D A F T A R U P A H P E K E R J A T A H U N S U M B E R D A T A : P A S A R D A E R A H : KABUPATEN Edisi Des NO. J E N I S B A H A N SAT 1 2 3 1 P e k e r j a Hr 2 M a n d o r Hr 3 T u k a n g l i s t r i k Hr 4 T u k a n g k a y u Hr 5 K e p . t k . k a y u Hr 6 T u k a n g b a t u Hr 7 K e p . t k . b a t u Hr 8 T u k a n g b e s i Hr 9 K e p . t k . b e s i Hr 10 T u k a n g c a t Hr 11 K e p . t k . c a t Hr 12 T u k a n g p l i t u r Hr 13 T u k a n g j a l a n Hr 14 T u k a n g g a l i Hr
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
D A F T A R U P A H P E K E R J A T A H U N 2 0 1 1
S U M B E R D A T A : P A S A R A N B E B A S D A E R A H : KABUPATEN MIMIKA
Edisi Desember 2012
NO. J E N I S B A H A N SAT HARGA
1 2 3 4
1 P e k e r j a Hr 100,000.00
2 M a n d o r Hr 175,000.00
3 T u k a n g l i s t r i k Hr 120,000.00
4 T u k a n g k a y u Hr 120,000.00
5 K e p . t k . k a y u Hr 150,000.00
6 T u k a n g b a t u Hr 120,000.00
7 K e p . t k . b a t u Hr 150,000.00
8 T u k a n g b e s i Hr 120,000.00
9 K e p . t k . b e s i Hr 150,000.00
10 T u k a n g c a t Hr 120,000.00
11 K e p . t k . c a t Hr 150,000.00
12 T u k a n g p l i t u r Hr 120,000.00
13 T u k a n g j a l a n Hr 120,000.00
14 T u k a n g g a l i Hr 100,000.00
2
305004875045000
48750
10.84990958409
27650
9493.75
Page 3 Daftar Harga Bahan 2012
D A F T A R H A R G A S A T U A N B A H A N B A N G U N A N
S U M B E R D A T A : P A S A R A N B E B A S
D A E R A H : KABUPATEN MIMIKA
Edisi Desember 2012
NO. J E N I S B A H A N sat Harga Satuan (Rp)
1 2 3 4
I B A H A N D A S A R 1 BATU BELAH Batu Kali 550,000.00
Batu Belah Bulat Putih 15/20 m3 575,000.00 Batu Belah Bulat Putih 5/7 m3 600,000.00 Batu Belah Batu Belah Hitam 15/20 m3 625,000.00 Batu Belah Batu Belah Hitam 5/7 m3 650,000.00 Batu Belah Batu Belah Hitam 3/5 m3 675,000.00
2 KERIKIL Batu Pecah 2/3 m3 950,000.00 Batu Pecah 1/2 m3 975,000.00 Batu Pecah 0,5/1 m3 1,000,000.00 Srtu Timbunan m3 125,000.00 Koral m3 350,000.00 Kerikil Biasa m3 350,000.00
6 KAPUR Padam m3 210,450.00 Semen Merah m3 13,623.33
7 PORTLAND CEMENT Semen PC kg 1,700.00 Semen warna kg 12,500.00
II B A H A N P E N U T U P A T A P 1 SIRAP (100 lbr) pak 4,803.75 2 GENTENG BETON
Genteng Beton Warna standard bh 4,331.00 Genteng Beton Warna Special bh 4,556.70 Genteng Beton Warna Khusus bh 4,723.54 Kerpus Beton Warna Standard bh 4,925.55 Kerpus Beton Warna Special bh 5,161.64 Kerpus Beton Warna Khusus bh 5,451.44
Page 4 Daftar Harga Bahan 2012
3 GENTENG TANAH LIAT Vlaam bh 879.93 Kodok bh 996.74 Kodok Glasur bh 5,947.50 Nok kerpus Kodok bh 3,954.83 Nok kerpus Kodok Glasur bh 5,749.25 Plentong super besar bh 1,265.75 Nok kerpus plentong super bh 4,473.33
4 GENTENG KACA Vlaam tebal 3 mm bh 8,761.82 Vlaam tebal 5 mm bh 10,884.14 Kodok tebal 3 mm bh 9,882.00 Kodok tebal 5 mm bh 12,352.50
5 ASBES GELOMBANG BESAR Asbes Gelombang Besar Uk. 200 cm X 110 cm X 5 mm bh 70,353.33 Asbes Gelombang Besar Uk . 225 cm X 110 cm X 5 mm bh 82,350.00 Asbes Gelombang Besar Uk . 250 cm X 110 cm X 5 mm bh 93,330.00 Asbes Gelombang Besar Uk . 200 cm X 110 cm X 6 mm bh 74,298.00 Asbes Gelombang Besar Uk . 225 cm X 110 cm X 6 mm bh 86,467.50 Asbes Gelombang Besar Uk . 250 cm X 110 cm X 6 mm bh 97,996.50 Asbes Gelombang Kecil Asbes Gelombang Kecil uk . 150 cm X 105 cm X 4 mm bh 37,006.67 Asbes Gelombang Kecil uk . 180 cm X 105 cm X 4 mm bh 40,937.78 Asbes Gelombang Kecil uk . 210 cm X 105 cm X 4 mm bh 49,959.00 Asbes Gelombang Kecil uk . 240 cm X 105 cm X 4 mm bh 59,078.50 Asbes Gelombang Kecil uk . 270 cm X 105 cm X 4 mm bh 68,320.00 Asbes Gelombang Kecil uk. 300 cm X 105 cm X 4 mm bh 79,910.00 Asbes Gelombang Kecil uk . 150 cm X 80 cm X 4 mm bh 27,282.37 Asbes Gelombang Kecil uk . 180 cm X 80 cm X 4 mm bh 29,604.28 Asbes Gelombang Kecil uk . 210 cm X 80 cm X 4 mm bh 34,248.08 Asbes Gelombang Kecil uk . 240 cm X 80 cm X 4 mm bh 38,311.42 Asbes Gelombang Kecil uk . 270 cm X 80 cm X 4 mm bh 63,736.26 Asbes Gelombang Kecil uk . 300 cm X 80 cm X 4 mm bh 68,689.66
6 ASBES PLAT Asbes Plat Uk.100cm X 100 cm X 3 mm bh 16,116.20 Asbes Plat Uk.100cm X 100 cm X 4 mm bh 22,875.00 Asbes Plat Uk.100cm X 100 cm X 5 mm bh 25,833.50 Asbes Plat Uk.100cm X 100 cm X 6 mm bh 32,635.00 Nok Nok Asbes Kerpus Asbes 1050x300x4 bh 30,622.00 Nok Asbes Stel Besar bh 31,923.33 Nok Asbes Paten Besar bh 35,786.67 Nokstel gelombang Nokstel gelombang Stel Besar bh 37,210.00 Nokstel gelombang Patent Besar 30x116x0,6 bh 46,512.50 Nokstel gelombang Plat besar 120x240x0,4 bh 65,117.50
7 FIBRE GLASS Fiber Gelas 180 X 92 cm bh 44,530.00 Fiber Gelas 200 X 92 cm bh 50,782.50 Fiber Gelas 250 X 92 cm bh 54,086.67 Fiber Gelas 180 X 105 cm bh 60,186.67 Fiber Gelas 200 X 105 cm bh 66,693.33 Fiber Gelas 250 X 105 cm bh 73,200.00
Page 5 Daftar Harga Bahan 2012
8 SENG PLAT Seng Plat BJLS 0,18 m' 17,995.00 Seng Plat BJLS 0,20 x 90 m' 27,602.50 Seng Plat BJLS 0,28 m' 32,940.00 Seng Plat BJLS 0,30 x 90 m' 44,936.67
9 SENG GELOMBANG Seng Gelombang BJLS 0,18 panjang 180 cm lbr 48,393.33 Seng Gelombang BJLS 0,20 panjang 180 cm lbr 49,132.73 Seng Gelombang BJLS 0,30 panjang 180 cm lbr 68,930.00 Seng Gelombang BJLS 0,40 panjang 180 cm lbr 79,300.00
10 ZINCALUME Zincalume Tebal 0,30 mm m' 63,440.00 Zincalume Tebal 0,35 mm m' 73,200.00 Zincalume Tebal 0,40 mm m' 85,400.00 Zincalume Tebal 0,50 mm m' 103,700.00
III . B A H A N K A Y U 1 JATI Papan m3 18,471,875.00
Balok/pesagen m3 15,921,000.00 2 KAMPER Papan m3 8,845,000.00
Balok/pesagen m3 8,540,000.00 3 KRUING Papan m3 7,938,486.90
Balok/pesagen m3 7,238,666.67 4 MERANTI Papan m3 5,185,000.00
Balok/pesagen m3 4,819,000.00 5 LANAN/BEGESTING Papan m3 5,111,416.67
Balok/pesagen m3 4,544,500.00 6 BENGKIRAI Papan m3 12,098,333.34
Balok/pesagen m3 11,132,500.00 4 MATOA Papan m3 2,100,000.00
Balok m3 2,000,000.00 4 KAYU BESI Papan m3 3,750,000.00
Balok m3 3,400,000.00 7 DOLKEN
Ø 8 - 10 x 400 cm ( Kayu BAKAU) bt 35,000.00 Ø 19 x 300 cm ( kayu BAKAU) bt 25,000.00
8 SENGON m3 686,860.00 9 KAYU BAKAR m3 500,000.00 10 BAMBU (6-8/600 cm)
Dolken Bambu Ori bt 19,977.50
IV . BAHAN PENUTUP DINDING / LANTAI 1 UBIN (TEGEL BIASA)
Ubin PC polos 30 X 30 cm m2 41,175.00 Ubin PC polos 20 X 20 cm m2 37,820.00 Ubin PC Warna 30 X 30 cm m2 54,137.50 Ubin PC Warna 20 X 20 cm m2 47,122.50
Teraso 30 X 30 cm m2 85,705.00 Teraso 20 X 20 cm m2 81,587.50
2 TEGEL PLINT Tegel PC warna 10 X 20 cm bh 1,830.00
Tegel PC abu-abu 15 x 20 bh 4,971.50 3 POLIS UBIN Lantai/badan m' 10,827.50
Plint m' 13,877.50 Trap m' 19,062.50
Page 6 Daftar Harga Bahan 2012
5 UBIN PORSELIN Lokal 11 X 11 putih dos 61,813.33
11 X 11 warna dos 61,813.33 Lokal 15 X 15 putih dos 71,980.00
15 X 15 warna dos 71,980.00 6 MOZAIK PORSELIN
10 X 20 cm m2 115,290.00 15 X 15 cm m2 202,926.67 20 X 20 cm m2 130,133.33 20 X 25 cm m2 133,590.00
7 Keramik 30 X 30 cm m2 42,928.75 20 X 20 cm m2 52,982.86 33 x 33 cm m2 84,180.00 25 x 25 cm m2 83,773.33 15 x 20 cm m2 53,680.00
8 KARPET Classic Bali m2 82,553.33 9 Batu Tempel Hitam m2 117,933.33 10 GRANITO 40 x 40 cm m2 159,413.33
60 x 60 cm m2 193,166.67 11 Marmer m2 849,933.33 12 Batu Paras m2 43,716.67 V . B A H A N C E T A K 1 10 cm - 100 cm bh 30,500.00
Ø 15 cm - 100 cm bh 36,000.00 Ø 20 cm - 100 cm bh 42,700.00 Ø 30 cm - 100 cm bh 58,966.67 Ø 50 cm - 100 cm bh 79,300.00 Ø 60 cm - 100 cm bh 139,062.89 Ø 70 cm - 100 cm bh 155,550.00 Ø 80 cm - 100 cm bh 215,177.33 Ø 100 cm - 100 cm bh 291,122.33 U 10 cm - 100 cm bh 28,060.00 U 15 cm - 100 cm bh 34,160.00 U 20 cm - 100 cm bh 38,633.33 U 30 cm - 100 cm bh 43,920.00 U 50 cm - 100 cm bh 49,206.67
2 LUBANG ANGIN (ROSTER) PC + PASIR 10 X 20 cm bh 4,168.33 20 X 20 cm bh 7,509.59 25 X 25 cm bh 8,540.00 30 X 30 cm bh 9,760.00 15 X 25 cm bh 10,370.00 15 X 30 cm bh 10,980.00
BUIS BETON Ø
Page 7 Daftar Harga Bahan 2012
VI . B A H A N B E S I 1 BESI BETON besi beton polos kg 19,000.00
besi beton ulir kg 20,000.00 2 BESI PLAT Besi Strip kg 7,030.71 3 BESI GALVANIS Besi Galvanis kg 12,200.00 4 BESI PROFIL Besi Profil CNP/UNP kg 12,078.00
5 JARING - JARING BAJA
Ø 4 - 2100 x 5400 mm lbr 701,500.00
Ø 6 - 2100 x 5400 mm lbr 1,242,570.00
5 BESI SIKU L 30 X 30 X 3 kg 8,207.15
L 40 X 40 X 4 kg 8,207.15
L 50 X 50 X 5 kg 8,207.15
6 kg 25,000.00
- Harmonika 12 X 45 mm m2 32,228.33
- Kawat Nyamuk Nylon m2 34,998.75
- Kawat Kasa m2 17,283.33
- Saringan pasir m2 14,884.00
- Kawat loket m2 18,763.60
- Kawat duri rol 82,214.44
- Kawat bronjong kg 18,544.00 VII . B A H A N P I P A 1 Pipa PVC SNI 06-0084-2002/ Standar ISO 4422 , S -10 (10 bar)
Pipa PVC (1/2 ") SCJ m 3,025.60 Pipa PVC ( 3/4" ) SCJ m 4,453.00 Pipa PVC ( 1" ) SCJ m 7,588.40
2 Pipa PVC SNI 06-0084-2002/ Standar ISO 4422 , S -10 (12,5 bar) Pipa PVC ( 2" ) SCJ m 27,023.00 Pipa PVC ( 3" ) SCJ m 54,790.20 Pipa PVC ( 4" ) SCJ m 82,289.00
3 Pipa Medium B Galvanis - SII Pipa Medium B Galvanis DN ½" m 15,616.76 Pipa Medium B Galvanis DN 25 ( ¾" ) m 19,940.39 Pipa Medium B Galvanis DN 32 ( 1" ) m 26,491.54 Pipa Medium B Galvanis DN 50 ( 1½" ) m 38,739.94 Pipa Medium B Galvanis DN 63 ( 2" ) m 52,762.15 Pipa Medium B Galvanis DN 2½" m 84,323.35 Pipa Medium B Galvanis DN 90 ( 3" ) m 107,295.95 Pipa Medium B Galvanis DN 110 ( 4" ) m 151,646.00 Pipa Medium B Galvanis DN 160 ( 6" ) m 242,414.00 Pipa Medium B Galvanis DN 160 ( 8" ) m 436,180.50 Pipa Medium B Galvanis DN 160 ( 10" ) m 615,815.33
KAWAT - Ikat beton/bendrat
Page 8 Daftar Harga Bahan 2012
4 Pipa Medium A Galvanis - SII Pipa Medium A Galvanis DN ½" m 19,977.50 Pipa Medium A Galvanis DN 25 ( ¾" ) m 25,620.00 Pipa Medium A Galvanis DN 32 ( 1" ) m 41,124.17 Pipa Medium A Galvanis DN 50 ( 1½" ) m 61,254.17 Pipa Medium A Galvanis DN 63 ( 2" ) m 83,163.33 Pipa Medium A Galvanis DN 2½" m 104,310.00 Pipa Medium A Galvanis DN 90 ( 3" ) m 132,166.67 Pipa Medium A Galvanis DN 110 ( 4" ) m 193,166.67
VIII . B A H A N L A N G I T - L A N G I T 1 AKUSTIK-uk : 30 X 30 lbr 13,725.00
30 X 60 lbr 15,961.67 60 X 120 lbr 22,875.00
List Kayu Profil 2 x 4 m' 7,747.00 2 SOFT BOARD-uk: 4'X 8'
Gypsum tebal 9 mm lbr 74,013.33 3 HARD BOARD-uk: 4'X 8' lbr 118,950.00 4 PLY WOOD
Teak wood 90 X 210 X 3 mm lbr 80,926.67 . 120 X 240 X 3 mm lbr 92,720.00 . 90 X 210 X 4 mm lbr 104,920.00 . 90 X 210 X 9 mm lbr 164,700.00 . 90 X 210 X 12 mm lbr 256,200.00 . 90 X 210 X 15 mm lbr 296,866.67 . 90 X 210 X 18 mm lbr 307,033.33 Tripleks . 120 X 240 X 3 mm lbr 51,683.64 . 120 X 240 X 4 mm lbr 67,527.00 . 120 X 240 X 6 mm lbr 80,723.33 Multipleks . 120 X 240 X 9 mm lbr 127,612.00 . 120 X 240 X 12 mm lbr 177,144.00 . 120 X 240 X 15 mm lbr 219,600.00 . 120 X 240 X 18 mm lbr 244,406.67 Formika ukuran pintu lbr 63,440.00
IX . B A H A N F I N I S H I N G 1 KAYU
Menie kg 22,147.69 Dempul plamur kg 19,131.82 Ambril/amplas lbr 3,331.54 Batu Apung kg 6,100.00 Cat dasar kg 21,984.40 Cat Penutup kg 31,354.00 . Sirlax ons 20,629.09 . Spiritus ltr 10,425.45 . Plitur jadi ltr 44,053.09
2 TEMBOK Kalkarium kg 5,591.67 Kapur sirih kg 8,235.00 Plamur kg 26,352.00 Cat Dasar kg 39,772.00 Cat Penutup kg 56,933.33
Page 9 Daftar Harga Bahan 2012
3 BESI Menie kg 21,738.18 Cat mengkilat kg 46,512.50 Cat dasar kg 18,300.00 Thinner A ltr 18,410.91 Minyak cat ltr 11,285.00 Thinner Super ltr 18,367.78 Residu (teer/aspal) blek 91,500.00
X . B A H A N K A C A 1 POLOS 3 mm m2 61,732.00
5 mm m2 76,372.00 2 ES KABUR 3 mm m2 77,775.00
5 mm m2 102,480.00 3 RAY BAND 3 mm m2 65,270.00
5 mm m2 84,790.00 XI . BAHAN INSTALASI LISTRIK 1 KABEL LISTRIK
N Y A : . 1 X 1 1/2 mm2 m' 1,240.33 SPLN LMK 1LMK 1 X 2 1/2 mm2 m' 2,379.00 N Y M : . 2 X 1 1/2 mm2 m' 2,257.00 SPLN 42-2LMK 2 X 2 1/2 mm2 m' 4,148.00
2 SKAKELAR Out bauw . Seri bh 10,736.00 . Engkel bh 11,224.00 In bauw . Seri bh 11,386.67 . Engkel bh 9,760.00
3 FUSE BOX (SEKERING KASA) 1 group bh 28,670.00 2 group bh 50,935.00
4 STEKER - Biasa bh 8,692.50 Arde bh 13,725.00 T Biasa bh 7,472.50 T dengan Arde bh 14,640.00
XII . ALAT - ALAT PENGUNCI & PENGGANTUNG 1 KUNCI TANAM Union : 1 X slag bh 118,950.00
2 X slag bh 140,300.00 Yale : 1 X slag bh 152,500.00
2 X slag bh 246,033.33 Kuda : 1 X slag bh 67,100.00
2 X slag bh 68,625.00
STOP KONTAK - Arde Outbow putih
Page 10 Daftar Harga Bahan 2012
2 ENGSEL DAN GERENDEL Engsel Angin bh 26,673.64 Kupu-kupu biasa bh 6,987.27 Nylon kupu-kupu bh 14,843.33 Espagnoled - dalam negeri bh 21,350.00 Grendel Tanam luar negeri bh 49,943.75 Grendel biasa bh 6,786.25 Kait Angin bh 7,930.00 Door Stop bh 32,177.50
XIII . BAHAN SANITAIR 1 KLOSET DUDUK bh 532,918.18 2 KLOSET JONGKOK bh 114,883.33 3 WASTAFEL MEJA OVAL bh 266,875.00 4 WASTAFEL GANTUNG BULAT bh 302,966.67 5 WASTAFEL GANTUNG SUDUT bh 91,500.00 6 WASTAFEL GANTUNG SUDUT KECIL bh 314,150.00 7 WASTAFEL BAK CUCI bh 249,422.22 8 TEMPAT SABUN GANTUNG bh 54,900.00 9 TEMPAT SABUN TANAM bh 37,653.64 10 LAIN - LAIN
Kran Air bh 15,707.50 Seal tape bh 4,244.58 Floor drain bh 9,353.33
XIV . ALAT PENGIKAT KAYU 1 Paku Biasa 1/2" - 1" kg 16,644.29
Paku Biasa 2" - 5 " kg 15,600.00 2 PAKU - payung kg 25,742.00 3 PAKU - sekrup doos 17,435.83 4 PAKU - beton doos 28,103.57 5 MUR BAUT (kuda-kuda) kg 10,675.00 6 ANGKUR BAUT KG 9,068.67 7 LEM KAYU bh 14,663.46
Paku Ramset bh 27,450.00 8 Tali Ijuk kg 3,863.33 XV . POMPA AIR. 1 POMPA AIR TANGAN
Dragon buatan Indonesia bh 393,450.00 2 POMPA AIR LISTRIK
6.15 Memasang 1 m² Terali Besi Strip (2x3) cm m2 406,975.00
6.16 Memasang 1 m² Kawat Nyamuk m2 24,375.00
6.17 Memasang 1 m² Jendela Nako & Tralis m2 47,175.00
6.18 Memasang 1 m¹ Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm m' 73,500.00
6.19 Memasang 1 m¹ Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm m' 56,900.00
XII Pt T-30-2000-C 6 PEKERJAAN KUNCI & KACA
6.2 Memasang 1 buah Kunci Tanam Biasa Buah 67,500.00
6.3 Memasang 1 Buah Kunci Silinder Buah 81,000.00
6.4 Memasang 1 buah Kunci Slot untuk Kamar Mandi atau WC Buah 33,750.00
6.5 Memasang 1 buah Engsel Pintu Buah 16,950.00
6.6 Memasang 1 buah Engsel Angin untuk pintu Buah 16,950.00
6.7 Memasang 1 buah engsel pintu klam Buah 81,500.00
6.8 Memasang 1 buah engsel jendela Buah 13,500.00
6.9 Memasang 1 buah Kait Angin Buah 27,000.00
6.10 Memasang 1 buah Door Closer Buah 27,000.00
6.11 Memasang 1 buah door holder Buah 13,500.00
6.12 Memasang 1 buah Door Stop Buah 16,950.00
6.13 Memasang 1 buah Rel Pintu Dorong Buah 123,000.00
6.14 Memasang 1 buah Gerendel m2 16,750.00
6.16 Memasang 1 m² Kaca tebal 3 mm m2 51,600.00
6.17 Memasang 1 m² Kaca tebal 5 mm m2 51,600.00
6.20 Memasang 1 m² Kaca Raiben (Cermin) tebal 5 mm m2 51,600.00
XIII 7395:2008 6 PEKERJAAN PENUTUP LANTAI & DINDING
6.2 Memasang 1 m² lantai Ubin PC Abu-abu Ukuran (30 x 30) cm m2 45,825.00
6.3 Memasang 1 m² lantai Ubin PC Abu-abu Ukuran (20 x 20) cm m2 47,750.00
6.5 Memasang 1 m² lantai Ubin Warna Ukuran (30 x 30) cm m2 45,825.00
6.6 Memasang 1 m² lantai Ubin Warna Ukuran (20 x 20) cm m2 47,750.00
6.8 Memasang 1 m² lantai Ubin Traso Ukuran (30 x 30) cm m2 45,825.00
6.9 Memasang 1 m² lantai Ubin Granit Ukuran ( 40 x 40 ) cm m2 43,475.00
6.16 Memasang 1 m² Plint Ubin PC abu -abu Ukuran (15 x 20 ) cm m2 22,025.00
6.19 Memasang 1m¹ Plint Ubin PC Warna Ukuran (10 x 20) cm m' 22,025.00
6.34 Memasang 1 m² Lantai Keramik Ukuran (33 x 33) cm m2 123,375.00
6.35 Memasang 1 m² Lantai Keramik Ukuran (30 x 30) cm m2 123,375.00
6.36 Memasang 1 m² Lantai Keramik Ukuran (20 x 20) cm m2 123,375.00
6.43 Memasang 1 m² Lantai Marmer Ukuran (100x100) cm m2 123,375.00
6.44 Memasang 1 m² Lantai Karpet m2 41,525.00 6.54 Memasang 1 m² Dinding Keramik Ukuran (20x20) cm, m2 -
6.55 Memasang 1 m² Dinding Marmer Ukuran (100x100) cm m2 229,125.00
6.57 Memasang 1 m² Dinding Batu Paras / Batu Tempel Hitam m2 123,375.00
6.60 Memasang 1 m² Wall Paper Lebar 50 cm m2 58,900.00
6.63 Memasang 1 m¹ Plint Kayu Kamper Ukuran (2x10) cm m' 822,650.00
XIV 6 PEKERJAAN PENGECATAN 6.1 Mengikis / Mengerok 1 m² Permukaan Cat Tembok Lama m2 15,437.50
6.2 Mencuci 1 m² Bidang Permukaan Tembok yang Pernah dicat m2 15,437.50
6.3 Mengerok 1 m² Karat Cat Lama permukaan Baja dg cara manual m2 15,437.50
6.4 Menyabun 1 m² Permukaan Tembok Lama m2 15,437.50
6.6 Mendempul dan Menggosok 1 m² Kayu m2 9,837.50
6.7 Pengecatan 1 m² Bidang Lama Kayu m2 17,562.50
C235
User:
D235
User:
G235
User:
H235
User:
C236
User:
D236
User:
G236
User:
H236
User:
C248
User:
D248
User:
G248
User:
H248
User:
G249
User:
C272
User:
D272
User:
G272
User:
H272
User:
C274
User:
D274
User:
G274
User:
H274
User:
H275
User:
Page 18 sat.pekerjaan
HARGA SATUAN
NO. SNI KODE URAIAN PEKERJAAN SAT PEKERJAAN
(Rp)
6.8 Pengecatan 1 m² Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 2 lap.Cat Penutup m2 9,417.50 6.9 Pengecatan 1 m² Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 3 lap.Cat Penutup m2 20,637.50
6.10 Pelaburan 1 m² Bidang Kayu dg Teak Oil m2 21,447.50 6.11 Pelaburan 1 m² Bidang Kayu dg Politur m2 10,037.50 6.12 Pelaburan 1 m² Bidang Kayu dg Cat Residu & Ter m2 11,050.00 6.13 Pelaburan 1 m² Bidang Kayu dg Vernis m2 38,037.50 6.14 Pengecatan 1 m² Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) m2 10,942.50 6.15 Pengecatan 1 m² Tembok Lama (1lap.Plamir, 2lap Cat Penutup) m2 8,907.50
6.20 Pengecatan 1 m² Permukaan Baja dg Meni Besi m2 28,050.00 6.21 Pengecatan 1 m² Permukaan Baja dg Meni Besi & Perancah m2 56,687.50
XV PEKERJAAN PAVING
G.55.b.1 Pasang Paving Tebal 6 cm (K.200) (Type Holland) m² 38,470.00
G.55.b.2 Pasang Paving Tebal 6 cm (K.250) (Type Holland) m² 38,470.00
G.55.b.3 Pasang Paving Tebal 6 cm (K.300) (Type Holland) m² 38,470.00
G.55.b.4 Pasang Paving Tebal 6 cm (K.400) (Type Holland) m² 38,470.00
G.55.c.1 Pasang Paving Tebal 8 cm (K.250) (Type Holland) m² 38,470.00
G.55.c.2 Pasang Paving Tebal 8 cm (K.300) (Type Holland) m² 38,470.00
G.55.c.3 Pasang Paving Tebal 8 cm (K.400) (Type Holland) m² 38,470.00
G.55.d.1 Pasang Paving Segitiga Kecil Tebal 6 cm (K.300) m² 38,470.00
G.55.d.2 Pasang Paving Segitiga Besar Tebal 6 cm (K.300) m² 38,470.00
G.55.e.1 Pasang Paving Segitiga Besar Tebal 8 cm (K.300) m² 38,470.00
Dihit I Pasang Kanstin Ukuran 13/16 x 28 x 50 K.200 ( Kanan + Kiri ) m 6,000.00
Dihit II Pasang Kanstin Ukuran 10 x 20 x 50 K.200 (Kanan + Kiri) m 6,000.00
Purwodadi, Desember 2011
: ………………………. Kepala Dinas
Sekretaris Dinas Cipta Karya Tata Ruang dan Kebersihan
NIP.19611023 198608 1 001 Kabupaten Grobogan
: ……………………….
