Rencana Material dan Upah PosRENCANA PENGGUNAAN DANAKEGIATAN:
Rehabilitasi Sarana dan Prasarana Kantor DesaPEKERJAAN: Rehab
Gedung Pos JagaDESA: SumberwaruKECAMATAN: BanyuputihKABUPATEN/KOTA:
SitubondoPROPINSI: Jawa TimurTAHUN:
2015NO.URAIANSATVOLUMEHARGAJUMLAHKETERANGANSATUAN (RP)HARGA
(RP)ABAHAN1Pasir Pasangm312.0080,000.00960,000.002Bata
Merahbh1,500.00600.00900,000.003Koral
pecahm32.00275,000.00550,000.004Semen Portland 40
Kgzak25.0060,000.001,500,000.005Pakukg5.0015,000.0075,000.006Kayu
6/15Buah1.00200,000.00200,000.007Kayu
3/5m30.203,750,000.00750,000.008Tripleks
9mmLembar7.00125,000.00875,000.009Besi Polos
6mmlonjor6.0030,000.00180,000.0010Besi Polos
8mmlonjor40.0038,000.001,520,000.0011Besi Polos
10mmlonjor6.0065,000.00390,000.0012Kawat
Bendratkg5.0015,000.0075,000.0013Kaca
5mmm24.0075,000.00300,000.0014Cat
Tembokkg15.0025,000.00375,000.0015Plamir
Tembokkg10.0015,000.00150,000.0016Plamir
Kayukg1.0030,000.0030,000.0017Minyak
Catliter2.0020,000.0040,000.0018Amplasbuah10.005,000.0050,000.0019Kunci
Pintubuah1.00150,000.00150,000.0020Grendel
Pintubuah1.0050,000.0050,000.0021Engsel
Pintubuah2.0065,000.00130,000.0022Kabel Nym
1,5mmm'15.005,000.0075,000.0023Saklar
Doublebuah1.0025,000.0025,000.0024Stop
Kontakbuah1.0020,000.0020,000.0025Lampu SL 20
WattBuah2.0065,000.00130,000.00Jumlah
I9,500,000.00BALAT1Timbabuah4.0010,000.0040,000.002Cangkulbuah1.0075,000.0075,000.004Sekopbuah1.0065,000.0065,000.005Kuas
4''buah2.0010,000.0020,000.006Cetokbuah2.0020,000.0040,000.009Kasut
Kayubuah1.0010,000.0010,000.0012Meteranbuah1.0050,000.0050,000.0013BenangBuah2.002,500.005,000.00Jumlah
II305,000.00CTUKANG DAN PEKERJA1Kepala
Tukangorg/hari21.0070,000.001,470,000.002Tujangorg/hari42.0065,000.002,730,000.003Pekerjaorg/hari69.0055,000.003,795,000.00Jumlah
III7,995,000.00Jumlah Total I+II+IIIRp17,800,000.00Terbilang :
Tujuh Belas Juta Delapan Ratus Ribu RupiahSitubondo, April
2015Mengetahui :Kepala Desa Sumber WaruKETUA LPMDesa Sumber
WaruSUMAKKI0
HOK Pos JagaDAFTAR HADIR DAN TANDA TERIMA INTENSIF PEKERJA(
Untuk Pekerjaan Sistem Harian )Kegiatan: Rehabilitasi Sedang /
Berat Gedung Kantor DesaPekerjaan: Rehab Gedung Pos JagaKecamatan:
BANYUPUTIHDesa: SumberwaruKabupaten: SitubondoTahun: 2015Provinsi:
Jawa TimurInsentif Untuk :Minggu Ke: III ( 18 April 2015 S/D 23
April 2015 )1 HOK PekerjaRp55,000.00Bulan: April1 HOK
TukangRp65,000.001 HOK K.TukangRp70,000.00NO.NAMAP/T/KPHari Orang
