REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) REHABILITASI SEDANG/BERAT FASILITAS UMUM KABUPATEN GOWA PEKERJAAN : REHAB. KANTOR DESA BERU TALLASA, KEC. BIRING BULU ANGGARAN : TAHUN 2010 NO J E N I S P E K E R J A A N TOTAL HARGA (Rp.) I PEK. PERSIAPAN Rp. 1,590,000.00 II PEK. TANAH DAN PONDASI Rp. 2,427,814.76 III PEK. STRUKTUR BETON Rp. 22,460,852.70 IV PEKERJAAN DINDING Rp. 9,437,401.18 V PEKERJAAN PINTU DAN JENDELA Rp. 6,071,601.40 VI PEK. PLAFOND Rp. 16,653,011.61 VII PEKERJAAN LANTAI Rp. 1,151,676.75 VIII PEK. PENGECATAN Rp. 6,748,002.68 IX PEK. KONSTRUKSI ATAP Rp. 20,706,167.71 X PEK. INSTALASI LISTRIK Rp. 3,512,960.00 XI PEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR Rp. 150,000.00 REAL COST TOTAL Rp. 90,909,488.79 PPN 10% Rp. 9,090,948.88 TOTAL COST Rp. 100,000,437.67 DIBULATKAN Rp. 100,000,000.00 guminasa, April 2010 Disetujui : Konsultan Perencana, PEJABAT PEMBUAT KOMITMEN CV. MALLOMO ENGINEERING Hj. RIKE SUSANTI, ST SJAMSIR, ST Nip. 19680731 199803 2 002 Direktur Disetujui KEPALA BIDANG CIPTA KARYA KABUPATEN GOWA Ir. H. MAHMUDDIN, M.Si Nip. 19680303 199403 1 013 TERBILANG : Seratus juta rupiah,-
93

RAB Ktr Desa Dtran Tinggi

Dec 18, 2015

Download

Documents

Blackbird Nee

contoh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript

Ds Beru TallasaREKAPITULASI RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA BERU TALLASA, KEC. BIRING BULUANGGARAN: TAHUN 2010NOJ E N I S P E K E R J A A NTOTAL HARGA (Rp.)IPEK. PERSIAPANRp.1,590,000.00IIPEK. TANAH DAN PONDASIRp.2,427,814.76IIIPEK. STRUKTUR BETONRp.22,460,852.70IVPEKERJAAN DINDINGRp.9,437,401.18VPEKERJAAN PINTU DAN JENDELARp.6,071,601.40VIPEK. PLAFONDRp.16,653,011.61VIIPEKERJAAN LANTAIRp.1,151,676.75VIIIPEK. PENGECATANRp.6,748,002.68IXPEK. KONSTRUKSI ATAPRp.20,706,167.71XPEK. INSTALASI LISTRIKRp.3,512,960.00XIPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIRRp.150,000.00REAL COST TOTALRp.90,909,488.79PPN 10%Rp.9,090,948.88TOTAL COSTRp.100,000,437.67DIBULATKANRp.100,000,000.00TERBILANG : Seratus juta rupiah,-Sungguminasa, April 2010Disetujui :Konsultan Perencana,PEJABAT PEMBUAT KOMITMENCV. MALLOMO ENGINEERINGHj. RIKE SUSANTI, STSJAMSIR, STNip. 19680731 199803 2 002DirekturDisetujuiKEPALA BIDANG CIPTA KARYAKABUPATEN GOWAIr. H. MAHMUDDIN, M.SiNip. 19680303 199403 1 013RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA BERU TALLASA, KEC. BIRING BULUANGGARAN: TAHUN 2010NOURAIAN PEKERJAANVOL.SATHRG. SAT. (Rp.)JML. HARGABatu GunungPasir UrugPasirKerikil (Max. 30mm)Semen @50KgBesi BetonDia. 6Besi Beton Dia. 8Besi Beton Dia. 10Besi Beton Dia. 12Besi Beton Dia. 14Besi Beton Dia. 16Besi Beton Dia. 19Besi Beton Dia. 22Kawat BetonPakuBatu BataPapan Kelas IIIMinyak BekistingMultipleks 9mmBalok Kayu Kelas IIKayu DolkenRangka Plafond (hollow 4x4)Rangka Plafond (hollow 2x4)Gypsum 9mmGRCKeramik 30/30Keramik 40/40Keramik 10/40Cat KimexPlamurCat Kayu ICIResiduAtap SpandekNokWoodplankLoster Motif BintangKusen Kayu Kelas IPapan Kayu Kelas IPapan Kayu Kelas IIKaca 5 mmEngsel PintuKunci PintuGrendel PintuIPEK. PERSIAPANm3m3m3m3ZakbtgbtgbtgbtgbtgbtgbtgbtgKgKgBijim3ltrlbrm3Btgm1m1lbrlbrDosDosDosKgKgKgKgm2m'lbrBhm3m3m3m2bhbhbh1.Pek. Pengukuran dan Pas. Bowplank1.00Ls150,000.00150,000.002.Pek. Penyediaan P3K, Listrik Dan Air Kerja1.00Ls450,000.00450,000.003.Pek. Papan Nama Proyek1.00Ls350,000.00350,000.004.Pek. Pembongkaran Rangka Atap, Atap Dan Plafond1.00Ls640,000.00640,000.00Jumlah1,590,000.00IIPEK. TANAH DAN PONDASI18.001.Pek. Galian Tanah Pondasi6.48m325,575.00165,726.000.366.482.Pek. Urugan Kembali2.16m31,196.502,584.443.Pek. Pasir Urug (Di Bawah Pondasi)1.08m3103,230.00111,488.400.061.084.Pek. Pondasi Batu Kosong2.16m3189,294.00408,875.040.122.165.Pek. Pondasi Batu Gunung 1:44.05m3429,417.501,739,140.880.234.05Jumlah2,427,814.76IIIPEK. STRUKTUR BETON18.001.Pek. Sloef 15/200.54m33,377,549.711,823,876.850.030.540.0426.672.Pek. Koloma.Type Kolom 20/201.12m35,172,800.515,793,536.570.141.12b.Type Kolom Praktis Kp 12/150.35m35,117,952.871,791,283.500.120.233.Pek. Ringbalk Dan Kuda - Kuda Betona.Ringbalk Praktis 12/150.97m35,441,613.745,278,365.330.020.97b.Ringbalk / Blk Gantung 15/250.68m35,179,685.483,522,186.130.040.68c.Ringbalk / Blk Gantung 20/250.30m34,558,496.801,367,549.040.050.30d.Ringbalk Kuda - Kuda Beton 12/150.53m35,441,613.742,884,055.280.020.53Jumlah22,460,852.70IVPEKERJAAN DINDING36.001.Pas. Pasangan Batu 1/2 Bata (1:5)52.86m272,422.503,828,253.350.3010.8027.6014.460.002.Pek. Plesteran Biasa( 1 : 5 )130.02m222,943.002,983,048.8624.30105.723.Pek. Plesteran Beton ( 1 : 3 )20.48m225,404.50520,284.1620.484.Pek. Acian150.50m213,992.132,105,814.8134.02105.7220.48Jumlah9,437,401.18VPEKERJAAN PINTU DAN JENDELA1.Pek. Pintu Panil Kayu Kls. I5.54m2485,000.002,686,900.001.395.542.Pek. Jendela Kaca Bingkai Kayu Kls. I5.63m2324,380.001,826,259.401.992.653.643.Pas. Engsel Pintu (Tiap Daun pintu = 3 bh engsel)12.00Bh17,443.50209,322.004.Pas. Engsel Jendela20.00Bh13,629.00272,580.005.Pas. Hak Angin20.00Bh18,443.50368,870.006.Pas. Grendel Jendela10.00Bh13,629.00136,290.007.Pas. Kunci Biasa 2 Slag4.00Set142,845.00571,380.00Jumlah6,071,601.40VIPEK. PLAFOND1.Pek. Rangka Plafond Kayu Kls. II Uk. 50 x 100 cm, (kayu 4/6)170.62m260,400.6010,305,550.3768.81101.812.Pek. Plafond Eternit 1 x 1 M170.62m223,207.003,959,578.343.Pek. List Datar Plafond217.10m'10,999.002,387,882.9043.6092.5081.00Jumlah16,653,011.61VIIPEKERJAAN LANTAI1.Pek. Urugan Pasir Di Bawah Lantai0.20m3103,230.0020,646.000.202.Pek. Lantai Kerja Beton Tebal 7 cm0.14m3573,735.3480,322.950.143.Pek. Lantai Utama Dan Teras Keramik 30/30 cm7.00m2114,973.00804,811.002.004.004.Pek. Plint Lantai Utama Dan Teras Uk. 10 x 3016.00m'15,368.55245,896.8016.00Jumlah1,151,676.75VIIIPEK. PENGECATAN1.Pek. Cat Tembok150.50m211,586.401,743,753.202.Pek. Cat Plafond170.62m211,586.401,976,871.573.Pek. Cat Kayu30.97m224,574.50761,072.2766.3019.8911.084.Pek. Cat Tembok Lama107.16m27,801.60836,019.462.7048.00129.6022.445.Pek. Cat Kayu Kuseng Lama28.73m221,781.50625,782.5035.6821.5629.8228.736.Pek. Residu Rangka Plafond150.15m25,358.00804,503.70170.62750.73150.15Jumlah6,748,002.68IXPEK. KONSTRUKSI ATAP1.Pek. Kuda - Kuda Kayu 6/12 Kls. II1.17m34,667,100.005,460,507.0020.6411.921.170.092.Pek. Gording Kayu 5/7 Kls. II1.21m34,301,920.005,205,323.20344.911.213.Pek. Pas. Atap Seng Gelombang (50% Pakai Yang Lama)109.66m232,296.003,541,579.36124.1182.3312.884.Pek. Nok/Bubungan Seng Plat25.72m'29,212.00751,332.6424.231.495.Pek. Jurai Talang Atap13.06m'162,940.002,127,996.4013.066.Pek. Lisplank Kayu 2 x 20 Kls. II66.33m'54,567.003,619,429.1120.489.4036.45Jumlah20,706,167.71XPEK. INSTALASI LISTRIK1.Pek. Instalasi Titik Mata Lampu7.00ttk264,230.001,849,610.002.Pek. Instalasi Titik Stop Kontak5.00ttk192,570.00962,850.003.Pek. Pas. Lampu TL 2 x 203.00Bh85,000.00255,000.004.Pek. Pas. Lampu SL 18 Watt4.00Bh36,000.00144,000.005.Pas. Saklar Tunggal5.00Bh13,000.0065,000.006.Pas. Saklar Ganda1.00Bh14,000.0014,000.007.Pas. Stop Kontak5.00Bh14,500.0072,500.008.Pas. MCB, Lengkap1.00Unit150,000.00150,000.00Jumlah3,512,960.00XIPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.Pek. Penyelesaian Akhir/Pembersihan1.00Ls150,000.00150,000.00Jumlah150,000.00RealcostRp90,909,488.790.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.010.0042500.007,215.62Rekapitulasi Material/Bahan Pembangunan Masjid Nurul Yasin Pangkep8.0027000.007,231.82NoNama MaterialVolumeSatuan1.0Batu Gunung0.00m32.0Pasir Urug0.00m33.0Pasir0.00m34.0Kerikil (Max. 30mm)0.00m35.0Semen @50Kg0Zak7.0Besi Beton Dia. 80btg8.0Besi Beton Dia. 100btg9.0Besi Beton Dia. 120btg10.0Besi Beton Dia. 140btg11.0Besi Beton Dia. 160btg12.0Kawat Beton0.00Kg13.0Paku0.00Kg14.0Batu Bata0Biji15.0Papan Kelas III0.00m316.0Minyak Bekisting0ltr17.0Multipleks 9mm0lbr18.0Balok Kayu Kelas II0.00m319.0Kayu Dolken0Btg20.0Rangka Plafond (hollow 4x4)0.00m121.0Rangka Plafond (hollow 2x4)0.00m122.0Gypsum 9mm0lbr23.0Keramik 30/300Dos24.0Keramik 40/400Dos25.0Cat Kimex0.00Kg26.0Plamur0.00Kg27.0Cat Kayu ICI0.00Kg28.0Atap Spandek0.00m229.0Nok0.00m'30.0Woodplank0lbr31.0Loster Motif Bintang0Bh32.0Kusen Kayu Kelas I0.00m333.0Papan Kayu Kelas I0.00m334.0Kaca 5 mm0.00m235.0Engsel Pintu0bh36.0Kunci Pintu0bh37.0Grendel Pintu0bh

