REKAPITULASI HARGA PENAWARAN PEKERJAAN PERLUASAN WORKSHOP BELAWAN INTERNATIONAL CONTAINER TERMINAL NO. URAIAN PEKERJAAN Jumlah Harga ( Rp) Upah Bahan Upah + Bahan 1 2 3 4 5 I PEKERJAAN PERSIAPAN DAN PENDAHULUAN 24,550,000.00 24,550,000.00 II PEKERJAAN TANAH DAN PONDASI 112,149,854.22 164,974,501.20 277,124,355.42 III PEKERJAAN TIANG DAN BALOK 76,836,417.22 179,505,979.94 256,342,397.16 IV PEKERJAAN ATAP 40,647,746.94 132,864,280.43 173,512,027.37 V PEKERJAAN DRAINASE 30,361,464.16 47,214,253.64 77,575,717.80 VI PEKERJAAN LAIN - LAIN 9,048,000.00 9,048,000.00 Jumlah : 818,152,497.751 PPN 10 % : 81,815,249.775 Total : 899,967,747.526 Dibulatkan : 899,967,000.000 Terbilang : delapan ratus sembilan puluh sembilan juta sembilan ratus enam puluh tujuh ribu Belawan, Ok Disetujui oleh, Dibuat o MANAJER TEKNIK ASISTEN MANAJE SADARUDDIN INGGU SAR Ditetapkan oleh, GENERAL MANAGER SYAMSUL BAHRI KAUTJIL
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
REKAPITULASI HARGA PENAWARAN
PEKERJAAN PERLUASAN WORKSHOP
BELAWAN INTERNATIONAL CONTAINER TERMINAL
URAIAN PEKERJAANJumlah Harga ( Rp)
KeteranganUpah Bahan Upah + Bahan
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN DAN PENDAH 24,550,000.00 24,550,000.00
II PEKERJAAN TANAH DAN PONDASI ### ### 277,124,355.42
III PEKERJAAN TIANG DAN BALOK 76,836,417.22 ### 256,342,397.16
IV PEKERJAAN ATAP 40,647,746.94 ### 173,512,027.37
V PEKERJAAN DRAINASE 30,361,464.16 47,214,253.64 77,575,717.80
VI PEKERJAAN LAIN - LAIN 9,048,000.00 9,048,000.00
Jumlah : 818,152,497.751
PPN 10 % : 81,815,249.775
Total : 899,967,747.526
Dibulatkan : ###
Terbilang : delapan ratus sembilan puluh sembilan juta sembilan ratus enam puluh tujuh ribu rupiah
Belawan, Oktober 2010
Disetujui oleh, Dibuat oleh,
MANAJER TEKNIK ASISTEN MANAJER FASILITAS
SADARUDDIN INGGU SARNAINI
Ditetapkan oleh,
GENERAL MANAGER
SYAMSUL BAHRI KAUTJIL
NO.
RINCIAN HARGA PENAWARAN PEKERJAAN PERLUASAN WORKSHOP
BELAWAN INTERNATIONAL CONTAINER TERMINAL
NO. URAIAN PEKERJAAN Satuan Volume Harga Satuan ( Rp) Jumlah Harga ( Rp)
Upah Bahan Upah + Bahan Upah Bahan
1 2 3 4 5 6 7 8 9
I PEKERJAAN PERSIAPAN DAN PENDAHULUAN1 Survey lokasi ls 1.00 300,000.00 300,000.00 300,000.002 Mobilisasi dan Demobilisasi Alat ls 1.00 5,000,000.00 5,000,000.00 5,000,000.003 Pekerjaan Bowplank ls 1.00 2,000,000.00 2,000,000.00 2,000,000.004 Gudang bahan dan peralatan ls 1.00 6,000,000.00 6,000,000.00 6,000,000.005 Pekerjaan Perancah ls 1.00 11,250,000.00 11,250,000.00 11,250,000.00
Jumlah I ### 24,550,000.00 24,550,000.00
II PEKERJAAN TANAH DAN PONDASI1 Galian tanah keras m³ 15.78 54,664.80 54,664.80 862,776.722 Urugan kembali galian m³ 14.62 13,666.20 13,666.20 199,863.263 Urugan pasir bawah pondasi m³ 0.77 16,406.00 84,000.00 100,406.00 12,599.81 64,512.004 lantai kerja cor 1 : 3 : 5 m³ 0.39 378,675.00 498,596.00 877,271.00 147,834.72 194,651.885