Kepala Bidang Perumahan dan Permukiman
NIP.19690911 199603 1 002 Ir. Muchamad Chanif, MT
NIP.19611007 199003 1 004
: ……………………….
Kepala Bidang Tata Ruang
NIP.19720503 199703 1 006
: ……………………….
Kepala Bidang Kebersihan
NIP.19590727 199203 1 004
: ………………………. Kepala Bidang Pertamanan dan PJU NIP.19660627 199303 1 009
Diperiksa oleh :
1. Aditya Wahyu Wardhana, SH, MM
2. Aris Munandar, ST, MT
3. Joni Sarjono, ST
4. Ir Ahmad Wahib Suyuti
5. Ir. Budi Prihantoro, Msi
C286
User:
D286
User:
G286
User:
H286
User:
C325
User:
D325
User:
G325
User:
H325
User:
G327
User:
H327
User:
H328
User:
G329
User:
G331
User:
G332
User:
G333
User:
G334
User:
Page 19 ABK
DAFTAR ANALISA PEKERJAAN TAHUN 2012
SUMBER DATA : Pasaran BebasDAERAH : Kabupaten MimikaJENIS PEKERJAAN : I. Pekerjaan Persiapan Untuk Konstruksi Bangunan Gedung dan Perumahan
HARGA (Rp) JUMLAH (Rp) No. RSNI INDEKS SAT. URAIAN PEKERJAAN BAHAN UPAH BAHAN UPAH
1 2 4 5 6 7 8
I T-12-2002 PEKERJAAN PERSIAPANMembuat 1 m Pagar Sementara dari Seng Gelombang Tinggi 2,00 m 704,377.11 70,500.00 1.250 Btg Dolken Bambu 19,977.50 24,971.88 - 2.500 Kg Portland Semen (PC) 1,700.00 4,250.00 - 1.200 Lbr Seng Gelombang 3" - 5" 68,930.00 82,716.00 - 0.005 m3 Pasir Beton 320,000.00 1,600.00 - 0.009 m3 Koral Beton 2 x 3 950,000.00 8,550.00 - 0.072 m3 Kayu 5/7X4m Kayu Kruing 7,938,486.90 571,571.06 - 0.060 Kg Paku Biasa 2" - 5" 15,600.00 936.00 - 0.450 Kg Meni Besi 21,738.18 9,782.18 - 0.200 OH Tukang Kayu 120,000.00 - 24,000.00 0.400 OH Pekerja 100,000.00 - 40,000.00 0.020 OH Kepala Tukang 150,000.00 - 3,000.00 0.020 OH Mandor 175,000.00 - 3,500.00
Mengukur dan Memasang 1 m Bouwplank 142,745.41 24,375.00 0.012 m3 Kayu 5/7x 4m Kayu Kruing 7,238,666.67 86,864.00 - 0.020 Kg Paku Biasa 2" - 5" 15,600.00 312.00 - 0.007 m3 Kayu Papan 3/20 Kruing 7,938,486.90 55,569.41 - 0.100 OH Tukang Kayu 120,000.00 - 12,000.00 0.100 OH Pekerja 100,000.00 - 10,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.005 OH Mandor 175,000.00 - 875.00
Membuat 1m2 Kantor Sementara dg Lantai Plesteran 1,279,189.34 613,750.00 1.250 Btg Dolken Bambu 19,977.50 24,971.88 - 0.180 m3 Kayu Lanan / Begesting 4,544,500.00 818,010.00 - 0.850 Kg Paku Biasa 2" - 5" 15,600.00 13,260.00 - 1.100 Kg Besi Strip 7,030.71 7,733.78 - 35.000 Kg Portalnd Semen (PC) 1,700.00 59,500.00 - 0.150 m3 Pasir pasang (PP) 350,000.00 52,500.00 - 0.100 m3 Pasir Beton 320,000.00 32,000.00 - 0.150 m3 Koral Beton 2 x3 950,000.00 142,500.00 - 30.000 buah Batu bata Merah 2,100.00 63,000.00 - 0.250 Lbr Seng Plat 17,995.00 4,498.75 - 2.000 buah Jendela Naco 18,910.00 37,820.00 - 0.080 m2 Kaca Polos 3 mm 61,732.00 4,938.56 - 0.150 buah Kunci Tanam 1 slag 67,100.00 10,065.00 - 0.300 buah Engsel 6,987.27 2,096.18 -
IV 6897:2008 P E K E R J A A N D I N D I N GMemasang 1 m² Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 Bata, Campuran Spesi 1PC : 395,950.00 92,250.00 140.000 Buah Bata Merah 2,100.00 294,000.00 - 43.500 Kg Portland Semen (PC #N/A 1,700.00 73,950.00 - 0.080 Pasir Pasang (PP) 350,000.00 28,000.00 - 0.600 OH Pekerja 100,000.00 - 60,000.00 0.200 OH Tukang Batu 120,000.00 - 24,000.00 0.020 OH Kepala Tukang Batu 150,000.00 - 3,000.00 0.030 OH Mandor 175,000.00 - 5,250.00
Memasang 1 m ² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Campuran spesi 1PC : 381,865.00 92,250.00 140.000 Buah Bata Merah 2,100.00 294,000.00 - 32.950 Kg Portland Semen (PC) 1,700.00 56,015.00 - 0.091 m³ Pasir Pasang (PP) 350,000.00 31,850.00 - 0.600 OH Pekerja 100,000.00 - 60,000.00 0.200 OH Tukang Batu 120,000.00 - 24,000.00 0.020 OH Kepala Tukang Batu 150,000.00 - 3,000.00 0.030 OH Mandor 175,000.00 - 5,250.00
Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Campuran Spesi 1PC : 371,685.00 92,250.00 140.000 Buah Bata Merah 2,100.00 294,000.00 - 26.550 Kg Portland Semen (PC) 1,700.00 45,135.00 - 0.093 m³ Pasir Pasang (PP) 350,000.00 32,550.00 - 0.600 OH Pekerja 100,000.00 - 60,000.00 0.200 OH Tukang Batu 120,000.00 - 24,000.00 0.020 OH Kepala Tukang Batu 150,000.00 - 3,000.00 0.030 OH Mandor 175,000.00 - 5,250.00
Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Campuran Spesi 1PC : 367,440.00 92,250.00 140.000 Buah Bata Merah 2,100.00 294,000.00 - 22.200 Kg Portland Semen (PC) 1,700.00 37,740.00 - 0.102 m³ Pasir Pasang (PP) 350,000.00 35,700.00 - 0.600 OH Pekerja 100,000.00 - 60,000.00 0.200 OH Tukang Batu 120,000.00 - 24,000.00 0.020 OH Kepala Tukang Batu 150,000.00 - 3,000.00 0.030 OH Mandor 175,000.00 - 5,250.00
Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Campuran Spesi 1PC : 368,150.00 92,250.00
m³
Page 29 ABK
140.000 Buah Bata Merah 2,100.00 294,000.00 - 18.500 Kg Portland Semen (PC) 1,700.00 31,450.00 - 0.122 m³ Pasir Pasang (PP) 350,000.00 42,700.00 - 0.600 OH Pekerja 100,000.00 - 60,000.00 0.200 OH Tukang Batu 120,000.00 - 24,000.00 0.020 OH Kepala Tukang Batu 150,000.00 - 3,000.00 0.030 OH Mandor 175,000.00 - 5,250.00
Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Campuran Spesi 1PC : 3 349,298.38 87,000.00 140.000 Buah Bata Merah 2,100.00 294,000.00 - 10.080 Kg Portland Semen (PC) 1,700.00 17,136.00 - 0.0925 m³ Pasir Pasang (PP) 350,000.00 32,375.00 - 0.0275 m³ Kapur Padam (KP) 210,450.00 5,787.38 - 0.600 OH Pekerja 100,000.00 - 60,000.00 0.200 OH Tukang Batu 120,000.00 - 24,000.00 0.020 OH Kepala Tukang Batu 150,000.00 - 3,000.00 0.030 OH Mandor 175,000.00 - 5,250.00
Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 187,212.10 46,125.00 70.000 Buah Bata Merah 2,100.00 147,000.00 - 18.950 Kg Pasir Pasang (PP) 1,700.00 32,215.00 - 0.038 m³ Kapur Padam (KP) 210,450.00 7,997.10 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.100 OH Tukang Batu 120,000.00 - 12,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.015 OH Mandor 175,000.00 - 2,625.00
Memasang 1 m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 179,847.00 46,125.00 70.000 Buah Bata Merah 2,100.00 147,000.00 - 14.370 Kg Pasir Pasang (PP) 1,700.00 24,429.00 - 0.040 m³ Kapur Padam (KP) 210,450.00 8,418.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.100 OH Tukang Batu 120,000.00 - 12,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.015 OH Mandor 175,000.00 - 2,625.00
Memasang 1m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 181,600.00 46,125.00 70.000 Buah Bata Merah 2,100.00 147,000.00 - 11.500 Kg Portland Semen (PC) 1,700.00 19,550.00 - 0.043 m³ Pasir Pasang (PP) 350,000.00 15,050.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.100 OH Tukang Batu 120,000.00 - 12,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.015 OH Mandor 175,000.00 - 2,625.00
Memasang 1m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 179,206.00 46,125.00 70.000 Buah Bata Merah 2,100.00 147,000.00 - 9.680 Kg Portland Semen (PC) 1,700.00 16,456.00 - 0.045 m³ Pasir Pasang (PP) 350,000.00 15,750.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.100 OH Tukang Batu 120,000.00 - 12,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.015 OH Mandor 175,000.00 - 2,625.00
Memasang 1m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 178,294.00 46,125.00 70.000 Buah Bata Merah 2,100.00 147,000.00 - 8.320 Kg Portland Semen (PC) 1,700.00 14,144.00 - 0.049 m³ Pasir Pasang (PP) 350,000.00 17,150.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.100 OH Tukang Batu 120,000.00 - 12,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.015 OH Mandor 175,000.00 - 2,625.00
Memasang 1m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 175,550.00 46,125.00 70.000 Buah Bata Merah 2,100.00 147,000.00 - 6.500 Kg Portland Semen (PC) 1,700.00 11,050.00 - 0.050 m³ Pasir Pasang (PP) 350,000.00 17,500.00 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.100 OH Tukang Batu 120,000.00 - 12,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.015 OH Mandor 175,000.00 - 2,625.00
Page 30 ABK
Memasang 1m² Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Campuran Spesi 1PC : 175,306.75 46,125.00 70.000 Buah Bata Merah 2,100.00 147,000.00 - 4.500 Kg Portland Semen (PC) 1,700.00 7,650.00 - 0.050 m³ Pasir Pasang (PP) 350,000.00 17,500.00 - 0.015 m³ Kapur Padam (KP) 210,450.00 3,156.75 - 0.300 OH Pekerja 100,000.00 - 30,000.00 0.100 OH Tukang Batu 120,000.00 - 12,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.015 OH Mandor 175,000.00 - 2,625.00
XV G.55.d.1 1 m² Pasang Paving Segitiga Kecil Tebal 6 cm (K.300) 77,451.16 38,470.00 1.000 m² Paving Block K.300 70,115.52 70,115.52 - 0.050 m³ Pasir Urug 115,026.61 5,751.33 - 0.010 m³ Pasir Pasang 158,430.56 1,584.31 - 0.060 OH Pekerja 100,000.00 - 6,000.00 0.006 OH Tukang Batu 120,000.00 - 720.00 0.200 OH Kepala Tukang 150,000.00 - 30,000.00 0.010 OH Mandor 175,000.00 - 1,750.00
XV G.55.d.2 1 m² Pasang Paving Segitiga Besar Tebal 6 cm (K.300) 78,832.50 38,470.00 1.000 m² Paving Block K.300 71,496.86 71,496.86 - 0.050 m³ Pasir Urug 115,026.61 5,751.33 - 0.010 m³ Pasir Pasang 158,430.56 1,584.31 - 0.060 OH Pekerja 100,000.00 - 6,000.00 0.006 OH Tukang Batu 120,000.00 - 720.00 0.200 OH Kepala Tukang 150,000.00 - 30,000.00 0.010 OH Mandor 175,000.00 - 1,750.00
XV G.55.e.1 1 m² Pasang Paving Segitiga Besar Tebal 8 cm (K.300) 105,581.00 38,470.00 1.000 m² Paving Block K.300 98,245.36 98,245.36 - 0.050 m³ Pasir Urug 115,026.61 5,751.33 - 0.010 m³ Pasir Pasang 158,430.56 1,584.31 - 0.060 OH Pekerja 100,000.00 - 6,000.00 0.006 OH Tukang Batu 120,000.00 - 720.00 0.200 OH Kepala Tukang 150,000.00 - 30,000.00 0.010 OH Mandor 175,000.00 - 1,750.00
XV Dihit I 1 m Pasang Kanstin Ukuran 13/16 x 28 x 50 K.200 ( Kanan + Kiri ) 85,489.28 6,000.00 4.000 bh Kanstin Ukuran 13/16 x 28 x 50 (K.200) 21,372.32 85,489.28 - 0.060 m³ Pekerja 100,000.00 - 6,000.00
XV Dihit II 1 m Pasang Kanstin Ukuran 10 x 20 x 50 K.200 (Kanan + Kiri) 47,061.17 6,000.00 4.000 bh Kanstin Ukuran 10 x 20 x 50 (K.200) 11,765.29 47,061.17 - 0.060 m³ Pekerja 100,000.00 - 6,000.00
VI 3434:2008 PEKERJAAN KAYU
Membuat dan Memasang 1m³ Kusen Pintu dan Kusen Jendela, Kayu klas I (Kayu Jati) 17,547,263.46 3,596,250.00 1.100 Kayu Klas I (Jati) , Balok 15,921,000.00 17,513,100.00 - 1.250 kg Paku Biasa 2" - 5 " 15,600.00 19,500.00 - 1.000 kg Lem Kayu 14,663.46 14,663.46 - 7.000 OH Pekerja 100,000.00 - 700,000.00 21.000 OH Tukang Kayu 120,000.00 - 2,520,000.00 2.100 OH Kepala Tukang 150,000.00 - 315,000.00 0.350 OH Mandor 175,000.00 - 61,250.00
Membuat dan Memasang 1m³ Kusen Pintu dan Kusen Jendela Kayu klas II (kayu Kamper) 10,282,163.46 3,082,500.00 1.200 Kayu Klas II (Kamfer) , Balok 8,540,000.00 10,248,000.00 - 1.250 kg Paku Biasa 2" - 5 " 15,600.00 19,500.00 - 1.000 kg Lem Kayu 14,663.46 14,663.46 -
Membuat dan Memasang 1m² Pintu Klamp Standard Kayu Klas II (Kayu Kamfer) 354,580.00 179,900.00 0.040 Kayu Klas II (Kamfer), papan 8,845,000.00 353,800.00 - 0.050 Kg Paku Biasa 2" - 5 " 15,600.00 780.00 - 0.350 OH Pekerja 100,000.00 - 35,000.00 1.050 OH Tukang Kayu 120,000.00 - 126,000.00 0.105 OH Kepala Tukang 150,000.00 - 15,750.00 0.018 OH Mandor 175,000.00 - 3,150.00
- - Membuat dan Memasang 1m² Daun Pintu Panel Kayu Kayu Klas II (Kayu Kamfer) 361,131.73 513,750.00 0.040 Kayu Klas II (Kamfer), papan 8,845,000.00 353,800.00 - 0.500 kg Lem Kayu 14,663.46 7,331.73 - 1.000 OH Pekerja 100,000.00 - 100,000.00 3.000 OH Tukang Kayu 120,000.00 - 360,000.00 0.300 OH Kepala Tukang 150,000.00 - 45,000.00 0.050 OH Mandor 175,000.00 - 8,750.00
Membuat dan Memasang 1m² Pintu dan Jendela Kaca Kayu Klas II (Kayu Kamfer) 216,679.04 411,000.00 0.024 Kayu Klas II (Kamfer), papan 8,845,000.00 212,280.00 - 0.300 kg Lem Kayu 14,663.46 4,399.04 - 0.800 OH Pekerja 100,000.00 - 80,000.00 2.400 OH Tukang Kayu 120,000.00 - 288,000.00 0.240 OH Kepala Tukang 150,000.00 - 36,000.00 0.040 OH Mandor 175,000.00 - 7,000.00
Membuat dan Memasang 1m² Pintu dan Jendela Jalusi Kayu Klas I (Kayu Jati) 1,189,531.73 513,750.00 0.064 Kayu Klas I (Jati), papan 18,471,875.00 1,182,200.00 - 0.500 kg Lem Kayu 14,663.46 7,331.73 - 1.000 OH Pekerja 100,000.00 - 100,000.00 3.000 OH Tukang Kayu 120,000.00 - 360,000.00 0.300 OH Kepala Tukang 150,000.00 - 45,000.00 0.050 OH Mandor 175,000.00 - 8,750.00
Membuat 1m² Daun Pintu kayu lapis (Plywood) Rangkap, Rangka Tertutup Kayu Klas II (lebar s #VALUE! #VALUE!(Kayu Kamper) #VALUE! #VALUE! 0.025 Kayu Klas II (Kamfer), papan 8,845,000.00 221,125.00 - 0.030 Kg Paku Biasa 1/2" - 1" 16,644.29 499.33 - 0.500 Ltr Lem Kayu 14,663.46 7,331.73 - 1.000 Lbr Plywood tebal 4 mm uk.90x210 cm 104,920.00 104,920.00 - 0.700 OH Pekerja 100,000.00 - 70,000.00 2.100 OH Tukang Kayu 120,000.00 252,000.00 0.210 OH Kepala Tukang 150,000.00 31,500.00 0.035 OH Mandor 175,000.00 6,125.00
Membuat 1m² Pintu Plywood rangkap, rangka expose kayu klas II (Kayu Kamfer) 339,183.06 411,000.00 0.0256 Kayu Klas II (Kamfer), papan 8,845,000.00 226,432.00 - 0.030 Kg Paku Biasa 1/2" - 1" 16,644.29 499.33 - 0.500 Ltr Lem Kayu 14,663.46 7,331.73 - 1.000 Lbr Plywood tebal 4 mm uk.90x210 cm 104,920.00 104,920.00 - 0.800 OH Pekerja 100,000.00 - 80,000.00 2.400 OH Tukang Kayu 120,000.00 - 288,000.00 0.240 OH Kepala Tukang 150,000.00 36,000.00 0.040 OH Mandor 175,000.00 7,000.00
-
Memasang 1m² Jalusi Kusen Kayu Klas I (kayu Jati) 1,110,809.14 395,625.00 0.060 Kayu Klas I (Jati), papan 18,471,875.00 1,108,312.50 - 0.150 Kg Paku Biasa 1/2" - 1" 16,644.29 2,496.64 - 0.670 OH Pekerja 100,000.00 - 67,000.00 2.000 OH Tukang Kayu 120,000.00 - 240,000.00 0.200 OH Kepala Tukang 150,000.00 - 30,000.00 0.335 OH Mandor 175,000.00 - 58,625.00
Memasang 1m² Teakwood Rangkap, Rangka Expose Kayu Klas I (Kayu Jati) 571,615.24 411,000.00 0.025 Kayu Klas I (Jati), papan 18,471,875.00 461,796.88 - 0.030 Kg Paku Biasa 1/2" - 1" 16,644.29 499.33 - 0.300 kg Lem Kayu 14,663.46 4,399.04 - 1.000 Lbr Teakwood (90 x 210) cm x 4 mm 104,920.00 104,920.00 -
Memasang 1m² Pintu Teakwood Rangkap Lapis Formika, Rangka expose Kayu Klas II Rangka ex #VALUE! #VALUE!Kayu Kamfer #VALUE! #VALUE! 0.025 Kayu Klas II (Kamfer), papan 8,845,000.00 221,125.00 - 0.030 Kg Paku Biasa 1/2" - 1" 16,644.29 499.33 - 0.800 kg Lem Kayu 14,663.46 11,730.77 - 1.000 Lbr Teakwood (90 x 210) cm x 4 mm 104,920.00 104,920.00 - 0.500 Lbr Formika 118,950.00 59,475.00 - 0.850 OH Pekerja 100,000.00 - 85,000.00 2.550 OH Tukang Kayu 120,000.00 - 306,000.00 0.255 OH Kepala Tukang 150,000.00 - 38,250.00 0.043 OH Mandor 175,000.00 - 7,525.00
Memasang 1m³ Konstruksi Kuda-kuda Konvensional Kayu Kelas II Bentang 6 meter #VALUE! #VALUE!Kayu Kamfer #VALUE! #VALUE! 1.100 Kayu Kamfer, balok 8,540,000.00 9,394,000.00 - 15.000 Kg Besi Strip 7,030.71 105,460.58 - 5.600 Kg Paku Biasa 2" - 5" 16,644.29 93,208.00 - 4.000 OH Pekerja 100,000.00 - 400,000.00 12.000 OH Tukang Kayu 120,000.00 - 1,440,000.00 1.200 OH Kepala Tukang 150,000.00 - 180,000.00 0.200 OH Mandor 175,000.00 - 35,000.00
Memasang 1m³ Konstruksi Kuda-kuda Expose, Kayu Klas I (Kayu Jati) 19,298,020.58 3,442,125.00 1.200 Kayu Klas I (jati), balok 15,921,000.00 19,105,200.00 - 15.000 Kg Besi Strip 7,030.71 105,460.58 - 5.600 Kg Paku Biasa 2" - 5" 15,600.00 87,360.00 - 6.700 OH Pekerja 100,000.00 - 670,000.00 20.100 OH Tukang Kayu 120,000.00 - 2,412,000.00 2.010 OH Kepala Tukang 150,000.00 - 301,500.00 0.335 OH Mandor 175,000.00 - 58,625.00