Ds BissoloroREKAPITULASI RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA BISSOLORO, KEC. BUNGAYAANGGARAN: TAHUN 2010NOJ E N I S P E K E R J A A NTOTAL HARGA (Rp.)IPEK. PERSIAPANRp.838,500.00IIPEK. TANAH DAN PONDASIRp.3,119,894.00IIIPEK. STRUKTUR BETONRp.10,004,927.53IVPEKERJAAN DINDINGRp.15,062,135.25VPEKERJAAN PINTU DAN JENDELARp.18,215,269.94VIPEK. PLAFONDRp.5,501,094.27VIIPEKERJAAN LANTAIRp.10,575,008.55VIIIPEK. PENGECATANRp.9,846,845.15IXPEK. KONSTRUKSI ATAPRp.5,860,046.37XPEK. INSTALASI LISTRIKRp.4,150,400.00XIPEK. KAMAR MANDI/WCRp.7,585,647.92XIIPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIRRp.150,000.00REAL COST TOTALRp.90,909,768.97PPN 10%Rp.9,090,976.90TOTAL COSTRp.100,000,745.87DIBULATKANRp.100,000,000.00TERBILANG : Seratus juta rupiah,-Sungguminasa, April 2010Disetujui :Konsultan Perencana,PEJABAT PEMBUAT KOMITMENCV. MALLOMO ENGINEERINGHj. RIKE SUSANTI, STSJAMSIR, STNip. 19680731 199803 2 002DirekturDisetujuiKEPALA BIDANG CIPTA KARYAKABUPATEN GOWAIr. H. MAHMUDDIN, M.SiNip. 19680303 199403 1 013RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA BISSOLORO, KEC. BUNGAYAANGGARAN: TAHUN 2010NOURAIAN PEKERJAANVOL.SATHRG. SAT. (Rp.)JML. HARGABatu GunungPasir UrugPasirKerikil (Max. 30mm)Semen @50KgBesi BetonDia. 6Besi Beton Dia. 8Besi Beton Dia. 10Besi Beton Dia. 12Besi Beton Dia. 14Besi Beton Dia. 16Besi Beton Dia. 19Besi Beton Dia. 22Kawat BetonPakuBatu BataPapan Kelas IIIMinyak BekistingMultipleks 9mmBalok Kayu Kelas IIKayu DolkenRangka Plafond (hollow 4x4)Rangka Plafond (hollow 2x4)Gypsum 9mmGRCKeramik 30/30Keramik 40/40Keramik 10/40Cat KimexPlamurCat Kayu ICIResiduAtap SpandekNokWoodplankLoster Motif BintangKusen Kayu Kelas IPapan Kayu Kelas IPapan Kayu Kelas IIKaca 5 mmEngsel PintuKunci PintuGrendel PintuIPEK. PERSIAPANm3m3m3m3ZakbtgbtgbtgbtgbtgbtgbtgbtgKgKgBijim3ltrlbrm3Btgm1m1lbrlbrDosDosDosKgKgKgKgm2m'lbrBhm3m3m3m2bhbhbh1.Pek. Pengukuran dan Pas. Bowplank1.00Ls100,000.00100,000.002.Pek. Penyediaan P3K, Listrik Dan Air Kerja1.00Ls300,000.00300,000.003.Pek. Papan Nama Proyek1.00Ls350,000.00350,000.004.Pek. Pembongkaran Pintu Lama1.00Ls88,500.0088,500.00Jumlah838,500.00IIPEK. TANAH DAN PONDASI26.361.Pek. Galian Tanah Pondasi6.48m325,575.00165,726.000.369.492.Pek. Urugan Kembali2.16m31,196.502,584.443.Pek. Pasir Urug (Di Bawah Pondasi)1.08m3103,230.00111,488.400.061.584.Pek. Pondasi Batu Kosong2.16m3189,294.00408,875.040.123.165.Pek. Pondasi Batu Gunung 1:44.05m3429,417.501,739,140.880.235.936.Pek. Pondasi Trassram (Teras/Selasar Belakang)4.53m2152,776.88692,079.244.53Jumlah3,119,894.00IIIPEK. STRUKTUR BETON44.081.Pek. Sloef 12/150.79m34,633,813.383,660,712.570.020.790.0426.672.Pek. Koloma.Type Kolom 20/200.30m35,172,800.511,551,840.150.150.30b.Type Kolom Praktis Kp 12/150.25m35,117,952.871,279,488.220.060.253.Pek. Ringbalk Dan Kuda - Kuda Betona.Ringbalk Praktis 12/150.36m35,441,613.741,958,980.950.020.36b.Ringbalk / Blk Gantung 15/250.30m35,179,685.481,553,905.640.040.30Jumlah10,004,927.53IVPEKERJAAN DINDING36.081.Pas. Pasangan Batu 1/2 Bata (1:5)97.71m272,422.507,076,402.483.30119.0621.3697.710.002.Pek. Plesteran Biasa( 1 : 5 )195.42m222,943.004,483,521.06195.423.Pek. Plesteran Pond. Trasram + Kaki Ddg Luar dkt selasar blkg( 1 : 5 )7.35m222,943.00168,631.053.733.627.354.Pek. Plesteran Beton ( 1 : 3 )12.60m225,404.50320,096.703.503.505.6012.605.Pek. Acian215.37m213,992.133,013,483.9634.02105.7220.48Jumlah15,062,135.25VPEKERJAAN PINTU DAN JENDELA1.Pek. Kuseng Kayu Kls. I0.52m39,308,925.004,840,641.0048.6025.700.522.Pek. Pintu Panil Kayu Kls. I9.56m2485,000.004,636,600.003.006.569.563.Pek. Jendela Kaca Bingkai Kayu Kls. I (termasuk Ganti Nako Jadi Bingkai)13.72m2324,380.004,450,493.601.066.367.364.Pek. Jalusi Kayu Kls. I2.40m2595,175.001,428,420.002.405.Pek. Pas. Kaca mati 5 mm1.64m2167,943.50275,427.341.646.Pas. Engsel Pintu (Tiap Daun pintu = 3 bh engsel)18.00Bh17,443.50313,983.007.Pas. Engsel Jendela40.00Bh13,629.00545,160.008.Pas. Hak Angin40.00Bh18,443.50737,740.009.Pas. Grendel Jendela20.00Bh13,629.00272,580.0010.Pas. Kunci Biasa 2 Slag5.00Set142,845.00714,225.00Jumlah18,215,269.94VIPEK. PLAFOND1.Pek. Rangka Plafond Kayu Kls. II Uk. 50 x 100 cm, (kayu 4/6)55.68m260,400.603,363,105.4155.682.Pek. Plafond Eternit 1 x 1 M55.68m223,207.001,292,165.763.Pek. List Datar Plafond (Plafond Baru Saja)76.90m'10,999.00845,823.1045.0017.7014.2073.00Jumlah5,501,094.27VIIPEKERJAAN