Kerja Menurut TanggalJUMLAHHOKUPAH /BesarnyaOngkos/Upah( Rp.)TANDA
TANGAN / CAP JEMPOLHARI181920212223( Rp )1A S I
SKP6.0070,000.00420,000.001.2HERU
RAHMANT6.0065,000.00390,000.002.3MARTOT5.0065,000.00325,000.003.4AMIRT6.0065,000.00390,000.004.5TOTOKT4.0065,000.00260,000.005.6TOYOT4.0065,000.00260,000.006.7SHALEHT3.0065,000.00195,000.007.8SA'ADIT3.0065,000.00195,000.008.9SUYANTOT5.0065,000.00325,000.009.10HARIKP4.0055,000.00220,000.0010.11NONOP4.0055,000.00220,000.0011.12FARUKP6.0055,000.00330,000.0012.13SAIFULP6.0055,000.00330,000.0013.14ILHAMP6.0055,000.00330,000.0014.15ARIFP4.0055,000.00220,000.0015.16TONOP4.0055,000.00220,000.0016.1717.1818.1919.2020.JUMLAH4,630,000.00Tanggal
Pembayaran :Situbondo, 23 April 2015Mengetahui;Kepala Desa Sumber
WaruKetua TPK Desa SumberwaruKepala TukangSUMAKKIHAILILIYAH
,SEASISKegiatan: Rehabilitasi Sedang / Berat Kantor DesaPekerjaan:
Rehab Gedung Kantor dan TerasKecamatan: BanyuputihDesa: Sumber
WaruKabupaten: SitubondoTahun: 2015Provinsi: Jawa
TimurPeriode:Insentif Untuk :Minggu Ke: II ( 12 April 2015 s/d 17
April 2015 )1 HOK PekerjaRp55,000.00Bulan: April1 HOK
TukangRp65,000.001 HOK K.TukangRp70,000.00NO.NAMAP/T/KPHari Orang
Kerja Menurut TanggalJUMLAHHOKUPAH /BesarnyaOngkos/Upah( Rp.)TANDA
TANGAN / CAP JEMPOLHARI123456( Rp )1A S I
SKP6.0070,000.00420,000.001.420,000.002HERU
RAHMANT6.0065,000.00390,000.002.3MARTOT5.0065,000.00325,000.003.4AMIRT5.0065,000.00325,000.004.5TOTOKT4.0065,000.00260,000.005.6TOYOT5.0065,000.00325,000.006.7SHALEHT3.0065,000.00195,000.007.8SA'ADIT3.0065,000.00195,000.008.9SUYANTOT5.0065,000.00325,000.009.10HARIKP4.0055,000.00220,000.0010.11NONOP4.0055,000.00220,000.0011.2,780,000.0012FARUKP6.0055,000.00330,000.0012.13SAIFULP6.0055,000.00330,000.0013.14ILHAMP4.0055,000.00220,000.0014.15ARIFP4.0055,000.00220,000.0015.16TONOP6.0055,000.00330,000.0016.1717.1818.1,430,000.001919.2020.JUMLAH4,630,000.004,630,000.00Tanggal
Pembayaran :Situbondo, 17 April 2015Mengetahui;Kepala Desa
SumberwaruKetua TPK Desa SumberwaruKepala TukangSUMAKKIHAILILIYAH,
SEASISKegiatan: Rehabilitasi Sedang / Berat Gedung Kantor
DesaPekerjaan: Rehab Gedung Kantor dan TerasKecamatan:
BanyuputihDesa: SumberwaruKabupaten: SitubondoTahun: 2015Provinsi:
Jawa TimurInsentif Untuk :Minggu Ke: III ( 18 April 2015 s/d 23
April 2015 )1 HOK PekerjaRp55,000.00Bulan: April1 HOK
TukangRp65,000.001 HOK K.TukangRp70,000.00NO.NAMAP/T/KPHari Orang
