JENDELA1 Pintu / Jendela

a Pasangan Pintu Panil Uk. 75 x 80 cm 1.00 Unit Rp 1,200,000.00 b Pasang Pintu Panil 90 x 210 1.00 Unit Rp 1,800,000.00 c Pasang Pintu WC ( Pintu Fiber ) 2.00 Unit Rp 700,000.00 d Pasangan Pintu Kaca Rangka Aluminium 70 x 210 2.00 Unit Rp 1,120,000.00 f Pas. Kaca Biru 6 mm 10.55 M2 Rp 132,267.30

Page 13: RAB RISP Kosong

NO URAIAN VOLUME HARGA SATUAN (Rp)

g Angkur Kosen 1.19 Kg Rp 13,139.34

VI PEKERJAAN PENGECATAN1 Pengecatan

a Mencat Kayu Yang Kelihatan Dengan Cat Politur / im 8.33 M2 Rp 50,201.91 b Mencat Plafond GRC 9 mm 16.50 M2 Rp 32,287.42 c Mencat Dinding Tembok 941.36 M2 Rp 32,287.42

VII PEKERJAAN PERLENGKAPAN DALAM1 Pekerjaan Besi Seluncuran

a Pasang Besi galvanis D 6" Tebal 4 mm 8.50 M Rp 500,000.00 1 Pekerjaan Sanitasi

a Pas. Kloset Jongkok 2.00 Bh Rp 557,633.78 b Pas. Bak Air Pasangan Lapis Keramik 2.00 Bh Rp 3,500,000.00 c Pas. Kran Air 2.00 Bh Rp 57,279.75 d Pas. Floor Drain 2.00 Bh Rp 37,545.20

VII PEKERJAAN PERLENGKAPAN LUAR1 Halaman

a Septictank Kap. 25 Orang 1.00 Bh Rp 6,619,538.87 b Slauran Air Hujan Keliling gedung 59.00 M1 Rp 342,797.28 c Bak kontrol Slauran Air 4.00 Bh Rp 136,569.41 d Urugan Pasir 4.91 M3 Rp 138,019.20 e Pasang Rabat Beton tumbuk + Aci 49.14 M2 Rp 745,745.17 f Pasang Plat Beton Bertulang 1.12 M2 Rp 6,364,211.70 g Pasang Saluran air tertutup besi gril 11.00 M1 Rp 492,797.28 h Pekerjaan Nama + Logo (STAINLESTEEL) 1.00 Unit

LANTAI III PEKERJAN BETON / DINDING 1 Kozen

a Pasang Kozen Aluminium 4 " 248.10 M1 Rp 127,780.40 b Pasang Kozen kayu 0.03 M3 Rp 5,714,247.83 c Meni Kayu 0.62 M2 Rp 35,000.00

2 Dindinga Pas. Dinding Bata 1 : 2 22.43 M2 Rp 134,829.24 b Pas. Dinding Bata 1 : 4 163.43 M2 Rp 125,760.73

3 Pasang Reilinga Pas. Reling tangga Dari Pipa Stainlessteel 11.15 M' Rp 550,000.00

4 Dinding Partisia Kerangka Dinding Partisi Besi Hollow 40.40 541.80 M1 Rp 65,000.00 b Pasang Kozen Aluminium 4 " pada partisi 37.65 M1 Rp 127,780.40 c Pasang Dinding Partisi GRC 9 mm Double 74.62 M2 Rp 133,017.28 d Pasang Kaca Polos 5mm 4.62 M2 Rp 112,851.75 e Pasang daun Pintu Kaca Rangka Aluminium 3.00 Unit Rp 850,000.00

II PEKERJAAN PLAFOND1 Rangka Plafond

a Kerangka Plafond Hollow 216.00 M2 Rp 106,154.10 b Kerangka Plafond dari Kayu 85.56 M2 Rp 78,388.22 c Memeni Kayu 41.07 M2 Rp 35,000.00

2 Pasang Plafonda Pas. Plafond GRC 9 mm 216.00 M2 Rp 66,508.64 c Pas. List Profil Gypsum 10 x 10 cm 166.00 M1 Rp 30,931.51

Page 14: RAB RISP Kosong

NO URAIAN VOLUME HARGA SATUAN (Rp)

Page 15: RAB RISP Kosong

NO URAIAN VOLUME HARGA SATUAN (Rp)

III PEKERJAAN PLESTERAN1 Plesteran Dinding

a Plesteran 1 : 2 44.85 M2 Rp 45,872.90 b Plesteran 1 : 4 331.73 M2 Rp 41,083.15 c Afwerking Beton 562.51 M2 Rp 88,403.04 d Finishing Lubang Ventilasi 1.11 M2 Rp 45,872.90 e Membuat Les Profil Dinding Tembok Keliling Jendela 8.10 M1 Rp 100,000.00 f Pas. Turap Dinding Keramik 20 x 25 cm (KM/WC) 24.60 M2 Rp 194,314.41 g Pasang Turap Keramik Ornamen 10 x 20 cm 1.64 M2 Rp 257,958.46 h Pasang Water Profing + Plesteran Pada Plat 121.93 M2 Rp 250,000.00

IV PEKERJAAN LANTAIa Lantai Keramaik 40 x40 cm 216.40 M2 Rp 198,673.22 b Lantai Keramik 20 x 20 cm pada KM/WC 7.26 M2 Rp 202,609.51 c Pek. Bon - bon Keramik 39.90 M' Rp 22,000.00

V PEKERJAAN PINTU JENDELA1 Pintu / Jendela

a Pasangan Pintu Panil Uk. 80 x 210 cm (P1) 1.00 Unit Rp 1,500,000.00 b Pasangan Pintu Panil Uk. 75x80 cm (P3) 1.00 Unit Rp 1,200,000.00 c Pintu Wc (Pintu Fiber ) 2.00 Unit Rp 800,000.00 d Pas. Jendela Kaca Rangka aluminium 42.00 Unit Rp 800,000.00 e Pas.Ventilasi Kaca +Rangka aluminium 40X60 cm 42.00 Unit Rp 220,000.00 f Pas. Ventilasi Kaca+ Rangka aluminium 40x80 cm 1.00 Unit Rp 250,000.00 g Pas. Kaca Polos 5 mm 3.68 M2 Rp 112,851.75 h Angkur Kozen 0.40 Kg Rp 13,139.34

VI PEKERJAAN PENGECATANa Mencat Kayu Yang Kelihatan Dengan Cat Politur / im 32.09 M2 Rp 50,201.91 b Mencat Plafond GRC 9 mm 240.90 M2 Rp 32,287.42 c Mencat Dinding Partisi dengan cat tembok 149.20 M2 Rp 32,287.42 d Mencat dinding dengan cat tembok 912.85 M2 Rp 32,287.42

VII PEKERJAAN PERLENGKAPAN DALAM1 Pekerjaan Sanitasi

a Pas. Kloset Jongkok 2.00 Bh Rp 557,633.78 b Urinoir 3.00 Bh Rp 2,790,664.17 c Pembatas Urinoir 2.00 Bh Rp 700,000.00 d Pas. Bak Air Pasangan Lapis Keramik 2.00 Bh Rp 3,500,000.00 e Pas. Kran Air 2.00 Bh Rp 57,279.75 f Pas. Floor Drain 3.00 Bh Rp 37,545.20

Page 16: RAB RISP Kosong

RENCANA ANGGARAN BIAYA (RAB)

TOTAL (Rp)

### Rp 4,510,648.12 Rp 474,282.57 Rp 54,950.00

Rp 3,775,892.98 Rp 19,137,010.89 Rp 3,716,859.18 Rp 31,669,643.74

1,751,542.61

Rp 1,097,392.56 Rp 804,219.13 Rp 3,653,154.30

Rp 2,199,147.02 Rp 12,502,835.65 Rp 54,379,759.81 Rp 50,918.92 Rp 2,739,833.12 Rp 242,480.95 Rp 1,934,688.44 Rp 1,775,693.77

Rp 1,040,000.00 Rp 76,865,357.68

Rp 1,328,731.24 Rp 4,032,921.02

Rp 2,436,768.49 Rp 12,888,925.28 Rp 568,319.66 Rp 391,600.00 Rp 11,313,467.87 Rp 32,960,733.57

rangka Rp 1,200,000.00 Rp 1,800,000.00 Rp 1,400,000.00 Rp 2,240,000.00 Rp 1,395,420.02

Page 17: RAB RISP Kosong

TOTAL (Rp)

Rp 15,570.11 Rp 8,050,990.13

Rp 418,181.91 Rp 532,742.43 Rp 30,394,085.69 Rp 31,345,010.03

Rp 4,250,000.00

Rp 1,115,267.56 Rp 7,000,000.00 Rp 114,559.50 Rp 75,090.40 Rp 12,554,917.46

Rp 6,619,538.87 Rp 20,225,039.53 Rp 546,277.66 Rp 677,674.27 Rp 36,645,917.79 Rp 7,127,917.11 Rp 5,420,770.08 Rp 71,842,365.23

Rp 31,702,317.24 Rp 182,855.93 Rp 21,700.00

Rp 3,024,219.94 Rp 20,553,076.76

Rp 6,132,500.00

Rp 35,217,000.00 Rp 4,810,932.06 Rp 9,925,084.35 Rp 521,375.09 Rp 2,550,000.00 Rp 114,641,061.36

###

Rp 22,929,285.06 Rp 6,706,896.27 Rp 1,437,450.00

Rp 14,365,866.24 Rp 5,134,629.83

Page 18: RAB RISP Kosong

TOTAL (Rp)

Rp 50,574,127.40

Page 19: RAB RISP Kosong

TOTAL (Rp)

Rp 2,057,399.74 Rp 13,628,514.01 Rp 49,727,594.03 Rp 50,918.92 Rp 810,000.00 Rp 4,780,134.39 Rp 423,051.87 Rp 30,482,500.00 Rp 101,960,112.97

Rp 42,992,885.24 Rp 1,470,438.49 Rp 877,800.00 Rp 45,341,123.73

rangka Rp 1,500,000.00 Rp 1,200,000.00 Rp 1,600,000.00 Rp 33,600,000.00 Rp 9,240,000.00 Rp 250,000.00 Rp 415,294.44 Rp 5,255.73 Rp 47,810,550.17

Rp 1,610,950.17 Rp 7,778,039.48 Rp 4,817,283.06 Rp 29,473,571.35 Rp 43,679,844.06

Rp 1,115,267.56 Rp 8,371,992.52 Rp 1,400,000.00 Rp 7,000,000.00 Rp 114,559.50 Rp 112,635.60 Rp 18,114,455.18