LANTAI1.Pek. Urugan Tanah Di Bawah Lantai + Pemadatan (selasar Blkg)1.68m3112,880.00189,638.401.682.Pek. Urugan Pasir Di Bawah Lantai (lantai Utama + Teras + Selasar)2.48m3103,230.00256,010.400.1016.39341.640.843.Pek. Lantai Kerja Beton Tebal 5 cm (Lantai Utama + Teras + Selasar)3.86m3573,735.342,214,618.430.0516.393452.453.440.424.Pek. Lantai Utama Dan entrance Keramik 30/30 cm68.84m2114,973.007,914,741.3216.393452.4568.84Jumlah10,575,008.55VIIIPEK. PENGECATAN1.Pek. Cat Tembok356.72m211,586.404,133,100.61169.3728.02141.352.Pek. Cat Plafond127.09m211,586.401,472,515.5838.1933.2271.413.Pek. Cat Kayu63.47m224,574.501,559,743.5212.2623.7827.4463.474.Pek. Cat Tembok Lama177.72m27,801.601,386,500.3556.00151.8330.11177.725.Pek. Cat Kayu Kuseng +Pintu Lama47.40m221,781.501,032,443.10107.6635.5311.8747.406.Pek. Residu Rangka Plafond49.00m25,358.00262,542.0055.68244.9949.00Jumlah9,846,845.15IXPEK. KONSTRUKSI ATAP1.Pek. Kuda - Kuda Kayu 6/12 Kls. II0.24m34,667,100.001,120,104.0016.960.242.Pek. Gording Kayu 5/10 Kls. II0.18m34,301,920.00774,345.6036.300.183.Pek. Kuda - Kuda Konsol atas jendela Kayu 5/10 Kls. II0.05m34,667,100.00233,355.0010.200.054.Pek. Gording Konsol Atas Jendela Kayu 5/7 Kls. II0.04m34,301,920.00172,076.8010.200.045.Pek. Pas. Atap Seng Gelombang20.84m232,296.00673,048.6417.713.1320.846.Pek. Nok/Bubungan Seng Plat3.30m'29,212.0096,399.603.307.Pek. Pas. Atap Konsol Seng Gelombang (atas Jendela)3.57m232,296.00115,296.723.578.Pek. Lisplank 2 x 20 Kayu Kls. II49.03m'54,567.002,675,420.0117.7831.25Jumlah5,860,046.37XPEK. INSTALASI LISTRIK1.Pek. Instalasi Titik Mata Lampu8.00ttk264,230.002,113,840.002.Pek. Instalasi Titik Stop Kontak8.00ttk192,570.001,540,560.003.Pek. Pas. Lampu SL 18 Watt8.00Bh36,000.00288,000.004.Pas. Saklar Tunggal6.00Bh13,000.0078,000.005.Pas. Saklar Ganda1.00Bh14,000.0014,000.006.Pas. Stop Kontak8.00Bh14,500.00116,000.00Jumlah4,150,400.00XIPEK. KAMAR MANDI/WC1.Pek. Tanah Dan Pondasi6.50-Pek. Galian tanah pondasi2.34m325,575.0059,845.500.362.34-Pek. Urugan pasir alas pondasi0.39m3103,230.0040,259.700.060.39-Pek. Pondasi Bt. Kosong0.78m3189,294.00147,649.320.120.78-Pek. Pondasi Bt. Gunung 1 : 41.06m3429,417.50455,182.550.161.062.Pek. Struktur Beton-Pek. Sloef 12/150.12m34,633,813.38556,057.610.026.500.12-Kolom Praktis Kp 12/150.19m35,117,952.87972,411.050.0210.360.19-Ringbalk Praktis 12/150.13m35,441,613.74680,201.720.026.960.12533.Pek. Dinding-Pas. Pasangan Batu 1/2 Bata (1:5)14.57m272,422.501,055,195.839.736.4816.211.6414.57-Pek. Plesteran Biasa( 1 : 5 )20.73m222,943.00475,608.3929.1321.48-Pek. Acian20.73m213,992.13290,056.754.Pek. Kusen, Pintu dan jendela-Pek. Pintu PVC Lengkap + Acsesories (Toilet/Km)1.00Set350,000.00350,000.005.Pek. Plafond-Pek. Rangka Plafond Kayu Kls. II Uk. 50 x 100 cm, (kayu 4/6)6.88m260,400.600.07.921.046.88-Pek. Plafond Eternit 1 x 1 M6.88m223,207.000.0-Pek. List Datar Plafond24.70m'10,999.000.011.547.265.9024.706.Pek. Lantai-Pek. Urugan Tanah Di Bawah Lantai + Pemadatan0.61m3112,880.0068,856.800.302.040.610.61-Pek. Urugan Pasir Di Bawah Lantai0.20m3103,230.0020,646.000.102.040.200.20-Pek. Lantai Kerja Beton Tebal 5 cm0.10m3573,735.3457,373.530.052.040.100.10-Pek. Lantai Keramik Toilet/KM/WC, Uk. 20 x 202.04m2125,917.50256,871.702.04-Pek. Keramik Dinding Toilet/KM/WC, Uk. 20 x 257.65m2131,111.250.05.101.507.657.657.Pek. Pengecatan-Pek. Cat Tembok20.73m211,586.400.0-Pek. Cat Plafond6.88m211,586.400.0-Pek. Residu Rangka Plafond6.05m25,358.000.06.8830.256.058.Pek. Konstruksi Atap-Pek. Kuda - Kuda Kayu 5/7 Kls. II0.02m34,667,100.0093,342.007.040.02-Pek. Gording Kayu 5/7 Kls. II0.04m34,301,920.00167,774.8811.250.039-Pek. Pas. Atap Seng Gelombang7.92m232,296.00255,784.327.92-Pek. Lisplank 2 x 20 Kayu Kls. II9.29m'54,567.00506,927.439.299.Pek. Instalasi Listrik-Pek. Instalasi Titik Mata Lampu1.00Ttk264,230.00264,230.00-Pek. Pas. Lampu pijar 15 Watt1.00Bh7,500.007,500.00-Pas. Saklar Tunggal1.00Bh13,000.0013,000.0010.Pek. Sanitasi Dan Instalasi-Pek. Kloset Jongkok1.00Bh403,280.00403,280.00-Pas. Kran Air Biasa1.00Bh22,932.5022,932.50-Pas. Floordrain Stainless1.00Bh40,845.0040,845.00-Pek. Pas. Pipa Air Bersih AW 