m¹ 216.00 220,000.00 220,000.00 47,520,000.00
6 Mobilisasi dan demobilisasi untuk pemancangan ls 1.00 12,000,000.00 12,000,000.00 12,000,000.007 Pengadaan crane bantu ls 1.00 13,000,000.00 13,000,000.00 13,000,000.008 Pile cap beton bertulang (195,5 kg) K 300 + sumbu m³ 5.79 2,589,339.75 3,205,228.75 5,794,568.50 14,989,169.94 18,554,428.199 Pekerjaan sloof 30 x 40 beton bertulang (93,64 kg) K 300 m³ 16.32 2,317,496.36 2,001,778.10 4,319,274.46 37,821,540.60 32,669,018.59
III PEKERJAAN TIANG DAN BALOK1 Penyambungan balok untuk bangunan baru kg 288.45 7,482.00 19,140.00 26,622.00 2,158,182.90 5,520,933.00
2 Pekerjaan pasangan bata m² 133.16 55,505.20 74,830.00 130,335.20 7,391,119.61 9,964,426.413 Pekerjaan lobang angin m² 35.41 9,025.00 67,500.00 76,525.00 319,587.89 2,390,269.504 Pekerjaan plesteran m² 266.32 39,910.00 11,441.00 51,351.00 10,628,899.05 3,046,986.575 Pekerjaan pengecatan ( 2 x cat) m² 266.32 9,552.25 18,445.00 27,997.25 2,543,971.46 4,912,303.766 Pekerjaan tiang Profil WF 350 x 175 (49,6 kg/m)+ sambun kg 3,958.08 7,482.00 19,140.00 26,622.00 29,614,354.56 75,757,651.207 Pekerjaan balok Profil WF 350 x 175 (49,6 kg/m)+ sambun kg 2,708.16 7,482.00 19,140.00 26,622.00 20,262,453.12 51,834,182.408 Pekerjaan tiang beton 30 x 60 kg 13.67 170,125.00 1,132,440.00 1,302,565.00 2,326,222.63 15,484,541.109 Pekerjaan balok beton 30 x 60 kg 9.36 170,125.00 1,132,440.00 1,302,565.00 1,591,626.01 10,594,686.01
Jumlah III 476,688.45 2,494,516.00 2,971,204.45 76,836,417.22 ###
Pengadaan material,pemancangan dan penyambungan V pile 28.28.28
m²
m²
NO. URAIAN PEKERJAAN Satuan Volume Harga Satuan ( Rp) Jumlah Harga ( Rp)
Upah Bahan Upah + Bahan Upah Bahan1 2 3 4 5 6 7 8 9
IV PEKERJAAN ATAP1 Pekerjan kuda - kuda profil WF 300 x 150 Kg 1,572.23 7,482.00 19,140.00 26,622.00 11,763,409.90 30,092,443.922 Gording kanal profil C 150 x 65 x 20 Kg 1,056.00 7,482.00 19,140.00 26,622.00 7,900,992.00 20,211,840.003 Ikatan angin besi bulat Ø 14 mm + klem Kg 181.40 8,955.40 10,120.00 19,075.40 1,624,538.22 1,835,800.384 Trackstang besi bulat Ø 14 mm + klem Kg 96.80 8,955.40 10,120.00 19,075.40 866,882.72 979,616.005 Besi siku 110.110.10 untuk dudukan gording Kg 72.48 6,555.63 14,800.00 21,355.63 475,152.24 1,072,704.006 Pelat besi 3 mm untuk pengait atap Kg 31.09 8,692.40 14,900.00 23,592.40 270,211.95 463,181.40
7 Rangka listplank L 45.45.5 Kg 332.76 6,555.63 14,800.00 21,355.63 2,181,458.83 4,924,862.80
8 Atap zinkalum warna standart 0.5 mm m² 428.40 21,338.00 138,000.00 159,338.00 9,141,199.20 59,119,200.00
9 Listplank zinkalum 0.5 mm m² 24.12 21,338.00 138,000.00 159,338.00 514,672.56 3,328,560.00
10 Rabung Rabung seng BJLS 35 K m¹ 24.12 3,512.25 23,645.00 27,157.25 84,715.47 570,317.40
11 Pekerjaan plafond m² 160.00 27,890.00 49,568.12 77,458.12 4,462,400.00 7,930,899.20
