Embung Satu Miliar Empat Ratus Tujuh Puluh Lima Juta Rupiah
satu miliar empat ratus tujuh puluh lima juta
10
1,475,000,000.00 - - sembilan
1,475,000,000 1,000,000,000 1 satu
475,000,000 400,000,000 4 empat
75,000,000 70,000,000 7 tujuh
5,000,000 5,000,000 5 lima
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
Rupiah
0
- - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
Rupiah
0
- - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
Rupiah
0
- - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
- - - sembilan
satu miliar empat ratus tujuh puluh lima juta
satu satu miliar satu miliar empat ratus tujuh puluh lima juta
empat empat ratus empat ratus tujuh puluh lima juta
tujuh tujuh puluh tujuh puluh lima juta
lima lima juta lima juta
ENGINEER'S ESTIMATE
PEKERJAAN : PERENCANAAN REHABILITASI TANGGUL PENUTUP INLET 14 DAN 15LOKASI : RAWA JITU TIMUR, KAB, TULANG BAWANG T.A. : 2015
No. Uraian
I PEKERJAAN PERSIAPANA. Mobilisasi dan Demobilisasi Alat Berat
1 Mobilisasi dan Demobilisasi
II PEKERJAAN TANGGUL PENUTUP INLET 15 (P=30 M)1 Pemancangan kayu sadeng 2 Pemancangan kayu Gelam3 Pemasangan Pengaku (kayu nibung)4 Pemasangan Geobag5 Pemasangan Karung Pasir6 Pengurugan tanah7 Penanaman Pohon Bakau
II PEKERJAAN TANGGUL PENUTUP INLET 14 (P=60 M)1 Pemancangan kayu sadeng 2 Pemancangan kayu Gelam3 Pemasangan Pengaku (kayu nibung)4 Pemasangan Geobag5 Pemasangan Karung Pasir6 Pengurugan tanah7 Penanaman Pohon Bakau
REKAPITULASI ENGINEER ESTIMATE
PEKERJAAN : PERENCANAAN REHABILITASI TANGGUL PENUTUP INLET 14 DAN 15LOKASI : RAWA JITU TIMUR, KAB, TULANG BAWANG T.A. : 2015
No. Uraian
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANGGUL PENUTUP INLET 15 (P=30 M)
III PEKERJAAN TANGGUL PENUTUP INLET 14 (P=60 M)
TOTALDIBULATKANGRAND TOTAL
TERBILANG :Satu Miliar Empat Ratus Tujuh Puluh Lima Juta Rupiah
ENGINEER'S ESTIMATE
PERENCANAAN REHABILITASI TANGGUL PENUTUP INLET 14 DAN 15
Analisa Volume Satuan Harga Satuan
Rp.
An.Mob Demb 1.00 Ls 29,169,000.00
Jumlah I
F.9 480.00 m 76,891.07 F.10 3,850.00 m 28,245.31 F.8 60.00 m 33,412.50
An.Mob Demb Mobilisasi dan Demobilisasi1.0000 Ls Mobilisasi Personil 2,500,000.00 2,500,000.00 3.0000 Bulan Sewa Rumah 750,000.00 2,250,000.00 3.0000 Bulan Sewa Perahu 5,000,000.00 15,000,000.00 1.0000 Unit Generator set 1 PK 2,000,000.00 2,000,000.00 1.0000 Unit Chain Saw 2,500,000.00 2,500,000.00 1.0000 Unit Knitting Machine 4,919,000.00 4,919,000.00
65,000.00 m 25,000.00 m 17,000.00 m 15,000.00 Kg 425,500.00 Bh 45,000.00 m2 Konsultan 20,000.00 kg 1,500.00 Bh Konsultan 18,197.15 Bh Ditambah Extra Hauling 9,098.58 Bh 297,000.00 Bh Konsultan
HARGA UPAH SATUAN KETERANGAN
Rp.