3/4" (Distribusi)4.00m'19,343.1577,372.60-Pek. Pipa Buangan Air Mandi Dia. 3" (D)1.00m'49,288.5549,288.55-Pek. Pipa Buangan Air Kotor Dia. 3" (D)4.00m'49,288.55197,154.20-Pek. Beerput (Gorong - Gorong Dia. 80), Kedalaman 1,50 m1.00Set500,000.000.0Jumlah7,585,647.92XIIPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.Pek. Penyelesaian Akhir/Pembersihan1.00Ls150,000.00150,000.00Jumlah150,000.00RealcostRp90,909,768.97Blm Final0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.010.0042500.007,215.62Rekapitulasi Material/Bahan Pembangunan Masjid Nurul Yasin Pangkep8.0027000.007,231.82NoNama MaterialVolumeSatuan1.0Batu Gunung0.00m32.0Pasir Urug0.00m33.0Pasir0.00m34.0Kerikil (Max. 30mm)0.00m35.0Semen @50Kg0Zak7.0Besi Beton Dia. 80btg8.0Besi Beton Dia. 100btg9.0Besi Beton Dia. 120btg10.0Besi Beton Dia. 140btg11.0Besi Beton Dia. 160btg12.0Kawat Beton0.00Kg13.0Paku0.00Kg14.0Batu Bata0Biji15.0Papan Kelas III0.00m316.0Minyak Bekisting0ltr17.0Multipleks 9mm0lbr18.0Balok Kayu Kelas II0.00m319.0Kayu Dolken0Btg20.0Rangka Plafond (hollow 4x4)0.00m121.0Rangka Plafond (hollow 2x4)0.00m122.0Gypsum 9mm0lbr23.0Keramik 30/300Dos24.0Keramik 40/400Dos25.0Cat Kimex0.00Kg26.0Plamur0.00Kg27.0Cat Kayu ICI0.00Kg28.0Atap Spandek0.00m229.0Nok0.00m'30.0Woodplank0lbr31.0Loster Motif Bintang0Bh32.0Kusen Kayu Kelas I0.00m333.0Papan Kayu Kelas I0.00m334.0Kaca 5 mm0.00m235.0Engsel Pintu0bh36.0Kunci Pintu0bh37.0Grendel Pintu0bh

Ds BontomanaiREKAPITULASI RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA BONTOMANAI, KEC. BUNGAYAANGGARAN: TAHUN 2010NOJ E N I S P E K E R J A A NTOTAL HARGA (Rp.)IPEK. PERSIAPANRp.1,617,000.00IIPEK. STRUKTUR BETONRp.10,082,813.70IIIPEKERJAAN DINDINGRp.3,702,388.55IVPEKERJAAN PINTU DAN JENDELARp.12,579,572.72VPEK. PLAFONDRp.17,628,299.00VIPEKERJAAN LANTAIRp.972,960.11VIIPEK. PENGECATANRp.8,195,761.02VIIIPEK. KONSTRUKSI ATAPRp.31,434,510.74IXPEK. INSTALASI LISTRIKRp.4,545,790.00XPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIRRp.150,000.00REAL COST TOTALRp.90,909,095.84PPN 10%Rp.9,090,909.58TOTAL COSTRp.100,000,005.42DIBULATKANRp.100,000,000.00TERBILANG : Seratus juta rupiah,-Sungguminasa, April 2010Disetujui :Konsultan Perencana,PEJABAT PEMBUAT KOMITMENCV. MALLOMO ENGINEERINGHj. RIKE SUSANTI, STSJAMSIR, STNip. 19680731 199803 2 002DirekturDisetujuiKEPALA BIDANG CIPTA KARYAKABUPATEN GOWAIr. H. MAHMUDDIN, M.SiNip. 19680303 199403 1 013RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA BONTOMANAI, KEC. BUNGAYAANGGARAN: TAHUN 2010NOURAIAN PEKERJAANVOL.SATHRG. SAT. (Rp.)JML. HARGABatu GunungPasir UrugPasirKerikil (Max. 30mm)Semen @50KgBesi BetonDia. 6Besi Beton Dia. 8Besi Beton Dia. 10Besi Beton Dia. 12Besi Beton Dia. 14Besi Beton Dia. 16Besi Beton Dia. 19Besi Beton Dia. 22Kawat BetonPakuBatu BataPapan Kelas IIIMinyak BekistingMultipleks 9mmBalok Kayu Kelas IIKayu DolkenRangka Plafond (hollow 4x4)Rangka Plafond (hollow 2x4)Gypsum 9mmGRCKeramik 30/30Keramik 40/40Keramik 10/40Cat KimexPlamurCat Kayu ICIResiduAtap SpandekNokWoodplankLoster Motif BintangKusen Kayu Kelas IPapan Kayu Kelas IPapan Kayu Kelas IIKaca 5 mmEngsel PintuKunci PintuGrendel PintuIPEK. PERSIAPANm3m3m3m3ZakbtgbtgbtgbtgbtgbtgbtgbtgKgKgBijim3ltrlbrm3Btgm1m1lbrlbrDosDosDosKgKgKgKgm2m'lbrBhm3m3m3m2bhbhbh1.Pek. Pengukuran dan Pas. Bowplank1.00Ls150,000.00150,000.002.Pek. Penyediaan P3K, Listrik Dan Air Kerja1.00Ls350,000.00350,000.003.Pek. Papan Nama Proyek1.00Ls350,000.00350,000.004.Pek. Pembongkaran Atap Lama + Kuseng Pintu Lama1.00Ls767,000.00767,000.00Jumlah1,617,000.00IIPEK. STRUKTUR BETON1.Pek. Koloma.Type Kolom 20/200.28m35,172,800.511,448,384.140.140.28b.Type Kolom Praktis Kp 12/150.23m35,117,952.871,177,129.160.010.232.Pek. Ringbalk Dan Kuda - Kuda Betona.Ringbalk Praktis 12/151.22m35,441,613.746,638,768.760.021.22b.Ringbalk / Blk Gantung 12/200.17m34,814,891.98818,531.640.020.17Jumlah10,082,813.70IIIPEKERJAAN DINDING68.001.Pas. Pasangan Batu 1/2 Bata (1:5)23.80m272,422.501,723,655.500.3523.800.002.Pek. Plesteran Biasa( 1 : 5 )47.60m222,943.001,092,086.8047.603.Pek. Plesteran Beton ( 1 : 3 )5.60m225,404.50142,265.205.604.Pek. Acian53.20m213,992.13744,381.05Jumlah3,702,388.55IVPEKERJAAN PINTU DAN JENDELA1.Pek. Kuseng Kayu