12 Pelat buhul tebal 6 mm Kg 156.70 8,692.40 14,900.00 23,592.40 1,362,113.86 2,334,855.33
Jumlah IV 137,449.12 467,133.12 604,582.24 40,647,746.94 ###
V PEKERJAAN DRAINASE1 Galian tanah keras m³ 31.65 54,664.80 54,664.80 1,730,272.122 Timbunan kembali m³ 13.74 13,666.20 13,666.20 187,718.923 Beton bertulang K 300 m³ 16.32 1,243,810.68 1,940,038.10 3,183,848.78 20,294,512.58 31,654,437.654 lantai kerja pasir urug m³ 1.60 16,406.00 84,000.00 100,406.00 26,249.60 134,400.005 Penutup parit pelat 3 mm kg 616.52 8,692.40 14,900.00 23,592.40 5,359,039.84 9,186,150.386 Besi siku 45.45.5 kg 421.57 6,555.63 14,800.00 21,355.63 2,763,671.10 6,239,265.60
Jumlah V 1,343,795.71 2,053,738.10 3,397,533.81 30,361,464.16 47,214,253.64
VI PEKERJAAN LAIN - LAIN1 Pembersihan akhir ls 1.00 3,000,000.00 3,000,000.00 3,000,000.002 Tes kuat tekan beton ls 1.00 3,500,000.00 3,500,000.00 3,500,000.003 Dokumentasi dan laporan ls 1.00 2,548,000.00 2,548,000.00 2,548,000.00
Jumlah VI 9,048,000.00 9,048,000.00 9,048,000.00
RINCIAN HARGA PENAWARAN PEKERJAAN PERLUASAN WORKSHOP
13 1 m¹ Pengadaan material,pemancangan dan penyambungan V pile 28.28.28
1.000220,000.000 220,000.00
0.00 220,000.00 0.00 220,000.00
14 G 55b. 1 M2 membongkar conblok
0.060 tukang batu 78,800.00 4,728.00
0.200 pekerja 52,500.00 10,500.00
15,228.00 0.00 0.00 15,228.00
11. 1 M3 timbunan base coarse kelas A :
1.200 M3 base coa 175,200.00 210,240.00
0.300 Pekerja 52,500.00 15,750.00
0.010 Mandor 65,600.00 656.00
0.000 Biaya gilas 26,760,000.00 7,136.00
23,542.00 210,240.00 0.00 233,782.00
m¹ material, pancang, penyambu
No. Anl Koef Uraian H. Satuan Upah Bahan Peralatan Total
12 G 55b. 1 M2 memasang kembali coneblok bekas bongkaran
0.060 tukang batu 45,000.00 2,700.00
0.200 pekerja 40,000.00 8,000.00
10,700.00 0.00 0.00 10,700.00
13 100 Kg Pekerjaan Besi profil WF/gording CNP
110.000 kg besi baja 17,400.000 1,914,000.00
1.500 tukang 78,800.000 118,200.00
2.000 kepala tuka 91,900.000 183,800.00
6.000 pekerja 52,500.000 315,000.00
2.000 mandor 65,600.000 131,200.00
748,200.00 1,914,000.00 0.00 2,662,200.00
Untuk 1 Kg 7,482.00 19,140.00 0.00 26,622.00
14 1 Kg Pekerjaan Track stang dan ikatan angin
1.000 kg besi baja 9,375.000 9,375.00
0.050 kg baut 14,900.000 745.00
1.000 ls alat bantu 1,000.000 1,000.00
0.080 tukang 78,800.000 6,304.00
0.006 kepala tuka 91,900.000 551.40
0.040 pekerja 52,500.000 2,100.00 1,000.00
8,955.40 10,120.00 2,000.00 21,075.40
15 1 Kg Pekerjaan besi siku
1.000 kg besi siku 14,800.000 14,800.00
0.067 tukang 78,800.000 5,253.99
0.001 mandor 65,600.000 77.08
0.023 pekerja 52,500.000 1,224.56 0.00
6,555.63 14,800.00 0.00 21,355.63
16 1 Kg Pekerjaan besi Pelat
1.000 kg besi siku 14,900.000 14,900.00
0.080 tukang 78,800.000 6,304.00
0.014 mandor 65,600.000 918.40
0.028 pekerja 52,500.000 1,470.00 0.00
8,692.40 14,900.00 0.00 23,592.40