- - Memasang 1m³ konstruksi Gording, Kayu Klas II Kayu Kamfer 9,546,260.58 1,233,000.00 1.100 Kayu Klas II (Kamfer), balok 8,540,000.00 9,394,000.00 - 15.000 Kg Besi Strip 7,030.71 105,460.58 - 3.000 Kg Paku Biasa 2" - 5" 15,600.00 46,800.00 - 2.400 OH Pekerja 100,000.00 - 240,000.00 7.200 OH Tukang Kayu 120,000.00 - 864,000.00 0.720 OH Kepala Tukang 150,000.00 - 108,000.00 0.120 OH Mandor 175,000.00 - 21,000.00
Memasang 1m² Usuk Reng Genteng Lokal, Kayu Klas II Kayu Kamfer 154,204.00 24,375.00 0.014 Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm 8,540,000.00 119,560.00 - 0.0036 Reng (2x3) cm, Kayu Kamper 8,540,000.00 30,744.00 - 0.250 Kg Paku Biasa 2" - 5" 15,600.00 3,900.00 - 0.100 OH Pekerja 100,000.00 - 10,000.00 0.100 OH Tukang Kayu 120,000.00 - 12,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.005 OH Mandor 175,000.00 - 875.00
Memasang 1m² Usuk Reng Genteng Beton, Kayu Klas II Kayu Kamfer 184,948.00 24,375.00 0.014 Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm 8,540,000.00 119,560.00 - 0.0072 Reng (2x3) cm, Kayu Kamper 8,540,000.00 61,488.00 - 0.250 Kg Paku Biasa 2" - 5" 15,600.00 3,900.00 - 0.100 OH Pekerja 100,000.00 - 10,000.00 0.100 OH Tukang Kayu 120,000.00 - 12,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00 0.005 OH Mandor 175,000.00 - 875.00
Memasang 1m² Rangka Atap Sirap, Kayu Klas II (Kayu Kamfer) 1,412,220.00 29,250.00 0.165 Kayu Klas II (Kamfer), balok 8,540,000.00 1,409,100.00 - 0.200 Kg Paku Biasa 2" - 5" 15,600.00 3,120.00 - 0.120 OH Pekerja 100,000.00 - 12,000.00 0.120 OH Tukang Kayu 120,000.00 - 14,400.00 0.012 OH Kepala Tukang 150,000.00 - 1,800.00 0.006 OH Mandor 175,000.00 - 1,050.00
m³
m³
m³
m³
m³m³
m³m³
m³
Page 39 ABK
Memasang 1m² Rangka Langit-langit (50x100) cm, kayu Klas II Kayu Kamfer 134,636.00 68,625.00 0.0154 Kayu Klas II (Kamfer), balok 8,540,000.00 131,516.00 - 0.200 Kg Paku Biasa 2" - 5" 15,600.00 3,120.00 - 0.150 OH Pekerja 100,000.00 - 15,000.00 0.300 OH Tukang Kayu 120,000.00 - 36,000.00 0.030 OH Kepala Tukang 150,000.00 - 4,500.00 0.075 OH Mandor 175,000.00 - 13,125.00
- - Memasang 1m² Rangka Langit-langit (60x60) cm, kayu Klas II atau III Kayu Kamfer 143,102.00 62,250.00 0.0163 Kayu Klas II (Kamfer), balok 8,540,000.00 139,202.00 - 0.250 Kg Paku Biasa 2" - 5" 15,600.00 3,900.00 - 0.200 OH Pekerja 100,000.00 - 20,000.00 0.300 OH Tukang Kayu 120,000.00 - 36,000.00 0.030 OH Kepala Tukang 150,000.00 - 4,500.00 0.010 OH Mandor 175,000.00 - 1,750.00
- - 201,056.25 37,875.00
0.0108 Kayu klas I (Jati), papan 18,471,875.00 199,496.25 - 0.100 Kg Paku Biasa 2" - 5" 15,600.00 1,560.00 - 0.100 OH Pekerja 100,000.00 - 10,000.00 0.200 OH Tukang Kayu 120,000.00 - 24,000.00 0.020 OH Kepala Tukang 150,000.00 - 3,000.00 0.005 OH Mandor 175,000.00 - 875.00
Memasang 1m¹ Listplank Uk. (3x30)cm Kayu klas I atau klas II Kayu Kamfer 98,075.00 37,875.00 0.011 Kayu klas II (Kamfer), papan 8,845,000.00 97,295.00 - 0.050 Kg Paku Biasa 2" - 5" 15,600.00 780.00 - 0.100 OH Pekerja 100,000.00 - 10,000.00 0.200 OH Tukang Kayu 120,000.00 - 24,000.00 0.020 OH Kepala Tukang 150,000.00 - 3,000.00 0.005 OH Mandor 175,000.00 - 875.00
Memasang 1m² Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III Kayu Kamfer 241,460.00 77,150.00 0.028 Kayu klas II (Kamfer), balok 8,540,000.00 239,120.00 - 0.150 Kg Paku Biasa 2" - 5" 15,600.00 2,340.00 - 0.150 OH Pekerja 100,000.00 - 15,000.00 0.450 OH Tukang Kayu 120,000.00 - 54,000.00 0.045 OH Kepala Tukang 150,000.00 - 6,750.00 0.008 OH Mandor 175,000.00 - 1,400.00
Memasang 1m² Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II Kayu Kamfer 307,744.76 77,150.00 0.028 Kayu klas II (Kamfer), balok 8,540,000.00 239,120.00 - 0.150 Kg Paku Biasa 2" - 5" 15,600.00 2,340.00 - 0.860 Lbr Teakwood 120 x 240 cm tebal 4mm 67,527.00 58,073.22 - 0.560 Ltr Lem Kayu 14,663.46 8,211.54 - 0.150 OH Pekerja 100,000.00 - 15,000.00 0.450 OH Tukang Kayu 120,000.00 - 54,000.00 0.045 OH Kepala Tukang 150,000.00 - 6,750.00 0.008 OH Mandor 175,000.00 - 1,400.00
Memasang 1m² Dinding Lambriziring dari Papan klas I (Kayu Jati) 133,478.50 308,250.00 0.007 Kayu klas I (Jati), papan 18,471,875.00 129,303.13 - 0.100 Kg Paku Biasa 2" - 5" 15,600.00 1,560.00 - 0.150 Kg Paku Sekrup 3,5" 17,435.83 2,615.37 - 0.600 OH Pekerja 100,000.00 - 60,000.00 1.800 OH Tukang Kayu 120,000.00 - 216,000.00 0.180 OH Kepala Tukang 150,000.00 - 27,000.00 0.030 OH Mandor 175,000.00 - 5,250.00
Memasang 1m² Dinding Lambriziring dari Plywood ukuran (120x240) cm 27,843.01 12,852.50 0.400 Lbr Plywood (120 X 240) cm x 4mm 67,527.00 27,010.80 - 0.050 Kg Paku Biasa 1/2" - 1" 16,644.29 832.21 - 0.025 OH Pekerja 100,000.00 - 2,500.00 0.075 OH Tukang Kayu 120,000.00 - 9,000.00 0.008 OH Kepala Tukang 150,000.00 - 1,125.00 0.001 OH Mandor 175,000.00 - 227.50
Memasang 1m² Dinding Bilik, Rangka Kayu Klas III (Kayu Meranti) 112,688.97 17,625.00 1.500 Bilik Bambu 30,000.00 45,000.00 - 0.014 Kayu Klas III (Meranti) 4,819,000.00 67,466.00 - 0.012 Kg Paku Biasa 1/2" - 1" 16,644.29 199.73 -
m³
m³
Memasang 1m¹ Listplank Uk. (3x20)cm Kayu klas I (Kayu Jati)m³
m³
m³
m³
m³
m²m³
Page 40 ABK
0.003 m' List Kayu 2/4 7,747.00 23.24 - 0.100 OH Pekerja 100,000.00 - 10,000.00 0.050 OH Tukang Kayu 120,000.00 - 6,000.00 0.005 OH Kepala Tukang 150,000.00 - 750.00 0.005 OH Mandor 175,000.00 875.00
VIII 03-3436-1994 PEKERJAAN PENUTUP ATAP
24,918.50 26,600.00 25 Buah Genteng Plentong 996.74 24,918.50 -
Memasang 1 m² Atap Asbes Gelombang ( 240 cm X 108 cm X 0,5 cm) 59,087.04 25,600.00 0.6 Lbr Asbes Gelombang 240 cm X 108 cm X 0, 93,330.00 55,998.00 - 0.12 Kg Paku Payung 25,742.00 3,089.04 - 0.14 OH Pekerja 100,000.00 - 14,000.00 0.075 OH Tukang Kayu 120,000.00 - 9,000.00 0.008 OH Kepala Tukang 150,000.00 - 1,200.00 0.008 OH Mandor 175,000.00 - 1,400.00
- - Memasang 1 m² Atap Asbes Gelombang ( 210 cm X 108 cm X 0,5 cm ) 52,499.04 24,675.00 0.6 Lbr Asbes Gelombang ( 210 cm X 108 cm X 0, 82,350.00 49,410.00 - 0.12 Kg Paku Payung 25,742.00 3,089.04 - 0.14 OH Pekerja 100,000.00 - 14,000.00 0.07 OH Tukang Kayu 120,000.00 - 8,400.00 0.007 OH Kepala Tukang 150,000.00 - 1,050.00 0.007 OH Mandor 175,000.00 - 1,225.00
- -
Memasang 1 m² Atap Genteng Plentong Kecil
Page 41 ABK
Memasang 1 m² Atap Asbes Gelombang ( 300 cm X 105 cm X 4 mm ) 31,057.54 24,675.00 0.35 Lbr Asbes Gelombang 300 cm X 105 cm X 4 79,910.00 27,968.50 - 0.12 Kg Paku Payung 25,742.00 3,089.04 - 0.14 OH Pekerja 100,000.00 - 14,000.00 0.07 OH Tukang Kayu 120,000.00 - 8,400.00 0.007 OH Kepala Tukang 150,000.00 - 1,050.00 0.007 OH Mandor 175,000.00 - 1,225.00
Memasang 1 m² Atap Asbes Gelombang ( 210 cm X 105 cm X 4 mm ) 28,568.13 24,315.00 0.51 Lbr Asbes Gelombang 210 cm X 105 cm X 4 49,959.00 25,479.09 - 0.12 Kg Paku Payung 25,742.00 3,089.04 - 0.14 OH Pekerja 100,000.00 - 14,000.00 0.067 OH Tukang Kayu 120,000.00 - 8,040.00 0.007 OH Kepala Tukang 150,000.00 - 1,050.00 0.007 OH Mandor 175,000.00 - 1,225.00
Memasang 1 m² Atap Genteng Beton 48,109.00 35,250.00 11 Lbr Genteng Beton Standar 4,331.00 47,641.00 - 0.03 Kg Paku Biasa 2" - 5" 15,600.00 468.00 - 0.2 OH Pekerja 100,000.00 - 20,000.00 0.1 OH Tukang Kayu 120,000.00 - 12,000.00 0.01 OH Kepala Tukang 150,000.00 - 1,500.00 0.01 OH Mandor 175,000.00 - 1,750.00
Memasang 1 m² Atap Sirap 291,553.86 51,750.00 60 Lbr Genteng Sirap 4,803.75 288,225.00 - 0.2 Kg Paku Biasa 1/2" - 1" 16,644.29 3,328.86 - 0.166 OH Pekerja 100,000.00 - 16,600.00 0.25 OH Tukang Kayu 120,000.00 - 30,000.00 0.025 OH Kepala Tukang 150,000.00 - 3,750.00 0.008 OH Mandor 175,000.00 - 1,400.00
Memasang 1 m Nok Genteng Beton 60,079.43 70,500.00 3.5 Buah Nok Genteng Beton 4,925.55 17,239.43 - 0.05 Kg Paku Biasa 2" - 5" 15,600.00 780.00 - 10.8 Kg Portland Semen 1,700.00 18,360.00 - 0.032 m3 Pasir Pasang 350,000.00 11,200.00 - 1 Kg Semen Warna 12,500.00 12,500.00 - 0.4 OH Pekerja 100,000.00 - 40,000.00 0.2 OH Tukang Kayu 120,000.00 - 24,000.00 0.02 OH Kepala Tukang 150,000.00 - 3,000.00 0.02 OH Mandor 175,000.00 - 3,500.00
Memasang 1 m Nok Sirap 57,354.66 47,300.00 0.4 Lbr Seng Plaat 3" x 6" BJLS 28 32,940.00 13,176.00 - 0.06 Kg Paku Biasa 1/2" - 1" 16,644.29 998.66 - 0.5 Kg Paku Biasa 2" - 5" 15,600.00 7,800.00 - 0.004 m3 Kayu Kamfer Papan Tebal 3 cm 8,845,000.00 35,380.00 - 0.125 OH Pekerja 100,000.00 - 12,500.00 0.25 OH Tukang Kayu 120,000.00 - 30,000.00 0.025 OH Kepala Tukang 150,000.00 3,750.00 0.006 OH Mandor 175,000.00 1,050.00
Memasang 1 m² Atap Seng Gelombang 23,390.89 21,150.00 0.7 Lbr Seng Gelombang 3" x 6" BJLS 28 32,940.00 23,058.00 - 0.02 Kg Paku Biasa 1/2" - 1" 16,644.29 332.89 - 0.12 OH Pekerja 100,000.00 - 12,000.00 0.06 OH Tukang Kayu 120,000.00 - 7,200.00 0.006 OH Kepala Tukang 150,000.00 - 900.00 0.006 OH Mandor 175,000.00 - 1,050.00
Memasang 1 m Atap Nok Seng 10,547.77 25,650.00 0.3 Lbr Seng Plaat 3" x 6" BJLS 28 32,940.00 9,882.00 - 0.04 Kg Paku Biasa 1/2" - 1" 16,644.29 665.77 - 0.15 OH Pekerja 100,000.00 - 15,000.00 0.07 OH Tukang Kayu 120,000.00 - 8,400.00 0.008 OH Kepala Tukang 150,000.00 - 1,200.00 0.006 OH Mandor 175,000.00 - 1,050.00
Memasang 1 m¹ Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm 185,667.92 73,500.00 1.050 Lbr Seng Plaat 32,940.00 34,587.00 - 0.015 Kg Paku Biasa 1 - 2,5 cm 16,644.29 249.66 - 0.019 m3 Kayu Papan Kruing 7,938,486.90 150,831.25 - 0.200 OH Pekerja 100,000.00 - 20,000.00 0.400 OH Tukang Kayu 120,000.00 - 48,000.00 0.025 OH Kepala Tukang 150,000.00 - 3,750.00 0.010 OH Mandor 175,000.00 - 1,750.00
Memasang 1 m¹ Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm 50,865.30 56,900.00 1.050 Lbr Seng Plaat 44,936.67 47,183.50 - 0.010 Kg Paku Biasa 1 - 2,5 cm 16,644.29 166.44 - 0.500 Kg Besi strip 7,030.71 3,515.35 - 0.150 OH Pekerja 100,000.00 - 15,000.00
Page 48 ABK
0.300 OH Tukang Kayu 120,000.00 - 36,000.00 0.030 OH Kepala Tukang 150,000.00 - 4,500.00 0.008 OH Mandor 175,000.00 - 1,400.00
Memasang 1 m PAGAR Kawat Duri ( MSC) 35,826.88 102,146.63 6.000 m Kawat Duri 3,288.58 19,731.47 - 1.089 kg Besi Siku 40.40.4 13,889.70 14,625.00 15,125.88 15,926.63 0.4000 Kg Cat Minyak pada Besi Siku 2,423.82 28,050.00 969.53 11,220.00 1.000 Ls Upah Pasang 75,000.00 - 75,000.00
XII Pt T-30-2000-C PEKERJAAN KUNCI dan KACA
Memasang 1 buah Kunci Tanam Biasa 118,950.00 67,500.00 1.000 Buah Kunci Tanam Biasa 118,950.00 118,950.00 - 0.500 OH Tukang Kayu 120,000.00 - 60,000.00 0.050 OH Kepala Tukang 150,000.00 - 7,500.00
Memasang 1 Buah Kunci Silinder 118,950.00 81,000.00 1.000 Buah Kunci Silinder 118,950.00 118,950.00 - 0.600 OH Tukang Kayu 120,000.00 - 72,000.00 0.060 OH Kepala Tukang 150,000.00 - 9,000.00
Memasang 1 buah Kunci Slot untuk Kamar Mandi atau WC 118,950.00 33,750.00 1.000 Buah Kunci Tanam Kamar Mandi 118,950.00 118,950.00 - 0.250 OH Tukang Kayu 120,000.00 - 30,000.00 0.025 OH Kepala Tukang 150,000.00 - 3,750.00
-
Memasang 1 buah Engsel Pintu 14,843.33 16,950.00 1.000 Buah Engsel pintu 14,843.33 14,843.33 - 0.125 OH Tukang Kayu 120,000.00 - 15,000.00 0.013 OH Kepala Tukang 150,000.00 - 1,950.00
-
Memasang 1 buah Engsel Angin untuk pintu 26,673.64 16,950.00 1.000 Buah Engsel Angin 26,673.64 26,673.64 - 0.125 OH Tukang Kayu 120,000.00 - 15,000.00 0.013 OH Kepala Tukang 150,000.00 - 1,950.00
Memasang 1 buah engsel jendela 6,987.27 13,500.00 1.000 Buah Engsel Jendela 6,987.27 6,987.27 - 0.100 OH Tukang Kayu 120,000.00 - 12,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00
Memasang 1 buah Kait Angin 7,930.00 27,000.00 1.000 Buah Kait Angin 7,930.00 7,930.00 - 0.100 OH Tukang Kayu 120,000.00 - 12,000.00 0.100 OH Kepala Tukang 150,000.00 - 15,000.00
Memasang 1 buah Door Closer 32,177.50 27,000.00 1.000 Buah Door Closer 32,177.50 32,177.50 - 0.200 OH Tukang Kayu 120,000.00 - 24,000.00 0.020 OH Kepala Tukang 150,000.00 - 3,000.00
Memasang 1 buah door holder 6,786.25 13,500.00 1.000 Buah Door holder 6,786.25 6,786.25 - 0.100 OH Tukang Kayu 120,000.00 - 12,000.00 0.010 OH Kepala Tukang 150,000.00 - 1,500.00
Memasang 1 buah Door Stop 32,177.50 16,950.00 1.000 Buah Door Stop 32,177.50 32,177.50 - 0.125 OH Tukang Kayu 120,000.00 - 15,000.00 0.013 OH Kepala Tukang 150,000.00 - 1,950.00
Mengikis / Mengerok 1 m² Permukaan Cat Tembok Lama 900.00 15,437.50 0.050 Kg Soda Api 18,000.00 900.00 - 0.150 OH Pekerja 100,000.00 - 15,000.00 0.003 OH Mandor 175,000.00 - 437.50
Mencuci 1 m² Bidang Permukaan Tembok yang Pernah dicat 1,050.00 15,437.50 0.050 Kg Sabun 21,000.00 1,050.00 - 0.150 OH Pekerja 100,000.00 - 15,000.00 0.003 OH Mandor 175,000.00 - 437.50
Mengerok 1 m² Karat Cat Lama permukaan Baja dg cara manual 1,050.00 15,437.50 0.050 Kg Sabun 21,000.00 1,050.00 - 0.150 OH Pekerja 100,000.00 - 15,000.00 0.003 OH Mandor 175,000.00 - 437.50
Menyabun 1 m² Permukaan Tembok Lama 1,050.00 15,437.50 0.050 Kg Sabun 21,000.00 1,050.00 - 0.150 OH Pekerja 100,000.00 - 15,000.00 0.003 OH Mandor 175,000.00 - 437.50
Mendempul dan Menggosok 1 m² Kayu 2,089.40 9,837.50 0.080 Kg Dempul Jadi 19,131.82 1,530.55 - 0.020 lt Minyak Cat 11,285.00 225.70 - 0.100 lbr Amplas 3,331.54 333.15 - 0.040 OH Pekerja 100,000.00 - 4,000.00 0.040 OH Tukang Cat 120,000.00 - 4,800.00 0.004 OH Kepala Tukang 150,000.00 - 600.00 0.003 OH Mandor 175,000.00 - 437.50
Pengecatan 1 m² Bidang Lama Kayu 11,937.30 17,562.50 0.150 Kg Plamir 19,131.82 2,869.77 - 0.170 Kg Cat Dasar 21,984.40 3,737.35 - 0.170 Kg Cat Penutup 31,354.00 5,330.18 - 0.070 OH Pekerja 100,000.00 - 7,000.00 0.075 OH Tukang Cat 120,000.00 - 9,000.00 0.008 OH Kepala Tukang 150,000.00 - 1,125.00 0.003 OH Mandor 175,000.00 - 437.50
Pengecatan 1 m² Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 2 lap.Cat Penutup 19,188.70 9,417.50 0.200 Kg Cat Meni 22,147.69 4,429.54 -
Memasang 1 m² Kaca tebal 3 mm
Page 50 ABK
0.150 Kg Plamir 19,131.82 2,869.77 - 0.170 Kg Cat Dasar 21,984.40 3,737.35 - 0.260 Kg Cat Penutup 2 kali 31,354.00 8,152.04 - 0.070 OH Pekerja 100,000.00 - 7,000.00 0.009 OH Tukang Cat 120,000.00 - 1,080.00 0.006 OH Kepala Tukang 150,000.00 - 900.00 0.003 OH Mandor 175,000.00 - 437.50
Pengecatan 1 m² Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 3 lap.Cat Penutup 22,010.56 20,637.50 0.200 Kg Cat Meni 22,147.69 4,429.54 - 0.150 Kg Plamir 19,131.82 2,869.77 - 0.170 Kg Cat Dasar 21,984.40 3,737.35 - 0.350 Kg Cat Penutup 2 kali 31,354.00 10,973.90 - 0.070 OH Pekerja 100,000.00 - 7,000.00 0.105 OH Tukang Cat 120,000.00 - 12,600.00 0.004 OH Kepala Tukang 150,000.00 - 600.00 0.003 OH Mandor 175,000.00 - 437.50
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR PEKERJAAN : PEMBANGUNAN GEDUNG DPRD - KABUPATEN MIMIKA (TAHAP III) LOKASI : KOTA TIMIKA T. ANGGARAN : 2011
NO JENIS PEKERJAAN1 2
1 1 M' PAGAR SEMENTARA dari SENG GELOMBANGTINGGI 2 METER 0.0300 M3 Kayu Matoa 5/10 (pengganti dolken) 2.5000 Kg Semen Portland 1.2000 Lbr Seng Gelombang 3" - 5" 0.0050 M3 Pasir Beton 0.0090 M3 Koral Beton 0.0720 M3 Kayu 5/7 0.0600 Kg Paku Biasa 2" - 5" 0.4000 Oh P e k e r j a 0.2000 Oh Tukang Kayu 0.0200 Oh Kepala Tukang 0.0200 Oh M a n d o r
2 1 M2 PEMBUATAN DIREKSI KEET / KONSTRUKSI KAYU 0.0600 m3 Balok Kayu Matoa 5/10 0.2760 m3 Kayu Matoa 0.7000 kg Paku campur 1.5000 lbr Seng Gelombang Bjls 30 1.0000 o/h Pekerja 1.5000 o/h Tukang 0.1500 o/h Kepala Tukang 0.0500 o/h Mandor