Kls. I0.14m39,308,925.001,303,249.5019.720.142.Pek. Pintu Panil Kayu Kls. I10.54m2485,000.005,111,900.002.468.0810.543.Pek. Jendela Kaca Bingkai Kayu Kls. I8.90m2324,380.002,886,982.006.902.008.909.Pek. Pas. Kaca mati 5 mm3.12m2167,943.50523,983.723.124.Pas. Engsel Pintu (Tiap Daun pintu = 3 bh engsel)21.00Bh17,443.50366,313.505.Pas. Engsel Jendela32.00Bh13,629.00436,128.006.Pas. Hak Angin32.00Bh18,443.50590,192.007.Pas. Grendel Jendela16.00Bh13,629.00218,064.008.Pas. Kunci Biasa 2 Slag8.00Set142,845.001,142,760.00Jumlah12,579,572.72VPEK. PLAFOND1.Pek. Rangka Plafond Kayu Kls. II Uk. 50 x 100 cm, (kayu 4/6)175.36m260,400.6010,591,849.2292.5651.9830.82175.362.Pek. Plafond Eternit 1 x 1 M175.36m223,207.004,069,579.523.Pek. List Datar Plafond269.74m'10,999.002,966,870.2691.00105.1073.64269.74Jumlah17,628,299.00VIPEKERJAAN LANTAI1.Pek. Urugan Pasir Di Bawah Lantai0.63m3103,230.0065,034.900.106.30000.632.Pek. Lantai Kerja Beton Tebal 5 cm0.32m3573,735.34183,595.310.056.30000.323.Pek. entrance Keramik 30/30 cm6.30m2114,973.00724,329.906.3000Jumlah972,960.11VIIPEK. PENGECATAN1.Pek. Cat Tembok53.20m211,586.40616,396.48169.3728.02141.352.Pek. Cat Plafond175.36m211,586.402,031,791.1038.1933.2271.413.Pek. Cat Kayu51.64m224,574.501,269,027.184.9321.0825.6451.644.Pek. Cat Atap Seng0.0m210,190.500.05.Pek. Cat Tembok Lama339.28m27,801.602,646,926.8568.00408.0068.72339.286.Pek. Cat Kayu Kuseng +Pintu Lama36.95m221,781.50804,826.4332.9672.6036.957.Pek. Residu Rangka Plafond154.31m25,358.00826,792.98175.36771.57154.31Jumlah8,195,761.02VIIIPEK. KONSTRUKSI ATAP1.Pek. Kuda - Kuda Kayu 6/12 Kls. II2.36m34,667,100.0011,014,356.00280.6846.562.362.Pek. Gording Kayu 5/10 Kls. II1.42m34,301,920.006,108,726.40118.9579.8026.4427.3031.371.423.Pek. Pas. Atap Seng Gelombang203.49m232,296.006,571,913.04102.5450.1314.6629.646.53203.494.Pek. Nok/Bubungan Seng Plat29.56m'29,212.00863,506.7217.4812.0829.565.Pek. Jurai Talang Atap7.86m'162,940.001,280,708.407.866.Pek. Lisplank Kayu Kls. II102.54m'54,567.005,595,300.18102.54Jumlah31,434,510.74IXPEK. INSTALASI LISTRIK1.Pek. Instalasi Titik Mata Lampu10.00ttk264,230.002,642,300.002.Pek. Instalasi Titik Stop Kontak7.00ttk192,570.001,347,990.003.Pek. Pas. Lampu SL 18 Watt10.00Bh36,000.00360,000.004.Pas. Saklar Tunggal4.00Bh13,000.0052,000.005.Pas. Saklar Ganda3.00Bh14,000.0042,000.006.Pas. Stop Kontak7.00Bh14,500.00101,500.00Jumlah4,545,790.00XPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.Pek. Penyelesaian Akhir/Pembersihan1.00Ls150,000.00150,000.00Jumlah150,000.00RealcostRp90,909,095.840.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.010.0042500.007,215.62Rekapitulasi Material/Bahan Pembangunan Masjid Nurul Yasin Pangkep8.0027000.007,231.82NoNama MaterialVolumeSatuan1.0Batu Gunung0.00m32.0Pasir Urug0.00m33.0Pasir0.00m34.0Kerikil (Max. 30mm)0.00m35.0Semen @50Kg0Zak7.0Besi Beton Dia. 80btg8.0Besi Beton Dia. 100btg9.0Besi Beton Dia. 120btg10.0Besi Beton Dia. 140btg11.0Besi Beton Dia. 160btg12.0Kawat Beton0.00Kg13.0Paku0.00Kg14.0Batu Bata0Biji15.0Papan Kelas III0.00m316.0Minyak Bekisting0ltr17.0Multipleks 9mm0lbr18.0Balok Kayu Kelas II0.00m319.0Kayu Dolken0Btg20.0Rangka Plafond (hollow 4x4)0.00m121.0Rangka Plafond (hollow 2x4)0.00m122.0Gypsum 9mm0lbr23.0Keramik 30/300Dos24.0Keramik 40/400Dos25.0Cat Kimex0.00Kg26.0Plamur0.00Kg27.0Cat Kayu ICI0.00Kg28.0Atap Spandek0.00m229.0Nok0.00m'30.0Woodplank0lbr31.0Loster Motif Bintang0Bh32.0Kusen Kayu Kelas I0.00m333.0Papan Kayu Kelas I0.00m334.0Kaca 5 mm0.00m235.0Engsel Pintu0bh36.0Kunci Pintu0bh37.0Grendel Pintu0bh

Ds BtlempangangREKAPITULASI RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA BONTOLEMPANGAN, KEC. BONTOLEMPANGANANGGARAN: TAHUN 2010NOJ E N I S P E K E R J A A NTOTAL HARGA (Rp.)IPEK. PERSIAPANRp.1,650,000.00IIPEK. TANAH DAN PONDASIRp.1,264,310.72IIIPEK. STRUKTUR BETONRp.4,939,887.21IVPEKERJAAN DINDINGRp.6,178,755.55VPEKERJAAN PINTU DAN JENDELARp.18,733,216.48VIPEK. PLAFONDRp.14,130,263.47VIIPEKERJAAN LANTAIRp.10,712,438.11VIIIPEK. PENGECATANRp.7,424,996.25IXPEK. KONSTRUKSI ATAPRp.3,648,245.76XPEK. INSTALASI LISTRIKRp.8,551,980.00XIPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIRRp.13,675,000.00REAL COST TOTALRp.90,909,093.55PPN 10%Rp.9,090,909.35TOTAL COSTRp.100,000,002.90DIBULATKANRp.100,000,000.00TERBILANG : Seratus juta rupiah,-Sungguminasa, April 2010Disetujui :Konsultan Perencana,PEJABAT PEMBUAT KOMITMENCV. MALLOMO ENGINEERINGHj. RIKE SUSANTI, STSJAMSIR, STNip. 