256,625.00 Jam 100,000.00 Hari 135,771.00 Jam 5,250.00 Jam Konsultan
100000 rupiah / hari150000 rupiah / hari
75000 rupiah / hari8 jam/ hari
40625 rupiah / jam
12000 rupiah / liter
Halaman 29 dari 75
18 liter/ jam216000 rupiah / jam256625 rupiah / jam
Asumsi panjang bendung 30 meter Asumsi panjang bendung 60 meter
Volume Tanah di Karung Volume Tanah di Karung 1.20 m3
Volume Tanah di dalam geobag Volume Tanah di dalam geobag 1,440.00 m3
Volume Tanah urugan di belakang geobag Volume Tanah urugan di belakang geobag 2,880.00 m3
volume tanah total 4,320.00
Volume Geotekstil Volume Geotekstil1 lapis = 5 m 1 lapis = total lapisan = 32 lapis total lapisan = 2 sisi = 30 sisi 2 sisi = panjang tanggul = #REF! m panjang tanggul = luas geotekstill 40000 m2 luas geotekstill harga #REF! rp harga
Volume Geotekstil 1 Volume Geotekstil1 lapis = 8 m 1 lapis = total lapisan = 2 lapis total lapisan = 2 sisi = 30 sisi 2 sisi = panjang tanggul = 480 m panjang tanggul = luas geotekstill 40000 m2 luas geotekstill harga 19,200,000.00 rp harga
Asumsi panjang bendung 60 meter Karung Pasir :Tipe : Geobag Non Woven 700
Volume Tanah di Karung Ukuran : 1.45 x 2.38 m 1.20 m3 volume tanah per karung 1.2
tinggi karung terisi tanah 0.3Volume Tanah di dalam geobag lebar karung terisi tanah 1.15
2,880.00 m3 panjang karung terisi tanah 2.08
Volume Tanah urugan di belakang geobag lebar sungai 30 5,760.00 m3 tinggi tanggul penutup 8
jumlah karung vertikal 26.66667Jumlah karung horizontal 14.42308
384.6154Volume Geotekstil
5 m32 lapis
2 sisi60 m
19200 m240000 rp
768,000,000.00
Volume Geotekstil1 m8 lapis2 sisi
60 m960 m2
40000 rp 38,400,000.00
133.10290.435
jum karung 305.9836781609p 14.4230769231
4413.226127321 372,167.83 1,642,460,794.86
Geobag Non Woven 7001.45 x 2.38 m
m3m3mm
mmbhbhbh
1 272 273 264 245 236 227 208 199
10111213141516171819202122
Page 43 of 75
PEMBUATAN TANGGUL (PAKET I)
BULLDOZER (STRIPPING)No. Subject Formulasi Data
1 Draw bar pull Pld = GVW x Kt (datar) Kt = 0.9a). P. (kg) loading = (Bo + Bm) Kt Bo = 10,000 Kg
Bm = q x Bj Bj = 950q = 1.85
Plt a = 2 (Bidang Miring turun) l = 3.72
0.034899497b) P (kg) Unloading Pud = GVW x Kt (datar) l = 3.72
= Bo x KtPun
(Bidang Miring Naik)
2 Kecepatan Dorong Vd Vdd (datar) N = 140 Hp(Km/Jam)
Vdt (turun)
Kecepatan Rata-rata Dorong Vrd2
3 Kecepatan Mundur Vm Vmd (datar) N = 140 Hp(Km/Jam)
Vmn (naik)
Kecepatan Rata-rata Mundur Vrm
Kg/m3
m3
= (l . Sin a) GVW x Kt O
= (l. Sin a) GVW x Kt
= N.75 x 3600 Pld 1000= N.75 x 3600 Plt 1000= Vdd + Vdt
= N.75 x 3600 Pud 1000= N.75 x 3600 Pun 1000= Vmd + Vmn