Page 20: RAB RISP Kosong

NO URAIAN SAT

V. DAFTAR PEKERJAAN ARSITEKTUR1 Pasang Kozen Aluminium 4 " M12 Pasang Kozen kayu Kelas II M33 Meni Kayu M24 Pasang Dinding Bata 1 : 2 M25 Pasang Dinding Bata 1 : 4 M26 Pasang Dinding Batu Kerawang Merah 20 x 20 M27 Kerangka Plafond Hollow M28 Pas. Plafond GRC 9 mm M29 Pas. List Profil Gypsum 10 x 10 cm M110 Plesteran 1:2 M211 Plesteran 1:4 M212 Afwerking Beton M213 Finishing Lubang Ventilasi M214 Pas. Dinding Keramik 20 x 25 cm (KM/WC) M215 Pasang Turap Keramik Ornamen 10 x 20 cm M216 Pasang Keramik Kristal pada Dinding Tembok depan M217 Pasang Acp + ragka Besi Hollow 40 x 40 dekat Pintu En m218 Pasang Les profil 3 x 5 cm Pada dinding tembok M119 Urugan Tanah M320 Urugan Pasir M321 Beton Cor K. 100 M322 Lantai Keramik 40 x 40 cm M223 Lantai Keramik 20 x 20 cm pada KM/WC M224 Pas Bon- Bon Keramik M'25 Pas Plesteran +Aci M226 Pasangan Pintu Panil Uk. 75 x 80 cm Unit27 Pasang Pintu Panil 90 x 210 Unit28 Pasang Pintu WC ( Pintu Fiber ) Unit29 Pasangan Pintu Kaca Rangka Aluminium 70 x 210 Unit31 Pas. Kaca Biru 6 mm M232 Angkur Kosen Kg33 Mencat Kayu Yang Kelihatan Dengan Cat Politur / impra M234 Mencat Plafond GRC 9 mm M235 Mencat Dinding Tembok M236 Pas. Kloset Jongkok Bh37 Pas. Bak Air Pasangan Lapis Keramik Bh38 Pas. Kran Air Bh39 Pas. Floor Drain Bh40 Septictank Kap. 25 Orang Bh41 Slauran Air Hujan Keliling gedung M142 Bak kontrol Slauran Air Bh43 Urugan Pasir M344 Pasang Rabat Beton tumbuk + Aci M245 Pasang Plat Beton Bertulang M246 Pas. Reling tangga Dari Pipa Stainlessteel M'47 Pasang Kaca Polos 5mm M248 Finishing Lubang Ventilasi M249 Membuat Les Profil Dinding Tembok Keliling Jendela M150 Pasang Water Profing + Plesteran Pada Plat M251 Pasangan Pintu Panil Uk. 80 x 210 cm (P1) Unit52 Pintu Wc (Pintu Fiber ) Unit

Page 21: RAB RISP Kosong

HARGA SATUAN (Rp)

Rp 127,780.40 Rp 5,714,247.83 Rp 35,000.00 Rp 134,829.24 Rp 125,760.73 Rp 321,805.99 Rp 106,154.10 Rp 66,508.64 Rp 30,931.51 Rp 45,872.90 Rp 41,083.15 Rp 88,403.04 Rp 45,872.90 Rp 194,314.41 Rp 257,958.46 Rp 257,958.46 Rp 306,154.10 Rp 100,000.00 Rp 142,663.40 Rp 138,019.20 Rp 720,937.42 Rp 198,673.22 Rp 202,609.51 Rp 22,000.00 Rp 65,890.90 Rp 1,200,000.00 Rp 1,800,000.00 Rp 700,000.00 Rp 1,120,000.00 Rp 132,267.30 Rp 13,139.34 Rp 50,201.91 Rp 32,287.42 Rp 32,287.42 Rp 557,633.78 Rp 3,500,000.00 Rp 57,279.75 Rp 37,545.20 Rp 6,619,538.87 Rp 342,797.28 Rp 136,569.41 Rp 138,019.20 Rp 745,745.17 Rp 6,364,211.70 Rp 550,000.00 Rp 112,851.75 Rp 45,872.90 Rp 100,000.00 Rp 250,000.00 Rp 1,500,000.00 Rp 800,000.00

Page 22: RAB RISP Kosong

REKAPITULASI BIAYA PEKERJAAN HALAMANKEGIATAN : PELAKSANAAN TEKNIS BANGUNAN GEDUNG PROVINSI SUMATERA BARAT PEKERJAAN : PENYUSUNAN RENCANA INDUK SISTEM PROTEKSI KEBAKARAN LOKASI : KABUPATEN SOLOK

I PEKERJAAN PEMBONGKARAN Rp.II PEKERJAAN GORONG-GORONG PASANGAN ( TYPE A) Rp.III PEKERJAAN GORONG-GORONG PASANGAN ( TYPE B) Rp.IV PEKERJAAN HALAMAN PARKIR Rp.

TOTAL Rp.

.............., ......................2012PENAWARPT/

CV .................................

................................JABATAN

Page 23: RAB RISP Kosong

REKAPITULASI BIAYA PEKERJAAN HALAMAN : PELAKSANAAN TEKNIS BANGUNAN GEDUNG PROVINSI SUMATERA BARAT : PENYUSUNAN RENCANA INDUK SISTEM PROTEKSI KEBAKARAN

23,286,000.00 94,396,176.93 52,505,459.17 72,698,272.37

242,885,908.46

.............., ......................2012PENAWARPT/

CV .................................

................................JABATAN

Page 24: RAB RISP Kosong

RENCANA ANGGARAN BIAYA (RAB)KEGIATAN : PELAKSANAAN TEKNIS BANGUNAN GEDUNG PROVINSI SUMATERA BARAT PEKERJAAN : PENYUSUNAN RENCANA INDUK SISTEM PROTEKSI KEBAKARANLOKASI : KABUPATEN SOLOK

NO URAIAN VOLUME HARGA SATUAN (Rp)

D PEKERJAAN HALAMANI PEKERJAAN PEMBONGKARAN

1 Pembongkaran aspal 185.00 M2 Rp 100,000.00 2 Bongkar Tiang basket 2.00 BH Rp 150,000.00 3 Bongkar Tempat Parkir Sepeda 1.00 Unit Rp 1,000,000.00 4 Bongkar Pagar Lama 38.10 M1 Rp 60,000.00 5 Bongkar Pohon kayu 4.00 Btg Rp 300,000.00

II PEKERJAAN GORONG-GORONG PASANGAN ( TYPE A)1 Bongkar Saluran Air 14.50 M1 Rp 60,000.00 2 Pasang Bowplank 12.00 M1 Rp 55,767.20 3 galian Tanah 41.76 M3 Rp 51,975.00 4 Urugan Kembali 10.44 M3 Rp 17,325.00 5 Pasang Batu kali 1 : 4 52.09 M3 Rp 704,710.16 6 Pasang Plat Beton Bertulang K250 7.49 M3 Rp 6,364,211.70 7 Pasang Cor Beton 1 : 2: 3 3.17 M3 Rp 816,421.57 8 Plester Pasangan 1 : 3 82.12 M2 Rp 43,123.08

III PEKERJAAN GORONG-GORONG PASANGAN ( TYPE B)1 Bongkar Saluran Air 14.00 M1 Rp 60,000.00 2 Pasang Bowplank 8.00 M1 Rp 55,767.20 3 galian Tanah 22.40 M3 Rp 51,975.00 4 Urugan Kembali 5.60 M3 Rp 17,325.00 5 Pasang Batu kali 1 : 4 25.48 M3 Rp 704,710.16 6 Pasang Plat Beton Bertulang 4.66 M3 Rp 6,364,211.70 7 Pasang Cor Beton 1 : 2: 3 0.96 M3 Rp 816,421.57 8 Plester Pasangan 1 : 3 36.20 M2 Rp 43,123.08

VI PEKERJAAN HALAMAN PARKIR1 Pasang Beton Cor K250 Pada Halaman parkir 82.00 M3 Rp 886,564.30

Page 25: RAB RISP Kosong

RENCANA ANGGARAN BIAYA (RAB)

TOTAL (Rp)

Rp 18,500,000.00 Rp 300,000.00 Rp 1,000,000.00 Rp 2,286,000.00 Rp 1,200,000.00 Rp 23,286,000.00

Rp 870,000.00 Rp 669,206.34 Rp 2,170,476.00 Rp 180,873.00 Rp 36,708,352.23 Rp 47,667,945.64 Rp 2,588,056.38 Rp 3,541,267.33 Rp 94,396,176.93

Rp 840,000.00 Rp 446,137.56 Rp 1,164,240.00 Rp 97,020.00 Rp 17,956,014.88 Rp 29,657,226.53 Rp 783,764.71 Rp 1,561,055.50 Rp 52,505,459.17

Rp 72,698,272.37 Rp 72,698,272.37

Page 26: RAB RISP Kosong

NO URAIAN SAT HARGA SATUAN (Rp)

VII. DAFTAR PEKERJAAN HALAMAN

1 Pembongkaran aspal M2 Rp 100,000.00 2 Bongkar Tiang basket BH Rp 150,000.00 3 Bongkar Tempat Parkir Sepeda Unit Rp 1,000,000.00 4 Bongkar Pagar Lama M1 Rp 60,000.00 5 Bongkar Pohon kayu Btg Rp 300,000.00 10 Bongkar Saluran Air M1 Rp 60,000.00 11 Pasang Bowplank M1 Rp 55,767.20 12 galian Tanah M3 Rp 51,975.00 13 Urugan Kembali M3 Rp 17,325.00 14 Pasang Batu kali 1 : 4 M3 Rp 704,710.16 15 Pasang Plat Beton Bertulang K250 M3 Rp 6,364,211.70 16 Pasang Cor Beton 1 : 2: 3 M3 Rp 816,421.57 17 Plester Pasangan 1 : 3 M2 Rp 43,123.08 31 Pasang Beton Cor K250 Pada Halaman parkir M3 Rp 886,564.30

Page 27: RAB RISP Kosong

RENCANA ANGGARAN BIAYA (RAB)KEGIATAN : PELAKSANAAN TEKNIS BANGUNAN GEDUNG PROVINSI SUMATERA BARAT PEKERJAAN : PENYUSUNAN RENCANA INDUK SISTEM PROTEKSI KEBAKARANLOKASI : KABUPATEN SOLOK

NO URAIAN VOLUME HARGA TOTAL

SATUAN (Rp) (Rp)

D PEKERJAAN GROUNDTANK1Pasang Papan Bowplank 28.00 M1 Rp 55,767.20 Rp 1,561,481.46 2 Galian Tanah 88.44 M3 Rp 51,975.00 Rp 4,596,669.00 3 Urugan Kembali 14.17 M3 Rp 17,325.00 Rp 245,495.25 4 Pasang Lantai Kerja 1 : 3 : 5 3.14 M3 Rp 720,937.42 Rp 2,263,743.51 5 Balok Beton 25/40 Lantai Dasar 2.50 M3 ### Rp 15,941,282.70 6 Kolom Beton 25/25 0.98 M3 ### Rp 8,883,915.29 7 Plat Beton Lantai Dasar 4.60 M3 ### Rp 29,275,373.83 8 Plat Dinding Beton 10.22 M3 ### Rp 50,272,514.65 9 Balok Beton 25/30 0.30 M3 ### Rp 1,675,597.23 10 Plat Beton Penutup Tebal 12 Cm 2.75 M3 ### Rp 17,501,582.18 11 Afwerking Beton 100.84 M2 Rp 88,403.04 Rp 8,914,562.55 12 Pintu Menhol 1.00 Unit ### Rp 2,143,352.53 13 Tangga Besi Pipa galvanis D 1 " dan D 1,5" 1.00 Unit ### Rp 2,000,000.00 14 Mencat Besi 3.74 M2 Rp 29,181.24 Rp 109,137.84 15 Pasang Lantai Keramik 40 x 40 24.00 M2 Rp 198,673.22 Rp 4,768,157.33 16 Pasang Dinding Keramik 40 x 40 50.00 M2 Rp 198,673.22 Rp 9,933,661.10

Rp 160,086,526.44

Page 28: RAB RISP Kosong

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN : PELAKSANAAN TEKNIS BANGUNAN GEDUNG PROVINSI SUMATERA BARAT PEKERJAAN : PENYUSUNAN RENCANA INDUK SISTEM PROTEKSI KEBAKARAN LOKASI : KABUPATEN SOLOK

NO U R A I A N H. SATUAN BAHAN UPAH Rp. Rp. Rp.