19680731 199803 2 002DirekturDisetujuiKEPALA BIDANG CIPTA KARYAKABUPATEN GOWAIr. H. MAHMUDDIN, M.SiNip. 19680303 199403 1 013RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA BONTOLEMPANGAN, KEC. BONTOLEMPANGANANGGARAN: TAHUN 2010NOURAIAN PEKERJAANVOL.SATHRG. SAT. (Rp.)JML. HARGABatu GunungPasir UrugPasirKerikil (Max. 30mm)Semen @50KgBesi BetonDia. 6Besi Beton Dia. 8Besi Beton Dia. 10Besi Beton Dia. 12Besi Beton Dia. 14Besi Beton Dia. 16Besi Beton Dia. 19Besi Beton Dia. 22Kawat BetonPakuBatu BataPapan Kelas IIIMinyak BekistingMultipleks 9mmBalok Kayu Kelas IIKayu DolkenRangka Plafond (hollow 4x4)Rangka Plafond (hollow 2x4)Gypsum 9mmGRCKeramik 30/30Keramik 40/40Keramik 10/40Cat KimexPlamurCat Kayu ICIResiduAtap SpandekNokWoodplankLoster Motif BintangKusen Kayu Kelas IPapan Kayu Kelas IPapan Kayu Kelas IIKaca 5 mmEngsel PintuKunci PintuGrendel PintuIPEK. PERSIAPANm3m3m3m3ZakbtgbtgbtgbtgbtgbtgbtgbtgKgKgBijim3ltrlbrm3Btgm1m1lbrlbrDosDosDosKgKgKgKgm2m'lbrBhm3m3m3m2bhbhbh1.Pek. Pengukuran dan Pas. Bowplank1.00Ls150,000.00150,000.002.Pek. Penyediaan P3K, Listrik Dan Air Kerja1.00Ls350,000.00350,000.003.Pek. Papan Nama Proyek1.00Ls350,000.00350,000.004.Pek. Pembongkaran Dinding, Pintu, Kupas Plesteran Lama dan Pagar1.00Ls800,000.00800,000.00Jumlah1,650,000.00IIPEK. TANAH DAN PONDASI9.361.Pek. Galian Tanah Pondasi (Entrance)2.25m325,575.0057,543.750.242.252.Pek. Urugan Kembali0.75m31,196.50897.383.Pek. Pasir Urug (Di Bawah Pondasi) (entrance)0.56m3103,230.0057,808.800.060.564.Pek. Pondasi Batu Kosong (entrance)1.12m3189,294.00212,009.280.121.125.Pek. Pondasi Batu Gunung 1:4 (entrance)1.76m3429,417.50755,774.800.191.766.Pek. Pondasi Trassram (Tangga Entrance dan Teras)1.18m2152,776.88180,276.711.13Jumlah1,264,310.72IIIPEK. STRUKTUR BETON44.081.Pek. Koloma.Type Kolom 20/20 (Entrance)0.28m35,172,800.511,448,384.140.140.28b.Type Kolom Praktis Kp 12/150.04m35,117,952.87204,718.110.0422.Pek. Ringbalk Dan Kuda - Kuda Beton (Entrance)a.Ringbalk Praktis 12/150.09m35,441,613.74489,745.240.020.087b.Ringbalk / Blk Gantung 15/250.18m35,179,685.48932,343.390.040.182c.Ringbalk / Blk Gantung 20/250.23m34,558,496.801,048,454.260.050.225d.Ringbalk Kuda - Kuda Beton 12/150.15m35,441,613.74816,242.060.020.154Jumlah4,939,887.21IVPEKERJAAN DINDING1.Pek. Pasangan Batu 1/2 Bata (1:5)13.50m272,422.50977,703.754.878.6313.500.002.Pas. Dinding 1 Bata (1 : 5) Teras2.92m2149,032.50435,174.902.923.Pek. Plesteran Biasa( 1 : 5 ) (termasuk Ddg blkang yg dikupas plesteran lamanya)116.33m222,943.002,668,959.1932.8329.5853.92116.334.Pek. Plesteran Beton ( 1 : 3 )11.91m225,404.50302,567.605.606.3111.915.Pek. Acian128.24m213,992.131,794,350.11Jumlah6,178,755.55VPEKERJAAN PINTU DAN JENDELA1.Pek. Kuseng Kayu Kls. I (Ganti Kusen Lama Kecuali Kuseng Jendela depan)0.68m39,308,925.006,330,069.0097.500.682.Pek. Pintu Panil Kayu Kls. I (ganti Semua Pintu)12.08m2485,000.005,858,800.009.352.7312.083.Pek. Jendela Kaca Bingkai Kayu Kls. I8.22m2324,380.002,666,403.602.535.698.224.Pek. Jalusi Kayu Kls. I1.92m2595,175.001,142,736.003.445.Pek. Pas. Kaca mati 5 mm1.25m2167,943.50209,929.381.256.Pas. Engsel Pintu (Tiap Daun pintu = 3 bh engsel)21.00Bh17,443.50366,313.5021.007.Pas. Engsel Jendela16.00Bh13,629.00218,064.0016.008.Pas. Hak Angin16.00Bh18,443.50295,096.009.Pas. Tarikan Stainless2.00Bh278,145.00556,290.0010.Pas. Grendel Jendela8.00Bh13,629.00109,032.0011.Pas. Kunci Pelor1.00Set266,258.00266,258.0012.Pas. Kunci Biasa 2 Slag5.00Set142,845.00714,225.00Jumlah18,733,216.48VIPEK. PLAFOND1.Pek. Rangka Plafond Kayu Kls. II Uk. 50 x 100 cm, (kayu 4/6)90.79m260,400.605,483,770.4737.9333.6419.2290.792.Pek. Rangka Plafond Kayu Kls. II Uk. 60 x 80 cm, (kayu 4/6)(Aula)39.59m273,835.002,923,127.6533.456.1439.593.Pek. Plafond Eternit 1 x 1 M90.79m223,207.002,106,963.534.Pek. Plafond Kalsiboard 6 mm (R. Pertemuan/Aula)39.59m228,714.001,136,787.265.Pek. List Datar Plafond225.44m'10,999.002,479,614.5669.14156.30225.44Jumlah14,130,263.47VIIPEKERJAAN