17 G 28a.1 M² pemasangan tembok bata 1:2
0.323 Pekerja 52,500.00 16,957.50
0.250 Tukang batu 78,800.00 19,700.00
0.123 Kepala tuka 91,900.00 11,303.70
0.115 Mandor 65,600.00 7,544.00
0.180 Pasir pasan 85,000.00 15,300.00
0.360 Semen portl 48,000.00 17,280.00
65.000 Batu bata j 650.00 42,250.00
55,505.20 74,830.00 0.00 130,335.20
18 1 m² Pekerjaan lobang angin
27.000 bh lobang an 2,500.000 67,500.00
0.038 tukang 78,800.000 2,955.00
0.013 mandor 65,600.000 820.00
0.100 pekerja 52,500.000 5,250.00 0.00
9,025.00 67,500.00 0.00 76,525.00
No. Anl Koef Uraian H. Satuan Upah Bahan Peralatan Total
19 1 m2 atap zinkalum
1.050 m² atap zin 120,000.00 126,000.00
6.000 bh baut 2,000.00 12,000.00
0.200 tukang besi 78,800.00 15,760.00
0.100 pekerja 52,500.00 5,250.00
0.005 mandor 65,600.00 328.00
21,338.00 138,000.00 0.00 159,338.00
20 H 10 10 M' rabung atap seng:
6.000 lbr. rabung 39,400.00 236,400.00
0.100 Kg Paku sen 500.00 50.00
0.250 tukang besi 78,800.00 19,700.00
0.025 kepala tuka 91,900.00 2,297.50
0.250 pekerja 52,500.00 13,125.00
35,122.50 236,450.00 0.00 271,572.50
1 M' 3,512.25 23,645.00 0.00 27,157.25
21 1 m² lisplank zingnalum
1.050 m² atap zin 120,000.00 126,000.00
6.000 bh baut 2,000.00 12,000.00
0.200 tukang besi 78,800.00 15,760.00
0.100 pekerja 52,500.00 5,250.00
0.005 mandor 65,600.00 328.00
21,338.00 138,000.00 0.00 159,338.00
22 1 m² plafond triplek 4 mm
1.050 m² triplek 4 47,000.00 49,350.00
0.020 kg paku bias 10,906.00 218.12
0.500 pekerja 52,500.00 26,250.00
0.025 mandor 65,600.00 1,640.00
27,890.00 49,568.12 0.00 77,458.12
23 K 9 10 m2 (mengecat dasar 1x dan mengecat warna 2x)
4.250 kg cat 41,000.00 174,250.00
0.567 ltr minyak c 18,000.00 10,200.00
0.750 tukang cat 78,800.00 59,100.00
0.075 kep. tukang 91,900.00 6,892.50
0.500 pekerja 52,500.00 26,250.00
0.050 mandor 65,600.00 3,280.00
95,522.50 184,450.00 0.00 279,972.50
1 m² 9,552.25 18,445.00 0.00 27,997.25
24 G 50i. 1 M2 plesteran dengan perekat PC tbl 15 mm camp. 1:3
0.204 zak semen 48,000.00 9,792.00
0.019 M3 Pasir 85,000.00 1,649.00
0.200 Tukang bat 78,800.00 15,760.00
0.020 Kepala tuk 91,900.00 1,838.00
0.400 Pekerja 52,500.00 21,000.00
0.020 Mandor 65,600.00 1,312.00
39,910.00 11,441.00 0.00 51,351.00
Belawan, Oktober 2010
Dibuat oleh,
ASISTEN MANAJER FASILITAS
INGGU SARNAINI
No. Uraian Satuan Koefisien
161 m¹ Pengadaan material,pemancangan dan penyambungan V pile 28.28.28a. Upah , bahan dan peralatanm¹ 1.000 220,000.00 220,000.00
220,000.00
Jumlah 220,000.000ver head 0.1 22,000.00
###
1 m³ Base Coarse Aa. UpahPekerja Jam 0.1071 6,562.50 702.84
Mandor Jam 0.0178 8,200.00 145.96848.80
b. BahanBase coar m³ 1.200 175,200.00 210,240.00210,240.00
c. PeralatanDump Tru Jam 0.2463 #REF! #REF!Motor Gra Jam 0.0044 #REF! #REF!Vibratory Jam 0.0067 #REF! #REF!Air Pema Ls 1.0000 3,000.00 3,000.00Alat bant Ls 1.0000 1,000.00 1,000.00
#REF!