3 1 M' PEMASANGAN PAPAN BOUWPLANK 0.0120 m3 Balok Kayu Matoa 0.0200 kg Paku campur 0.0070 m3 Papan Kayu Matoa 0.1000 o/h Pekerja 0.1000 o/h Tukang 0.0100 o/h Kepala Tukang 0.0050 o/h Mandor
4 1 M3 GALIAN TANAH sedalam 1 meter 0.7500 o/h Pekerja 0.0250 o/h Mandor
12 1 M3 MEMASANG LAPISAN BATU KOSONG (AAMSTAMPING) 1.2000 m3 Batu gunung 0.4320 M3 Pasir Urug 0.7800 Oh Pekerja 0.3900 o/h Tukang batu
0.0390 o/h Kepala tukang 0.0390 Oh Mandor
13 1 M3 MEMASANG PONDASI BATU GUNUNG(campuran 1 pc : 4 psr) 1.2000 M3 Batu gunung 163.0000 Kg Semen 0.5200 M3 Pasir 1.5000 o/h Pekerja 0.7500 o/h Tukang batu 0.0750 o/h Kepala tukang 0.0750 o/h Mandor
14 1 M2 PASANGAN BATAKO 1 PC : 2 PSR 23.0000 Bh Batako 10 x 18 x 24 cm 18.9500 Kg Semen 0.0380 M3 Pasir pasang 0.3000 o/h Pekerja 0.1000 o/h Tukang batu 0.0100 o/h Kepala Tukang 0.0150 o/h Mandor
15 1 M2 PASANGAN BATAKO 1 PC : 4 PSR 23.0000 Bh Batako 10 x 18 x 24 cm 11.5000 Kg Semen Pc 0.0430 M3 Pasir Pasang 0.3000 o/h Pekerja 0.1000 o/h Tukang 0.0100 o/h Kepala Tukang 0.0150 o/h Mandor
16 1 M3 LANTAI BETON TUMBUK K.100 230.00 Kg Semen PC 893.00 Kg Pasir Cor
1,027.00 Kg Kerikil 200.00 Ltr Air 1.20 o/h Pekerja 0.20 o/h Tukang 0.02 o/h Kepala Tukang 0.06 o/h Mandor
17 1 M3 LANTAI BETON TUMBUK K.100 (BERTULANG) RG 1.0000 M3 Beton Tumbuk K. 125 49.3300 Kg Besi Beton
18 1 M3 CAMPURAN BETON K. 225 371.000 Kg Semen Pc 698.000 Kg Pasir cor 1,047.000 Kg Batu Pecah 2/3 215.000 Ltr Air 1.650 o/h Pekerja 0.275 o/h Tukang 0.028 o/h Kepala Tukang 0.083 o/h Mandor
19 1 M3 CAMPURAN BETON K. 175 326.0000 Kg Semen Pc 760.0000 Kg Pasir cor 1,029.000 Kg Batu Pecah 2/3 215.0000 Ltr Air 1.6500 o/h Pekerja 0.2750 o/h Tukang 0.0280 o/h Kepala Tukang 0.0830 o/h Mandor
1 2 3
20 1 M3 CAMPURAN BETON K. 125 (Beton Kolom, Sloof Praktis) 276.0000 Kg Semen Pc 829.0000 Kg Pasir cor 1,012.000 Kg Kerikil 215.0000 Ltr Air 1.6500 o/h Pekerja 0.2750 o/h Tukang 0.0280 o/h Kepala Tukang 0.0830 o/h Mandor
21 10 KG PEMBESIAN (BESI POLOS / ULIR) 10.5000 Kg Besi beton 0.1500 Kg Kawat pengikat 0.0700 o/h Pekerja 0.0700 o/h Tukang besi 0.0070 o/h Kepala Tukang 0.0040 o/h Mandor
22 1 M2 BEKISTING untuk PONDASI 0.0400 M3 Balok / Papan Kayu Matoa 0.3000 Kg Paku campur 0.1000 Ltr Minyak Bekisting 0.5200 o/h Pekerja 0.2600 o/h Tukang 0.0260 o/h Kepala tukang 0.0260 o/h Mandor
23 1 M2 BEKISTING untuk SLOOF 0.0450 M3 Balok / Papan Kayu Matoa 0.3000 Kg Paku campur 0.1000 Ltr Minyak Bekisting 0.5200 o/h Pekerja 0.2600 o/h Tukang 0.0260 o/h Kepala tukang 0.0260 o/h Mandor
2 3
24 1 M2 BEKISTING untuk KOLOM 0.0400 M3 Balok Kayu kelas III 0.4000 Kg Paku campur 0.2000 Ltr Minyak Bekisting 2.0000 Btg Dolken Kayu - 4 mtr 0.3500 Lbr Tripleks 9 mm 0.0150 M3 Balok Kayu kelas II 0.6600 o/h Pekerja
0.3300 o/h Tukang 0.0330 o/h Kepala tukang 0.0330 o/h Mandor
25 1 M2 BEKISTING untuk BALOK 0.0400 M3 Balok Kayu kelas III 0.4000 Kg Paku campur 0.2000 Ltr Minyak Bekisting 2.0000 Btg Dolken Kayu - 4 mtr 0.3500 Lbr Tripleks 9 mm 0.0180 M3 Balok Kayu kelas II 0.6600 o/h Pekerja 0.3300 o/h Tukang 0.0330 o/h Kepala tukang 0.0330 o/h Mandor
1 2 3
26 1 M2 BEKISTING untuk PLAT LANTAI 0.0400 M3 Balok Kayu kelas III 0.4000 Kg Paku campur 0.2000 Ltr Minyak Bekisting 0.0150 M3 Balok Kayu kelas II 0.3500 Lbr Tripleks 9 mm 6.0000 Btg Dolken Kayu - 4 mtr 0.6600 o/h Pekerja 0.3300 o/h Tukang 0.0330 o/h Kepala tukang 0.0330 o/h Mandor
27 1 M2 BEKISTING untuk TANGGA 0.0300 M3 Balok Kayu kelas III 0.4000 Kg Paku campur 0.1500 Ltr Minyak Bekisting 0.0150 M3 Balok Kayu kelas II 0.3500 Lbr Tripleks 9 mm 2.0000 Btg Dolken Kayu - 4 mtr
27 1 M2 BEKISTING untuk DINDING 0.0300 M3 Balok Kayu kelas III 0.4000 Kg Paku campur 0.2000 Ltr Minyak Bekisting 0.0200 M3 Balok Kayu kelas II 0.3500 Lbr Tripleks 9 mm 3.0000 Btg Dolken Kayu - 4 mtr 0.6600 o/h Pekerja 0.3300 o/h Tukang 0.0330 o/h Kepala tukang 0.0330 o/h Mandor
28 1 M' KOLOM PRAKTIS BETON BERTULANG (11 x 11) cm 0.0020 M3 Balok Kayu kelas III 0.0100 Kg Paku campur 3.0000 Kg Besi Beton Polos 0.0450 Kg Kawat Beton 4.0000 Kg Semen 0.0060 M3 Pasir Cor 0.0090 M3 Kerikil 0.1800 o/h Pekerja 0.0200 o/h Tukang Batu 0.0200 o/h Tukang Kayu 0.0200 o/h Tukang Besi 0.0060 o/h Kepala tukang 0.0090 o/h Mandor
29 1 M' RINGBALK BETON BERTULANG (10 x 15) cm 0.0030 M3 Balok Kayu kelas III 0.0200 Kg Paku campur 3.6000 Kg Besi Beton Polos 0.0500 Kg Kawat Beton 5.5000 Kg Semen 0.0090 M3 Pasir Cor 0.0150 M3 Kerikil 0.2970 o/h Pekerja 0.0330 o/h Tukang Batu 0.0330 o/h Tukang Kayu 0.0330 o/h Tukang Besi 0.0100 o/h Kepala tukang 0.0150 o/h Mandor
30 1 M3 DINDING BETON BERTULANG(150 Kg Besi + Bekisting) 0.2400 M3 Balok Kayu kelas III 3.2000 Kg Paku campur 1.6000 Ltr Minyak Bekisting 157.5000 Kg Besi Beton Polos 2.2500 Kg Kawat Beton 336.0000 Kg Semen 0.5400 M3 Pasir Cor 0.8100 M3 Kerikil 0.1600 M3 Balok Kayu kelas II 2.8000 Lbr Tripleks 9 mm 24.0000 Btg Dolken Kayu - 4 mtr 5.3000 o/h Pekerja 0.2750 o/h Tukang Batu 1.3000 o/h Tukang Kayu 1.0500 o/h Tukang Besi 0.2620 o/h Kepala tukang 0.2650 o/h Mandor
63 1 M3 MEJA BETON (WASHTAFEL) 1.0000 M3 Beton K. 125 35.5500 Kg Besi beton 10.0000 M2 Bekisting 0.5000 o/h Tukang bongkar/siram
64 1 M2 PLESTERAN 1 PC : 2 PSR (Tebal 1,5 cm) 10.2240 Kg Semen 0.0200 m3 Pasir 0.3000 o/h Pekerja 0.1500 o/h Tukang batu 0.0150 o/h Kepala tukang 0.0150 o/h Mandor
1 2 3
65 1 M2 PLESTERAN 1 PC : 3 PSR (Tebal 1,5 cm) 7.7760 Kg Semen 0.0230 m3 Pasir 0.3000 o/h Pekerja
0.1500 o/h Tukang batu 0.0150 o/h Kepala tukang 0.0150 o/h Mandor
1 2 3
66 1 M2 ACIAN 3.2500 Kg Semen Pc 0.2000 o/h Pekerja 0.1000 o/h Tukang 0.0100 o/h Kepala tukang 0.0100 o/h Mandor
67 1 M2 PLESTERAN 1 PC : 4 PSR (Tebal 1,5 cm) 6.2400 Kg Semen 0.0240 m3 Pasir 0.3000 o/h Pekerja 0.1500 o/h Tukang batu 0.0150 o/h Kepala tukang 0.0150 o/h Mandor
68 1 M2 WATER PROOFING 2.9000 kg Water proofing 0.3000 o/h Pekerja 0.2000 o/h Tukang batu 0.0200 o/h Kepala tukang 0.0150 o/h Mandor
1 2 3
1 2 369 1 M' PASANGAN PLINT KERAMIK 10/60
0.6820 Bh Plint Keramik 10/60 cm 1.9200 Kg Semen 0.0090 M3 Pasir 0.3240 Kg Semen Warna 0.1400 o/h Pekerja 0.0700 o/h Tukang batu 0.0070 o/h Kepala tukang 0.0070 o/h Mandor
Jumlah Lt 1 x70 1 M' PASANGAN BORDER KERAMIK 6/20
5.3000 Bh List Keramik 6/20 cm 1.1400 Kg Semen 0.0030 M3 Pasir 0.1000 Kg Semen Warna 0.0900 o/h Pekerja 0.0900 o/h Tukang batu 0.0090 o/h Kepala tukang 0.0050 o/h Mandor
Jumlah Lt 1 x71 1 M2 PASANGAN DINDING KERAMIK 20/25
21.6000 Bh Tegel keramik 20/25 cm 9.3000 Kg Semen 0.0180 M3 Pasir 1.9400 Kg Semen Warna 0.9000 o/h Pekerja 0.4500 o/h Tukang batu 0.0450 o/h Kepala tukang 0.0450 o/h Mandor
3.1000 Bh Keramik 60/60 cm 0.0450 M3 Pasir 9.6000 Kg Semen 1.6200 Kg Semen Warna 0.7000 o/h Pekerja 0.3500 o/h Tukang batu 0.0350 o/h Kepala tukang 0.0350 o/h Mandor
Jumlah Lt 1 Jumlah Lt 2 X
1 M 2 PASANG LANTAI GRANITO 60 x 60 1.0500 M2 Granito 60 x 60 cm 2.0000 Bh Pacu Pancing 60 x 230 12.4400 Kg Semen Portland 0.0250 M3 Pasir Pasang 1.5000 Kg Semen Warna 0.5200 h.o Pekerja 0.6500 h.o Tukang Batu 0.0650 h.o Kepala Tukang 0.0350 h.o Mandor
Jumlah Lt 3 X
1 2 373 1 M2 PASANG DINDING GRANIT 30/60
1.0600 M2 Granit 3.0030 Bh Paku 12 0.0250 M3 Pasir 12.4400 Kg Semen 0.6500 Kg Semen Warna 1.3000 o/h Pekerja 0.6500 o/h Tukang batu 0.0650 o/h Kepala tukang 0.0650 o/h Mandor
Jumlah Lt 1
74 1 M2 PASANGAN LANTAI KERAMIK 40/40 6.6300 Bh Keramik 40/40 cm 0.0450 M3 Pasir 8.1900 Kg Semen 1.6200 Kg Semen Warna 0.7000 o/h Pekerja 0.3500 o/h Tukang batu 0.0350 o/h Kepala tukang 0.0350 o/h Mandor
Jumlah Lt 1 x
75 1 M2 PASANGAN LANTAI KERAMIK 30/30 11.8700 Bh Keramik 30/30 cm 0.0450 M3 Pasir 10.0000 Kg Semen 1.5000 Kg Semen Warna 0.7000 o/h Pekerja 0.3500 o/h Tukang batu 0.0350 o/h Kepala tukang 0.0350 o/h Mandor
Jumlah Lt 1 x
76 1 M2 PASANGAN LANTAI KERAMIK 20/20 26.5000 Bh Keramik 20/20 cm 0.0450 M3 Pasir 10.4000 Kg Semen 1.6200 Kg Semen Warna 0.7000 o/h Pekerja 0.3500 o/h Tukang batu 0.0350 o/h Kepala tukang 0.0350 o/h Mandor
Jumlah Lt 1 x
77 1 M2 PASANG DINDING LOSTER KERAMIK 30/30
25.0000 Bh Loster Keramik 30/30 9.3000 Kg Semen Pc 0.0180 M3 Pasir Pasang 0.6000 o/h Pekerja 0.1000 o/h Tukang 0.0450 o/h Kepala Tukang 0.0300 o/h Mandor
81 1 M2 PELABURAN BIDANG KAYU DENGAN VERNIS81 1 M2 0.15 Ltr Vernis
0.0500 Kg Dempul 0.1000 Lbr Amplas 0.0100 Bh Kuas 0.1600 H.o Pekerja 0.1600 H.o Tukang Cat 0.0160 H.o Kepala Tukang
0.0025 H.o Mandor
1 2 3
0.1500 Ltr Vernis
0.0500 Kg Dempul0.1000 Lbr Amplas0.0100 Bh Kuas0.1600 H.o Pekerja0.1600 H.o Tukang Cat0.0160 H.o Kepala Tukang0.0025 H.o Mandor
82 1 M' PEKERJAAN COMPOUND
1.2000 M' Plester "Cotton Tape"
0.4500 Kg Compound (2 x Lari )
0.0200 o/h Pekerja
0.0630 o/h Tukang
0.0063 o/h Kepala Tukang
0.0025 o/h Mandor
83 1 M2 CAT MINYAK (1 x Lapis Plamur Kayu, 1 x Cat Dasar, 3 x Cat Penutup)
0.2000 Kg Cat Meny 0.1500 Kg Plamur 0.1700 Kg Cat Dasar (Minyak) 0.3500 kg Cat minyak / Cat Penutup 0.2500 o/h Pekerja 0.2500 o/h Tukang cat 0.0250 o/h Kepala tukang 0.0010 o/h Mandor
0.0150 o/h Tukang 0.0090 o/h Kepala Tukang 0.0005 o/h Mandor
Lantai 2 xLantai 3 x
92 1 Kg PEKERJAAN BESI HOLLOW PADA RANGKA PLAFOND 1.1500 Kg Hollow 40x40x3.2 Mm 1.0000 Ls Bending dan Las 0.0800 Kg Meni Besi 0.0600 o/h Pekerja 0.0600 o/h Tukang 0.0060 o/h Kepala Tukang 0.0030 o/h Mandor 1.0000 Ls Alat Bantu
93 1 M2 PEKERJAAN RANGKA PLAFON KAYU 60/60 PADA DOME 0.0283 M3 Balok kayu matoa 0.4000 Kg Paku campur 1.0000 Ls Perlengkapan/pengikat 0.2700 o/h Pekerja 0.4050 o/h Tukang 0.0405 o/h Kepala tukang 0.0135 o/h Mandor
0.3600 Lbr Tripleks 6 mm 0.0200 Kg Paku Tripleks 0.2500 Kg Lem Fox kuning 0.0120 M3 Kayu Penggantung 0.1500 Kg Paku Campur 0.2800 o/h Pekerja 0.8000 o/h Tukang 0.0800 o/h Kepala Tukang 0.0140 o/h Mandor
100 1 M2 PLAFON HIAS LAPIS SUNGKAI (DOMB) 0.3670 Lbr Sungkai 0.3600 Lbr Tripleks 6 mm 0.0200 Kg Paku Tripleks 0.2500 Kg Lem Fox kuning 0.0120 M3 Kayu Penggantung 0.1500 Kg Paku Campur 0.3780 o/h Pekerja 1.0800 o/h Tukang 0.1080 o/h Kepala Tukang 0.0189 o/h Mandor 1.0000 Ls Alat Bantu
102 1 M' PEKERJAAN LIST PLAFON PROFIL 1.2000 m' List Plafon 0.0100 kg Paku 0.0500 o/h Pekerja 0.0500 o/h Tukang kayu 0.0050 o/h Kepala tukang 0.0030 o/h Mandor
103 1 M' PEKERJAAN LIST PLAFON KAYU PROFIL LURUS 1.2000 m' List Plafon 5 cm 0.0100 kg Paku 0.0500 o/h Pekerja 0.0500 o/h Tukang kayu 0.0050 o/h Kepala tukang 0.0030 o/h Mandor
104 1 M' PEKERJAAN LIST PLAFON KAYU PROFIL LURUS 1.2000 m' List Plafon 4 cm 0.0100 kg Paku 0.0500 o/h Pekerja 0.0500 o/h Tukang kayu 0.0050 o/h Kepala tukang 0.0030 o/h Mandor
1 2 3.00
105 1 M' PEKERJAAN LIST PROFIL DINDING 1.2000 m' List Profil Dinding 0.1000 Kg Paku Campur 0.0500 o/h Pekerja 0.0500 o/h Tukang Kayu 0.0050 o/h Kepala Tukang 0.0030 o/h Mandor
106 1 M' PEKERJAAN LIST PLINT KAYU 1.0500 m' List Plint Kayu 0.0100 kg Paku 0.0500 o/h Pekerja 0.0500 o/h Tukang kayu 0.0050 o/h Kepala tukang 0.0030 o/h Mandor
1 2 3
107 1 M' PEKERJAAN LIST KODOK 1.0500 m' List Kodok 0.0100 kg Paku 0.0500 o/h Pekerja 0.0500 o/h Tukang kayu 0.0050 o/h Kepala tukang 0.0030 o/h Mandor
108 1 M' PEKERJAAN LIST LD 3 Cm 1.0500 m' List LD 3 cm
0.0100 kg Paku 0.0500 o/h Pekerja 0.0500 o/h Tukang kayu 0.0050 o/h Kepala tukang 0.0030 o/h Mandor
1 2 3
109 1 M3 KUSEN, PINTU DAN JENDELA (Kayu Besi) 1.1000 M3 Balok kayu besi 5/10 1.2500 Kg Paku campur 1.0000 Kg Lem Kayu (Lem Fox Putih) 7.0000 o/h Pekerja 21.0000 o/h Tukang 2.1000 o/h Kepala tukang 0.3500 o/h Mandor
110 1 M2 RANGKA KAYU PINTU / JENDELA KACA 0.0240 M3 Papan Kayu Besi 0.3000 Kg Lem Kayu (Lem Fox Putih) 0.8000 o/h Pekerja 2.4000 o/h Tukang 0.2400 o/h Kepala tukang 0.0400 o/h Mandor
111 1 M2 RANGKA DAUN JENDELA + KACA POLOS 1.0000 M3 Rangka kayu 1.0000 M2 Kaca polos 5 mm
1 2 3
112 1 M2 JENDELA KACA MATI 1.1000 M2 Kaca polos 5 mm 0.0150 o/h Pekerja 0.1500 o/h Tukang 0.0150 o/h Kepala tukang 0.00075 o/h Mandor
113 1 M2 PASANG PINTU PANIL KACA (BENING) 0.0240 M3 Papan Kayu Besi 1.1000 M2 Kaca bening 5 mm 0.3000 Kg Lem Kayu (Lem Fox Putih) 0.3000 o/h Pekerja 2.4000 o/h Tukang 0.2400 o/h Kepala tukang 0.0400 o/h Mandor
114 1 M2 DAUN PINTU PANIL KAYU 0.0400 M3 Papan Kayu Besi 0.5000 Kg Lem Kayu (Lem Fox Putih) 1.0000 o/h Pekerja 3.0000 o/h Tukang 0.3000 o/h Kepala tukang 0.0500 o/h Mandor
115 1 M2 PINTU dan JENDELA JALUSI 0.0640 M3 Papan Kayu Besi 0.5000 Kg Lem Kayu (Lem Fox Putih) 1.0000 o/h Pekerja 3.0000 o/h Tukang 0.3000 o/h Kepala tukang 0.0500 o/h Mandor
116 1 M2 PEKERJAAN VERGOLA KAYU 0.0150 M3 Papan Kayu Besi 0.5000 Kg Lem Kayu (Lem Fox Putih) 1.2800 M2 Finising Kayu 1.0500 m2 Polycarbonat 0.2500 Kg Paku campur 1.0000 o/h Pekerja 3.0000 o/h Tukang 0.3000 o/h Kepala tukang 0.0500 o/h Mandor
117 1 Daun PINTU KACA tebal 12 mm 1.7850 m2 Kaca Polos 1.0000 o/h Pekerja 3.0000 o/h Tukang 0.3000 o/h Kepala Tukang 0.0500 o/h Mandor
119 1 M2 PASANG KACA tebal 6 mm 1.1000 m2 Kaca Polos 0.0430 o/h Pekerja 0.0430 o/h Tukang 0.0043 o/h Kepala Tukang 0.0021 o/h Mandor
1 2 3
120 1 Unit PINTU PANIL YANG DIUKIR KHAS PAPUA 2.0400 m2 Pintu Panil Kayu 4.0800 m2 Ukiran Khas Papua 4.0800 m2 Cat Melamin
121 I Unit PINTU UTAMA dan JENDELA KACA ALUMUNIUMLAPIS GRANIT 10.5900 m2 Pasang Dinding Granit 29.6000 m' Kusen Alumunium 29.6000 m' Karet Skoning 7.2300 m2 Kaca Polos 6 mm 2.0000 daun Pintu Kaca Tebal 12 mm 2.0000 Psg Flooring + Asesoris 2.0000 Psg Handle Stainless 2.0000 Bh Kunci
122 I Set PASANG PINTU PANIL UKIRAN dan GERBANGLAPIS GRANIT (PU. 2) 14.4000 m2 Pasang Dinding Granit 7.2000 m2 Pintu Panil yang diukir 12.0000 Bh Engsel Pintu Stainless Steel 2.0000 set Kunci Tanam 4.0000 Psg Handle Pintu 2.0000 Psg Grendel Tanam 4.0000 set Door Closer
123 1 M2 PINTU KM/W DOUBLE TEAKWOOD LAPISALUMUNIUM (210 x 72) 0.0250 M3 Papan Kayu Besi 0.5000 Kg Lem Kayu (Lem Fox Putih) 0.0300 Kg Paku Campur 1.0000 Lbr Teakwood ukuran 90 x 220 cm 0.5000 Lbr Plat Alumunium 90 x 220 cm 0.8000 o/h Pekerja 2.4000 o/h Tukang 0.2400 o/h Kepala tukang 0.0400 o/h Mandor
124 1 M2 PINTU DOUBLE TEAKWOOD (pintu shaft)(150 x 82) 0.0250 M3 Papan Kayu Besi 0.5000 Kg Lem Kayu (Lem Fox Putih) 0.0300 Kg Paku Campur 1.0000 Lbr Teakwood ukuran 90 x 220 cm 0.8000 o/h Pekerja 2.4000 o/h Tukang 0.2400 o/h Kepala tukang 0.0400 o/h Mandor
125 1 Unit PINTU RAK LEMARI DIBAWAH MEJA 0.2400 M2 Pintu Panil 4.0000 Bh Engsel 2.0000 Bh Grendel 1.0000 Bh Kunci Gembok 2.0000 Bh Tarikan 0.5400 M2 Cat Minyak
1 2 3
126 1 Set PASANG PINTU HARMONIKA 1.0000 Set Pintu Harmonika 0.5000 Dos Kawat Las 8.0000 Jam Mesin Las 2.0000 Psg Handle 1.0000 Bh Kunci 2.0000 Bh Gembok 0.0360 M3 Cor 1 : 3 : 5 sekitar Kusen 0.6000 M2 Acian sekitar Kusen 0.6000 M2 Plesteran sekitar Kusen 6.0000 o/h Pekerja 8.0000 o/h Tukang 0.8000 o/h Kepala tukang 0.2000 o/h Mandor
127 1 M2 PASANG TERALIS BESI STRIP 2 x 3 mm
6.1770 Kg Besi Strip 27.0280 Cm Pengelasan 1.6700 o/h Pekerja 1.6700 o/h Tukang 0.0167 o/h Kepala tukang 0.0830 o/h Mandor
128 1 Unit PINTU BESI pada RUANG PANEL 1.5000 Btg Besi Kotak 4 cm 1.2000 Btg Besi Kotak 2 cm 0.2750 Lbr Besi Plat 3 mm 1.1000 Btg Besi Beton Ø 12 mm 1.0000 Set Kunci + Gembok 368.0000 Cm Pengelasan 1.6700 o/h Pekerja 1.6700 o/h Tukang 0.0167 o/h Kepala tukang 0.0830 o/h Mandor
129 1 M3 MEMASANG KONSTRUKSI KUDA-KUDA KONVENSIONAL(Bentangan lebih 6 m')