Kerja Menurut TanggalJUMLAHHOKUPAH /BesarnyaOngkos/Upah( Rp.)TANDA
TANGAN / CAP JEMPOLHARI123456( Rp )1A S I
SKP6.0070,000.00420,000.001.420,000.002HERU
RAHMANT6.0065,000.00390,000.002.3MARTOT5.0065,000.00325,000.003.4AMIRT5.0065,000.00325,000.004.5TOTOKT4.0065,000.00260,000.005.6TOYOT5.0065,000.00325,000.006.7SHALEHT3.0065,000.00195,000.007.8SA'ADIT3.0065,000.00195,000.008.9SUYANTOT5.0065,000.00325,000.009.10HARIKP6.0055,000.00330,000.0010.11NONOP6.0055,000.00330,000.0011.3,000,000.0012FARUKP4.0055,000.00220,000.0012.13SAIFULP4.0055,000.00220,000.0013.14ILHAMP4.0055,000.00220,000.0014.15ARIFP4.0055,000.00220,000.0015.16TONOP6.0055,000.00330,000.0016.1717.1818.1,210,000.001919.2020.JUMLAH4,630,000.004,630,000.00Tanggal
Pembayaran :Situbondo, 23 April 2015Mengetahui;Kepala Desa Sumber
WaruKetua TPK Desa SumberwaruKepala TukangSUMAKKIHAILILIYAH,
SEASISKegiatan: Rehabilitasi Sedang / Berat Kantor DesaPekerjaan:
Rehab Gedung Kantor dan TerasKecamatan: BanyuputihDesa: Sumber
WaruKabupaten: SitubondoTahun: 2015Provinsi: Jawa TimurInsentif
Untuk :Minggu Ke: IV ( 24 April 2015 s/d 29 April 2015 )1 HOK
PekerjaRp55,000.00Bulan: April1 HOK TukangRp65,000.001 HOK
K.TukangRp70,000.00NO.NAMAP/T/KPHari Orang Kerja Menurut
TanggalJUMLAHHOKUPAH /BesarnyaOngkos/Upah( Rp.)TANDA TANGAN / CAP
JEMPOLHARI123456( Rp )1A S I
SKP6.0070,000.00420,000.001.420,000.002HERU
RAHMANT5.0065,000.00325,000.002.3MARTOT5.0065,000.00325,000.003.4AMIRT6.0065,000.00390,000.004.5TOTOKT4.0065,000.00260,000.005.6TOYOT5.0065,000.00325,000.006.7SHALEHT3.0065,000.00195,000.007.8SA'ADIT3.0065,000.00195,000.008.9SUYANTOT5.0065,000.00325,000.009.10HARIKP4.0055,000.00220,000.0010.11NONOP4.0055,000.00220,000.0011.2,780,000.0012FARUKP6.0055,000.00330,000.0012.13SAIFULP4.0055,000.00220,000.0013.14ILHAMP4.0055,000.00220,000.0014.15ARIFP6.0055,000.00330,000.0015.16TONOP6.0055,000.00330,000.0016.1717.1818.1,430,000.001919.2020.JUMLAH4,630,000.004,630,000.00Tanggal
Pembayaran :Situbondo, 29 April 2015Mengetahui;Kepala Desa Sumber
WaruKetua TPK Desa SumberwaruKepala TukangSUMAKKIHAILILIYAH,
SEASISKegiatan: Rehabilitasi Sedang / Berat Gedung Kantor
DesaPekerjaan: Rehab Gedung Kantor dan TerasKecamatan:
BanyuputihDesa: Sumber WaruKabupaten: SitubondoTahun: 2015Provinsi:
Jawa TimurInsentif Untuk :Minggu Ke: V ( 30 April 2015 s/d 05 Mei
2015 )1 HOK PekerjaRp55,000.00Bulan: April -Mei1 HOK
TukangRp65,000.001 HOK K.TukangRp70,000.00NO.NAMAP/T/KPHari Orang