PEKERJAAN PERSIAPAN, SNI 03-2835-20021 1 M' Pengukuran dan pemasangan bowplank

0.0120 Kayu 5 x 7 cm (klas IV) 1,800,810.00 21,609.72 0.0200 Kg Besi paku 17,655.00 353.10 0.0070 Kayu papan 1,912,090.00 13,384.63 0.1000 Oh Tukang kayu 80,000.00 8,000.00 0.1000 Oh Pekerja 60,000.00 6,000.00 0.0100 Oh Kepala tukang 90,000.00 900.00 0.0050 Oh Mandor 90,000.00 450.00

Jumlah Keuntungan dan Over head 10% Jumlah

PEKERJAAN TANAH, SNI-DT -91 -0006-20071 1 M3 Galian tanah biasa sedalam 1 meter

0.7500 Oh Pekerja 60,000.00 45,000.00 0.0250 Oh Mandor 90,000.00 2,250.00

Jumlah Keuntungan dan Over head 10% Jumlah

2 1 M3 Urugan kembali 0.2500 Oh Pekerja 60,000.00 15,000.00 0.0083 Oh Mandor 90,000.00 750.00

Jumlah Keuntungan dan Over head 10% Jumlah

3 1 M3 Urugan Tanah 1.2000 M3 Tanah urug 83,995.00 100,794.00 0.3000 Oh Pekerja 60,000.00 18,000.00 0.0100 Oh Mandor 90,000.00 900.00 1.0000 Ls Alat Bantu 10,000.00 10,000.00

Jumlah Keuntungan dan Over head 10% Jumlah

4 1 M3 Urugan pasir 1.2000 M3 Pasir urug 88,810.00 106,572.00 0.3000 Oh Pekerja 60,000.00 18,000.00 0.0100 Oh Mandor 90,000.00 900.00

Jumlah Keuntungan dan Over head 10% Jumlah

PEKERJAAN PONDASI, SNI DT -91-0007-20071 1 M3 Pasang pondasi batu belah 1 Pc : 4 Pp

1.2000 M3 Batu Kali 177,620.00 213,144.00 163.0000 Kg Semen portland 1,210.00 197,230.00 0.5200 M3 Pasir pasangan 154,080.00 80,121.60 1.5000 Oh Pekerja 60,000.00 90,000.00 0.6000 Oh Tukang batu 80,000.00 48,000.00 0.0600 Oh Kepala tukang 90,000.00 5,400.00 0.0750 Oh Mandor 90,000.00 6,750.00

Jumlah Keuntungan dan Over head 10% Jumlah

2 1 M3 Pasang pondasi batu kosong (aanstampang) 1.2000 M3 Batu Kali 177,620.00 213,144.00 0.4320 M3 Pasir urug 88,810.00 38,365.92 0.7800 Oh Pekerja 60,000.00 46,800.00 0.3900 Oh Tukang batu 80,000.00 31,200.00 0.0390 Oh Kepala tukang 90,000.00 3,510.00 0.0390 Oh Mandor 90,000.00 3,510.00

Jumlah Keuntungan dan Over head 10% Jumlah

M3

M3

Page 29: RAB RISP Kosong

NO U R A I A N H. SATUAN BAHAN UPAH Rp. Rp. Rp.

3 1 M' Pasang Pondasi Bore Pile Dia. 40 cm dengan K. 250 1.2500 Ltr Diesel Oil 9,095.00 11,368.75 0.1040 Ltr Lubricant 26,750.00 2,782.00 0.1260 M3 Beton K. 250 886,564.30 111,707.10 24.5000 Kg 10,111.50 247,731.75 0.3090 Kg Kawat Beton 16,585.00 5,124.77 0.1520 Jam Boring Equipment 550,000.00 83,600.00 0.1880 M3 Buang Tanah Hasil Pengeboran 20,000.00 3,760.00 0.0050 Oh Mandor 90,000.00 450.00 0.0160 Oh Kepala tukang 90,000.00 1,440.00 0.0050 Oh Mekanik 90,000.00 450.00 0.0050 Oh Electrician 80,000.00 400.00 0.0050 Oh Operator 100,000.00 500.00 0.0260 Oh Pekerja 60,000.00 1,560.00 0.0420 Oh Cut of Pile 100,000.00 4,200.00

Jumlah Keuntungan dan Over head 10% Jumlah

PEKERJAAN DINDING, SNI DT -91-0009-20071 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Pp

70.0000 Bh Bata merah 5 x 11 x 22 cm 936.25 65,537.50 18.9500 Kg Semen portland 1,210.00 22,929.50 0.0380 M3 Pasir pasangan 154,080.00 5,855.04 0.3000 Oh Pekerja 60,000.00 18,000.00 0.1000 Oh Tukang batu 80,000.00 8,000.00 0.0100 Oh Kepala tukang 90,000.00 900.00 0.0150 Oh Mandor 90,000.00 1,350.00

Jumlah Keuntungan dan Over head 10% Jumlah

8 1 M2 Pasangan batu Karawang 1 : 2 25.0000 Bh batu Karawang 20 x 20 cm 9,630.00 240,750.00 14.3700 Kg Semen portland 1,210.00 17,387.70 0.0400 M3 Pasir pasangan 154,080.00 6,163.20 0.3000 Oh Pekerja 60,000.00 18,000.00 0.1000 Oh Tukang batu 80,000.00 8,000.00 0.0100 Oh Kepala tukang 90,000.00 900.00 0.0150 Oh Mandor 90,000.00 1,350.00

Jumlah Keuntungan dan Over head 10% Jumlah

2 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps 70.0000 Bh Bata merah 5 x 11 x 22 cm 936.25 65,537.50 11.5000 Kg Semen portland 1,210.00 13,915.00 0.0430 M3 Pasir pasangan 154,080.00 6,625.44 0.3000 Oh Pekerja 60,000.00 18,000.00 0.1000 Oh Tukang batu 80,000.00 8,000.00 0.0100 Oh Kepala tukang 90,000.00 900.00 0.0150 Oh Mandor 90,000.00 1,350.00

Jumlah Keuntungan dan Over head 10% Jumlah

PEKERJAAN PLESTERAN, SNI DT - 91 00010 - 20071 1 M2 Plesteran 1 Pc : 2 Pp, tebal 15 mm

10.2240 Kg Semen portland 1,210.00 12,371.04 0.0200 M3 Pasir pasangan 154,080.00 3,081.60 0.2000 Oh Pekerja 60,000.00 12,000.00 0.1500 Oh Tukang batu 80,000.00 12,000.00 0.0150 Oh Kepala tukang 90,000.00 1,350.00 0.0100 Oh Mandor 90,000.00 900.00

Jumlah Keuntungan dan Over head 10% Jumlah

3 1 M2 Plesteran 1 Pc : 3 Pp, tebal 15 mm 7.7760 Kg Semen portland 1,210.00 9,408.96 0.0230 M3 Pasir pasangan 154,080.00 3,543.84 0.2000 Oh Pekerja 60,000.00 12,000.00 0.1500 Oh Tukang batu 80,000.00 12,000.00 0.0150 Oh Kepala tukang 90,000.00 1,350.00 0.0100 Oh Mandor 90,000.00 900.00

Jumlah Keuntungan dan Over head 10% Jumlah

Besi Beton

Page 30: RAB RISP Kosong

NO U R A I A N H. SATUAN BAHAN UPAH Rp. Rp. Rp.

2 1 M2 Plesteran 1 Pc : 4 Pp, tebal 15 mm 6.2400 Kg Semen portland 1,210.00 7,550.40 0.0240 M3 Pasir pasangan 154,080.00 3,697.92 0.2000 Oh Pekerja 60,000.00 12,000.00 0.1500 Oh Tukang batu 80,000.00 12,000.00 0.0150 Oh Kepala tukang 80,000.00 1,200.00 0.0100 Oh Mandor 90,000.00 900.00

Jumlah Keuntungan dan Over head 10% Jumlah

3 1 M2 Acian 3.2500 Kg Semen portland 1,210.00 3,932.50 0.1500 Oh Pekerja 60,000.00 9,000.00 0.1000 Oh Tukang batu 80,000.00 8,000.00 0.0100 Oh Kepala tukang 90,000.00 900.00 0.0080 Oh Mandor 90,000.00 720.00 Jumlah

Keuntungan dan Over head 10% Jumlah

3 1 M2 Afwerking Beton 0.6400 OH Pekerja 60,000.00 38,400.00 0.0320 OH Mandor 90,000.00 2,880.00 0.3000 OH Tukang Batu 80,000.00 24,000.00 0.0300 OH Kepala Tukang 90,000.00 2,700.00 9.6000 Kg Semen 1,210.00 11,616.00 0.0050 M3 Pasir Pasang 154,080.00 770.40

Jumlah Keuntungan dan Over head 10% Jumlah

PEKERJAAN KAYU, SNI DT - 91 00011 - 20072 1 M3 Pasang kosen pintu dan jendela, kayu kelas II atau III

1.2000 M3 Balok kayu 2,624,710.00 3,149,652.00 1.2500 Kg Paku 10 cm 17,655.00 22,068.75 1.0000 Kg Lem kayu 16,050.00 16,050.00 6.0000 Oh Pekerja 60,000.00 360,000.00 18.0000 Oh Tukang kayu 80,000.00 ### 2.0000 Oh Kepala tukang 90,000.00 180,000.00 0.3000 Oh Mandor 90,000.00 27,000.00