1.1000 m3 Balok kayu besi 5/10 15.0000 Kg Besi Strip tebal 5 mm 5.6000 Kg Paku campur 4.0000 o/h Pekerja 12.0000 o/h Tukang 1.2000 o/h Kepala Tukang 0.2000 o/h Mandor
144 10 CM PENGELASAN DENGAN LAS LISTRIK 0.4000 Dos Kawat Las Listrik 0.3000 Ltr Solar 0.0400 Ltr Minyak Pelumas 0.0400 o/h Pekerja 0.0200 o/h Tukang 0.0020 o/h Kepala tukang 0.0020 o/h Mandor 0.1700 Jam Sewa Alat
145 1 M' PEKERJAAN TRUNKING CABLE 4.0000 Kg Besi Siku 40.40.3
151 1 M' SALURAN Type 2 (dari Halaman ke Saluran type 1) 0.2500 m3 Galian Tanah 0.0625 m3 Urugan Tanah kembali 0.0250 m3 Pasir Urug 0.2250 m3 Cor Rabat Bertulang 0.8000 m2 Bekisting Dinding Cor 1.2000 m2 Plesteran 1 : 3 1.2000 m2 Plesteran Beton 48.9780 kg Besi Grill (Penutup saluran)
152 1 M' SALURAN DITEPI JALAN Type 3 0.9600 m3 Galian Tanah 0.2400 m3 Urugan Tanah kembali 0.1200 m3 Pasir Urug 0.2400 m3 Lapisan Batu Kosong 0.4800 m3 Pondasi Batu Gunung 0.1200 m3 Cor Lantai Rabat 3.0000 m2 Plesteran 1 : 3 3.0000 m2 Acian
153 1 M' PASANG KAWAT DURI pada PAGAR KELILING 1.2000 m' Besi Siku 50.50.5 7.7000 m' Kawat Duri 0.4000 m2 Cat Minyak pada Besi Siku
154 1 M' PROFIL BETON LIST PLANK 12.50000 Kg Semen PC 25.0000 Bh Paku beton 0.0010 M3 Pasir pasang 0.7500 o/h Pekerja 1.0000 o/h Tukang 0.5000 o/h Kepala tukang 0.1000 o/h Mandor
155 1 M' PEKERJAAN SALURAN KELILING BANGUNAN 0.1000 m3 Cor Rabat 1 Pc : 3 Psr : 5 Krl 2.2000 m2 Plesteran 1 Pc : 3 Psr 2.2000 m2 Acian
156 1 M' PEK. SALURAN PEMBUANGAN KE RIOL KOTA 0.2500 m3 Beton bertulang 1.7000 m2 Plesteran 1 Pc : 3 Psr
157 1 Unit PEKERJAAN SEPTICTANK & REMBESAN 21.3650 M3 Galian tanah 6.4095 M3 Urugan tanah kembali
0.3800 M3 Urugan Pasir 1.2190 M3 Pasangan Pondasi Batu Kali 1 : 4
2.2240 M3 Pasangan Tembok 1 pc : 4 psr 0.2180 M3 Cor rabat 1 pc : 3 psr : 5 krl 0.5500 M3 Sloof, Kolom, Ringbalk
0.4200 M3 Beton Plat Penutup 25.0000 M2 Plesteran 1 pc : 2 psr
158 1 M2 PEKERJAAN LAPISAN BATU PECAH 5/7 0.0600 M3 Batu Pecah 5/7 0.2000 o/h Pekerja 0.0190 o/h Mandor 0.0045 hari Mesin Gilas (Wales)
159 1 M3 PEKERJAAN LAPISAN SIRTU 1.2000 M3 Sirtu 0.3000 o/h Pekerja 0.0100 o/h Mandor 0.0045 hari Mesin Gilas (Wales)
1 2 3
160 100 M2 PEKERJAAN LAPISAN PENETRASI (LAPEN) tebal 6 cm 3.6000 M3 Batu Pecah 3/5 2.4000 M3 Batu Pecah 2/3 1.2000 M3 Batu Pecah 1/2 2.0000 M3 Pasir Pasang 120.0000 Kg Aspal 1.0000 M3 Kayu Bakar 7.5000 o/h Pekerja
0.3750 o/h Mandor 0.6600 hari Mesin Gilas (Wales)
161 1 UNIT GROUND RESERVOAR BAWAH WING KANAN BANGUNAN 14.0000 M3 Galian Tanah Pondasi / Bak 1.2000 M3 Urugan Tanah kembali 2.1200 M3 Pondasi Poer Plat 0.3600 M3 Sloof Beton Bertulang 15/20 0.2160 M3 Kolom Beton Bertulang 25/25 3.6800 M3 Plat Dinding & Lantai tebal 10 cm 0.8000 M3 Plat Penutup tebal 12 cm 0.2880 M3 Balok Beton 20/30 0.8000 M3 Lantai Cor 1 : 3 : 5 tebal 10 cm 8.0000 M2 Plester pada Plat Lantai 36.8000 M2 Plesteran Bak Air 32.0000 M2 Pasang Keramik 20/20 1.0000 Unit Tangga Besi turun ke Reservoar 1.0000 Unit Pintu Besi Bak Kontrol 50/50 + Acc
162 100 M2 LAPISAN ASPAL GORENG tebal 3 cm (LATASIR) 0.8000 M3 Abu Batu / Filter 2.4000 M3 Batu Pecah 2/3 1.2000 M3 Batu Pecah 1/2 2.0000 M3 Pasir Kasar 120.0000 Kg Aspal 1.0000 M3 Kayu Bakar 7.5000 o/h Pekerja 0.3750 o/h Mandor 0.6600 hari Mesin Gilas (Wales)
163 1 Unit KUDA-KUDA PIPA dia. 3 " (K. 5) 18.0000 M' Pipa Gip dia. 3 "
2.0000 Bh Besi Plat Dudukan Kuda-kuda 0.4000 Bh Besi Plat Penghubung Dudukan 8.0000 Bh Baut Anker Dudukan Kuda-kuda 1.0000 Dos Kawat Las 8.0000 Jam Sewa Mesin Las 3.0000 o/h Pekerja 4.0000 o/h Tukang 0.4000 o/h Kepala Tukang 0.1000 o/h Mandor
164 1 Unit KUDA-KUDA PIPA dia. 2 " (K. 4) 15.0000 M' Pipa Gip dia. 2 "
2.0000 Bh Besi Plat Dudukan Kuda-kuda 4.0000 Bh Baut Anker Dudukan Kuda-kuda 0.7500 Dos Kawat Las
6.0000 Jam Sewa Mesin Las 2.5000 o/h Pekerja 3.0000 o/h Tukang 0.3000 o/h Kepala Tukang 0.1000 o/h Mandor
165 1 M' GORDING PIPA MEDIUM dia. 1 ½ " 1.0500 M' Pipa Gip dia. 1 ½ "
3.0000 m' Pipa Gip Ø 2 " 2.0000 o/h Kawat BC 2,5 mm 3.0000 o/h Kabel BC 50 mm 1.0000 o/h Box Pengaman Pasangan Batu Tela 1.0000 o/h Upah Kerja
1 2 3
221 1 M3 GALIAN TANAH dan URUGAN PASIR pada KABELFEEDER / INSTALASI LAMPU JALAN 1.0000 m3 Galian Tanah 0.3000 m3 Pasir Urug 0.6440 m3 Urugan Tanah kembali
222 1 M3 URUGAN TANAH SUBUR 1.2000 M3 Tanah Subur 0.3000 o/h Pekerja 0.0100 o/h Mandor
222 1 M2 TANAM RUMPUT HALAMAN 1.1000 M2 Rumput Halaman 0.5000 Kg Pupuk (TSP) 0.0200 o/h Pekerja 0.2000 o/h Tukang 0.0200 o/h Kepala Tukang 0.0100 o/h Mandor 1.0000 Ls Pemeliharaan selama 1 bulan
223 1 Phn TANAM PALEM RAJA 1.0000 Phn Palem Raja
1.0000 Kg Pupuk (TSP) 0.5000 o/h Pekerja 0.2500 o/h Tukang 0.0250 o/h Kepala Tukang 0.0100 o/h Mandor 1.0000 Ls Pemeliharaan selama 1 bulan
224 1 Phn TANAM PALEM BOTOL 1.0000 Phn Palem Botol 1.0000 Kg Pupuk (TSP) 0.5000 o/h Pekerja 0.2500 o/h Tukang 0.0250 o/h Kepala Tukang 0.0100 o/h Mandor 1.0000 Ls Pemeliharaan selama 1 bulan
1 2 3
225 1 Phn TANAM CEMARA 1.0000 Phn Cemara 1.0000 Kg Pupuk (TSP) 0.5000 o/h Pekerja 0.2500 o/h Tukang 0.0250 o/h Kepala Tukang 0.0100 o/h Mandor 1.0000 Ls Pemeliharaan selama 1 bulan
226 1 M2 PASANG DINDING BATU ALAM 1.0600 M2 Batu alam Palimanan/Batu Candi 3.0030 Bh Paku 12 0.0250 M3 Pasir 12.4400 Kg Semen 0.6500 Kg Semen Warna 1.3000 o/h Pekerja 0.6500 o/h Tukang batu 0.0650 o/h Kepala tukang 0.0650 o/h Mandor
240 1 M 2 PASANG DINDING BATU ALAM ANDHESIT 1.0500 M2 Batu Andhesit 11.7500 Kg Semen Portland 0.0350 M3 Pasir Pasang 0.7200 h.o Pekerja 0.3800 h.o Tukang Batu 0.0350 h.o Kepala Tukang 0.0300 h.o Mandor
241 1 M 2 PASANG DINDING BATU ALAM CANDI 1.0500 M2 Batu Alam Candi 11.7500 Kg Semen Portland 0.0350 M3 Pasir Pasang 0.7200 h.o Pekerja 0.3800 h.o Tukang Batu 0.0350 h.o Kepala Tukang 0.0300 h.o Mandor
3.5000 Kg Besi Siku 40.40.3 8.0000 Cm Pengelasan 8.0000 Bj Ree fet 0.5600 o/h Pekerja 0.5600 o/h Tukang batu 0.0560 o/h Kepala tukang 0.0083 o/h Mandor
243 1 UNIT PEMBUATAN Pembuatan stage Ruang Sidang 90.6867 M3 Urugan tanah 1.8619 M3 Urugan Pasir 8.6209 M3 Pas Dinding bata 27.0000 m Kolom Praktis 51.3900 m Ring Balk Praktis 5.1515 M3 Lantai Cor 1 : 3 : 5 tebal 7 cm 114.9448 M2 Plester 1;3 114.9448 m2 Acian 93.7900 M2 Lantai Keramik 60x60 (Granitto) 28.5750 m2 Keramik tangga (Granitto) 1.0000 Ls Pek. Finising & Assesories
244 1 M 2 PASANG DINDING BATU ALAM ANDHESIT 1.0500 M2 Batu Andhesit 11.7500 Kg Semen Portland 0.0350 M3 Pasir Pasang 0.7200 h.o Pekerja 0.3800 h.o Tukang Batu 0.0350 h.o Kepala Tukang 0.0300 h.o Mandor
245 1 M 2 PASANG DINDING BATU ALAM LIMESTONE 1.0500 M2 Batu Alam Limestone 11.7500 Kg Semen Portland
0.0350 M3 Pasir Pasang 0.7200 h.o Pekerja 0.3800 h.o Tukang Batu 0.0350 h.o Kepala Tukang 0.0300 h.o Mandor
245 1 M 2 PASANG DINDING BATU ALAM CANDI 1.0500 M2 Batu Alam Candi 11.7500 Kg Semen Portland 0.0350 M3 Pasir Pasang 0.7200 h.o Pekerja 0.3800 h.o Tukang Batu 0.0350 h.o Kepala Tukang 0.0300 h.o Mandor
246 1 M 2 PASANG DINDING BATU ANDHESIT SUSUN SIRIH 1.0500 M2 Batu Andhesit Susun Sirih 11.7500 Kg Semen Portland 0.0350 M3 Pasir Pasang 0.7200 h.o Pekerja 0.3800 h.o Tukang Batu 0.0350 h.o Kepala Tukang 0.0300 h.o Mandor
247 1 M 2 PASANG BATU KORAL SIKAT 1.0500 M2 Batu koral sikat 11.7500 Kg Semen Portland 0.0350 M3 Pasir Pasang 0.5000 h.o Pekerja 0.3800 h.o Tukang Batu 0.0350 h.o Kepala Tukang 0.0300 h.o Mandor
248 1 M 2 FLOOR HARDENER FERROVAX 3.0000 Kg Floor Hardener Ferrovax 0.1200 h.o Pekerja 0.1200 h.o Tukang Batu 0.0120 h.o Kepala Tukang 0.0060 h.o Mandor
249 1 M Pas. Tembok garfus atap lantai 3 0.0405 m3 Pas Tela 0.7400 M2 Plester 1;3 0.7400 m2 Acian
250 1 M Pembesaran Kolom Ø 30cm 0.2700 m3 Pas Tela 2.2000 M2 Plester 1;3 2.2000 m2 Acian
251 1 M Pembesaran Kolom Ø 45cm 0.1700 m3 Pas Tela 2.2000 M2 Plester 1;3 2.2000 m2 Acian
252 1 M' PROFIL BETON LIST LEBAR 10 Cm12.5000 Kg Semen PC25.0000 Bh Paku beton
253 1 UNIT PROFIL PADA KOLOM 45 Cm1.8134 m2 Pasangan Batu Tela 1 : 21.0362 m2 Plesteran 1 : 2 + Acian
20.0000 bh Paku Beton Angkur Batu Tela1.7270 m List Profil dia. 55 cm Lebar 10 Cm1.7270 m List Profil dia. 55 cm Lebar 15 Cm2.0410 m List Profil dia. 65 cm Lebar 20 Cm2.0410 m List Profil Bawah dia. 65 cm Lebar 30 Cm
254 1 m' FLASHING ALCUBOUND PADA ATAP LANTAI 031.5000 m2 Alcubound2.2000 m' Besi Siku 4x4x2 mm1.0000 tube Sealent
16.0000 cm Pengelasan
0.1100 Dos Rifeat
4.0000 Bh Dinabolt
0.3520 Bh Meni Besi
0.7500 o/h Pekerja1.0000 o/h Tukang0.5000 o/h Kepala tukang
0.0750 o/h Mandor
255 1 m PEMBUNGKUS PIPA AIR HUJAN PADA KOLOM 45 CM0.0518 m3 Beton K-1750.7500 m2 Plesteran 1 : 2 + Acian3.0000 Kg Besi Beton0.0450 Kg Kawat0.7500 m2 Bekisting
2.0410 Ls Alat bantu (Scafolding, dll)
256 1 Unit PEKERJAAN ORNAMEN FIBER1.000 Unit Ornamen Fiber0.480 Klg Lem8.000 Bh Paku Beton1.000 Ls Cat Duco1.000 Ls Biaya Pemasangan
1 1 Unit PEMASANGAN SPLIT AC 1 PK 1.0000 Set Ac Panasonik Split 1 PK 15.0000 m Pipa Tembaga 1/4" 15.0000 m Pipa PVC 3/4 5.0000 bh Elbo PVC 3/4 10.0000 bh Sock PVC 3/4 0.2500 Tb Lem Pipa 30.0000 bh Klem Clipsal PVC 3/4 0.5000 Btl Freon Merk DUPON
1.000 Ls Biaya alat dan Pemasangan
1 1 Unit PEMASANGAN SPLIT AC 1,5 PK 1.0000 Set Ac Panasonik Split 1,5 PK 15.0000 m Pipa Tembaga 5/16"
KEGIATAN : PEMBANGUNAN SPORT COMPLEXPEKERJAAN : PENIMBUNAN AREA DAN PEMBANGUNAN PAGAR KELILING LOKASI : KOTA TIMIKATAHUN ANGG : 2013
NO. JENIS PEKERJAAN SAT VOLUMEHARGA SATUAN JUMLAH HARGA
Bahan Upah/alat Bahan Upah
1 2 3 4 5 6 7 = (4x5) 8 = (4x6)
I PEKERJAAN PENIMBUNAN LOKASI
1 Pek. Penimbunan Sirtu m3 54,000.000 Rp 150,000.00 Rp 61,125.00 Rp 8,100,000,000.00 Rp 3,300,750,000.00 2 Pek. Perataan dan Pemadatan m3 54,000.000 Rp - Rp 29,375.00 Rp - Rp 1,586,250,000.00
TOTAL ......... 1 Rp 8,100,000,000.00 Rp 4,887,000,000.00
II PEKERJAAN PAGAR BATU m 1.000 a. Pekerjaan Awal
1 Pek. Pengukuran dan bouplank m 0.800 Rp 142,745.41 Rp 24,375.00 Rp 114,196.33 Rp 19,500.00 2 Pek. Galian tanah Pondasi m3 0.990 Rp - Rp 79,375.00 Rp - Rp 78,581.25 3 Pek. Urugan Kembali ex galian m3 0.330 Rp - Rp 58,750.00 Rp - Rp 19,387.50
Sub Tota-----2a Rp 114,196.33 Rp 117,468.75
b. Pekerjaan Batu
1 Pek. Pasangan batu kosong m3 0.180 Rp 810,960.00 Rp 137,475.00 Rp 145,972.80 Rp 24,745.50 2 Pek. Pasangan pondasi batu kali m3 0.495 Rp 1,149,100.00 Rp 264,375.00 Rp 568,804.50 Rp 130,865.63 3 Pek. Pasangan dinding batu kali m3 1.250 Rp 1,203,150.00 Rp 264,375.00 Rp 1,503,937.50 Rp 330,468.75 4 Pek. Plesteran siar/mata sapi m2 5.500 Rp 14,978.00 Rp 50,250.00 Rp 82,379.00 Rp 276,375.00
Sub Tota-----2b Rp 2,301,093.80 Rp 762,454.88
c. Pekerjaan Beton
1 Pek. Pondasi pile cap m3 0.040 Rp 4,739,422.00 Rp 930,675.00 Rp 189,576.88 Rp 37,227.00 2 Pek. Slof 20x20 m3 0.040 Rp 5,819,752.20 Rp 1,051,175.00 Rp 232,790.09 Rp 42,047.00 3 Pek. Kolom 20x20 m3 0.050 Rp 10,287,144.00 Rp 1,310,225.00 Rp 514,357.20 Rp 65,511.25 4 Pek. Ring balk 20x15 M 1.000 Rp 98,502.58 Rp 43,955.00 Rp 98,502.58 Rp 43,955.00
Sub Tota-----2c Rp 1,035,226.75 Rp 188,740.25
TOTAL ......... (2a+2b+2c) Rp 3,450,516.87 Rp 1,068,663.88
III PEKERJAAN PAGAR BETON PRECAST m 1,400.000
a. Pekerjaan Awal
1 Pek. Pengukuran dan bouplank m 560.000 Rp 142,745.41 Rp 24,375.00 Rp 79,937,428.63 Rp 13,650,000.00 2 Pek. Galian tanah Pondasi m3 1,386.000 Rp - Rp 79,375.00 Rp - Rp 110,013,750.00 3 Pek. Urugan Kembali ex galian m3 462.000 Rp - Rp 58,750.00 Rp - Rp 27,142,500.00
Sub Total----3a Rp 79,937,428.63 Rp 150,806,250.00
b. Pekerjaan Batu
1 Pek. Pasangan batu kosong m3 252.000 Rp 810,960.00 Rp 137,475.00 Rp 204,361,920.00 Rp 34,643,700.00 2 Pek. Pasangan pondasi batu kali m3 693.000 Rp 1,149,100.00 Rp 264,375.00 Rp 796,326,300.00 Rp 183,211,875.00
Sub Total----3b Rp 1,000,688,220.00 Rp 217,855,575.00
c. Pekerjaan Beton
1 Pek. Kolom Precast 20 x 20 x 300 cm m3 67.200 Rp 9,700,001.40 Rp 3,131,652.49 Rp 651,840,094.02 Rp 210,447,047.45 2 Pek. Plat Precast 5x40 x 250 cm m3 168.000 Rp 17,065,833.98 Rp 4,015,660.36 Rp 2,867,060,108.28 Rp 674,630,940.90
Sub Total----3c Rp 3,518,900,202.29 Rp 885,077,988.35
d. Pekerjaan kawat duri
1 Pek. Besi siku 40.40.4 dan Pemasangan Kawat duri m 1,400.000 Rp 35,826.88 Rp 102,146.63 Rp 50,157,628.14 Rp 143,005,275.00
Sub Tota-----3d Rp 50,157,628.14 Rp 143,005,275.00
TOTAL ......... (3a+3b+3c+3d) Rp 4,649,683,479.06 Rp 1,396,745,088.35
REKAPITULASI
KEGIATAN : PEMBANGUNAN SPORT COMPLEXPEKERJAAN : PENIMBUNAN AREA DAN PEMBANGUNAN PAGAR KELILING LOKASI : KOTA TIMIKATAHUN ANGG : 2013
NO. JENIS PEKERJAANJUMLAH HARGA (Rp)
Bahan Upah
1 2 3 4
I PEKERJAAN PENIMBUNAN LOKASI Rp 8,100,000,000.00 Rp 4,887,000,000.00
II PEKERJAAN PAGAR BATU
III PEKERJAAN PAGAR BETON PRECAST Rp 4,649,683,479.06 Rp 1,396,745,088.35
TOTAL (REAL COST) ----------------------- Rp 12,749,683,479.06 Rp 6,283,745,088.35
PPN 10% ----------------------------------------- Rp - Rp - GREND TOTAL -------------------------------- Rp 12,749,683,479.06 Rp 6,283,745,088.35 PEMBULATAN --------------------------------- Rp 12,749,683,000.00 Rp 6,283,745,000.00
TERBILANG :
Timika,
Sembilan Belas Milyar Tiga Puluh Tiga Juta Empat Ratus Dua Puluh Delapan Ribu Rupiah
RENCANA ANGGARAN BIAYA (RAB)
TOTAL HARGAKETERANGAN
9 = (7+8) 10
Rp 11,400,750,000.00 Rp 1,586,250,000.00
Rp 12,987,000,000.00
Rp 133,696.33 Rp 78,581.25 Rp 19,387.50
Rp 231,665.08
Rp 170,718.30 Rp 699,670.13 Rp 1,834,406.25 Rp 358,754.00
Rp 3,063,548.68
Rp 226,803.88 Rp 274,837.09 Rp 579,868.45 Rp 142,457.58
Rp 1,223,967.00
Rp 4,519,180.75 4,519,180.75 per m'
Rp 93,587,428.63 Rp 110,013,750.00 Rp 27,142,500.00
Rp 230,743,678.63 164,816.91 per m'
Rp 239,005,620.00 Rp 979,538,175.00
Rp 1,218,543,795.00 870,388.43 per m'
Rp 862,287,141.46 Rp 3,541,691,049.18
Rp 4,403,978,190.64 3,145,698.71 per m'
Rp 193,162,903.14
Rp 193,162,903.14
Rp 6,046,428,567.40 4,318,877.55 per m'
REKAPITULASI
TOTAL HARGAKETERANGAN
5 = (3+4) 6
Rp 12,987,000,000.00
Rp 6,046,428,567.40
Rp 19,033,428,567.40
Rp - Rp 19,033,428,567.40 Rp 19,033,428,000.00
19 April 2023
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : PEMBANGUNAN SPORT COMPLEXPEKERJAAN : PENIMBUNAN AREA DAN PEMBANGUNAN PAGAR KELILING LOKASI : KOTA TIMIKATAHUN ANGG : 2013
NO. JENIS PEKERJAAN SAT VOLUMEHARGA SATUAN JUMLAH HARGA
Bahan Upah/alat Bahan Upah
1 2 3 4 5 6 7 = (4x5) 8 = (4x6)
I PEKERJAAN PENIMBUNAN LOKASI
1 Pek. Penimbunan Sirtu m3 54,000.000 Rp 150,000.00 Rp 61,125.00 Rp 8,100,000,000.00 Rp 3,300,750,000.00 2 Pek. Perataan dan Pemadatan m3 54,000.000 Rp - Rp 29,375.00 Rp - Rp 1,586,250,000.00
TOTAL ......... 1 Rp 8,100,000,000.00 Rp 4,887,000,000.00
II PEKERJAAN PAGAR BATU 1.000 a. Pekerjaan Awal
1 Pek. Pengukuran dan bouplank m 0.800 Rp 142,745.41 Rp 24,375.00 Rp 114,196.33 Rp 19,500.00 2 Pek. Galian tanah Pondasi m3 0.990 Rp - Rp 79,375.00 Rp - Rp 78,581.25 3 Pek. Urugan Kembali ex galian m3 0.330 Rp - Rp 58,750.00 Rp - Rp 19,387.50
Sub Tota-----2a Rp 114,196.33 Rp 117,468.75
b. Pekerjaan Batu
1 Pek. Pasangan batu kosong m3 0.180 Rp 810,960.00 Rp 137,475.00 Rp 145,972.80 Rp 24,745.50 2 Pek. Pasangan pondasi batu kali m3 0.495 Rp 1,149,100.00 Rp 264,375.00 Rp 568,804.50 Rp 130,865.63
Sub Tota-----2b Err:522 Err:522
c. Pekerjaan Beton
1 Pek. Pondasi pile cap m3 0.040 Rp 4,739,422.00 Rp 930,675.00 Rp 189,576.88 Rp 37,227.00 2 Pek. Slof 20x20 m3 0.040 Rp 5,819,752.20 Rp 1,051,175.00 Rp 232,790.09 Rp 42,047.00 3 Pek. Kolom 20x20 m3 0.050 Rp 10,287,144.00 Rp 1,310,225.00 Rp 514,357.20 Rp 65,511.25 4 Pek. Ring balk 20x15 M 1.000 Rp 98,502.58 Rp 43,955.00 Rp 98,502.58 Rp 43,955.00