Kerja Menurut TanggalJUMLAHHOKUPAH /BesarnyaOngkos/Upah( Rp.)TANDA
TANGAN / CAP JEMPOLHARI123456( Rp )1A S I
SKP6.0070,000.00420,000.001.420,000.002HERU
RAHMANT5.0065,000.00325,000.002.3MARTOT6.0065,000.00390,000.003.4AMIRT5.0065,000.00325,000.004.5TOTOKT4.0065,000.00260,000.005.6TOYOT5.0065,000.00325,000.006.7SHALEHT3.0065,000.00195,000.007.8SA'ADIT3.0065,000.00195,000.008.9SUYANTOT5.0065,000.00325,000.009.10HARIKP4.0055,000.00220,000.0010.11NONOP6.0055,000.00330,000.0011.2,890,000.0012FARUKP4.0055,000.00220,000.0012.13SAIFULP6.0055,000.00330,000.0013.14ILHAMP4.0055,000.00220,000.0014.15ARIFP6.0055,000.00330,000.0015.16TONOP4.0055,000.00220,000.0016.1717.1818.1,320,000.001919.2020.JUMLAH4,630,000.004,630,000.00Tanggal
Pembayaran :Situbondo, 05 Mei 2015Mengetahui;Kepala Desa Sumber
WaruKetua TPK Desa SumberwaruKepala TukangSUMAKKIHAILILIYAH
,SEASISKegiatan: Rehabilitasi Sedang / Berat Kantor DesaPekerjaan:
Rehab Gedung Kantor dan TerasKecamatan: BanyuputihDesa: Sumber
WaruKabupaten: SitubondoTahun: 2015Provinsi: Jawa Timur:Insentif
Untuk :Minggu Ke: V ( 06 Mei 2015 s/d 11 Mei 2015 )1 HOK
PekerjaRp55,000.00Bulan: Mei1 HOK TukangRp65,000.001 HOK
K.TukangRp70,000.00NO.NAMAP/T/KPHari Orang Kerja Menurut
TanggalJUMLAHHOKUPAH /BesarnyaOngkos/Upah( Rp.)TANDA TANGAN / CAP
JEMPOLHARI123456( Rp )1A S I
SKP6.0070,000.00420,000.001.420,000.002HERU
RAHMANT6.0065,000.00390,000.002.3MARTOT5.0065,000.00325,000.003.4AMIRT4.0065,000.00260,000.004.5TOTOKT5.0065,000.00325,000.005.6TOYOT4.0065,000.00260,000.006.7SHALEHT4.0065,000.00260,000.007.8SA'ADIT3.0065,000.00195,000.008.9SUYANTOT5.0065,000.00325,000.009.10HARIKP4.0055,000.00220,000.0010.11NONOP4.0055,000.00220,000.0011.2,780,000.0012FARUKP6.0055,000.00330,000.0012.13SAIFULP6.0055,000.00330,000.0013.14ILHAMP5.0055,000.00275,000.0014.15ARIFP4.0055,000.00220,000.0015.16TONOP5.0055,000.00275,000.0016.1717.1818.1,430,000.001919.2020.JUMLAH4,630,000.004,630,000.00Tanggal
Pembayaran :Situbondo, 11 Mei 2015Mengetahui;Kepala Desa Sumber
WaruKetua TPK Desa SumberwaruKepala TukangSUMAKKIHAILILIYAH,
SEASISKegiatan: Rehabilitasi Sedang / Berat Kantor DesaPekerjaan:
Rehab Gedung Kantor dan TerasKecamatan: BanyuputihDesa:
SumberwaruKabupaten: SitubondoTahun: 2015Provinsi: Jawa
TimurInsentif Untuk :Minggu Ke: VI ( 12 Mei 2015 s/d 17 Mei 2015 )1
HOK PekerjaRp55,000.00Bulan: Mei1 HOK TukangRp65,000.001 HOK