Jumlah Keuntungan dan Over head 10% Jumlah

5 1 M1 Pasang lisplank ukuran ( 3 x 20 ) cm, kayu kelas II 0.0108 M3 Papan kayu II 2,730,640.00 29,490.91 0.1000 Kg Paku 5 cm dan 7 cm 17,655.00 1,765.50 0.1000 Oh Pekerja 60,000.00 6,000.00 0.2000 Oh Tukang kayu 80,000.00 16,000.00 0.0250 Oh Kepala tukang 90,000.00 2,250.00 0.0050 Oh Mandor 90,000.00 450.00

Jumlah Keuntungan dan Over head 10% Jumlah

32 1 M2 Pasang rangka langit-langit (1.00 x 1.00) m kayu Kelas II 0.0120 M3 Kayu Kelas II 2,624,710.00 31,496.52 0.1000 Kg Paku biasa 2" - 5" 17,655.00 1,765.50 0.1500 Oh Pekerja 60,000.00 9,000.00 0.2500 Oh Tukang kayu 80,000.00 20,000.00 0.0250 Oh Kepala tukang 90,000.00 2,250.00 0.0750 Oh Mandor 90,000.00 6,750.00

Jumlah Keuntungan dan Over head 10% Jumlah

PEKERJAAN BETON SNI DT 91 - 0008 - 20071

247.0000 Kg Semen portland 1,210.00 298,870.00 0.6207 M3 Pasir beton 154,080.00 95,639.66 0.7400 M3 Kerikil ( maksimum 30 mm) 144,450.00 106,893.00 215.0000 Liter Air 107.00 23,005.00 1.6500 Oh Pekerja 60,000.00 99,000.00 0.2750 Oh Tukang batu 80,000.00 22,000.00 0.0280 Oh Kepala tukang 90,000.00 2,520.00 0.0830 Oh Mandor 90,000.00 7,470.00

Jumlah Keuntungan dan Over head 10% Jumlah

1 M3 Membuat beton mutu f'c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87

Page 31: RAB RISP Kosong

NO U R A I A N H. SATUAN BAHAN UPAH Rp. Rp. Rp.

3 326.0000 Kg Semen portland 1,210.00 394,460.00 0.5429 M3 Pasir beton 154,080.00 83,643.43 0.7622 M3 Kerikil ( maksimum 30 mm) 144,450.00 110,103.00 215.0000 Liter Air 107.00 23,005.00 1.6500 Oh Pekerja 60,000.00 99,000.00 0.2750 Oh Tukang batu 80,000.00 22,000.00 0.0280 Oh Kepala tukang 90,000.00 2,520.00 0.0830 Oh Mandor 90,000.00 7,470.00

Jumlah Keuntungan dan Over head 10% Jumlah

4 384.0000 Kg Semen portland 1,210.00 464,640.00 0.4943 M3 Pasir beton 154,080.00 76,159.54 0.7696 M3 Split 144,450.00 111,173.00 215.0000 Liter Air 107.00 23,005.00 1.6500 Oh Pekerja 60,000.00 99,000.00 0.2750 Oh Tukang batu 80,000.00 22,000.00 0.0280 Oh Kepala tukang 90,000.00 2,520.00 0.0830 Oh Mandor 90,000.00 7,470.00

Jumlah Keuntungan dan Over head 10% Jumlah

5 10 Kg Pembesian dengan besi polos 10.5000 Kg Besi beton polos 10,111.50 106,170.75 0.1500 Kg Kawat beton 16,585.00 2,487.75 0.0700 Oh Pekerja 60,000.00 4,200.00 0.0700 Oh Tukang besi 80,000.00 5,600.00 0.0070 Oh Kepala tukang 90,000.00 630.00 0.0040 Oh Mandor 90,000.00 360.00

Jumlah Untuk 1 Kg Keuntungan dan Over head 10% Jumlah

8 1 M2 Memasang bekisting untuk sloof 0.0450 M3 Kayu kelas III 2,140,000.00 96,300.00 0.3000 Kg Paku 5 cm - 10 cm 17,655.00 5,296.50 0.1000 Liter Minyak bekisting 17,441.00 1,744.10 0.5200 Oh Pekerja 60,000.00 31,200.00 0.2600 Oh Tukang kayu 80,000.00 20,800.00 0.0260 Oh Kepala tukang 90,000.00 2,340.00 0.0260 Oh Mandor 90,000.00 2,340.00

Jumlah Keuntungan dan Over head 10% Jumlah

9 1 M2 Memasang bekisting untuk kolom 0.0400 M3 Kayu kelas III 2,140,000.00 85,600.00 0.4000 Kg Paku 5 cm - 12 cm 17,655.00 7,062.00 0.2000 Liter Minyak bekisting 17,441.00 3,488.20 0.0150 M3 Balok kayu kelas II 2,624,710.00 39,370.65 0.3500 Lbr Plywood tebal 9 mm 112,168.10 39,258.84 2.0000 Batang Dolken kayu galam ø (8 - 10)cm, panjang 4m 74,358.12 148,716.24 0.6600 Oh Pekerja 60,000.00 39,600.00 0.3300 Oh Tukang kayu 80,000.00 26,400.00 0.0330 Oh Kepala tukang 90,000.00 2,970.00 0.0330 Oh Mandor 90,000.00 2,970.00

Jumlah Keuntungan dan Over head 10% Jumlah

9 1 M2 Memasang bekisting untuk balok 0.0400 M3 Kayu kelas III 2,140,000.00 85,600.00 0.4000 Kg Paku 5 cm - 12 cm 17,655.00 7,062.00 0.2000 Liter Minyak bekisting 17,441.00 3,488.20 0.0180 M3 Balok kayu kelas II 2,624,710.00 47,244.78 0.3500 Lbr Plywood tebal 9 mm 112,168.10 39,258.84 1.0000 Ls Dolken kayu galam ø (8 - 10)cm, panjang 4m 74,358.12 74,358.12 0.6600 Oh Pekerja 60,000.00 39,600.00 0.3300 Oh Tukang kayu 80,000.00 26,400.00 0.0330 Oh Kepala tukang 90,000.00 2,970.00 0.0330 Oh Mandor 90,000.00 2,970.00

Jumlah Keuntungan dan Over head 10% Jumlah

1 M3 Membuat beton mutu f'c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66

1 M3 Membuat beton mutu f'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Page 32: RAB RISP Kosong

NO U R A I A N H. SATUAN BAHAN UPAH Rp. Rp. Rp.

11 1 M2 Memasang bekisting untuk dinding 0.0300 M3 Kayu kelas III 2,140,000.00 64,200.00 0.4000 Kg Paku 5 cm - 12 cm 17,655.00 7,062.00 0.2000 Liter Minyak bekisting 17,441.00 3,488.20 0.0200 M3 Balok kayu kelas II 2,624,710.00 52,494.20 0.3500 Lbr Plywood tebal 9 mm 112,168.10 39,258.84 3.0000 Batang Dolken kayu galam ø (8 - 10)cm, panjang 4m 74,358.12 223,074.36 4.0000 Buah Formite/penjaga jarak bekisting/spacer 4,000.00 16,000.00 0.6600 Oh Pekerja 60,000.00 39,600.00 0.3300 Oh Tukang kayu 80,000.00 26,400.00 0.0330 Oh Kepala tukang 90,000.00 2,970.00 0.0330 Oh Mandor 90,000.00 2,970.00

Jumlah Keuntungan dan Over head 10% Jumlah

11 1 M2 Memasang bekisting untuk lantai 0.0400 M3 Kayu kelas III 2,140,000.00 85,600.00 0.4000 Kg Paku 5 cm - 12 cm 17,655.00 7,062.00 0.2000 Liter Minyak bekisting 17,441.00 3,488.20 0.0150 M3 Balok kayu kelas II 2,624,710.00 39,370.65 0.3500 Lbr Plywood tebal 9 mm 112,168.10 39,258.84 1.0000 Ls Scafolding 100,000.00 100,000.00 0.6600 Oh Pekerja 60,000.00 39,600.00 0.3300 Oh Tukang kayu 80,000.00 26,400.00 0.0330 Oh Kepala tukang 90,000.00 2,970.00 0.0330 Oh Mandor 90,000.00 2,970.00

Jumlah Keuntungan dan Over head 10% Jumlah

12 1 M2 Memasang bekisting untuk tangga 0.0300 M3 Kayu kelas III 2,140,000.00 64,200.00 0.4000 Kg Paku 5 cm - 12 cm 17,655.00 7,062.00 0.1500 Liter Minyak bekisting 17,441.00 2,616.15 0.0150 M3 Balok kayu kelas II 2,624,710.00 39,370.65 0.3500 Lbr Plywood tebal 9 mm 112,168.10 39,258.84 2.0000 Batang Dolken kayu galam ø (8 - 10)cm, panjang 4m 74,358.12 148,716.24 0.6600 Oh Pekerja 60,000.00 39,600.00 0.3300 Oh Tukang kayu 80,000.00 26,400.00 0.0330 Oh Kepala tukang 90,000.00 2,970.00 0.0330 Oh Mandor 90,000.00 2,970.00

Jumlah Keuntungan dan Over head 10% Jumlah

13 1 M3 Poor Beton K250 1.0000 M3 Beton K250 886,564.30 2.8600 M2 Bekisting 1 kali pakai 434,979.52 95.0000 Kg Pembesian Ulir 13,324.71

Jumlah14 1 M3 Pondasi Beton Bertulang Plat Tangga K 250

1.0000 M3 Beton K250 886,564.30 2.7500 M2 Bekisting 2 kali pakai 164,252.66 195.0000 Kg Pembesian ulir 13,324.71

Jumlah17 1 M3 Sloof Beton 25/40 K 250 (S1)

1.0000 M3 Beton K250 886,564.30 4.0000 M2 Bekisting 2 x pakai 176,022.66 232.0000 Kg Pembesian Ulir 13,324.71

Jumlah18 1 M3 Kolom Beton 40/50 K 250 (K1)

1.0000 M3 Beton K250 886,564.30 2.7778 M2 Bekisting 2 x pakai 434,979.52 275.0000 Kg Pembesian Ulir 13,324.71

Jumlah19 1 M3 Kolom Beton L50.40.25 K 250 (K3)

1.0000 M3 Beton K250 886,564.30 3.9500 M2 Bekisting 2 x pakai 434,979.52 250.0000 Kg Pembesian Polos 13,139.34

Jumlah20 1 M3 Kolom Beton 50/50 K 250 (K2)

1.0000 M3 Beton K250 886,564.30 4.3750 M2 Bekisting 2 x pakai 434,979.52 230.0000 Kg Pembesian Ulir 13,324.71

Jumlah

Page 33: RAB RISP Kosong

NO U R A I A N H. SATUAN BAHAN UPAH Rp. Rp. Rp.