Sub Tota-----2c Rp 1,035,226.75 Rp 188,740.25
TOTAL ......... (2a+2b+2c) Err:522 Err:522
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : PEMBANGUNAN SPORT COMPLEXPEKERJAAN : PENIMBUNAN AREA DAN PEMBANGUNAN PAGAR KELILING LOKASI : KOTA TIMIKATAHUN ANGG : 2013
NO. JENIS PEKERJAAN SAT VOLUMEHARGA SATUAN JUMLAH HARGA
1 Pek. Pengukuran dan bouplank m 560.000 Rp 142,745.41 Rp 24,375.00 Rp 79,937,428.63 Rp 13,650,000.00 2 Pek. Galian tanah Pondasi m3 1,386.000 Rp - Rp 79,375.00 Rp - Rp 110,013,750.00 3 Pek. Urugan Kembali ex galian m3 462.000 Rp - Rp 58,750.00 Rp - Rp 27,142,500.00
Sub Total----3a Rp 79,937,428.63 Rp 150,806,250.00
b. Pekerjaan Batu
1 Pek. Pasangan batu kosong m3 252.000 Rp 810,960.00 Rp 137,475.00 Rp 204,361,920.00 Rp 34,643,700.00 2 Pek. Pasangan pondasi batu kali m3 693.000 Rp 1,149,100.00 Rp 264,375.00 Rp 796,326,300.00 Rp 183,211,875.00 3 Pek. Pasangan dinding batu kali m3 1,750.000 Rp 1,203,150.00 Rp 264,375.00 Rp 2,105,512,500.00 Rp 462,656,250.00 4 Pek. Plesteran siar/mata sapi m2 7,700.000 Rp 14,978.00 Rp 50,250.00 Rp 115,330,600.00 Rp 386,925,000.00
Sub Total----3b Rp 3,221,531,320.00 Rp 1,067,436,825.00
c. Pekerjaan Beton
1 Pek. Kolom Precast 20x20 cm m3 67.200 Rp 9,700,001.40 Rp 3,131,652.49 Rp 651,840,094.02 Rp 210,447,047.45 2 Pek. Plat Precast 5x40 cm m3 168.000 Rp 17,065,833.98 Rp 4,015,660.36 Rp 2,867,060,108.28 Rp 674,630,940.90
Sub Total----3c Rp 3,518,900,202.29 Rp 885,077,988.35
d. Pekerjaan kawat duri
1 Pek. Besi siku 40.40.4 dan Pemasangan Kawat duri m 1,400.000 Rp 35,826.88 Rp 102,146.63 Rp 50,157,628.14 Rp 143,005,275.00
Sub Tota-----3d Rp 50,157,628.14 Rp 143,005,275.00
TOTAL ......... (3a+3b+3c+3d) Rp 6,870,526,579.06 Rp 2,246,326,338.35
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : PEMBANGUNAN SPORT COMPLEXPEKERJAAN : PENIMBUNAN AREA DAN PEMBANGUNAN PAGAR KELILING LOKASI : KOTA TIMIKATAHUN ANGG : 2013
NO. JENIS PEKERJAAN SAT VOLUMEHARGA SATUAN JUMLAH HARGA
Bahan Upah/alat Bahan Upah
1 2 3 4 5 6 7 = (4x5) 8 = (4x6)
REKAPITULASI
KEGIATAN : PEMBANGUNAN SPORT COMPLEXPEKERJAAN : PENIMBUNAN AREA DAN PEMBANGUNAN PAGAR KELILING LOKASI : KOTA TIMIKATAHUN ANGG : 2013
NO. JENIS PEKERJAANJUMLAH HARGA (Rp)
Bahan Upah
1 2 3 4
I PEKERJAAN PENIMBUNAN LOKASI Rp 8,100,000,000.00 Rp 4,887,000,000.00
II PEKERJAAN PAGAR BATU
III PEKERJAAN PAGAR BETON PRECAST Rp 6,870,526,579.06 Rp 2,246,326,338.35
TOTAL (REAL COST) ----------------------- Rp 14,970,526,579.06 Rp 7,133,326,338.35
PPN 10% ----------------------------------------- Rp - Rp - GREND TOTAL -------------------------------- Rp 14,970,526,579.06 Rp 7,133,326,338.35 PEMBULATAN --------------------------------- Rp 14,970,527,000.00 Rp 7,133,326,000.00
TERBILANG :
Timika,
Dua PULUH Dua Milyar Seratus Tiga Juta Delapan Ratus Lima Puluh Tiga Ribu Rupiah
RENCANA ANGGARAN BIAYA (RAB)
TOTAL HARGAKETERANGAN
9 = (7+8) 10
Rp 11,400,750,000.00 Rp 1,586,250,000.00
Rp 12,987,000,000.00
Rp 133,696.33 Rp 78,581.25 Rp 19,387.50
Rp 231,665.08
Rp 170,718.30 Rp 699,670.13
Err:522
Rp 226,803.88 Rp 274,837.09 Rp 579,868.45 Rp 142,457.58
Rp 1,223,967.00
Err:522 Err:522
RENCANA ANGGARAN BIAYA (RAB)
TOTAL HARGAKETERANGAN
9 = (7+8) 10
Rp 93,587,428.63 Rp 110,013,750.00 Rp 27,142,500.00
Rp 230,743,678.63
Rp 239,005,620.00 Rp 979,538,175.00 Rp 2,568,168,750.00 Rp 502,255,600.00
Rp 4,288,968,145.00
Rp 862,287,141.46 Rp 3,541,691,049.18
Rp 4,403,978,190.64
Rp 193,162,903.14
Rp 193,162,903.14
Rp 9,116,852,917.40 6,512,037.80 per m'
RENCANA ANGGARAN BIAYA (RAB)
TOTAL HARGAKETERANGAN
9 = (7+8) 10
REKAPITULASI
TOTAL HARGAKETERANGAN
5 = (3+4) 6
Rp 12,987,000,000.00
Rp 9,116,852,917.40
Rp 22,103,852,917.40
Rp - Rp 22,103,852,917.40 Rp 22,103,853,000.00
19 April 2023
II 10 M PEKERJAAN PAGAR BATU 10m 1m
a. Pekerjaan Awal
1 Pek. Pengukuran dan bouplank m 8 0.8
2 Pek. Galian tanah Pondasi m3 9.9 0.99
3 Pek. Urugan Kembali ex galian m3 3.3 0.33
b. Pekerjaan Batu
1 Pek. Pasangan batu kosong m3 1.8 0.18
2 Pek. Pasangan pondasi batu kali m3 4.95 0.495
3 Pek. Pasangan dinding batu kali m3 12.5 1.25
4 Pek. Plesteran foeg/mata sapi m2 55 5.5
c. Pekerjaan Beton
1 Pek. Pondasi pile cap m3 0.4 0.04
2 Pek. Slof 20x20 m3 0.4 0.04
3 Pek. Kolom 20x20 m3 0.5 0.05
4 Pek. Ring balk 20x15 m3 0.3 0.03
III PEKERJAAN PAGAR BETON PRECAST
a. Pekerjaan Awal m1 Pek. Pengukuran dan bouplank m32 Pek. Galian tanah Pondasi m33 Pek. Urugan Kembali ex galian m3
b. Pekerjaan Batu
#VALUE! Pek. Pasangan batu kosong m3 1.8 0.18
#VALUE! Pek. Pasangan pondasi batu kali m3 4.95 0.495
c. Pekerjaan Beton
1 Pek. Kolom Precast 20x20 m3 0.48 0.048
2 Pek. Plat Precast 5x40 cm m3 1.2 0.12
d. Pekerjaan kawat duri
1 Pek. Besi siku 40.40.4 kg2 Pek. Pemasangan Kawat duri m
5.56
2.02
0.80
5.50
25.00
25.00
20.00
33.33
0.6165 0.88776 0.22194
beton besi 10 besi 12 besi 6
20.833333333 44.032896 3.10716 47.140056
8.3333333333 318.11 Ø10mm'
265.095 91.7352 6.47325 98.20845
560 batang Kolom3360 Batang Plat
120.0 kg/bh
288.0 kg/bh
m/m3
m/m3
m/m3
m2/m 5.2 0.3 5.5
0.00 Ø10mm'
mal
11.04 23
54 45
DAFTAR HARGA SATUAN BAHAN
Kegiatan : Normallsasl Sungal dl Kabupaten Mimika
Pekerjaan : Normallsasl Sungai dl Kabupaten Mimika
Lokasi : Distrik Kuala Kencana SP-III Kabupaten Mimika
T.A. : 2013
NO U R A I A N KODE SAT
1 Batu belah 10/15 ; 10/20 CM M.020 M3 2 Batu pecah 5/7 cm M.021 M3 3 Batu pecah 3/5 cm M.023 M3 4 Batu pecah 2/3 cm M.024 M3 5 Batu pecah 1/2 cm M.025 M3 6 Batu pecah 0,5/1 cm M.026 M3 7 Batu pecah 1/1,5 cm M.028 M3 8 Batu pecah max 2 cm M.029 M3 9 Batu pecah 2/4 cm M.030 M3
10 Pasir urug M.040 M3 11 Pasir pasang /cor M.041 M3 12 Sirtu royalti MR.42 M3 13 Batu belah quarry MR.10 M3 14 Tanah urug pilihan M.050 M3 15 Aspal curah M.061 Kg 16 Aspal bitumen M.061A Kg 17 Minyak tanah M.065 Ltr 18 Kayu bakar M.070 M3 19 Semen isi 50 kg M.080 Zak 20 Semen M.080 Kg 21 Kapur M.081 M3 22 Cat besi M.090 Kg 23 Cat kayu M.091 Kg 24 P a k u M.166 Kg 25 Besi beton polos M.167 Kg 26 Besi beton ulir M.167 Kg 27 Kawat baja M.168 Kg 28 Alat bantu M.170 set 29 Acuan dari kayu M.180 M3 30 Solar industri M.183 Ltr 31 Solar subsidi M.183 Ltr 32 Premium M.184 Ltr 33 Minyak pelumas M.185 Ltr 34 Meni M.187 Kg 35 Minyak cat (thinner A) M.188 Ltr 36 Minyak cat (thinner B) M.188 Ltr 37 Bata merah klas 1 Bh
TIMIKA,PT. ABU KIMIA
DAFTAR HARGA SATUAN UPAH KERJA
Kegiatan : Normallsasl Sungal dl Kabupaten Mimika
Pekerjaan : Normallsasl Sungai dl Kabupaten Mimika
Lokasi : Distrik Kuala Kencana SP-III Kabupaten Mimika
T.A. : 2013
NO U R A I A N KODE SAT HARGA SATUAN
1 Mandor L.061 Hari 120,000.00 2 Mekanik terampil L.071 Hari 130,000.00 3 Mekanik semi terampil L.072 Hari 140,000.00 4 Kepala tukang L.073 Hari 155,000.00 5 Tukang L.079 Hari 165,000.00 6 Operator terampil L.081 Hari 175,000.00 7 Operator semi terampil L.082 Hari 165,000.00 8 Pembantu operator L.083 Hari 160,000.00 9 Sopir terampil L.091 Hari 150,000.00
10 Pembantu sopir L.099 Hari 75,000.00 11 Pekerja tak terampil L.101 Hari 110,000.00 12 Pekerja semi terampil L.103 Hari 48,500.00 13 Pekerja terampil L.106 Hari 53,000.00 14 Masinis L.107 Hari 40,000.00 15 Tukang aspal L.108 Hari 7,000.00 16 Penjaga L.110 Hari 11,000.00
###
Surabaya, 5 Juli 2010PT. HUTOMO MANDALA PERKASA
YENNY KURNIAWATIDirektur Utama
DAFTAR HARGA SATUAN UPAH KERJA
KET
PT. HUTOMO MANDALA PERKASA
DAFTAR HARGA SEWA PERALATAN
Kegiatan : Normallsasl Sungal dl Kabupaten Mimika
Pekerjaan : Normallsasl Sungai dl Kabupaten Mimika
Lokasi : Distrik Kuala Kencana SP-III Kabupaten Mimika
T.A. : 2013
NO JENIS ALAT KODE SAT
1 Motor grader 100 HP E.010 Jam 225,000.00
2 Roller 3 Wheeled 6-8 T 37 HP E.080 Jam 87,591.76
3 Roller Tandem 6-10T 40 HP E.081 Jam 95,843.71
4 Roller Pneumatic 8-15 T 95 HP E.084 Jam 134,184.40
5 Roller Vibrator Pedestrian 1 T 12 HP E.087 Jam 33,297.40
6 Tamper Vibrator Plate 4 HP E.088 Jam 10,665.24
7 Concrete Vibrator 4 HP E.089 Jam 12,270.32
8 Asphalt sprayer towed 100 L 6 HP E.154 Jam 22,266.48
9 Sprayer selfprop 350 L 25 HP E.153 Jam 63,885.56
10 Asphalt Mixing Plant 30 T/H 150 HP E.155 Jam 605,992.80
11 Asphalt finisher 1,82 M 30 HP E.157 Jam 194,634.00
12 Compresor Air 210 M3 35 HP E.301 Jam 82,375.47
13 Pump, water 5 CM 8 HP E.341 Jam 21,342.05
14 Pump, water 10 CM 12 HP E.342 Jam 35,000.00
15 Dump Truck 3,5 T 115 HP E.211 Jam 286,638.37
16 Dump Truck 5 T 145 HP E.212 Jam 125,000.00
17 Flat bed truck 3,5 T 115 HP E.221 Jam 170,210.31
18 Watertank truck 4000 L 115 HP E.182 Jam 201,959.14
19 Mixer concrete 0,125 M3 4 HP E.251 Jam 17,727.02
20 Mixer concrete 0,5 M3 20 HP E.253 Jam 47,912.32
20 Screening plant 80 HP E.040 Jam 179,311.84
21 Stone Crusher 185 HP E.031 Jam 466,968.08
22 Bulldozer 110 HP E.001 Jam 185,000.00
23 Loader Wheeled 185 HP E.052 Jam 350,508.40
### 24 Excavator 160 HP Jam 285,000.00
HARGA SATUAN
DAFTAR HARGA SEWA PERALATAN
KET
ANALISA HARGA SATUAN PEKERJAAN
PEKERJAAN : PEMELIHARAAN JALAN SUMBER SEWU - TEMBOKREJONO. MATA PEMBAYARAN : 1.2.4JENIS PEKERJAAN : MOBILISASI DAN DEMOBILISASISATUAN PEKERJAAN : Ls
U R A I A NHarga Jumlah
NO Sat Satuan Harga
(Rp.) (Rp.)
MOBILISASI PERALATAN
1 Dump Tcuck 8 - 10 m3 Unit 5.00 100,000.00 500,000.00 2 Asphalt Finisher Unit 1.00 1,000,000.00 1,000,000.00 3 Asphalt Sprayer Unit 1.00 250,000.00 250,000.00 4 Compresor Unit 1.00 250,000.00 250,000.00 5 Tandem Roller Unit 1.00 750,000.00 750,000.00 6 Tire Roller Unit 1.00 500,000.00 500,000.00 7 Jack Hammer Unit 1.00 500,000.00 500,000.00 8 Water Tanker Unit 1.00 100,000.00 100,000.00 9 Vibro Roller Unit 1.00 750,000.00 750,000.00 10 Motor Grader Unit 1.00 500,000.00 500,000.00 11 Road Roller Unit 1.00 750,000.00 750,000.00
Jumlah 5,850,000.00
Surabaya, 5 Juli 2010
PT. HUTOMO MANDALA PERKASA
YENNY KURNIAWATI
Direktur Utama
Perkiraan
Kuantitas
ANALISA BIAYA PEKERJAAN KODE
PENGADAAN KERIKIL SUNGAI ( TIDAK DISARING ) K.013(MENGGUNAKAN BURUH)PROPINSI : KODE : KABUPATEN : DISIAPKAN OLEH : TANGGAL :NTB 52 LOMBOK UTARA PT. HUTOMO MANDALA PERKASA 5 JULI 2010
PROSES : ANGGAPAN :1 Menggali Kerikil sungai dan memuat ke truck 1 Menggunakan tenaga manusia (60 m3/hari) dalam dua kelompok
dengan tenaga manusia di sungai 2 Material dikirim kelokasi pekerjaan atau penimbunan.2 Truck mengangkut kerikil sungai ke lokasi 3 Muatan 5 truck per jam (1 m3 / orang / hari )
pekerjaan / penimbunan 4 Waktu muat 12 menit/10 org/truk waktu bongkar 5 mnt/5 org/truk3 Membongkar muatan truck dengan tenaga 5 Dua tim @ 5 org membongkar truck
manusia. 6 Jarak angkut 10 km, 72 mnt per trip, 5 trip/hari/truk7 Volume yang diukur berdasarkan 3 ton lepas/truk ( BJ = 1,5)8 Umur alat bantu rata-rata 1 bln/org/set @ 3 alat
Truck Bak Terbuka 3.5 T/115 HP 6.00 1.00 E.211 36.00 170,210.31 6,127,571.08
6,127,571.08 JUMLAH 16,801,571.08
VOLUME 60.00 SATUAN : M3 HARGA SATUAN ( Rp) : 280,026.18 Per M3 QUANTITY
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RRETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
ANALISA BIAYA PEKERJAAN KODE
PENGADAAN KERIKIL SUNGAI TERSARING K.016( MENGGUNAKAN ALAT )PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :NTB 52 LOMBOK UTARA PT. HUTOMO MANDALA PERKASA 5 JULI 2010
PROSES : ANGGAPAN :1 Buldozer menimbun stok disungai untuk loader 1 Menggunakan alat bantu ( 60 m3/hari )2 Dump Truck memuat dan mengangkut kerikil 2 Loader memuati bergantian diantara truck pengangkut dan
sungai ke tempat saringan truck pengisi tempat saringan di sungai3 Kerikil disaring sesuai ukuran 3 Sumber material tersedia bebas/dengan ganti rugi royalty yang4 Loader memuati dump truck berlaku.5 Dump truck mengangkut kerikil sungai yang disaring 4 Volume yang diukur berdasarkan 5 ton lepas/truk (BJ = 1.5 )
ke lokasi pekerjaan / penimbunan 5 Suplai ke lokasi jarak 10 km dari sumber; 1 trip/jam/truk (dgn 3 truk)6 Umur alat bantu rata-rata 1 bulan/org/set @ 3 alat7 Kapasitas saringan rata-rata 20 ton/jam, dengan ditambah bagian
Sirtu-Royalty 80.00 M3 MR.42 80.00 48,500.00 3,880,000.00 Alat bantu (@ 3 alat) 0.20 Set M.170 0.20 10,000.00 2,000.00
3,882,000.00
PERALATAN JUMLAH KODE JAM KERJA
Buldozer 110 HP 1.00 1.00 E.001 3.00 185,000.00 555,000.00 Mesin penyaring 80 HP 1.00 1.00 E.040 5.00 179,311.84 896,559.20 Wheel Loader 115 HP 1.00 1.00 E.052 6.00 350,508.40 2,103,050.40 Dump Truck 5 ton/145 HP 4.00 1.00 E.212 24.00 125,000.00 3,000,000.00
6,554,609.60 JUMLAH 12,235,609.60
VOLUME 60.00 SATUAN : M3 HARGA SATUAN ( Rp) : 203,926.83 Per M3 QUANTITY
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RRETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
ANALISA BIAYA PEKERJAAN KODE
PRODUKSI KERIKIL PECAH TERSARING
K.017(MENGGUNAKAN ALAT)
PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :NTB 52 LOMBOK UTARA PT. HUTOMO MANDALA PERKASA 5 JULI 2010
PROSES : ANGGAPAN :1 Buldozer membuat timbunan disungai untuk loader 1 Menggunakan alat berat (60 m3/hari), material diolah 2x2 Loader memuat ke Dump Truck yang membongkar 2 Kerikil diambil dari sungai dan diangkut kesaringan pertama
kesaringan 1 3 33,3 bt lolos saringan pd mesin dg produksi 15 t/jam3 Batu oversize ke pemecah 1 4 70% batu yg sdh dipecah dicampur kembali dgn batu dari sungai4 Hasil pecahan batu dicampur ulang dengan hasil yg lolos saringan
saringan untuk pemecah 2 5 Volume yang diukur berdasarkan 5 ton lepas / truk (BJ = 1,5)5 Dumptruck angkut batu pecah tersaring 6 Jarak kirim dari sumber bahan kelokasi pekerjaan 10 km, 1 trip/jam/truk
7 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat.
Kerikil sungai-Royalty 80.00 M3 MR.12 80.00 48,500.00 3,880,000.00 Alat bantu (@ 3 alat) 0.20 Set M.170 0.20 10,000.00 2,000.00
3,882,000.00
PERALATAN JUMLAH KODE JAM KERJA
Buldozer 110 HP 1.00 1.00 E.001 2.00 185,000.00 370,000.00 Mesin pecah batu 30 t/j 185 HP 1.00 1.00 E.031 6.00 179,311.84 1,075,871.04 Wheel Loader 115 HP 1.00 1.00 E.052 5.00 350,508.40 1,752,542.00 Dump Truck 5 ton/145 HP 4.00 1.00 E.212 24.00 125,000.00 3,000,000.00
6,198,413.04 JUMLAH 12,154,413.04
VOLUME 60.00 SATUAN : M3 HARGA SATUAN ( Rp) : 202,573.55 Per M3 QUANTITY
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
ANALISA BIAYA PEKERJAAN KODE
PROD. BATU PECAH TERSARING MEMPERGUNAKAN QUARRY K.018(MENGGUNAKAN ALAT)
PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :NTB 52 LOMBOK UTARA PT. HUTOMO MANDALA PERKASA 5 JULI 2010
PROSES : ANGGAPAN :1 Buldozer membongkar batu quarry dan menimbun batu 1 Menggunakan alat berat (60 m3/hari), material diolah tiga kali.
untuk loader 2 Batu diambil dari quarry dan diangkut kesaringan pertama (25 t/j)2 Loader memuat ke Dump Truck yang membongkar 3 Ex.saringan 1-2 t/j ke pemecah 1,21 t/j ke saringan 2 & 2 t/j terbuang
kesaringan 1 4 Ex. Saringan 2: 19 t/j ke pemecah 1 & 1,8 t/j ke pemecah 2 3 Batu oversize ke pemecah 1 5 Ex. Saringan 1: 12,2 t/j ke pemecah 2,7,2 t/j untuk dikirim & 1,8 t/j4 Hasil pecahan batu dicampur ulang dengan hasil terbuang.
saringan untuk pemecah 2 6 Ex.pemecah 2: 14 t/j untuk dikirim.5 Dumptruck angkut batu pecah tersaring 7 Volume yang diukur berdasarkan 5 ton lepas / truk (8j = 1,35)
8 Jarak kirim dari sumber bahan kelokasi pekerjaan 10 km, 1 trip/jam/truk9 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat.
PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :NTB 52 LOMBOK UTARA PT. HUTOMO MANDALA PERKASA 5 JULI 2010PROSES : ANGGAPAN :
1 Semua material dikirim pemasok 1 LATASIR dihasilkan dari AMP produksi 100 ton/hari2 Loader menjaga bin tetap penuh 2 Aspal dipanaskan lebih dahulu agar aspal sudah siap saat dimulai3 Produksi AMP 100 ton/hari 3 Biaya produksi termasuk pengangkutan s/d 10 km dari AMP4 Dumptruck dimuati dan ditutup terpal untuk 4 Produksi dimuat kedalam dump truck 5 ton dam dikirim ke tempat
mempertahankan suhu pekerjaan5 Dumptruck membongkar langsung kedalam mesin 5 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat.
penghampar aspal 6 Sesuai Spesifikasi BM No.12/PT/B/1983 dan revisi Spesifikasi Umum Maret 1989Buku 3
VOLUME 100.00 SATUAN : TON HARGA SATUAN ( Rp) : 790,897.74 Per TON
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
KODE
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
ANALISA BIAYA PEKERJAAN KODE
K.026PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :NTB 52 LOMBOK UTARA PT. HUTOMO MANDALA PERKASA 5 JULI 2010PROSES : ANGGAPAN :
1 Semua material dikirim pemasok 1 ATB dibuat AMP produksi 100 ton/hari2 Loader menjaga bin tetap penuh 2 Agregat pecah tersaring3 Produksi AMP 100 ton/hari 3 Aspal dipanaskan lebih dahulu agar aspal siap saat dimulai4 Dumptruck dimuati dan ditutup terpal untuk 4 Produksi dimuat kedalam dump truck 5 ton dam dikirim ke tempat
mempertahankan suhu pekerjaan5 Dumptruck mengangkut ke tempat pekerjaan 5 Biaya produksi termasuk pengangkutan sampai 10 km dari AMP
6 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat.7 Spek.B.M. No.03/PT/B/1983 dan revisi Spesifikasi Umum Maret 1989
Pasir ayak untuk beton 25.00 M3 M.041 25.00 110,000.00 2,750,000.00 Aspal 5,900.00 kg M.061 5,900.00 7,000.00 41,300,000.00 Alat bantu 0.20 set M.170 0.20 10,000.00 2,000.00 Batu sungai pecah tersaring 47.00 M3 K.012 47.00 202,573.55 9,520,956.88
53,572,956.88
PERALATAN JUMLAH KODE JAM KERJA
Wheel Loader 115 HP 2.00 1.00 E.052 9.00 350,508.40 3,154,575.60 Mesin pencampur aspal 30 t/j 1.00 1.00 E.155 5.00 605,992.80 3,029,964.00 Dump truck 5t/145 HP 7.00 1.00 E.212 35.00 125,000.00 4,375,000.00 Bulldozer 110 HP 1.00 1.00 E.001 4.00 185,000.00 740,000.00 Pemecah batu 200 HP 1.00 1.00 E.031 4.00 466,968.08 1,867,872.32
13,167,411.92 JUMLAH 70,089,868.80
VOLUME 100.00 SATUAN : TON HARGA SATUAN ( Rp) : 700,898.69 Per TON
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN MEMPRODUKSI CAMPURAN ASPAL BETON UNTUK LAPIS PONDASI ATAS (LASTON ATAS) (MENGGUNAKAN ALAT)
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
ANALISA BIAYA PEKERJAAN KODE
MEMBUAT PARIT TEPI JALAN
K.110(MENGGUNAKAN BURUH)
PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :NTB 52 LOMBOK UTARA PT. HUTOMO MANDALA PERKASA 5 JULI 2010PROSES : ANGGAPAN :
1 Galian parit dengan tenaga manusia 1 Menggunakan tenaga manusia (1oo m/hr)Membuang sisa galian dengan menggunakan truck 2 Dimensi Parit : Lebar bawah = 0,50 m bakterbuka Lebar atas = 1,30 m
Kedalaman = 0,60 m Volume = 0,54 m3/m
3 25% hasil galian dibuang setempat4 Sisa galian dibuang sejauh 2 km5 Menggali dan membuang dihitung 1,5 m3/org/hr6 Umur alat bantu rata-rata 1 bln/org/set @ 3 alat
Alat bantu (set @ 3 alat) 1.50 set M.170 1.50 10,000.00 15,000.00
15,000.00
PERALATAN JUMLAH KODE JAM KERJA
Truck bak terbuka 3,5 ton 2.00 1.00 E.221 10.00 170,210.31 1,702,103.08
1,702,103.08 JUMLAH 6,097,103.08
VOLUME 54.00 SATUAN : M3 HARGA SATUAN ( Rp) : 112,909.32 Per M3
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
ANALISA BIAYA PEKERJAAN KODE
GALIAN TANAH UNTUK KONSTRUKS
K.224(MENGGUNAKAN BURUH)
PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :NTB 52 LOMBOK UTARA PT. HUTOMO MANDALA PERKASA 5 JULI 2010PROSES : ANGGAPAN :
1 Digali dengan tenaga manusia 1 Menggunakan tenaga manusia2 Membuang tanah galian sejauh 30 m dari 2 Kapasitas kerja per kelompok 50 m3/hari
lubang galian 3 Kedalaman rata-rata galian s/d 3 m4 Umur alat bantu rata -rata 1 bulan/orang/set @ 3 alat5 Untuk jenis tanah berbaru, harga satuan pekerjaan K.224 dikalikan dengan
Alat bantu (set @ 3 alat) 10.00 set M.170 10.00 10,000.00 100,000.00
100,000.00
PERALATAN JUMLAH KODE JAM KERJA
- JUMLAH 3,626,000.00
VOLUME 50.00 SATUAN : m3 HARGA SATUAN ( Rp) : 72,520.00 Per M3
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
ANALISA BIAYA PEKERJAAN KODE
K.225PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :NTB 52 LOMBOK UTARA PT. HUTOMO MANDALA PERKASA 5 JULI 2010PROSES : ANGGAPAN :
1 Membersihkan struktur dari bahan-bahan organik. 1 Bahan urugan dikirim kelokasi pekerjaan oleh pemasok.2 Buruh mengurug bagian belakang struktur. 2 Urugan dipadatkan berlapis tebal 10 cm.3 Memadatkan dengan tamper dan mesin gilas bergetar.
Kerirkil sungai tidak disaring (sirtu 20.00 m3 M.042 20.00 48,500.00 970,000.00 Alat bantu (set @ 3 alat) 0.30 set M.170 0.30 10,000.00 3,000.00
973,000.00
PERALATAN JUMLAH KODE JAM KERJA
Mesin gilas bergetar 1.00 1.00 E.087 5.00 33,297.40 166,487.00 T a m p e r 1.00 2.00 E.088 10.00 10,665.24 106,652.40
273,139.40 JUMLAH 2,611,639.40
VOLUME 15.00 SATUAN : m3 HARGA SATUAN ( Rp) : 174,109.29 Per M3
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN PENIMBUNAN & PEMADATAN UNTUK JEMBATAN, GORONG-GORONG (MENGGUNAKAN BURUH)
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
ANALISA BIAYA PEKERJAAN KODE
PENIMBUNAN BADAN JALAN / SUBGRADE
K.310(MENGGUNAKAN BURUH)
PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :
PROSES : ANGGAPAN :1 Material dihampar (maksimum) setiap lapis 20 cm 1 Menggunakan tenaga manusia2 Setiap lapis dipadatkan minimal 4 kali lintasan 2 Harga material yang termurah untuk timbunan dikirim kelokasi
dengan mesin gilas roda karet. pekerjaan sejauh 10 km oleh pemasok.3 Harga material tergantung harga dilokasi pekerjaan4 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
Pasir urug / Tanah timbunan 1.00 M3 M.040 1.00 40,000.00 40,000.00 Alat bantu 1.00 set M.170 1.00 10,000.00 10,000.00
50,000.00
PERALATAN JUMLAH KODE JAM KERJA
Mesin gilas roda karet 8 - 15 T 1.00 6.00 E.084 30.00 134,184.40 4,025,532.00 Truck tangki air 115 HP 1.00 6.00 E.182 24.00 201,959.14 4,847,019.43
8,872,551.43 JUMLAH 43,722,551.43
VOLUME 375.00 SATUAN : m3 HARGA SATUAN ( Rp) : 116,593.47 Per M3 QUANTITY
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
ANALISA BIAYA PEKERJAAN KODE
PEMBERSIHAN PARIT SAMPING
K.424(MENGGUNAKAN BURUH)
PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :0 0 0 0 0
PROSES : ANGGAPAN :1 Membersihkan saluran samping dan gorong2 dari 1 Menggunakan tenaga manusia
kotoran / sampah dan tumbuh-tumbuhan 2 Membersihkan sampah/kotoran yang menyumbat, tumbuh2an dari parit2 Buang sampah / kotoran tersebut manggunakan truck dan gorong-gorong.
3 Pembuangan puing sejauh 1 km4 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat5 Kapsitas 1 rit pp/jam/truck.
Alat bantu (set @ 3 alat) 1.20 set M.170 1.20 10,000.00 12,000.00
12,000.00
PERALATAN JUMLAH KODE JAM KERJA
Truck bak terbuka 3,5 ton 2.00 1.00 E.221 10.00 170,210.31 1,702,103.08
1,702,103.08 JUMLAH 6,094,103.08
VOLUME 500.00 SATUAN : M' HARGA SATUAN ( Rp) : 12,188.21 Per M'
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
ANALISA BIAYA PEKERJAAN KODE
KONSTRUKSI LAPIS PONDASI BAWAH (LPB) KLAS B
K.513(MENGGUNAKAN BURUH)
PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :0 0 0 0 0
PROSES : ANGGAPAN :1 Membentuk lagi permukaan jalan lama 1 Menggunakan tenaga manusia (60 M3 / hari)2 Agregat ditempatkan disepanjang jalan 2 Dimulai dengan pekerjaan memperbaiki penurunan3 Menghampar agregat 3 Bahan dicampur dan diratakan tebal 12 cm4 Jalan disiram dengan truck air 4 Harga material berdasarkan harga dilokasi5 Pemadatan dilakukan dengan mesin gilas 5 Tebal lapisan 10 cm
Batu pecah 3-5 cm 10.00 M3 M.023 10.00 140,000.00 1,400,000.00 Batu pecah 2-3 cm 11.00 M3 M.024 11.00 155,000.00 1,705,000.00 Batu pecah 1-2 cm 7.50 M3 M.025 7.50 165,000.00 1,237,500.00 Batu pecah 0,5-1cm 11.00 M3 M.025 11.00 165,000.00 1,815,000.00 Pasir urug / Tanah timbunan 32.50 M3 M.040 32.50 40,000.00 1,300,000.00 Alat bantu 1.20 set M.170 1.20 10,000.00 12,000.00
7,469,500.00
PERALATAN JUMLAH KODE JAM KERJA
Mesin gilas 3 roda 6-8 T 1.00 1.00 E.080 5.00 87,591.76 437,958.80 Mesin gilas roda karet 8 - 15 T 1.00 1.00 E.084 5.00 134,184.40 670,922.00 Truck tangki air 115 HP 1.00 1.00 E.182 4.00 201,959.14 807,836.57
1,916,717.37 JUMLAH 14,856,217.37
VOLUME 60.00 SATUAN : M3 HARGA SATUAN ( Rp) : 247,603.62 Per M3 QUANTITY
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
ANALISA BIAYA PEKERJAAN KODE
K.515PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :
0 0 0 0 0PROSES : ANGGAPAN :
1 Agregat ditempatkan disepanjang jalan oleh pemasok 1 Menggunakan tenaga manusia 2 Menghampar material dgn tenaga orang 2 Material ditimbun disepanjang jalan oleh pemasok3 Pemadatan 2 lapis menggunakan mesin gilas roda baja 3 Kerikil dgn ukuran lebih (oversize) yg tersingkir saat penghamparan dihit 6%4 Perapihan dengan tenaga orang 4 Dihampar dengan tenaga manusia dalam 2 lapis & dipadatkan
sampai tebal padat 10 cm5 Dihampar dan dipadatkan 600 m2/hari6 Koefissien pemadatan sama dengan 1,27 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
Buruh tak terampil 60.00 1.00 L.101 60.00 110,000.00 6,600,000.00
7,240,000.00
MATERIAL SATUAN KODE Total Volume
Kerikil sungai tidak disaring (sirtu) 75.00 M3 M.042 75.00 48,500.00 3,637,500.00 Alat bantu 2.50 set M.170 2.50 10,000.00 25,000.00
3,662,500.00
PERALATAN JUMLAH KODE JAM KERJA
Mesin gilas 3 roda baja 8 - 10 T 1.00 1.00 E.080 5.00 134,184.40 670,922.00 Truck tangki air 115 HP 1.00 1.00 E.182 5.00 201,959.14 1,009,795.71
1,680,717.71 JUMLAH 12,583,217.71
VOLUME 60.00 SATUAN : m3 HARGA SATUAN ( Rp) : 209,720.30 Per M3 QUANTITY
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN LAPIS PONDASI BAWAH (LPB) KLAS C SIRTU (MENGGUNAKAN BURUH)
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
ANALISA BIAYA PEKERJAAN KODE
KONSTRUKSI PONDASI LAPIS ATAS (LPA) KLAS B
K.523(MENGGUNAKAN BURUH)
PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :0 0 0 0 0
PROSES : ANGGAPAN :1 Kerikil tersaring ditimbun di sepanjang jalan oleh 1 Menggunakan tenaga manusia
pemasok 2 Material ditimbun disepanjang jalan oleh pemasok2 Material dihampar oleh tenaga manusia 3 Buruh menghampar kerikil pecah diatas LPB dalam 2 lapis3 Jalan disiram air dengan truck air 4 Dipadatkan hingga padat yang ditentukan4 Dipadatkan dengan mesin gilas roda baja 5 Hasil kerja menghampar dan memadatkan 750 m2 / hari
Buruh tak terampil 50.00 2.00 L.101 100.00 110,000.00 11,000,000.00
12,040,000.00
MATERIAL SATUAN KODE Total Volume
Kerikil sungai tersaring 200.00 M3 K.016 200.00 203,926.83 40,785,365.33 Alat bantu 4.00 set M.170 4.00 10,000.00 40,000.00
40,825,365.33
PERALATAN JUMLAH KODE JAM KERJA
Mesin gilas 3 roda baja 8-10 T 1.00 2.00 E.080 10.00 87,591.76 875,917.60 Truck tangki air 115 HP 1.00 2.00 E.182 10.00 201,959.14 2,019,591.43
2,895,509.03 JUMLAH 55,760,874.36
VOLUME 150.00 SATUAN : m3 HARGA SATUAN ( Rp) : 371,739.16 Per M3 QUANTITY
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
ANALISA BIAYA PEKERJAAN KODE
K.528PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :
0 0 0 0 0PROSES : ANGGAPAN :
1 Permukaan jalan dibersihkan dan kering 1 Menggunakan alat berat ( 45 m3 / hari ) 2 Lapis Tack/pengikat aspal cutback dihampar 2 Dikirim ATB ke lokasi pekerjaan oleh pemasok dari AMP
@ 0,5 l/m2 3 ATB dihampar dan dipadatkan sampai tebal 10 cm3 ATB dihampar dengan aspalt finisher 4 BJ ATB padat 2,35 ton/m34 Temperatur ATB 120° C dan tidak kurang dari 100° C 5 Sesuai spesifikasi BM No.03/PT/B/1983 dan Rev.Spesifikasi
ATB (Laston atas) ton K.026 100.00 700,898.69 70,089,868.80 Pasir ayak untuk beton m3 M.041 0.60 110,000.00 66,000.00 Aspal kg M.061A 180.00 7,000.00 1,260,000.00 Minyak bakar lt M.065 45.00 7,150.00 321,750.00 Alat bantu set M.170 0.48 10,000.00 4,800.00
71,742,418.80
PERALATAN JUMLAH KODE JAM KERJA
Mesin gilas 3 roda 6-8 T 1.00 1.00 E.080 5.00 87,591.76 437,958.80 Mesin gilas roda karet 8-15 T 1.00 1.00 E.084 5.00 134,184.40 670,922.00 Mesin penyemprot aspal 1000 l 1.00 1.00 E.153 3.00 22,266.48 66,799.44 Mesin penghampar 1,82 M/30 HP 1.00 1.00 E.157 5.00 194,634.00 973,170.00 Compressor 210 m3/jam 1.00 1.00 E.301 4.00 82,375.47 329,501.89
2,478,352.13 JUMLAH 76,824,770.93
VOLUME 45.00 SATUAN : M3 HARGA SATUAN ( Rp) : 1,707,217.13 Per M3 QUANTITY
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
ANALISA BIAYA PEKERJAAN KODE
LABURAN ASPAL SATU LAPIS (BURTU)
K.615(MENGGNAKAN BURUH)
PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :0 0 0 0 0
PROSES : ANGGAPAN :1 Bersihkan permukaan tidak beraspal dari oli dan 1 Hasil kerja 600 m2 / hari
material lepas 2 Agregat halus hasil saringan 20 mm dari mesin pemacah batu 2 Permukaan perkerasan dilapisi prime aspal cut back ditimbun dilokasi pekerjaan oleh pemasok3 Bersihkan dan tutup permukaan yg sudah dilapisi prime 3 Permukaan yang akan diaspal telah selesai dipadatkan
lapis aspal cut back dan serpihan dengan mesin dan terikat dengan Binder4 Tiap lapis digilas dengan mesin gilas pneumatic roda karet 4 Lap. Prime / Resap permukaan menggunakan aspal MC @ 1,1 ltr/m2
5 Menggunakan minyak Residu ± 1,6 liter / m26 Agregat halus 1,2 cm disebar dari dump truck tiap 50 m2/m3
Batu sungai tersaring 36.00 M3 K.017 36.00 202,573.55 7,292,647.82 Aspal 3,745.00 Kg M.061 3,745.00 7,000.00 26,215,000.00 Minyak Tanah 580.00 Ltr M.065 580.00 7,150.00 4,147,000.00 Alat bantu 1.50 set M.170 1.50 10,000.00 15,000.00
VOLUME 1,800.00 SATUAN : M2 HARGA SATUAN ( Rp) : 27,253.01 Per M2 QUANTITY
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
ANALISA BIAYA PEKERJAAN KODE
LABURAN ASPAL DUA LAPIS (BURDA)
K.617(MENGGNAKAN ALAT)
PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :0 0 0 0 0
PROSES : ANGGAPAN :1 Permukaan harus rata, kering dan bersih 1 Menggunakan alat berat, kapasitas 450 m2/hari2 Untuk permukaan jalann yang tak beraspal perlu 2 Agregat uk. 1-2 cm timbun dikirim oleh leveransir
prime coat 0,7 ltr/m2 3 Permukaan yang akan diaspal telah selesai dipadatkan3 Menebarkan agregat/batu pecah 1-2 dgn gradasi prime aspal cair 1 liter/m2
seragam dua lapis 4 Bitumen residu yg dipakai : Lapis 1, sebanyak 1,6 ltr/m24 Pemadatan dengan PTR 4-6 Lapis 2, sebanyak 1,3 ltr/m2
5 Chip dari dumptruck harus masuk spreader dengan rata-rata 50 m2/m3
Batu sungai tersaring 54.00 M3 K.017 54.00 202,573.55 10,938,971.74 Aspal 6,085.00 Kg M.061 6,085.00 7,000.00 42,595,000.00 Minyak Tanah 580.00 Ltr M.065 580.00 7,150.00 4,147,000.00 Alat bantu 2.50 set M.170 2.50 10,000.00 25,000.00
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
8,129,017.60 JUMLAH 72,886,989.34
VOLUME 1,800.00 SATUAN : M2 HARGA SATUAN ( Rp) : 40,492.77 Per M2 QUANTITY
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
PERALATAN
ANALISA BIAYA PEKERJAAN KODE
LAPIS PENETRASI / PERMUKAAN MAC. 50 MM
K.618LAPEN (MENGGNAKAN BURUH)
PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :0 0 0 0 0
PROSES : ANGGAPAN :1 Semprotkan aspal prime coat 0,8 ltr/m2 1 Menggunakan tenaga manusia2 Hampar batu pecah 3,5 cm 25 m2/m3 2 Harga material (agregat pokok, agregat pengunci, agregat penutup aspal)3 Hampar batu pecah 2,3 cm 45 m2/m3 adalah dilokasi proyek4 Setiap lapis batu dipadatkan 3 Volume aspal cair untuk tack / prime coat 0,8 ltr/m25 Semprotkan aspal 2,5 ltr/m2 4 Tebal lapisan penetrasian + Cm6 Hampar batu pecah 1,2 cm 90 m2/m3 5 Agregat dikirim sampai lokasi pekerjaan oleh pemasok7 Semprotkan aspal 1,5 ltr/m28 Hampar pasir Blinder 400 m2/m3
Batu pecah 3-5 cm 56.00 M3 M.023 56.00 140,000.00 7,840,000.00 Batu pecah 2-3 cm 31.00 M3 M.024 31.00 155,000.00 4,805,000.00 Batu pecah 1-2 cm 15.50 M3 M.025 15.50 165,000.00 2,557,500.00 Aspal 6,270.00 Kg M.061 6,270.00 7,000.00 43,890,000.00 Minyak Tanah 450.00 Ltr M.065 450.00 7,150.00 3,217,500.00 Pasir ayak untuk beton 3.50 M3 M.041 10.00 110,000.00 1,100,000.00 Alat bantu 8.10 set M.170 8.10 10,000.00 81,000.00
63,410,000.00
PERALATAN JUMLAH KODE JAM KERJA
Mesin gilas 3 roda 6-8 T 1.00 3.00 E.080 15.00 87,591.76 1,313,876.40 Asphalt Sprayer 1000 ltr 1.00 3.00 E.153 15.00 22,266.48 333,997.20 Truck bak terbuka 3,5 ton 1.00 3.00 E.221 15.00 170,210.31 2,553,154.62
4,201,028.22 JUMLAH 84,729,028.22
VOLUME 1,400.00 SATUAN : M2 HARGA SATUAN ( Rp) : 60,520.73 Per M2 QUANTITY
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
ANALISA BIAYA PEKERJAAN KODE
K.636PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :JAWA TIMUR BANYUWANGI PT. PUTRA MAJAPAHIT 11 AGUSTUS 2008PROSES : ANGGAPAN :
1 Pengisian material sampai bin oleh pemasok 1 Menggunakan peralatan berat 1.500 m2/hari2 Material dihampar dgn spreader dan dipadatkan 2 HRS (LATASTON) dikirim kelokasi oleh pemasok dari AMP
dgn mesin gilas roda besi dan pneumatic roda 3 Tebal padat rata-rata 3 cmkaret 4 BJ Lataston 2,2 ton/m3
HRS (LATASTON) ton K.035 100.00 - - Aspal kg M.061 600.00 7,000.00 4,200,000.00 Minyak bakar ltr M.065 150.00 7,150.00 1,072,500.00 Alat bantu Set M.170 0.48 10,000.00 4,800.00
VOLUME 1,500.00 SATUAN : m2 HARGA SATUAN ( Rp) : 6,963.63 Per M2 QUANTITY
ANALISA BIAYA PEKERJAAN KODE
PERANCAH (BEGESTING) BETON BERTULANG
K.710(MENGGUNAKAN BURUH)
PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :0 0 0 0 0
PROSES : ANGGAPAN :1 Pengadaan barang oleh leveransir 1 Kelompok tukang kayu memasang 100 m2 dalam 5 hari kerja2 Kelompok tukang kayu memotong dan membuat acuan 2 1/3 material dapat dipakai kembali3 Kelompok tukang kayu membongkar acuan setelah 3 Pengadaan bahan oleh pemasok
beton cukup kuat 4 Untuk 1 m3 beton digunakan 40 lembar playwood untuk 4 Kelompok tukang kayu membersihkan Acuan kayu 120 cm x 240 cm x 1,7 cm
untuk dipakai kembali 5 Kelompok tukang kayu membongkar acuan
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN PENGHAMPARAN LAPIS TIPIS ASPAL BETON LATASTON (MENGGUNAKAN ALAT)
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL SATUAN KODE Total Volume
Paku 20.00 kg M.166 20.00 12,000.00 240,000.00 Kayu unt. Perancah 3.00 M3 M.180 3.00 2,000,000.00 6,000,000.00 Alat bantu (set @ 3 alat) 3.00 set M.170 3.00 10,000.00 30,000.00
6,270,000.00
PERALATAN JUMLAH KODE JAM KERJA
- JUMLAH 13,522,500.00
VOLUME 100.00 SATUAN : M2 HARGA SATUAN ( Rp) : 135,225.00 Per M2 QUANTITY
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
ANALISA BIAYA PEKERJAAN KODE
PENULANGAN BETON (MEMOTONG, MEMBENGKOK DAAN
K.715MEMASANG BESI TULANGAN)(MENGGUNAKAN BURUH)
PROPINSI : KODE : KOTA : DISIAPKAN OLEH : TANGGAL :0 0 0 0 0
PROSES : ANGGAPAN :1 Batang besi beton dipotong sesuai ukuran panjang 1 200 kg tulangan jadi disiapkan dalam 1 hari
yang diperlukan 2 Besi tulangan dikirim ke tempat pekerjaan oleh pemasok2 Batang dan beugel besi beton dibengkok sesuai bentuk 3 Penyusutan akibat pemotongan 10% dan pakai kawat baja dll dianggap 1 %
yang diinginkan 4 Membengkok dan memasang batang besi beton dilaksankan dengan tangan3 Perakitan tulangan besi beton dan diikat dengan
Pasir ayak untuk beton 3.00 M3 M.041 3.00 110,000.00 330,000.00 Semen 1,920.00 Kg M.080 1,920.00 920.00 1,766,400.00 Kerikil pecah tersaring 4.60 M3 K.017 4.60 202,573.55 931,838.33 Alat bantu (set @ 3 alat) 0.60 set M.170 0.60 10,000.00 6,000.00
3,034,238.33
PERALATAN JUMLAH KODE JAM KERJA
Alat penggetar beton 4 HP 1.00 1.00 E.089 5.00 12,270.32 61,351.60 Pengaduk beton 125 ltr/5 HP 1.00 1.00 E.253 5.00 47,912.32 239,561.60 Pompa air (dim 50 mm) 30 m3/jam 1.00 1.00 E.341 5.00 21,342.05 106,710.24
407,623.44 JUMLAH 4,558,861.77
VOLUME 6.00 SATUAN : M3 HARGA SATUAN ( Rp) : 759,810.30 Per M3 QUANTITY
HARGA SATUAN PEKERJAAN INI SUDAH TERMASUK JASA, RETRIBUSI, KEUNTUNGAN DAN PUNGUTAN RESMI LAINNYA KECUALI PPN
DIREKTORAT JENDRAL BINA MARGA DIREKTORAT BINA PROGRAMBJALAN SUBDIT. PERENCANAAN JALAN LOKAL
DAN KABUPATEN
PEKERJA
JUMLAHORANG
JUMLAHHr-Org
UPAHRp/Hr/Org
BIAYARupiah
SUB JUMLAHRupiah
MATERIAL
HARGA SAT. (Rp)
BIAYARupiah
SUB JUMLAHRupiah
PERALATAN
HARIKERJA
BIAYARupiah/Jam
BIAYARupiah
SUB JUMLAHRupiah
ANALISA HARGA LUMP SUM UNTUK MOBILISASI
PEKERJAAN : PEMELIHARAAN JALAN SUMBER SEWU - TEMBOKREJO0 : 0
00 : 0
NO. MATA PEMBAYARAN : 1.2JENIS PEKERJAAN : MOBILISASISATUAN PEKERJAAN : Ls
U R A I A NHarga Jumlah
NO Sat Satuan Harga
(Rp.) (Rp.)