Page 44 of 75
2
4 Cyrcle Time Ct Ft = 0.015 MenitCt (menit) VF2 VR1 D = 0.07 Km
VF2 = 15.54 Km/JamVR1 = 18.28 Km/Jam
5 Produksi Q q = 1.85Q (m3 B/Jam0 shf = 0.1
E = 0.66044484sf = 0.3Cf = 0.769
= D + D + Ft
= 60.q.E Ct (1 + sf)
Page 45 of 75
BULLDOZER (PENGHAMPARAN)No. Subject Formulasi Data
1 Draw bar pull Pld = GVW x Kt (datar) Kt = 0.9a). P. (kg) loading = (Bo + Bm) Kt Bo = 10,000 Kg
Bm = q x Bj Bj = 950q = 1.85
Plt a = 2 (Bidang Miring turun) l = 3.72
0.034899497b) P (kg) Unloading Pud = GVW x Kt (datar) l = 3.72
= Bo x KtPun
(Bidang Miring Naik)
2 Kecepatan Dorong Vd Vdd (datar) N = 140 Hp(Km/Jam)
Vdt (turun)
Kecepatan Rata-rata Dorong Vrd2
3 Kecepatan Mundur Vm Vmd (datar) N = 140 Hp(Km/Jam)
Vmn (naik)
Kecepatan Rata-rata Mundur Vrm2
Kg/m3
m3
= (l . Sin a) GVW x Kt O
= (l. Sin a) GVW x Kt
= N.75 x 3600 Pld 1000= N.75 x 3600 Plt 1000= Vdd + Vdt
= N.75 x 3600 Pud 1000= N.75 x 3600 Pun 1000= Vmd + Vmn
Page 46 of 75
4 Cyrcle Time Ct Ft = 0.015 MenitCt (menit) VF2 VR1 D = 0.17 Km
VF2 = 15.54 Km/JamVR1 = 18.28 Km/Jam
5 Produksi Q q = 1.85Q (m3 B/Jam0 shf = 0.1
E = 0.7sf = 0.3Cf = 0.769
= D + D + Ft
= 60.q.E Ct (1 + sf)
Page 47 of 75
VIBROLLLERNo. Subject Formulasi Data
1 Produksi Q L = 2.134 m(m3 C/jam) n V = 1.5 Km/Jam
t = 0.22 mE = 0.600n = 1 (double drum)
= L x V x t x 1000 x E
Page 48 of 75
WATER TAN No. Subject Formulasi Data
1 Rimpull, Angkut Air (Kg) Pa = (GVW x RR - GVW sin a) 2/3 RR = 50 Kg/tonGVW = Bo + (q.Bj) Bo = 6000 kg
5 Cyrcle Time Ct = waiting time (Wt)+ = 0 menitCt (menit) Loading time (Lt)+ q wt = 5000 liter
Carry time (Cat)+ q pompa = 2106 ltr / menit Dumpling time (dt)+ Lt = q wt Return time (Ft)+ q pompa Fix time (F2) = 2.374 menit= 0 + 2.374 + 0.78 + 12.64 D = 0.12 Km + 0.5 + 0.2 Va = 38.00 km/jam
Cat = Va
= 0.189 menitr = 395.52 ltr/menitdt = q wt
r
o
= N.75 x 3.6
= N.75 x 3.6
Wt (+)
D x 60
Page 49 of 75
= 12.64 menitVk = 60.00 km/jamRt =
Vk= 0.1 menit= 0.2 menit
6 Produksi Continous Loading Q q = 5 m3Q (m3 B/Jam) Ct E = 0.7047
Ct = 15.53
D x 60
Ft (+)
= 60.q. E
Page 50 of 75
PEMBUATAN TANGGUL RAWA JITUEXCAVATOR
No. Subject Formulasi Data
1 = Ct spec x r Galian Borrow Area(menit) Ct spec = 0.27
r = 1
2 Produksi Q q = 0.7 Cta (1 + Sf) E = 0.66044484
Sf = 0.25Cta Cta = 0.27
CF = 0.55
Cycle time actual Cta
Cta
= 60.q.E m3
Q (m3/Jam)= 60.q.E.CF
Page 51 of 75
DUMP TRUCKNo. Subject Formulasi Data
1 Rimpul, membawa muatan = (GVW x RR) 2/3 Daerah galian= (Bo + Bm)* RR x 2/3 RR = 50 Kg/ton= (Bo + q.Bj)* RR x 2/3 Bo = 11400 Kg
q = 5.7 m3Bj = 1510 Kg/m3