21 1 M3 Kolom Beton 25/25 K250 (KP1) 1.0000 M3 Beton K175 886,564.30 12.6100 M2 Bekisting 2 x pakai 434,979.52 205.0000 Kg Pembesian Polos 13,139.34

Jumlah22 1 M3 Kolom Beton 30/40 K 250 (K3)

1.0000 M3 Beton K250 886,564.30 5.8333 M2 Bekisting 2 x pakai 434,979.52 285.0000 Kg Pembesian Ulir 13,324.71

Jumlah22 1 M3 Kolom Beton 23/23 K 250

1.0000 M3 Beton K250 886,564.30 5.8333 M2 Bekisting 2 x pakai 434,979.52 254.0000 Kg Pembesian Ulir 13,324.71

Jumlah23 1 M3 Kolom Beton 13/13 K. 175

1.0000 M3 Beton K175 816,421.57 5.1282 M2 Bekisting 2 x pakai 434,979.52 298.0000 Kg Pembesian Polos 13,139.34

Jumlah25 1 M3 Balok Beton latei 13/20 K.175

1.0000 M3 Beton K175 816,421.57 8.1923 M2 Bekisting 2 x pakai 335,053.20 166.0000 Kg Pembesian Polos 13,139.34

Jumlah Jumlah

30 1 M3 Balok Beton 25/40 K250 (B1) 1.0000 M3 Beton K250 886,564.30 5.2500 M2 Bekisting 2 x pakai 335,053.20 280.0000 Kg Pembesian Ulir 13,324.71

Jumlah30 1 M3 Balok Beton 25/35K250 (B3)

1.0000 M3 Beton K250 886,564.30 11.4400 M2 Bekisting 335,053.20 255.0000 Kg Pembesian Ulir 13,324.71

Jumlah32 1 M3 Ring Balok Beton 25/40 K.250

1.0000 M3 Beton K250 886,564.30 10.0000 M2 Bekisting 335,053.20 225.0000 Kg Pembesian Ulir 13,324.71

Jumlah32 1 M3 Balok Beton 20/30 K250

1.0000 M3 Beton K250 886,564.30 6.8750 M2 Bekisting 2 x pakai 335,053.20 280.0000 Kg Pembesian Ulir 13,324.71

Jumlah29 1 M3 Balok Beton 25/30 K225 (groundtank)

1.0000 M3 Beton K250 886,564.30 6.6667 M2 Bekisting 335,053.20 185.0000 Kg Pembesian Ulir 13,324.71

Jumlah33 1 M3 Lisplank Beton K.250

1.0000 M3 Beton K250 886,564.30 6.2500 M2 Bekisting 2 x pakai 381,391.65 75.0000 Kg Pembesian Polos 13,139.34

Jumlah34 1 M3 Plat Lantai Beton Bertulang K250 (tb=12 cm)

1.0000 M3 Beton K250 886,564.30 8.3333 M2 Bekisting 381,391.65 175.0000 Kg Pembesian Polos 13,139.34

Jumlah35 1 M3 Plat Deck Beton Bertulang K.250 (tb=10 cm)

1.0000 M3 Beton K250 886,564.30 10.9600 M2 Bekisting 381,391.65 185.0000 Kg Pembesian Polos 13,139.34

Jumlah36 1 M3 Plat Deck Beton Bertulang K.250 (tb=12 cm)

1.0000 M3 Beton K250 886,564.30 8.3300 M2 Bekisting 381,391.65 185.0000 Kg Pembesian Polos 13,139.34

Jumlah37 1 M3 Plat Leuvel Beton Bertulang K250

1.0000 M3 Beton K250 886,564.30 5.0000 M2 Bekisting 2 x pakai 381,391.65 120.0000 Kg Pembesian Polos 13,139.34

Jumlah

Page 34: RAB RISP Kosong

NO U R A I A N H. SATUAN BAHAN UPAH Rp. Rp. Rp.

38 1 M3 Plat Sirip Beton Bertulang K250 (8 Cm ) 1.0000 M3 Beton K250 886,564.30 6.2500 M2 Bekisting 381,391.65 275.0000 Kg Pembesian Polos 13,139.34

Jumlah39 1 M3 Plat Sirip Beton Bertulang K250 ( 15 Cm )

1.0000 M3 Beton K250 886,564.30 7.5000 M2 Bekisting 381,391.65 220.0000 Kg Pembesian Polos 13,139.34

Jumlah36 1 M3 Dinding Beton Bertulang K250 (groundTank)

1.0000 M3 Beton 250 886,564.30 4.3000 M2 Bekisting 525,269.35 135.0000 Kg Pembesian Polos 13,139.34

Jumlah38 1 M3 Plat Tangga Beton Bertulang K250

1.0000 M3 Beton K250 886,564.30 4.1650 M2 Bekisting 2 x pakai 410,480.26 240.0000 Kg Pembesian Polos 13,139.34

JumlahPEKERJAAN PENUTUP ATAP, SNI 03-3436-2002

1 Pasang Kuda Kuda Baja Ringan / 500 M2 a. Memotong Bahan Kuda Kuda' 1.0000 Oh Pekerja 60,000.00 60,000.00 1.0000 Oh Tukang 80,000.00 80,000.00 0.5000 Oh Kepala tukang 90,000.00 45,000.00 0.5000 Oh Mandor 90,000.00 45,000.00

Untuk 6 Hari Kerja, Biaya Per M2 b. Pemasangan Wallplate / Metal Beam 1.0000 Oh Pekerja 60,000.00 60,000.00 1.0000 Oh Tukang 80,000.00 80,000.00 0.5000 Oh Kepala tukang 90,000.00 45,000.00 0.5000 Oh Mandor 90,000.00 45,000.00

Untuk 4 Hari Kerja, Biaya Per M2 c. Pabrikasi Kuda Kuda 2.0000 Oh Pekerja 60,000.00 120,000.00 2.0000 Oh Tukang 80,000.00 160,000.00 0.5000 Oh Kepala tukang 90,000.00 45,000.00 1.0000 Oh Mandor 90,000.00 90,000.00

Untuk 8 Hari Kerja, Biaya Per M2 d. Instalasi Kuda Kuda Diatas Ring balok 2.0000 Oh Pekerja 60,000.00 120,000.00 2.0000 Oh Tukang 80,000.00 160,000.00 1.0000 Oh Kepala tukang 90,000.00 90,000.00 1.0000 Oh Mandor 90,000.00 90,000.00

Untuk 12 Hari Kerja, Biaya Per M2 e. Pemasangan Reng 2.0000 Oh Pekerja 60,000.00 120,000.00 2.0000 Oh Tukang 80,000.00 160,000.00 0.5000 Oh Kepala tukang 90,000.00 45,000.00 1.0000 Oh Mandor 90,000.00 90,000.00

Untuk 7 Hari Kerja, Biaya Per M2 f. Pemakaian Material 1,800.0000 M' Profil C.75.75 21,000.00 37,800,000.00 2,105.0000 M' Reng / Topspan 10,000.00 21,050,000.00 3,500.0000 Pcs Baut / Skrew 14/20 1,000.00 3,500,000.00 3,500.0000 Pcs Baut / Skrew 16/16 900.00 3,150,000.00 45.0000 M' Talang 50,000.00 2,250,000.00 100.0000 Pcs Dynabolt 3,210.00 321,000.00

Alat bantuMaterial bantu JumlahJumlah (a+b+c+d+e+f)Untuk 1 m2 = 1/500 Keuntungan dan Over head 10% Jumlah

2 1 M2 Pasang atap genteng metal 1.2987 Lbr Genteng metal 60,241.00 78,235.06 0.2000 Kg Paku biasa 2" - 5" 17,655.00 3,531.00 0.2000 Oh Pekerja 60,000.00 12,000.00 0.1000 Oh Tukang kayu 80,000.00 8,000.00 0.0100 Oh Kepala tukang 90,000.00 900.00 0.0010 Oh Mandor 90,000.00 90.00

Jumlah Keuntungan dan Over head 10% Jumlah

Page 35: RAB RISP Kosong

NO U R A I A N H. SATUAN BAHAN UPAH Rp. Rp. Rp.

3 1 M1 Pasang nok genteng metal 1.1000 M' Perabung Genteng metal 48,150.00 52,965.00 0.0500 Kg Paku biasa 1/2" - 1" 17,655.00 882.75 0.2500 Oh Pekerja 60,000.00 15,000.00 0.1500 Oh Tukang kayu 80,000.00 12,000.00 0.0150 Oh Kepala tukang 90,000.00 1,350.00 0.0130 Oh Mandor 90,000.00 1,170.00

Jumlah Keuntungan dan Over head 10% Jumlah

PEKERJAAN LANGIT-LANGIT, SNI DT - 91 - 00013-20071 1 M2 Langit-langit gypsum board ukuran (120 x 240 x 9 ) mm, tebal 9 mm

0.3640 Lbr Gypsum board 9 mm 128,400.00 46,737.60 0.1100 Kg Paku skrup 25,680.00 2,824.80 0.1000 Oh Pekerja 60,000.00 6,000.00 0.0500 Oh Tukang 80,000.00 4,000.00 0.0050 Oh Kepala tukang 90,000.00 450.00 0.0050 Oh Mandor 90,000.00 450.00

Jumlah Keuntungan dan Over head 10% Jumlah

3 1 M2 Rangka Plafond Hollow 3.6000 M' Profil Hollow 10,700.00 38,520.00 0.1500 Kg Besi Penggantung Dia. 10 mm 10,111.50 1,516.73 1.0500 Ls Ramset / Dynabolt 2,140.00 2,247.00 0.1500 Oh Pekerja 60,000.00 9,000.00 0.5000 Oh Tukang kayu 80,000.00 40,000.00 0.0500 Oh Kepala tukang 90,000.00 4,500.00 0.0080 Oh Mandor 90,000.00 720.00

Jumlah Keuntungan dan Over head 10% Jumlah

4 1 M' List Profil Gypsum 10 x 10 1.0500 M' List profil gypsum 10 x 10 cm 19,260.00 20,223.00 0.0100 Kg Paku 17,655.00 176.55 0.0500 Oh Pekerja 60,000.00 3,000.00 0.0500 Oh Tukang kayu 80,000.00 4,000.00 0.0050 Oh Kepala tukang 90,000.00 450.00 0.0030 Oh Mandor 90,000.00 270.00

Jumlah Keuntungan dan Over head 10% Jumlah

PEKERJAAN SANITASI SNI 20021 Memasang 1 buah kran dia. 3/4" atau 1/2"

1.0000 Bh Kran air 1/2 " 41,997.50 41,997.50 0.0250 Bh Seal tape 5,000.00 125.00 0.0100 Oh Pekerja 60,000.00 600.00 0.1000 Oh Tukang batu 80,000.00 8,000.00 0.0100 Oh Kepala tukang 90,000.00 900.00 0.0050 Oh Mandor 90,000.00 450.00

Jumlah 42,122.50 9,950.00 Keuntungan dan Over head 10% Jumlah

2 Memasang 1 buah Floor drain1.0000 Bh Floor drain 24,182.00 24,182.00 0.0100 Oh Pekerja 60,000.00 600.00 0.1000 Oh Tukang batu 80,000.00 8,000.00 0.0100 Oh Kepala tukang 90,000.00 900.00 0.0050 Oh Mandor 90,000.00 450.00

Jumlah 24,182.00 9,950.00 Keuntungan dan Over head 10% Jumlah

4 Memasang 1 buah kloset jongkok 1.0000 Bh Klosed jongkok 168,739.00 168,739.00 6.0000 Kg Semen portland 1,210.00 7,260.00 0.0100 M3 Pasir pasang 154,080.00 1,540.80 1.0000 Oh Pekerja 60,000.00 60,000.00 1.5000 Oh Tukang batu 80,000.00 120,000.00 1.5000 Oh Kepala tukang 90,000.00 135,000.00 0.1600 Oh Mandor 90,000.00 14,400.00

Jumlah Keuntungan dan Over head 10% Jumlah

Page 36: RAB RISP Kosong

NO U R A I A N H. SATUAN BAHAN UPAH Rp. Rp. Rp.