A BARAK KERJA DAN KANTOR1 Barak kerja dan kantor lapangan (sewa) Bln 3.00 1,000,000.00 3,000,000.00
B PERLENGKAPAN BARAK KERJA (Sewa)1 Meja & kursi kerja Set 1.00 250,000.00 250,000.00 2 Kursai lipat Bh 8.00 100,000.00 800,000.00 3 Papan tempel Bh 1.00 100,000.00 100,000.00 4 White Board Bh 1.00 100,000.00 100,000.00 5 Meja rapat Bh 1.00 200,000.00 200,000.00 6 Kursi tamu Set 1.00 300,000.00 300,000.00 7 Almari arsip Bh 1.00 100,000.00 100,000.00 8 Kotak P3K Bh 1.00 150,000.00 150,000.00
C SEWA KENDARAAN OPERASIONAL1 Roda 4 (empat) : 1 buah (pem. Diatas 2000 Bln 3.00 4,800,000.00 14,400,000.00 2 Roda 2 (dua) : 2 buah (pem. Diatas 2000 Bln 6.00 3,540,000.00 21,240,000.00
D BIAYA KOMUNIKASI1 Telepon dan komunikasi Ls 1.00 3,000,000.00 3,000,000.00
E PENGATURAN LALU LINTAS1 Biaya pengaturan lalu lintas Ls 1.00 2,500,000.00 2,500,000.00
F MOBILISASI dan DEMOBILISASI1 Mob Demob peralatan Ls 1.00 5,850,000.00 5,850,000.00
G JUMLAH (A+B+C+D+E+F) 51,990,000.00
H Biaya Umum dan keuntungan (10% x G) 5,199,000.00
I Harga Lump Sum = (G+H) ###
Surabaya, 5 Juli 2010
PT. HUTOMO MANDALA PERKASA
YENNY KURNIAWATI
Direktur Utama
Perkiraan
Kuantitas
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.001 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh : NTB 052 LOMBOK UTARA PT. HUTOMO MANDALA PERKASA
JENIS ALAT : BULDOZER 110 HP TENAGA : 110.00 HP HARGA : 600 (dalam jutaan rupiah) UMUR BAN : - HARGA BAN : -
600 UMUR KERJA : 8 Tahun : 9,600 Jam kerja FAKTOR CRF : 0.20483
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 1,200 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 600 x 0.20483 x 1jam/tahun
0.90 x 600 x 0.20483 x 10^6 = Rp 92,173.50 1,200
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 600 x 10^6 = Rp 15,000.00
1,200
Sub total = Rp 107,173.50
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.160 liter / HP / jamBensin = 0.170 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.160 x 110.00 x 12,000 = 211,200.00 Pelumas = 0.006 x 110.00 x 35,000 = 23,100.00 Perbaikan dan spareparts = 0.600 x = 55,304.10 (60% x depresiasi)
Sub total 289,604.10 TOTAL 396,777.60
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 107,173.50 + 289,604.10 = 396,777.60 / jam
Atau = 5.00 x 396,777.60 = 1,983,888.00 / hari
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.031 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh : NTB 052 LOMBOK UTARA PT. HUTOMO MANDALA PERKASA
JENIS ALAT : STONE CRUSHER 185 HP TENAGA : 185.00 HP HARGA : 400 (dalam jutaan rupiah) UMUR BAN : - HARGA BAN : -
400 UMUR KERJA : 10 Tahun : 15,000 Jam kerja FAKTOR CRF : 0.18062
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 1,500 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 400 x 0.18062 x 1jam/tahun
0.90 x 400 x 0.18062 x 10^6 = Rp 43,348.80 1,500
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 400 x 10^6 = Rp 8,000.00
1,500
Sub total = Rp 51,348.80
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 185.00 x 12,000 = 350,760.00 Pelumas = 0.006 x 185.00 x 35,000 = 38,850.00 Perbaikan dan spareparts = 0.600 x = 26,009.28 (60% x depresiasi)
Sub total 415,619.28 TOTAL 466,968.08
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 51,348.80 + 415,619.28 = 466,968.08 / jam
Atau = 5.00 x 466,968.08 = 2,334,840.40 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.052 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : LOADER WHEELED 115 HP TENAGA : 115 HP HARGA : 500 (dalam jutaan rupiah) UMUR BAN : - HARGA BAN : -
500
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
UMUR KERJA : 8 Tahun : 12,000 Jam kerja FAKTOR CRF : 0.20483 1 Tahun : 300 hari kerja (pada 12,5%)
Atau : 1,500 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 500 x 0.20483 x 1jam/tahun
0.90 x 500 x 0.20483 x 10^6 = Rp 61,449.00 1,500
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 500 x 10^6 = Rp 10,000.00
1,500
Sub total = Rp 71,449.00
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 115.00 x 12,000 = 218,040.00 Pelumas = 0.006 x 115.00 x 35,000 = 24,150.00 Perbaikan dan spareparts = 0.600 x = 36,869.40 (60% x depresiasi)
Sub total 279,059.40 TOTAL 350,508.40
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 71,449.00 + 279,059.40 = 350,508.40 / jam
Atau = 5.00 x 350,508.40 = 1,752,542.00 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.212 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : DUMP TRUCK 5T / 145 HP TENAGA : 145 HP HARGA : 150 (dalam jutaan rupiah) UMUR BAN : 1 TH HARGA BAN : 4
154 UMUR KERJA : 6 Tahun : 7,800 Jam kerja FAKTOR CRF : 0.24668
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 1,300 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 150 x 0.24668 x 1jam/tahun
0.90 x 150 x 0.24668 x 10^6 = Rp 25,616.77 1,300
2. Lain - lain :
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
Asuransi 3% /tahun + PPn 10% 0.03 x hargatahun
0.03 x 150 x 10^6 = Rp 3,461.54 1,300
Sub total = Rp 29,078.31
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 6,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 145.00 x 6,000 = 137,460.00 Pelumas = 0.006 x 145.00 x 35,000 = 30,450.00 Perbaikan dan spareparts = 0.600 x = 15,370.06 (60% x depresiasi)
Sub total 183,280.06 TOTAL 212,358.37
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 29,078.31 + 183,280.06 = 212,358.37 / jam
Atau = 5.00 x 212,358.37 = 1,061,791.85 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.211 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : DUMP TRUCK 3,5T / 115 HP TENAGA : 115 HP HARGA : 150 (dalam jutaan rupiah) UMUR BAN : 1 TH HARGA BAN : 4
154 UMUR KERJA : 6 Tahun : 7,800 Jam kerja FAKTOR CRF : 0.24668
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 1,300 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 150 x 0.24668 x 1jam/tahun
0.90 x 150 x 0.24668 x 10^6 = Rp 25,616.77 1,300
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 150 x 10^6 = Rp 3,461.54
1,300
Sub total = Rp 29,078.31
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 115.00 x 12,000 = 218,040.00 Pelumas = 0.006 x 115.00 x 35,000 = 24,150.00 Perbaikan dan spareparts = 0.600 x = 15,370.06 (60% x depresiasi)
Sub total 257,560.06 TOTAL 286,638.37
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 29,078.31 + 257,560.06 = 286,638.37 / jam
Atau = 5.00 x 286,638.37 = 1,433,191.85 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.080 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : ROLLER 3 WHEELED 6-8 T 37 HP TENAGA : 37 HP HARGA : 50 (dalam jutaan rupiah) UMUR BAN : 1 TH HARGA BAN :
50 UMUR KERJA : 10 Tahun : 15,000 Jam kerja FAKTOR CRF : 0.18062
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 1,500 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 50 x 0.18062 x 1jam/tahun
0.90 x 50 x 0.18062 x 10^6 = Rp 5,418.60 1,500
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 50 x 10^6 = Rp 1,000.00
1,500
Sub total = Rp 6,418.60
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 37.00 x 12,000 = 70,152.00 Pelumas = 0.006 x 37.00 x 35,000 = 7,770.00 Perbaikan dan spareparts = 0.600 x = 3,251.16 (60% x depresiasi)
Sub total 81,173.16 TOTAL 87,591.76
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 6,418.60 + 81,173.16 = 87,591.76 / jam
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
Atau = 5.00 x 87,591.76 = 437,958.80 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.081 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : ROLLER TANDEM 6-10 T 40 HP TENAGA : 40 HP HARGA : 60 (dalam jutaan rupiah) UMUR BAN : 1 TH HARGA BAN :
60 UMUR KERJA : 10 Tahun : 15,000 Jam kerja FAKTOR CRF : 0.18062
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 1,500 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 60 x 0.18062 x 1jam/tahun
0.90 x 60 x 0.18062 x 10^6 = Rp 6,502.32 1,500
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 60 x 10^6 = Rp 1,200.00
1,500
Sub total = Rp 7,702.32
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 40.00 x 12,000 = 75,840.00 Pelumas = 0.006 x 40.00 x 35,000 = 8,400.00 Perbaikan dan spareparts = 0.600 x = 3,901.39 (60% x depresiasi)
Sub total 88,141.39 TOTAL 95,843.71
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 7,702.32 + 88,141.39 = 95,843.71 / jam
Atau = 5.00 x 95,843.71 = 479,218.56 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.084 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : ROLLER PNEUMATIC 8-15 T 40 HP TENAGA : 95 HP HARGA : 125 (dalam jutaan rupiah) UMUR BAN : 1 TH HARGA BAN :
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
125 UMUR KERJA : 10 Tahun : 15,000 Jam kerja FAKTOR CRF : 0.18062
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 1,500 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 125 x 0.18062 x 1jam/tahun
0.90 x 125 x 0.18062 x 10^6 = Rp 13,546.50 1,500
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 125 x 10^6 = Rp 2,500.00
1,500
Sub total = Rp 16,046.50
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 6,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 95.00 x 6,000 = 90,060.00 Pelumas = 0.006 x 95.00 x 35,000 = 19,950.00 Perbaikan dan spareparts = 0.600 x = 8,127.90 (60% x depresiasi)
Sub total 118,137.90 TOTAL 134,184.40
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 16,046.50 + 118,137.90 = 134,184.40 / jam
Atau = 5.00 x 134,184.40 = 670,922.00 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.087 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : ROLLER VIBRATOR - PED 1 T / 12 HP TENAGA : 12 HP HARGA : 25 (dalam jutaan rupiah) UMUR BAN : 1 TH HARGA BAN :
25 UMUR KERJA : 6 Tahun : 7,200 Jam kerja FAKTOR CRF : 0.24668
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 1,200 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 25 x 0.24668 x 1jam/tahun
0.90 x 25 x 0.24668 x 10^6 = Rp 4,625.25 1,200
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 25 x 10^6 = Rp 625.00
1,200
Sub total = Rp 5,250.25
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 12.00 x 12,000 = 22,752.00 Pelumas = 0.006 x 12.00 x 35,000 = 2,520.00 Perbaikan dan spareparts = 0.600 x = 2,775.15 (60% x depresiasi)
Sub total 28,047.15 TOTAL 33,297.40
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 5,250.25 + 28,047.15 = 33,297.40 / jam
Atau = 5.00 x 33,297.40 = 166,487.00 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.088 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : TAMPER VIBRATOR PLATE 4 HP TENAGA : 4 HP HARGA : 15 (dalam jutaan rupiah) UMUR BAN : TH HARGA BAN :
15 UMUR KERJA : 6 Tahun : 7,200 Jam kerja FAKTOR CRF : 0.24668
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 1,200 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 15 x 0.24668 x 1jam/tahun
0.90 x 15 x 0.24668 x 10^6 = Rp 2,775.15 1,200
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 15 x 10^6 = Rp 375.00
1,200
Sub total = Rp 3,150.15
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.167 x 4.00 x 7,500 = 5,010.00 Pelumas = 0.006 x 4.00 x 35,000 = 840.00 Perbaikan dan spareparts = 0.600 x = 1,665.09 (60% x depresiasi)
Sub total 7,515.09 TOTAL 10,665.24
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 3,150.15 + 7,515.09 = 10,665.24 / jam
Atau = 5.00 x 10,665.24 = 53,326.20 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.089 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : CONCRETE VIBRATOR 4 HP TENAGA : 4 HP HARGA : 10 (dalam jutaan rupiah) UMUR BAN : TH HARGA BAN :
10 UMUR KERJA : 5 Tahun : 3,000 Jam kerja FAKTOR CRF : 0.24668
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 600 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 10 x 0.24668 x 1jam/tahun
0.90 x 10 x 0.24668 x 10^6 = Rp 3,700.20 600
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 10 x 10^6 = Rp 500.00
600
Sub total = Rp 4,200.20
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.167 x 4.00 x 7,500 = 5,010.00 Pelumas = 0.006 x 4.00 x 35,000 = 840.00 Perbaikan dan spareparts = 0.600 x = 2,220.12 (60% x depresiasi)
Sub total 8,070.12 TOTAL 12,270.32
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALAT
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
A + B = 4,200.20 + 8,070.12 = 12,270.32 / jamAtau = 5.00 x 12,270.32 = 61,351.60 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.153 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : SPRAYER, SELFPROP 350 L 25 HP TENAGA : 25 HP HARGA : 35 (dalam jutaan rupiah) UMUR BAN : TH HARGA BAN :
35 UMUR KERJA : 6 Tahun : 7,200 Jam kerja FAKTOR CRF : 0.24668
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 1,200 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 35 x 0.24668 x 1jam/tahun
0.90 x 35 x 0.24668 x 10^6 = Rp 6,475.35 1,200
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 35 x 10^6 = Rp 875.00
1,200
Sub total = Rp 7,350.35
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 25.00 x 12,000 = 47,400.00 Pelumas = 0.006 x 25.00 x 35,000 = 5,250.00 Perbaikan dan spareparts = 0.600 x = 3,885.21 (60% x depresiasi)
Sub total 56,535.21 TOTAL 63,885.56
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 7,350.35 + 56,535.21 = 63,885.56 / jam
Atau = 5.00 x 63,885.56 = 319,427.80 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.154 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : ASPHALT SPRAYER TOWED 100 L 6 HP TENAGA : 6 HP HARGA : 30 (dalam jutaan rupiah) UMUR BAN : TH
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
HARGA BAN : 30
UMUR KERJA : 6 Tahun : 7,200 Jam kerja FAKTOR CRF : 0.24668 1 Tahun : 300 hari kerja (pada 12,5%)
Atau : 1,200 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 30 x 0.24668 x 1jam/tahun
0.90 x 30 x 0.24668 x 10^6 = Rp 5,550.30 1,200
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 30 x 10^6 = Rp 750.00
1,200
Sub total = Rp 6,300.30
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 6.00 x 12,000 = 11,376.00 Pelumas = 0.006 x 6.00 x 35,000 = 1,260.00 Perbaikan dan spareparts = 0.600 x = 3,330.18 (60% x depresiasi)
Sub total 15,966.18 TOTAL 22,266.48
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 6,300.30 + 15,966.18 = 22,266.48 / jam
Atau = 5.00 x 22,266.48 = 111,332.40 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.155 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : ASPHALT MIXING PLANT 30T/H 150 HP TENAGA : 150 HP HARGA : 1,200 (dalam jutaan rupiah) UMUR BAN : TH HARGA BAN :
1,200 UMUR KERJA : 10 Tahun : 12,000 Jam kerja FAKTOR CRF : 0.18062
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 1,200 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 1,200 x 0.18062 x 1jam/tahun
0.90 x 1,200 x 0.18062 x 10^6 = Rp 162,558.00 1,200
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 1,200 x 10^6 = Rp 30,000.00
1,200
Sub total = Rp 192,558.00
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 150.00 x 12,000 = 284,400.00 Pelumas = 0.006 x 150.00 x 35,000 = 31,500.00 Perbaikan dan spareparts = 0.600 x = 97,534.80 (60% x depresiasi)
Sub total 413,434.80 TOTAL 605,992.80
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 192,558.00 + 413,434.80 = 605,992.80 / jam
Atau = 5.00 x 605,992.80 = 3,029,964.00 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.157 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : ASPHALT FINISHER 1.82 M 30 HP TENAGA : 30 HP HARGA : 450 (dalam jutaan rupiah) UMUR BAN : TH HARGA BAN :
450 UMUR KERJA : 7 Tahun : 8,400 Jam kerja FAKTOR CRF : 0.2226
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 1,200 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 450 x 0.2226 x 1jam/tahun
0.90 x 450 x 0.2226 x 10^6 = Rp 75,127.50 1,200
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 450 x 10^6 = Rp 11,250.00
1,200
Sub total = Rp 86,377.50
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jam
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
Pelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 30.00 x 12,000 = 56,880.00 Pelumas = 0.006 x 30.00 x 35,000 = 6,300.00 Perbaikan dan spareparts = 0.600 x = 45,076.50 (60% x depresiasi)
Sub total 108,256.50 TOTAL 194,634.00
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 86,377.50 + 108,256.50 = 194,634.00 / jam
Atau = 5.00 x 194,634.00 = 973,170.00 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.182 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : WATERTANK TRUCK 115 HP TENAGA : 115 HP HARGA : 125 (dalam jutaan rupiah) UMUR BAN : 1 TH HARGA BAN : 4
129 UMUR KERJA : 8 Tahun : 5,600 Jam kerja FAKTOR CRF : 0.24668
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 700 Jam : ( dengan 2 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 125 x 0.24668 x 1jam/tahun
0.90 x 125 x 0.24668 x 10^6 = Rp 39,645.00 700
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 125 x 10^6 = Rp 5,357.14
700
Sub total = Rp 45,002.14
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 6,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 115.00 x 6,000 = 109,020.00 Pelumas = 0.006 x 115.00 x 35,000 = 24,150.00 Perbaikan dan spareparts = 0.600 x = 23,787.00 (60% x depresiasi)
Sub total 156,957.00 TOTAL 201,959.14
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 45,002.14 + 156,957.00 = 201,959.14 / jam
Atau = 5.00 x 201,959.14 = 1,009,795.71 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.221 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : FLAT BED TRUCK 3.5 T / 115 HP TENAGA : 115 HP HARGA : 125 (dalam jutaan rupiah) UMUR BAN : 1 TH HARGA BAN : 4
129 UMUR KERJA : 6 Tahun : 7,800 Jam kerja FAKTOR CRF : 0.24668
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 1,300 Jam : ( dengan 4 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 125 x 0.24668 x 1jam/tahun
0.90 x 125 x 0.24668 x 10^6 = Rp 21,347.31 1,300
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 125 x 10^6 = Rp 2,884.62
1,300
Sub total = Rp 24,231.92
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 6,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 115.00 x 6,000 = 109,020.00 Pelumas = 0.006 x 115.00 x 35,000 = 24,150.00 Perbaikan dan spareparts = 0.600 x = 12,808.38 (60% x depresiasi)
Sub total 145,978.38 TOTAL 170,210.31
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 24,231.92 + 145,978.38 = 170,210.31 / jam
Atau = 5.00 x 170,210.31 = 851,051.54 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.251 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : CONCRETE MIXER 0.125 M3 /6 HP TENAGA : 6 HP
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
HARGA : 15 (dalam jutaan rupiah) UMUR BAN : TH HARGA BAN :
15 UMUR KERJA : 4 Tahun : 6,000 Jam kerja FAKTOR CRF : 0.33271
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 1,500 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 15 x 0.33271 x 1jam/tahun
0.90 x 15 x 0.33271 x 10^6 = Rp 2,994.39 1,500
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 15 x 10^6 = Rp 300.00
1,500
Sub total = Rp 3,294.39
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 6.00 x 12,000 = 11,376.00 Pelumas = 0.006 x 6.00 x 35,000 = 1,260.00 Perbaikan dan spareparts = 0.600 x = 1,796.63 (60% x depresiasi)
Sub total 14,432.63 TOTAL 17,727.02
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 3,294.39 + 14,432.63 = 17,727.02 / jam
Atau = 5.00 x 17,727.02 = 88,635.12 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.253 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : CONCRETE MIXER 0.5 M3 / 20 HP TENAGA : 20 HP HARGA : 20 (dalam jutaan rupiah) UMUR BAN : TH HARGA BAN :
20 UMUR KERJA : 5 Tahun : 7,500 Jam kerja FAKTOR CRF : 0.28085
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 1,500 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 20 x 0.28085 x 1jam/tahun
0.90 x 20 x 0.28085 x 10^6 = Rp 3,370.20
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
1,500
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 20 x 10^6 = Rp 400.00
1,500
Sub total = Rp 3,770.20
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 20.00 x 12,000 = 37,920.00 Pelumas = 0.006 x 20.00 x 35,000 = 4,200.00 Perbaikan dan spareparts = 0.600 x = 2,022.12 (60% x depresiasi)
Sub total 44,142.12 TOTAL 47,912.32
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 3,770.20 + 44,142.12 = 47,912.32 / jam
Atau = 5.00 x 47,912.32 = 239,561.60 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.301 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : COMPRESOR AIR 210 M3 / 35 HP TENAGA : 35 HP HARGA : 20 (dalam jutaan rupiah) UMUR BAN : TH HARGA BAN :
20 UMUR KERJA : 8 Tahun : 6,000 Jam kerja FAKTOR CRF : 0.20483
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 750 Jam : ( dengan 2 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 20 x 0.20483 x 1jam/tahun
0.90 x 20 x 0.20483 x 10^6 = Rp 4,915.92 750
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 20 x 10^6 = Rp 800.00
750
Sub total = Rp 5,715.92
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jam
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
Bensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 35.00 x 12,000 = 66,360.00 Pelumas = 0.006 x 35.00 x 35,000 = 7,350.00 Perbaikan dan spareparts = 0.600 x = 2,949.55 (60% x depresiasi)
Sub total 76,659.55 TOTAL 82,375.47
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 5,715.92 + 76,659.55 = 82,375.47 / jam
Atau = 5.00 x 82,375.47 = 411,877.36 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.341 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : PUMP WATER 5 CM / 8 HP TENAGA : 8 HP HARGA : 15 (dalam jutaan rupiah) UMUR BAN : TH HARGA BAN :
15 UMUR KERJA : 4 Tahun : 3,000 Jam kerja FAKTOR CRF : 0.33271
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 750 Jam : ( dengan 2 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 15 x 0.33271 x 1jam/tahun
0.90 x 15 x 0.33271 x 10^6 = Rp 5,988.78 750
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 15 x 10^6 = Rp 600.00
750
Sub total = Rp 6,588.78
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 8.00 x 7,500 = 9,480.00 Pelumas = 0.006 x 8.00 x 35,000 = 1,680.00 Perbaikan dan spareparts = 0.600 x = 3,593.27 (60% x depresiasi)
Sub total 14,753.27 TOTAL 21,342.05
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN
KABUPATEN
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 6,588.78 + 14,753.27 = 21,342.05 / jam
Atau = 5.00 x 21,342.05 = 106,710.24 / hari
BIAYA ALAT UNTUK PERHITUNGAN ANALISA BIAYA PEKERJAANKODE
E.040 PROPINSI KODE KABUPATEN KODE Disiapkan Oleh :
PT. PUTRA MAJAPAHIT JAWA TIMUR BANYUWANGI
JENIS ALAT : SCREENING PLANT 80 HP TENAGA : 80 HP HARGA : 50 (dalam jutaan rupiah) UMUR BAN : TH HARGA BAN :
50 UMUR KERJA : 8 Tahun : 12,000 Jam kerja FAKTOR CRF : 0.20483
1 Tahun : 300 hari kerja (pada 12,5%)Atau : 1,500 Jam : ( dengan 5 jam / hari )
A. BIAYA PEMILIKAN (OWNERSHIP COST)
1. Depresiasi : 0.90 x 50 x 0.20483 x 1jam/tahun
0.90 x 50 x 0.20483 x 10^6 = Rp 6,144.90 1,500
2. Lain - lain : Asuransi 3% /tahun + PPn 10% 0.03 x harga
tahun0.03 x 50 x 10^6 = Rp 1,000.00
1,500
Sub total = Rp 7,144.90
B. BIAYA OPERASI (OPERATING COST)
Kebutuhan bahan bakar dan pelumas tiap HPDiesel = 0.158 liter / HP / jamBensin = 0.167 liter / HP / jamPelumas = 0.006 liter / HP / jam
Harga Solar / MinyakDiesel = Rp 12,000.00 / LiterBensin = Rp 7,500.00 / LiterPelumas = Rp 35,000.00 / Liter
Bahan bakar = 0.158 x 80.00 x 12,000 = 151,680.00 Pelumas = 0.006 x 80.00 x 35,000 = 16,800.00 Perbaikan dan spareparts = 0.600 x = 3,686.94 (60% x depresiasi)
Sub total 172,166.94 TOTAL 179,311.84
C. TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL ALATA + B = 7,144.90 + 172,166.94 = 179,311.84 / jam
Atau = 5.00 x 179,311.84 = 896,559.20 / hari
DIREKTORAT BINA PROGRAM JALAN SUB DIT PERENCANAAN JALAN LOKAL DAN