= (GVW x RR + GUW Sin a) 2/3 a = 2= (RR + sin a) 2/3 GVW
2 Rimpul kosong= (GVW x RR ) 2/3= Bo x RR x 2/3= (Bo x RR - GVW Sin a)2/3
3 Kecepatan angkutN = 125 Hp
Kecepatan Angkut Rata-rata VraVra (Km/Jam) 2
4 Kecepatan balik (kosong)
Pa (3500)
Pa (kg) 3500
Pa (kg) 4500
Pa (4500)
o
Pk (kg) 3500
Pk 3500
Pk (kg) 4500
Pk 4500
Va (km/jam) 3500
Va 3500 = N.75 x 3,6
Pa (3500)
Va (km/jam) 4500
Va 4500 = N.75 x 3,6
Pa (4500)
= Va 3500
+ Va 4500
vk (km/jam) 3500
Vk 3500 = N.75 x 3,6
Pk (3500)
vk (km/jam) 4500
Vk 4500 = N.75 x 3,6
Pk (4500)
Page 52 of 75
Kecepatan Kosong Rata-rata VrkVrk (Km/Jam) 2
No. Subject Formulasi Data
5 Cycle time Ct (menit) Ct = waiting time (Wt)+ = 0.5 menitloading Exc't Loading time (Lt)+ q dt = 5.7 m3
Carry time (Cat)+ q ex = 0.7 m3 Dumpling time (dt)+ C tex = 0.27 menit Return time (Ft)+ Lt = Fix time (F2) qex= 0,5 + 2,19 + 0,3 + 10,43 = 2.1986 menit + 7,05 + 0.2 D = 1 km
Va = 46 km/jamCat =
Va= 1.304347826 menit= 0.3 menit
Vk = 68 km/jamDt =
Vk= 0.8824 menit= 0.2 menit
6 Produksi Q q = 5.7 m3 Ct ( 1 + Sf) E = 0.66044484
Cf = 0.8 Ct Sf = 0.25
= Vk 3500
+ Vk 4500
Wt (+)
qdt x C tex
D x 60
dt (+)
D x 60
Ft (+)
= 60.q.E
= 60.q.E x Cf
Page 53 of 75
PEMBUATAN TANGGUL (PAKET I) 0et6de*er0en 2/13
Hasil KeteranganBulldozer
Pld = 10,581.75 Kg RR = Rolling ResistanceP spec = 12,300.00 Kg Bo = Berat Alat Operasi kapasitaspengupasanP<P spec Bj = Berat Jenis Materialbelum terjadi selip q = Kapasitas Blade
a = Derajat Kemiringan q =terhadap Arah Gusur Fb =
Plt = 1373.8 Kg pada mesin Fm =Pa = Rimpul Membawa Muatan Fa =Pk = Rimpul Kosong
Pud = 9000 Kg Va = Kecepatan Alat kapasitasperataanmembawa muatan
Vk = Kecepatan AlatPun = 1168.4 Kg Kondisi Kosong q =
Wt = waiting time Fb =Lt = Loading time Fm =
Vdd = 3.6 Km/Jam Cat = Carry time Fa =dt = Dumpling time
Vdt = 27.515 Km/Jam Ft = Return time F2 = Fix time
Vrd = 15.54 Km/Jam Ct = Waktu Siklus EfektifV Spec = 2.7 Km/Jam Q = Produksi Alatdengan F2 E = Job Factor
Pld = 10,581.75 Kg RR = Rolling ResistanceP spec = 12,300.00 Kg Bo = Berat Alat OperasiP<P spec Bj = Berat Jenis Materialbelum terjadi selip q = Kapasitas Blade
a = Derajat Kemiringan terhadap Arah Gusur
Plt = 1373.8 Kg pada mesinPa = Rimpul Membawa MuatanPk = Rimpul Kosong
Pud = 9000 Kg Va = Kecepatan Alatmembawa muatan
Vk = Kecepatan AlatPun = 1168.4 Kg Kondisi Kosong
Wt = waiting timeLt = Loading time
Vdd = 3.6 Km/Jam Cat = Carry time dt = Dumpling time
Vdt = 27.515 Km/Jam Ft = Return time F2 = Fix time
Vrd = 15.54 Km/Jam Ct = Waktu Siklus EfektifV Spec = 2.7 Km/Jam Q = Produksi Alatdengan F2 E = Job Factor