5 Memasang 1 buah urinoir 1.0000 Bh Urinoir 1,823,205.10 1,823,205.10 0.3000 Pkt Perlengkapan (3% dari harga urinoir) 1,823,205.10 546,961.53 6.0000 Kg Semen portland 1,210.00 7,260.00 0.0100 M3 Pasir pasang 154,080.00 1,540.80 1.0000 Oh Pekerja 60,000.00 60,000.00 1.0000 Oh Tukang batu 80,000.00 80,000.00 0.1000 Oh Kepala tukang 90,000.00 9,000.00 0.1000 Oh Mandor 90,000.00 9,000.00

Jumlah Keuntungan dan Over head 10% Jumlah

PEKERJAAN BESI DAN ALLUMUNIUM SNI DT - 91 00014 - 20075 10 cm Kerja pengelasan dengan las listrik

0.4000 Kg Kawat las listrik 29,960.00 11,984.00 0.3000 Ltr Solar 7,900.00 2,370.00 0.0400 Ltr Minyak pelumas 26,750.00 1,070.00 0.0400 Oh Pekerja 60,000.00 2,400.00 0.0200 Oh Tukang besi 80,000.00 1,600.00 0.0020 Oh Kepala tukang 90,000.00 180.00 0.0020 Oh Mandor 90,000.00 180.00 0.1700 Jam Sewa alat 5,000.00 850.00

Jumlah Keuntungan dan Over head 10%Jumlah Jumlah 1 cm1

1 1 M Pasang kusen alluminium 4" 1.1000 M' Profil alluminium 4" 96,300.00 105,930.00 2.0000 Bh Skrup fixer 856.00 1,712.00 0.0600 Tube Sealant 32,100.00 1,926.00 0.0430 Oh Pekerja 60,000.00 2,580.00 0.0430 Oh Tukang besi konstruksi 80,000.00 3,440.00 0.0043 Oh Kepala tukang 90,000.00 387.00 0.0021 Oh Mandor 90,000.00 189.00

Jumlah Keuntungan dan Over head 10% Jumlah

PEKERJAAN KUNCI DAN KACA5 1 M2 Pasang kaca tebal 5 mm

1.1000 M2 Kaca 80,250.00 88,275.00 0.0150 Oh Pekerja 60,000.00 900.00 0.1500 Oh Tukang kayu 80,000.00 12,000.00 0.0150 Oh Kepala tukang 90,000.00 1,350.00 0.0008 Oh Mandor 90,000.00 67.50

Jumlah Keuntungan dan Over head 10% Jumlah

6 1 M2 Pasang kaca tebal 6 mm (Bening) 1.1000 M2 Kaca bening tbl 6 mm 96,300.00 105,930.00 0.0150 Oh Pekerja 60,000.00 900.00 0.1500 Oh Tukang kayu 80,000.00 12,000.00 0.0150 Oh Kepala tukang 90,000.00 1,350.00 0.0007 Oh Mandor 90,000.00 63.00

Jumlah Keuntungan dan Over head 10% Jumlah

PEKERJAAN PENUTUP LANTAI DAN DINDING SNI DT-91-0012-20072 1 M2 Pasang lantai keramik ukuran (40x 40) cm

1.0608 M2 Keramik 40 x 40 74,900.00 79,453.92 10.0000 Kg Semen portland 1,210.00 12,100.00 0.0450 M3 Pasir pasang 154,080.00 6,933.60 1.5000 Kg Semen warna 7,383.00 11,074.50 0.6200 Oh Pekerja 60,000.00 37,200.00 0.3500 Oh Tukang batu 80,000.00 28,000.00 0.0350 Oh Kepala tukang 90,000.00 3,150.00 0.0300 Oh Mandor 90,000.00 2,700.00

Jumlah Keuntungan dan Over head 10% Jumlah

Page 37: RAB RISP Kosong

NO U R A I A N H. SATUAN BAHAN UPAH Rp. Rp. Rp.

3 1 M2 Pasang lantai keramik ukuran (20x 20) cm 1.0600 M2 Keramik 20 x 20 77,040.00 81,662.40 10.4000 Kg Semen portland 1,210.00 12,584.00 0.0450 M3 Pasir pasang 154,080.00 6,933.60 1.6200 Kg Semen warna 7,383.00 11,960.46 0.6200 Oh Pekerja 60,000.00 37,200.00 0.3500 Oh Tukang batu 80,000.00 28,000.00 0.0350 Oh Kepala tukang 90,000.00 3,150.00 0.0300 Oh Mandor 90,000.00 2,700.00

Jumlah Keuntungan dan Over head 10% Jumlah

3 1 M2 Pasang dinding Keramik Ornamen ukuran (10 x 20) cm 1.0600 m2 Keramik Ornamen 10 x 20 96,300.00 102,078.00 9.3000 Kg Semen portland 1,210.00 11,253.00 0.0180 M3 Pasir pasang 154,080.00 2,773.44 2.7500 Kg Semen warna 7,383.00 20,303.25 0.9000 Oh Pekerja 60,000.00 54,000.00 0.4500 Oh Tukang batu 80,000.00 36,000.00 0.0450 Oh Kepala tukang 90,000.00 4,050.00 0.0450 Oh Mandor 90,000.00 4,050.00

Jumlah Keuntungan dan Over head 10% Jumlah

4 1 M2 Pasang dinding keramik ukuran (20 x 25) cm 20.0000 Bh Keramik 3,477.50 69,550.00 9.3000 Kg Semen portland 1,210.00 11,253.00 0.0180 M3 Pasir pasang 154,080.00 2,773.44 1.9400 Kg Semen warna 7,383.00 14,323.02 0.6000 Oh Pekerja 60,000.00 36,000.00 0.4500 Oh Tukang batu 80,000.00 36,000.00 0.0450 Oh Kepala tukang 90,000.00 4,050.00 0.0300 Oh Mandor 90,000.00 2,700.00

Jumlah Keuntungan dan Over head 10% Jumlah

PEKERJAAN PENGECATAN SNI 20021 1 M2 Pengecatan bidang kayu baru (1 lapis plamir) 1 lapis cat dasar 3 lapis cat penutup

0.2000 Kg Cat meni 21,828.00 4,365.60 0.1500 Kg Plamir Kayu 18,190.00 2,728.50 0.1700 Kg Cat dasar 21,400.00 3,638.00 0.3500 Kg Cat penutup 3 belah (ex. Dulux V-Gloss) 62,060.00 21,721.00 0.0700 Oh Pekerja 60,000.00 4,200.00 0.1050 Oh Tukang batu 80,000.00 8,400.00 0.0040 Oh Kepala tukang 90,000.00 360.00 0.0025 Oh Mandor 90,000.00 225.00

Jumlah Keuntungan dan Over head 10% Jumlah

3 1 M2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar 2 lapis cat penutup) 0.1000 Kg Plamir 18,190.00 1,819.00 0.1000 Kg Cat dasar 21,400.00 2,140.00 0.2600 Kg Cat penutup 2 kali (ex. Dulux weather shield) 70,620.00 18,361.20 0.0200 Oh Pekerja 60,000.00 1,200.00 0.0630 Oh Tukang cat 80,000.00 5,040.00 0.0063 Oh Kepala tukang 90,000.00 567.00 0.0025 Oh Mandor 90,000.00 225.00

Jumlah Keuntungan dan Over head 10% Jumlah

19 1 M2 Pengecatan permukaan besi dengan cat minyak 0.3000 Kg Cat minyak 21,828.00 6,548.40 0.0100 Bh Kuas 8,000.00 80.00 0.0200 Oh Pekerja 60,000.00 1,200.00 0.2000 Oh Tukang cat 80,000.00 16,000.00 0.0200 Oh Kepala tukang 90,000.00 1,800.00 0.0100 Oh Mandor 90,000.00 900.00

Jumlah Keuntungan dan Over head 10% Jumlah

Page 38: RAB RISP Kosong

NO U R A I A N H. SATUAN BAHAN UPAH Rp. Rp. Rp.