K.TukangRp70,000.00NO.NAMAP/T/KPHari Orang Kerja Menurut
TanggalJUMLAHHOKUPAH /BesarnyaOngkos/Upah( Rp.)TANDA TANGAN / CAP
JEMPOLHARI123456( Rp )1A S I
SKP6.0070,000.00420,000.001.420,000.002HERU
RAHMANT6.0065,000.00390,000.002.3MARTOT5.0065,000.00325,000.003.4AMIRT5.0065,000.00325,000.004.5TOTOKT4.0065,000.00260,000.005.6TOYOT5.0065,000.00325,000.006.7SHALEHT3.0065,000.00195,000.007.8SA'ADIT3.0065,000.00195,000.008.9SUYANTOT5.0065,000.00325,000.009.10HARIKP4.0055,000.00220,000.0010.11NONOP4.0055,000.00220,000.0011.2,780,000.0012FARUKP6.0055,000.00330,000.0012.13SAIFULP6.0055,000.00330,000.0013.14ILHAMP4.0055,000.00220,000.0014.15ARIFP4.0055,000.00220,000.0015.16TONOP6.0055,000.00330,000.0016.1717.1818.1,430,000.001919.2020.JUMLAH4,630,000.004,630,000.00Tanggal
Pembayaran :Situbondo, 17 Mei 2015Mengetahui;Kepala Desa
SumberwaruKetua TPK Desa SumberwaruKepala TukangSUMAKKIHAILILIYAH,
SEASISKegiatan: Rehabilitasi Sedang / Berat Kantor DesaPekerjaan:
Rehab Gedung Kantor dan TerasKecamatan: BanyuputihDesa: Sumber
WaruKabupaten: SitubondoTahun: 2015Provinsi: Jawa TimurInsentif
Untuk :Minggu Ke: VII ( 18 Mei 2015 s/d 23 Mei 2015 )1 HOK
PekerjaRp55,000.00Bulan: Mei1 HOK TukangRp65,000.001 HOK
K.TukangRp70,000.00NO.NAMAP/T/KPHari Orang Kerja Menurut
TanggalJUMLAHHOKUPAH /BesarnyaOngkos/Upah( Rp.)TANDA TANGAN / CAP
JEMPOLHARI123456( Rp )1A S I
SKP6.0070,000.00420,000.001.420,000.002,520,000.002HERU
RAHMANT6.0065,000.00390,000.002.36.003MARTOT5.0065,000.00325,000.003.4AMIRT5.0065,000.00325,000.004.5TOTOKT4.0065,000.00260,000.005.6TOYOT5.0065,000.00325,000.006.7SHALEHT3.0065,000.00195,000.007.8SA'ADIT4.0065,000.00260,000.008.9SUYANTOT4.0065,000.00260,000.009.10HARIKP4.0055,000.00220,000.0010.11NONOP4.0055,000.00220,000.0011.2,780,000.0012FARUKP6.0055,000.00330,000.0012.13SAIFULP5.0055,000.00275,000.0013.14ILHAMP5.0055,000.00275,000.0014.15ARIFP4.0055,000.00220,000.0015.16TONOP6.0055,000.00330,000.0016.1717.1818.1,430,000.001919.2020.JUMLAH4,630,000.004,630,000.00Tanggal
Pembayaran :Situbondo, 23 Mei 2015Mengetahui;Kepala Desa Sumber
WaruKetua TPK Desa SumberwaruKepala TukangSUMAKKIHAILILIYAH,
SEASISKegiatan: Rehabilitasi Sedang / Berat Kantor DesaPekerjaan:
Rehab Gedung Kantor dan TerasKecamatan: BanyuputihDesa: Sumber
WaruKabupaten: SitubondoTahun: 2015Provinsi: Jawa TimurInsentif
Untuk :Minggu Ke: VII ( 24 Mei 2015 s/d 29 Mei 2015 )1 HOK
PekerjaRp55,000.00Bulan: Mei1 HOK TukangRp65,000.001 HOK