Jumlah #REF!0ver head 0.1 #REF!Harga satuan #REF!
171 m¹ Pekerjaan cerocok kayu lauta. UpahPekerja jam 0.063 6,562.50 410.16
410.16
b. BahanKayu Laut btg 1.000 25,000.00 25,000.0025,000.00
c. Peralatanexcavator jam 0.031 #REF! #REF!#REF!
Jumlah #REF!0ver head 0.1 #REF!Harga satuan 1 Kg #REF!
181m² memasang Kembali Pas. Conebloka. upahPekerja jam 1.400 6,562.50 9,187.50
Mandor jam 0.093 8,200.00 765.069,952.56
a. bahanPasir pas m³ 0.055 85,000.00 4,675.004,675.00
c. alat Vibratory jam 0.0040 #REF! #REF!Alat bant ls 1.0000 500.00 500.00
#REF!
Jumlah #REF!0ver head 0.1 #REF!Harga satuan #REF!
Harga Satuan (Rp)
Jlh. Harga (Rp)
Total Harga (Rp)
No. Uraian Satuan Koefisien
19100 Kg Pekerjaan Besi profil WF/gording CNPa. UpahPekerja jam 24 6,562.50 157,500.00
Tukang jam 24 9,850.00 236,400.00 Mandor jam 8 8,200.00 65,600.00
459,500.00
Kg 110 17,400.00 1,914,000.00
ls 1 30,000
30,000.00
1,944,000.00
Jumlah 2,403,500.00
Untuk 1 Kg 0.01 x 2,403,500.00 24,035.00
Jumlah 24,035.000ver head 0.1 2,403.50Harga satuan 26,438.50
201 Kg Pekerjaan Track stang dan ikatan angina. UpahPekerja jam 0.020 6,562.50 131.25
Tukang jam 0.040 9,850.00 394.00Mandor jam 0.003 8,200.00 24.60
549.85
b. BahanBesi beto Kg 1.050 9,375.00 9,843.75
Bahan ba ls 0.500 10,000.00 5,000.0014,843.75
Jumlah 15,393.600ver head 0.1 1,539.36Harga satuan 1 Kg 16,932.96
211 kg memasang besi siku
a. UpahPekerja jam 0.0933 6,562.50 612.50
Tukang jam 0.2667 9,850.00 2,626.67
Mandor jam 0.0047 8,200.00 38.27
3,277.43
kg 1.0000 14,800.00 14,800.00
14,800.00
Jumlah 18,077.43
0ver head 0.1 1,807.74
Harga satuan 19,885.18
Harga Satuan (Rp)
Jlh. Harga (Rp)
Total Harga (Rp)
b. Baha
n
Profil WFKawat Las & peralatan
b. Baha
n
besi siku
No. Uraian Satuan Koefisien
221 kg memasang pelat besi polos
a. UpahPekerja jam 0.0560 6,562.50 367.50
Tukang jam 0.1600 9,850.00 1,576.00
Mandor jam 0.0028 8,200.00 22.96
1,966.46
kg 1.0000 14,900.00 14,900.00
baut ls 1.0000 2,000.00 2,000.00
16,900.00
Jumlah 18,866.46
0ver head 0.1 1,886.65
Harga satuan 20,753.11
23 1 m2 Pekerjaan Atap Zinknalum
a. UpahPekerja jam 0.8000 6,562.50 5,250.00
Tukang jam 1.6000 9,850.00 15,760.00
Mandor jam 0.0400 8,200.00 328.00
21,338.00
b. Bahanbaut bh 6.0000 2,000.00 12,000.00
Atap Zink m² 1.0500 120,000.00 126,000.00
138,000.00
C. Peralatan
Alat bant ls 1.0000 500.00 500.00
500.00
Jumlah 159,838.00
0ver head 0.1 15,983.80
Harga satuan ###
241 m¹ Pasang Rabung Atap seng BJLS 35
a. UpahPekerja jam 0.2000 6,562.50 1,312.50
Tukang jam 0.1600 9,850.00 1,576.00
Mandor jam 0.0160 8,200.00 131.20
3,019.70
m¹ 1.1000 39,400.00 43,340.00
Paku sen bh 4.0000 500.00 2,000.00
45,340.00
Jumlah 48,359.70
0ver head 0.1 4,835.97
Harga satuan 53,195.67
Harga Satuan (Rp)