PEKERJAAN EKSTERNAL1 1 Unit Pintu Penutup groundtank

20.0000 Kg Besi Siku L 40 .40. 4 10,450.00 8.0000 Kg Besi Plat trip 40 .4 10,450.00 10.0000 Kg Bitumen 11,000.00 30.0000 Kg Besi Plat 3 mm 10,450.00 1.0000 Kg Besi D 12mm 10,111.50 420.0000 Cm Pengelasan 2,269.74 3.0000 M3 Pekerja 60,000.00 1.0000 M3 Tukang Besi 80,000.00 0.1000 M3 Mandor 90,000.00

JumlahKeuntungan 10 % Jumlah

1 Septictank Kap. 25 Orang 6.3200 M3 Galian tanah 51,975.00 1.6000 M3 Urugan kembali 12,993.75 0.2000 M3 Beton K. 175 816,421.57 17.6364 M2 Pasangan Batu Bata 1 : 4 125,760.73 16.5000 M2 Plesteran 1 : 4 41,083.15 0.3000 M3 Beton bertulang 6,364,211.70 2.0000 M3 Koral Beton 144,450.00 2.0000 M3 Pasir Pasang 154,080.00 5.0000 M1 Pipa paralon 4 " 52,965.00 3.0000 M1 Pipa Besi 2 " 100,000.00 20.0000 Kg Ijuk saringan 7,000.00

Jumlah Jumlah

2 1 M' Saluran Keliling 0.1750 M3 Galian tanah 51,975.00 0.0438 M3 Urugan Kembali 12,993.75 0.0500 M3 Cor beton 1 : 3 : 5 663,377.03 0.7000 M2 Pas. Batu bata 1 : 2 134,829.24 0.9000 M2 Plesteran 1 : 2 45,872.90 0.0400 M3 Plat Beton Bertulang 4,107,456.06

Jumlah Jumlah

3 1 Bh Bak Kontrol Saluran 0.1810 M3 Galian tanah 51,975.00 0.0160 M3 Urugan Kembali 12,993.75 0.0340 M3 Cor beton 1 : 3 : 5 663,377.03 0.4273 M2 Pas. Batu bata 1 : 2 134,829.24 1.0200 M2 Plesteran 1 : 2 45,872.90

Jumlah Jumlah

8 1 M1 PASANG TALANG TEGAK0.4000 bt Pipa PVC dia.4 " Rp 31,250.00 0.2000 tb Lem paralon Rp 5,750.00 1.0000 bh Sambungan Rp 11,500.00 1.0000 ls Ongkos pasang Rp 4,000.00

Jumlah Keuntungan 10 %Total

.............., ......................2012PENAWARPT/

CV .................................

................................JABATAN

Page 39: RAB RISP Kosong

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

JUMLAH Rp.

PEKERJAAN PERSIAPAN, SNI 03-2835-2002

35,347.45

15,350.00 50,697.45 5,069.75 55,767.20

PEKERJAAN TANAH, SNI-DT -91 -0006-2007

47,250.00 47,250.00 4,725.00 51,975.00

15,750.00 15,750.00 1,575.00 17,325.00

100,794.00

28,900.00 129,694.00 12,969.40 142,663.40

106,572.00

18,900.00 125,472.00 12,547.20 138,019.20

PEKERJAAN PONDASI, SNI DT -91-0007-2007

490,495.60

150,150.00 640,645.60 64,064.56 704,710.16

251,509.92

85,020.00 336,529.92 33,652.99 370,182.91

Page 40: RAB RISP Kosong

JUMLAH Rp.

466,074.37

9,000.00 475,074.37 47,507.44 522,581.80

PEKERJAAN DINDING, SNI DT -91-0009-2007

94,322.04

28,250.00 122,572.04 12,257.20 134,829.24

264,300.90

28,250.00 292,550.90 29,255.09 321,805.99

86,077.94

28,250.00 114,327.94 11,432.79 125,760.73

PEKERJAAN PLESTERAN, SNI DT - 91 00010 - 2007

15,452.64

26,250.00 41,702.64 4,170.26 45,872.90

12,952.80

26,250.00 39,202.80 3,920.28 43,123.08

Page 41: RAB RISP Kosong

JUMLAH Rp.

11,248.32

26,100.00 37,348.32 3,734.83 41,083.15

3,932.50

18,620.00 22,552.50 2,255.25 24,807.75

67,980.00

12,386.40 80,366.40 8,036.64 88,403.04

PEKERJAAN KAYU, SNI DT - 91 00011 - 2007

3,187,770.75

2,007,000.00 5,194,770.75 519,477.08 5,714,247.83

31,256.41

24,700.00 55,956.41 5,595.64 61,552.05

33,262.02

38,000.00 71,262.02 7,126.20 78,388.22

PEKERJAAN BETON SNI DT 91 - 0008 - 2007

524,407.66

130,990.00 655,397.66 65,539.77 720,937.42

Page 42: RAB RISP Kosong

JUMLAH Rp.

611,211.43

130,990.00 742,201.43 74,220.14 816,421.57

674,977.54

130,990.00 805,967.54 80,596.75 886,564.30

108,658.50

10,790.00 119,448.50 11,944.85 1,194.49 13,139.34

103,340.60

56,680.00 160,020.60 16,002.06 176,022.66

323,495.92

71,940.00 395,435.92 39,543.59 434,979.52

257,011.93

71,940.00 328,951.93 32,895.19 -

Page 43: RAB RISP Kosong

JUMLAH Rp.

405,577.59

71,940.00 477,517.59 47,751.76 525,269.35

274,779.69

71,940.00 346,719.69 34,671.97 381,391.65

301,223.87

71,940.00 373,163.87 37,316.39 410,480.26

1 M3 Poor Beton K250 886,564.30 1,244,041.42 1,265,847.69 3,396,453.40

1 M3 Pondasi Beton Bertulang Plat Tangga K 250 886,564.30 451,694.82 2,598,318.94 3,936,578.05

1 M3 Sloof Beton 25/40 K 250 (S1) 886,564.30 704,090.64 3,091,333.30 4,681,988.24

1 M3 Kolom Beton 40/50 K 250 (K1) 886,564.30 1,208,276.44 3,664,295.94 5,759,136.67

1 M3 Kolom Beton L50.40.25 K 250 (K3) 886,564.30 1,718,169.09 3,284,833.75 5,889,567.14

1 M3 Kolom Beton 50/50 K 250 (K2) 886,564.30 1,903,035.39 3,064,683.88 5,854,283.56

Page 44: RAB RISP Kosong

JUMLAH Rp.

1 M3 Kolom Beton 25/25 K250 (KP1) 886,564.30 5,485,091.71 2,693,563.68 9,065,219.69

1 M3 Kolom Beton 30/40 K 250 (K3) 886,564.30 2,537,380.52 3,797,543.06 7,221,487.88

1 M3 Kolom Beton 23/23 K 250 886,564.30 2,537,380.52 3,384,476.98 6,808,421.79

1 M3 Kolom Beton 13/13 K. 175 816,421.57 2,230,664.19 3,915,521.83 6,962,607.59

1 M3 Balok Beton latei 13/20 K.175 816,421.57 2,744,858.88 2,181,129.61 5,742,410.06 5,742,410.06

1 M3 Balok Beton 25/40 K250 (B1) 886,564.30 1,759,029.28 3,730,919.50 6,376,513.08

1 M3 Balok Beton 25/35K250 (B3) 886,564.30 3,833,008.57 3,397,801.69 8,117,374.55

1 M3 Ring Balok Beton 25/40 K.250 886,564.30 3,350,531.97 2,998,060.31 7,235,156.57

1 M3 Balok Beton 20/30 K250 886,564.30 2,303,490.73 3,730,919.50 6,920,974.52

1 M3 Balok Beton 25/30 K225 (groundtank) 886,564.30 2,233,687.98 2,465,071.81 5,585,324.09

1 M3 Lisplank Beton K.250 886,564.30 2,383,697.83 985,450.13 4,255,712.26

1 M3 Plat Lantai Beton Bertulang K250 (tb=12 cm) 886,564.30 3,178,263.78 2,299,383.63 6,364,211.70

1 M3 Plat Deck Beton Bertulang K.250 (tb=10 cm) 886,564.30 4,180,052.52 2,430,776.98 7,497,393.79

1 M3 Plat Deck Beton Bertulang K.250 (tb=12 cm) 886,564.30 3,176,992.47 2,430,776.98 6,494,333.75

1 M3 Plat Leuvel Beton Bertulang K250 886,564.30 1,906,958.27 1,576,720.20 4,370,242.76

Page 45: RAB RISP Kosong

JUMLAH Rp.

1 M3 Plat Sirip Beton Bertulang K250 (8 Cm ) 886,564.30 2,383,697.83 3,613,317.13 6,883,579.26

1 M3 Plat Sirip Beton Bertulang K250 ( 15 Cm ) 886,564.30 2,860,437.40 2,890,653.70 6,637,655.40

1 M3 Dinding Beton Bertulang K250 (groundTank) 886,564.30 2,258,658.22 1,773,810.23 4,919,032.75

1 M3 Plat Tangga Beton Bertulang K250 886,564.30 1,709,650.29 3,153,440.40 5,749,654.99

PEKERJAAN PENUTUP ATAP, SNI 03-3436-2002 Pasang Kuda Kuda Baja Ringan / 500 M2

230,000.00 1,380,000.00

230,000.00 920,000.00

415,000.00 3,320,000.00

460,000.00 5,520,000.00

415,000.00 2,905,000.00

68,071,000.00 6,807.10 6,807.10 68,084,614.20 82,129,614.20 164,259.23 16,425.92 180,685.15

1 M2 Pasang atap genteng metal

81,766.06

20,990.00 102,756.06 10,275.61 113,031.67

Page 46: RAB RISP Kosong

JUMLAH Rp.

1 M1 Pasang nok genteng metal

53,847.75

29,520.00 83,367.75 8,336.78 91,704.53

PEKERJAAN LANGIT-LANGIT, SNI DT - 91 - 00013-2007

49,562.40

10,900.00 60,462.40 6,046.24 66,508.64

42,283.73

54,220.00 96,503.73 9,650.37 106,154.10

20,399.55

7,720.00 28,119.55 2,811.96 30,931.51

PEKERJAAN SANITASI SNI 2002

52,072.50 5,207.25 57,279.75

34,132.00 3,413.20 37,545.20

177,539.80

329,400.00 506,939.80 50,693.98 557,633.78

Page 47: RAB RISP Kosong

JUMLAH Rp.

2,378,967.43

158,000.00 2,536,967.43 253,696.74 2,790,664.17

PEKERJAAN BESI DAN ALLUMUNIUM SNI DT - 91 00014 - 2007

15,424.00

4,360.00 850.00 20,634.00 2,063.40 22,697.40 2,269.74

109,568.00

6,596.00 116,164.00 11,616.40 127,780.40

PEKERJAAN KUNCI DAN KACA

88,275.00

14,317.50 102,592.50 10,259.25 112,851.75

105,930.00

14,313.00 120,243.00 12,024.30 132,267.30

PEKERJAAN PENUTUP LANTAI DAN DINDING SNI DT-91-0012-2007

109,562.02

71,050.00 180,612.02 18,061.20 198,673.22

Page 48: RAB RISP Kosong

JUMLAH Rp.

113,140.46

71,050.00 184,190.46 18,419.05 202,609.51

136,407.69

98,100.00 234,507.69 23,450.77 257,958.46

97,899.46

78,750.00 176,649.46 17,664.95 194,314.41

PEKERJAAN PENGECATAN SNI 2002

32,453.10

13,185.00 45,638.10 4,563.81 50,201.91

22,320.20

7,032.00 29,352.20 2,935.22 32,287.42

6,628.40

19,900.00 26,528.40 2,652.84 29,181.24

Page 49: RAB RISP Kosong

JUMLAH Rp.