K.TukangRp70,000.00NO.NAMAP/T/KPHari Orang Kerja Menurut
TanggalJUMLAHHOKUPAH /BesarnyaOngkos/Upah( Rp.)TANDA TANGAN / CAP
JEMPOLHARI123456( Rp )1A S I SKP6.0070,000.00420,000.001.2HERU
RAHMANT6.0065,000.00390,000.002.3MARTOT5.0065,000.00325,000.003.4AMIRT4.0065,000.00260,000.004.5TOTOKT3.0065,000.00195,000.005.6TOYOT1.0065,000.0065,000.006.7SHALEHT0.065,000.000.07.8SA'ADIT0.065,000.000.08.9HARIKP4.0055,000.00220,000.009.10NONOP4.0055,000.00220,000.0010.11SUYANTOT0.055,000.000.011.1,675,000.0020,115,000.0012FARUKP5.0055,000.00275,000.0012.309.4613SAIFULP5.0055,000.00275,000.0013.14ILHAMP4.0055,000.00220,000.0014.15ARIFP4.0055,000.00220,000.0015.16TONOP4.0055,000.00220,000.0016.1717.1818.1,210,000.000.01919.2020.2640000JUMLAH3,305,000.000.0Tanggal
Pembayaran :Situbondo, 29 Mei 2015665,000.00Mengetahui;Kepala Desa
Sumber WaruKetua TPK Desa SumberwaruKepala TukangSUMAKKIHAILILIYAH,
SEASIS
Buku Kas UmumLAPORAN KEUANGAN/BUKU KAS KPMKegiatan: REHABILITASI
SARANA DAN PRASARANA KANTOR DESAPekerjaan: REHAB GEDUNG KANTOR DAN
TERASLokasi: DESA SUMBERWARU, KECAMATAN BANYUPUTIHKabupaten/Kota:
SITUBONDOPropinsi: JAWA
TIMURNO.HARIURAIANPEMASUKANPENGELUARANSALDOTANGGAL(RP)(RP)(RP)1Rabu,
12 NopTermijn30,000,000Belanja bahan bangunan dan Alat :2Sabtu, 14
NopTimba40,00029,960,000Cangkul75,00029,885,000Sekop65,00029,820,000Kuas
4''20,00029,800,000Cetok40,00029,760,000Kasut
Kayu10,00029,750,00000.00.000.00.0Meteran50,0000.0Paku75,0000.000.00.0Belanja
bahan bangunan dan Alat :3Sabtu, 15 NopPasir
Pasang960,0000.04Minggu, 16 NopBatu Gunung/Batu Kali0.00.05Senin,
17 NopSemen 40 Kg1,500,0000.06Minggu, 23 NopUpah Kerja
MingguanKepala Tukang0.00.0Tukang0.00.0Pekerja0.00.07Minggu, 30
NopUpah Kerja Mingguan0.0Kepala
Tukang0.00.0Tukang0.00.0Pekerja0.00.030,000,0000.00.0Situbondo, 30
Nopember 2014Diperiksa oleh :Dibuat Oleh :Kepala Desa
SumberanyarKETUA LPMSUMAKKI0.0
Rekap Pos JagaREKAPITULASI RENCANA ANGGARAN
BIAYAKEGIATANRehabilitasi Sarana dan Prasarana Kantor
DesaPEKERJAANRehab Gedung Pos JagaLOKASIDesa Sumber WaruKecamatan
BanyuputihKabupaten SitubondoTAHUN2015NoUraian PekerjaanJumlah
HargaIPEKERJAAN PERSIAPAN1,700,000.00IIIPEKERJAAN
TANAH305,000.00IIIPEKERJJAAN PASANGAN4,969,000.00IVPEKERJJAAN
STRUKTUR BETON6,600,000.00VPEKERJAAN KUSEN PINTU DAN
JENDELA1,657,000.00VIIIPEKERJAAN
PENGECATAN1,529,000.00VIIIPEKERJAAN LANTAI540,000.00IXPEKERJAAN
INSTALASI LISTRIK500,000.00Jumlah