Jlh. Harga (Rp)
Total Harga (Rp)
b. Baha
n
besi pelat polos
b. Baha
n
Rabung Atap seng
No. Uraian Satuan Koefisien
251 m² lisplank zingnalum
a. UpahPekerja jam 0.4200 6,562.50 2,756.25
Tukang jam 1.2000 9,850.00 11,820.00
Mandor jam 0.0210 8,200.00 172.20
14,748.45
zinkalum m² 1.0500 120,000.00 126,000.00
baut bh 6.0000 2,000.00 12,000.00
126,000.00
C. Peralatan
Alat bant ls 1.0000 500.00 500.00
500.00
Jumlah 141,248.45
0ver head 0.1 14,124.85
Harga satuan ###
26100 m² cat tembok
a. UpahPekerja jam 40.0000 6,562.50 262,500.00
Tukang jam 60.0000 9,850.00 591,000.00
Mandor jam 2.0000 8,200.00 16,400.00
869,900.00
untuk 1m² 0.0100 869,900.00 8,699.00
b. BahanCat kg 0.1415 20,500.00 2900.75
jlh untuk 1m² 1 x cat 11,599.75
2.000 X cat 23,199.50
Jumlah 23,199.50
0ver head 0.1 2,319.95
Harga satuan 25,519.45
Harga Satuan (Rp)
Jlh. Harga (Rp)
Total Harga (Rp)
b. Baha
n
No. Uraian Satuan Koefisien
27 1 m2 Plesteran 1
a. UpahPekerja jam 2.0020 6,562.50 13,138.12
Tukang jam 1.4980 9,850.00 14,755.30
Mandor jam 0.1400 8,200.00 1,148.00
29,041.42
b. BahanSemen Zak 0.2960 48,000.00 14,208.00
Pasir Pas 0.0190 85,000.00 1,615.00
15,823.00
C. Peralatan
Alat bant ls 1.0000 500.00 500.00
500.00
Jumlah 45,364.42
0ver head 0.1 4,536.44
Harga satuan 49,900.87
281 m² Pasangan lobang angin
a. UpahPekerja jam 0.8000 15,000.00 12,000.00
Tukang jam 0.3000 500.00 150.00
Mandor jam 0.1000 25,000.00 2,500.00
14,650.00
b. BahanLobang a Bh 27.0000 2,500.00 67,500.00
Semen Zak 0.2881 48,000.00 13,827.00
81,327.00
C. Peralatan
Alat bant ls 1.0000 500.00 500.00
500.00
Jumlah 96,477.00
0ver head 0.1 9,647.70
Harga satuan ###
Harga Satuan (Rp)
Jlh. Harga (Rp)
Total Harga (Rp)
M3
No. Uraian Satuan Koefisien
291 m² Pasangan plafond
a. UpahPekerja jam 2.6667 6,562.50 17,500.00
Mandor jam 0.1333 8,200.00 1,093.33
18,593.33
b. BahanTriplek 4 m² 1.0500 47,000.00 49,350.00
Paku Zak 0.2881 10,906.00 3,141.61
52,491.61
C. Peralatan
Alat bant ls 1.0000 500.00 500.00
500.00
Jumlah 71,584.94
0ver head 0.1 7,158.49
Harga satuan 78,743.44
301 m² Pasangan Dinding 1/2 Bata
a. UpahPekerja hr 0.3754 6,562.50 2,463.40
Tukang hr 0.1873 9,850.00 1,844.41
Mandor hr 0.0096 8,200.00 78.93
4,386.74
b. BahanBatu Bata Bh 70.0000 650.00 45,500.00
Semen Zak 0.5761 48,000.00 27,654.00
Pasir Pas M3 0.0470 85,000.00 3,995.00
77,149.00
C. Peralatan
Alat bant ls 1.0000 500.00 500.00
500.00
Jumlah 82,035.74
0ver head 0.1 8,203.57
Harga satuan 90,239.31
Belawan, September 2010
Dibuat oleh,
ASISTEN MANAJER FASILITAS
INGGU SARNAINI
Harga Satuan (Rp)
Jlh. Harga (Rp)
Total Harga (Rp)
PERHITUNGAN VOLUME BESI
PEKERJAAN PERLUASAN WORKSHOPBELAWAN INTERNATIONAL CONTAINER TERMINAL
No Ø Besi(mm) Jumlah Jumlah Berat Besi (Kg) Keterangan