PEKERJAAN EKSTERNAL

209,000.00 83,600.00 110,000.00 313,500.00 10,111.50 953,290.80 180,000.00 80,000.00 9,000.00 1,948,502.30 194,850.23 2,143,352.53

328,482.00 20,790.00 163,284.31 2,217,962.04 677,872.01 1,909,263.51 288,900.00 308,160.00 264,825.00 300,000.00 140,000.00 6,619,538.87 6,619,538.87

9,095.63 568.48 33,168.85 94,380.47 41,285.61 164,298.24 342,797.28 342,797.28

9,407.48 207.90 22,554.82 57,608.86 46,790.36 136,569.41 136,569.41

Rp 12,500.00 Rp 1,150.00 Rp 11,500.00 Rp 4,000.00 Rp 29,150.00 Rp 2,915.00 Rp 32,065.00

.............., ......................2012PENAWARPT/

CV .................................

................................JABATAN

Page 50: RAB RISP Kosong

DAFTAR SATUAN HARGA UPAH,BAHAN & PEKERJAAN

KEGIATAN : PELAKSANAAN TEKNIS BANGUNAN GEDUNG PROVINSI SUMATERA BARATPEKERJAAN : PENYUSUNAN RENCANA INDUK SISTEM PROTEKSI KEBAKARANLOKASI : KABUPATEN SOLOK

NO URAIAN SATUAN

I. UPAH

1 Kepala tukang Hari2 Tukang kayu Hari3 Tukang batu Hari4 Tukang besi Hari5 Tukang cat Hari6 Pekerja Hari7 Mandor Hari

II. BAHAN-BAHANBahan Pekerjaan Struktur dan Arsitektur

Zak1 Semen Padang Type I @ 50 Kg Kg2 Semen Warna (afa) Kg3 Batu bata Bh4 Batu Karawang Bh5 Batu kali bulat M36 Pasir Beton M37 Pasir pasang M38 Kerikil beton M39 Tanah urug M310 Pasir urug M311 Besi Beton Polos Kg12 Besi Beton Ulir Kg16 Besi Plat Kg17 Besi Siku Kg18 Paku Biasa Kg19 Paku Triplek Kg20 Paku Sekrup Kg21 Kawat Beton Kg22 Keramik 10 x 20 ornamen M223 Keramik 40 x 40 cm M224 Keramik 30 x 30 cm M225 Keramik 20 x 25 cm M226 Keramik 20 x 20 cm M227 Batu Alam M228 Kayu balok kls IV (bekisting) M329 Kayu papan kls IV (bekisting) M330 Kayu balok (Kelas III) M331 Kayu papan (Kelas III) M332 Kayu Balok (Kelas II) M333 Kayu Papan (Kelas II) M334 Kayu balok (Kelas I) M335 Kayu papan (Kelas I) M336 Plywood tebal 9 mm Lbr37 Engsel 4" (Kuningan)/Nilon-SES Bh38 Engsel 3" (Kuningan)/Nilon-SES Bh39 Dolken kayu dia 8 s/d 10 pjg 400 cm Btg40 GRC tebal 9 mm Lbr

Page 51: RAB RISP Kosong

NO URAIAN SATUAN

41 Triplek 4 mm 120x240 mm Lbr42 Compound UB 888 Zak43 Textile Tape roll44 List Profil Gypsum 10 x 10 M'45 Profil aluminium 4" M'46 Sekrup fixer BH47 Sealant Tube48 Rangka Hollow M' 49 Ramset Bh 50 Kaca bening tbl 5 mm M251 Kaca bening tbl 6 mm M252 Kunci 2x slag Bh53 Kunci 1x slag Bh54 Air Liter55 Amplas Lbr56 Minyak Bekisting Liter57 Lem Kayu Kg58 Plamir Kayu Kg59 Cat Tembok (Air) (ex. Dulux Pentalite) Kg60 Cat Dasar Kg61 Cat warna Kayu (ex. Dulux V-Gloss) Kg62 Cat Tembok (Minyak) (ex. Dulux) Kg63 Dempul Impra Kg64 Cat Impra Kg65 Cat Pengilat Kg66 Plamir wall putih (ex. RJ) Kg67 Dempul Kayu Kg68 Meni kayu/Besi Kg69 Pipa PVC dia. 4" AW Class (setara Wavin) M'73 Klosed Jongkok Rapi Ex setara American Standar bh74 Klosed Duduk Granada 3000 CCST setara American Standar Unit75 Wastafel Studio 35 Wall Hung Lava setara Amerika Standar Unit76 Urinoir setara American Standar Unit77 Kran Air Ø 1/2" Type F062G102 TP 0009 setara Americn Standard bh78 Floor Drain Ø 2,5' Type F030A262, in 23 R setara American Standard bh81 Argregat Kasar M382 Argregat Halus M383 Aspal Kg84 Kerosin Ltr85 Bahan Pengisi Kg86 Tiang Pancang Diameter 35 cm M'87 Profil C 75.75 M'88 Reng/Topspan M'89 Baut / Skrew 14/20 Bh90 Baut / Skrew 16/16 Bh91 Talang M'92 Dynabolt Bh93 Genteng Metal Lbr94 Perabung Genteng Metal M'95 solar ( Industri ) Ltr96 Pelumas Ltr97 Kawat Las Kg98 Lubricant Ltr99 Diesel Oil Ltr

Page 52: RAB RISP Kosong

NO URAIAN SATUAN

III. PERALATAN

1 Wheel Loader Jam2 Vibrator Roller Jam3 Pneumatic Tire Roller Jam4 Alat Bantu Jam6 Genset Jam10 Boring Equipment Jam

Page 53: RAB RISP Kosong

DAFTAR SATUAN HARGA UPAH,BAHAN & PEKERJAAN

: PELAKSANAAN TEKNIS BANGUNAN GEDUNG PROVINSI SUMATERA BARAT

HARGA SATUAN (RP)

Rp 90,000.00 Rp 80,000.00 Rp 80,000.00 Rp 80,000.00 Rp 80,000.00 Rp 60,000.00 Rp 90,000.00 Rp 12,857.14

Rp 55,000.00 Rp 1,210.00 Rp 7,383.00 Rp 936.25 Rp 9,630.00 Rp 177,620.00 Rp 154,080.00 Rp 154,080.00 Rp 144,450.00 Rp 83,995.00 Rp 88,810.00 Rp 10,111.50 Rp 10,272.00 Rp 10,450.00 Rp 9,095.00 Rp 17,655.00 Rp 17,655.00 Rp 25,680.00 Rp 16,585.00 Rp 96,300.00 Rp 74,900.00 Rp 96,300.00 Rp 69,550.00 Rp 77,040.00 Rp 267,500.00 Rp 1,800,810.00 Rp 1,912,090.00 Rp 2,035,140.00 Rp 2,140,000.00 Rp 2,624,710.00 Rp 2,730,640.00 Rp 3,700,060.00 Rp 3,972,910.00 Rp 112,168.10 Rp 12,840.00 Rp 10,700.00 Rp 74,358.12 Rp 128,400.00

Page 54: RAB RISP Kosong

HARGA SATUAN (RP)

Rp 56,393.28 Rp 69,550.00 Rp 6,420.00 Rp 19,260.00 Rp 96,300.00 Rp 856.00 Rp 32,100.00 Rp 10,700.00 Rp 2,140.00 Rp 80,250.00 Rp 96,300.00 Rp 74,900.00 Rp 69,550.00 Rp 107.00 Rp 5,350.00 Rp 17,441.00 Rp 16,050.00 Rp 9,095.00 Rp 70,620.00 Rp 21,400.00 Rp 62,060.00 Rp 57,780.00 Rp 32,100.00 Rp 99,617.00 Rp 48,150.00 Rp 18,190.00 Rp 18,190.00 Rp 21,828.00 Rp 52,965.00 Rp 168,739.00 Rp 1,284,000.00 Rp 682,339.00 Rp 1,823,205.10 Rp 41,997.50 Rp 24,182.00 Rp 231,120.00 Rp 231,120.00 Rp 11,000.00 Rp 4,922.00 Rp 1,605.00 Rp 374,500.00 Rp 21,000.00 Rp 10,000.00 Rp 1,000.00 Rp 900.00 Rp 50,000.00 Rp 3,210.00 Rp 60,241.00 Rp 48,150.00 Rp 9,095.00 Rp 26,750.00 Rp 29,960.00 Rp 26,750.00 Rp 28,890.00

Page 55: RAB RISP Kosong

HARGA SATUAN (RP)

Rp 412,850.23 Rp 416,647.85 Rp 570,196.68 Rp 34,240.00 Rp 409,599.36 Rp 695,500.00

Page 56: RAB RISP Kosong

JADWAL PELAKSANAAN

KEGIATAN : PELAKSANAAN TEKNIS BANGUNAN GEDUNG PROVINSI SUMATERA BARATPEKERJAAN : PENYUSUNAN RENCANA INDUK SISTEM PROTEKSI KEBAKARANLOKASI : KABUPATEN SOLOK

NO URAIAN PEKERJAAN BOBOT %SCHEDULE

BULAN I BULAN II BULAN III BULAN IV BULAN V1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

A PEKERJAAN STRUKTURI LANTAI Ia PEKERJAAN PENDAHULUANb PEKERJAAN BETON

II LANTAI IIa PEKERJAAN BETONb RANGKA ATAP

B PEKERJAAN ARSITEKTURI LANTAI Ia PEKERJAN DINDING b PEKERJAAN PLAFONDc PEKERJAAN PLESTERANd PEKERJAAN LANTAIe PEKERJAAN PINTU JENDELAf PEKERJAAN PENGECATANg PEKERJAAN PERLENGKAPAN DALAMh PEKERJAAN PERLENGKAPAN LUAR

II LANTAI IIa PEKERJAN BETON / DINDING b PEKERJAAN PLAFONDc PEKERJAAN PLESTERANd PEKERJAAN LANTAIe PEKERJAAN PINTU JENDELAf PEKERJAAN PENGECATANg PEKERJAAN PERLENGKAPAN DALAM

C PEKERJAAN MEKANIKAL ELECTRICALa PEKERJAAN LISTRIK b PEKERJAAN PENANGKAL PETIRc PEKERJAAN SOUND SYSTEMd PEKERJAAN AIRCONDITIONING (AC) Komplit, Terpasange PEKERJAAN AUDIO VISUAL / PROYEKTORf PEKERJAAN SANITARY DAN PLUMBING

D PEKERJAAN GROUNDTANK

E PEKERJAAN HALAMANBOBOT PERMINGGU - - - - - - - - - - - - - - - - - - - - - - RENCANA AKUMULASI - - - - - - - - - - - - - - - - - - - - - -

Keterangan : Waktu Pelaksanaan 150 (Seratus Lima Puluh ) hari kalender.............., ......................2012

PENAWARPT/CV .................................

................................JABATAN

Page 57: RAB RISP Kosong

.............., ......................2012PENAWAR

PT/CV .................................

................................JABATAN