Total17,800,000.00Dibulatkan17,800,000.00Terbilang : Tujuh Belas
Juta Delapan Ratus Ribu Rupiah
Rab Pos JagaRENCANA ANGGARAN BIAYAKEGIATANRehabilitasi Sarana
dan Prasarana Kantor DesaPEKERJAANRehab Gedung Pos JagaLOKASIDesa
Sumber WaruKecamatan BanyuputihKabupaten SitubondoTAHUN2015NoUraian
PekerjaanVolumeSatuanHarga SatuanJumlah HargaIPEKERJAAN
PERSIAPAN1Pengukuran14.00M25,000.0070,000.002Pembersihan14.00M24,500.0063,000.003Pembongkaran
:- Penutup Atap Genteng Lama17.00M23,500.0059,500.00- Bubungan
Lama17.00M'7,000.00119,000.00- Rangka Atap / Kap
Lama17.00M210,000.00170,000.00- Rangka Plafond dan Penutup Plafond
Lama24.00M25,000.00120,000.00- Dinding
Lama63.00M215,000.00945,000.00- Kusen Pintu dan Jendela
Lama1.00Buah55,500.0055,500.00- Lantai Keramik
Lama14.00M27,000.0098,000.00Jumlah1,700,000.00IIPEKERJAAN
TANAH1Galian Tanah Pondasi Teras6.60M325,000.00165,000.002Urug
tanah kembali4.00M315,000.0060,000.003Urug pasir bawah lantai dan
pondasi1.00M380,000.0080,000.00Jumlah305,000.00IIIPEKERJJAAN
PASANGAN1Pasang Pondasi Rollag
Teras0.42M3450,000.00189,000.002Pasang
Dinding30.00M280,000.002,400,000.003Plesteran60.00M235,000.002,100,000.004Benangan28.00M'10,000.00280,000.00Jumlah4,969,000.00IVPEKERJJAAN
STRUKTUR BETON1Pasang Atap Beton tebal
10cm1.00M33,000,000.003,000,000.002Pasang Kolom Induk
30/301.00M33,000,000.003,000,000.003Pasang Balok Gantung
15/250.20M33,000,000.00600,000.00Jumlah6,600,000.00VPEKERJAAN KUSEN
PINTU DAN JENDELA1Pasang Kusen1.00Unit250,000.00250,000.006Pasang
Daun Pintu1.00Buah950,000.00950,000.008Pasang Kunci
Pintu1.00Buah150,000.00150,000.009Pasang Engsel
Pintu2.00Buah35,000.0070,000.0010Pasang Grendel
Pintu1.00Buah45,000.0045,000.0013Pasang Kaca 5
mm2.40M280,000.00192,000.00Jumlah1,657,000.00VIIPEKERJAAN
PENGECATAN2Pengecatan Plafon20.25M220,000.00405,000.003Pengecatan
Dinding52.50M220,000.001,050,000.004Pengecatan
Kayu2.00M237,000.0074,000.00Jumlah1,529,000.00VIIIPEKERJAAN
LANTAI1Plesterisasi12.00M245,000.00540,000.00Jumlah540,000.00IXPEKERJAAN
INSTALASI LISTRIK1Pasang Instalasi
Listrik3.00Titik100,000.00300,000.002Pasang Saklar
Ganda1.00Buah25,000.0025,000.003Pasang
Stopkontak1.00Buah25,000.0025,000.004Pasang Lampu SL 20
Watt2.00Buah75,000.00150,000.00Jumlah500,000.00
Sheet1IMPORTGGkontrakUpah / kgUpah / kgPPh 2%PPh 2%BRUTOBRUTOWF
30089009150145005600535011210754885243WF
35089009150145005600535011210754885243WF
400896091501450055405350110.81075429.25243