LANTAI1.Pek. Urugan Tanah Di Bawah Lantai + Pemadatan (Entrance)2.74m3112,880.00309,291.2013.67942.73592.Pek. Urugan Pasir Di Bawah Lantai (entrance)1.37m3103,230.00141,425.101.36793.Pek. Lantai Kerja Beton Tebal 5 cm (entrance)0.68m3573,735.34390,140.030.68404.Pek. Lantai Utama Dan entrance Keramik 30/30 cm85.86m2114,973.009,871,581.7813.679472.1885.86Jumlah10,712,438.11VIIIPEK. PENGECATAN1.Pek. Cat Tembok128.24m211,586.401,485,839.942.Pek. Cat Plafond130.38m211,586.401,510,634.833.Pek. Cat Kayu46.61m224,574.501,145,417.4518.6824.163.7746.614.Pek. Cat Atap Seng25.74m210,190.50262,303.475.Pek. Cat Tembok Lama247.60m27,801.601,931,676.16102.42195.5650.39247.606.Pek. Cat Kayu Kuseng +Pintu Lama21.78m221,781.50474,401.0711.7010.0821.787.Pek. Residu Rangka Plafond114.73m25,358.00614,723.34130.38573.67114.73Jumlah7,424,996.25IXPEK. KONSTRUKSI ATAP1.Pek. Kuda - Kuda Kayu 6/12 Kls. II (Entrance +konsol)0.13m34,667,100.00606,723.0013.465.040.132.Pek. Gording Kayu 5/10 Kls. II (Entrance + Konsol)0.21m34,301,920.00903,403.207.8434.9842.820.213.Pek. Pas. Atap Seng Gelombang25.74m232,296.00831,299.0423.282.4725.744.Pek. Nok/Bubungan Seng Plat3.18m'29,212.0092,894.163.185.Pek. Jurai Talang Atap2.40m'162,940.00391,056.002.406.Pek. Lisplank Kayu Kls. II15.08m'54,567.00822,870.3615.08Jumlah3,648,245.76XPEK. INSTALASI LISTRIK1.Pek. Instalasi Titik Mata Lampu16.00ttk264,230.004,227,680.002.Pek. Instalasi Titik Stop Kontak10.00ttk192,570.001,925,700.003.Pek. Pas. Lampu Hias1.00Bh1,500,000.001,500,000.004.Pek. Pas. Lampu TL 2 x 202.00Bh85,000.00170,000.005.Pek. Pas. Lampu Downlight DL 18 Watt8.00Bh43,200.00345,600.006.Pek. Pas. Lampu SL 18 Watt4.00Bh36,000.00144,000.007.Pas. Saklar Tunggal4.00Bh13,000.0052,000.008.Pas. Saklar Ganda3.00Bh14,000.0042,000.009.Pas. Stop Kontak10.00Bh14,500.00145,000.00Jumlah8,551,980.00XIPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.Pek. Pagar Besi + Pilar, P = 17,00 m17.00M'650,000.0011,050,000.002.Pek. Pintu Pagar Besi + Acs, Uk. L = 3,00 m, t = 1,50 m4.50M2550,000.002,475,000.003.Pek. Penyelesaian Akhir/Pembersihan1.00Ls150,000.00150,000.00Jumlah13,675,000.00RealcostRp90,909,093.550.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.010.0042500.007,215.62Rekapitulasi Material/Bahan Pembangunan Masjid Nurul Yasin Pangkep8.0027000.007,231.82NoNama MaterialVolumeSatuan1.0Batu Gunung0.00m32.0Pasir Urug0.00m33.0Pasir0.00m34.0Kerikil (Max. 30mm)0.00m35.0Semen @50Kg0Zak7.0Besi Beton Dia. 80btg8.0Besi Beton Dia. 100btg9.0Besi Beton Dia. 120btg10.0Besi Beton Dia. 140btg11.0Besi Beton Dia. 160btg12.0Kawat Beton0.00Kg13.0Paku0.00Kg14.0Batu Bata0Biji15.0Papan Kelas III0.00m316.0Minyak Bekisting0ltr17.0Multipleks 9mm0lbr18.0Balok Kayu Kelas II0.00m319.0Kayu Dolken0Btg20.0Rangka Plafond (hollow 4x4)0.00m121.0Rangka Plafond (hollow 2x4)0.00m122.0Gypsum 9mm0lbr23.0Keramik 30/300Dos24.0Keramik 40/400Dos25.0Cat Kimex0.00Kg26.0Plamur0.00Kg27.0Cat Kayu ICI0.00Kg28.0Atap Spandek0.00m229.0Nok0.00m'30.0Woodplank0lbr31.0Loster Motif Bintang0Bh32.0Kusen Kayu Kelas I0.00m333.0Papan Kayu Kelas I0.00m334.0Kaca 5 mm0.00m235.0Engsel Pintu0bh36.0Kunci Pintu0bh37.0Grendel Pintu0bh

Ds RappoalaREKAPITULASI RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA RAPPOALA, KEC. TOMPOBULUANGGARAN: TAHUN 2010NOJ E N I S P E K E R J A A NTOTAL HARGA (Rp.)IPEK. PERSIAPANRp.1,640,000.00IIPEK. TANAH DAN PONDASIRp.932,308.55IIIPEK. STRUKTUR BETONRp.1,396,656.14IVPEKERJAAN DINDINGRp.545,046.93VPEKERJAAN PINTU DAN JENDELARp.9,794,153.59VIPEK. PLAFONDRp.14,050,092.21VIIPEKERJAAN LANTAIRp.12,523,037.39VIIIPEK. PENGECATANRp.8,399,587.39IXPEK. KONSTRUKSI ATAPRp.12,946,502.49XPEK. INSTALASI LISTRIKRp.3,561,030.00XIPEK. PAGAR DEPANRp.24,971,448.69XIIPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIRRp.150,000.00REAL COST TOTALRp.90,909,863.38PPN 10%Rp.9,090,986.34TOTAL COSTRp.100,000,849.71DIBULATKANRp.100,000,000.00TERBILANG : Seratus juta rupiah,-Sungguminasa, April 2010Disetujui :Konsultan Perencana,PEJABAT PEMBUAT KOMITMENCV. MALLOMO ENGINEERINGHj. RIKE SUSANTI, STSJAMSIR, STNip. 19680731 199803 2 002DirekturDisetujuiKEPALA BIDANG CIPTA KARYAKABUPATEN GOWAIr. H. MAHMUDDIN, M.SiNip. 19680303 199403 1 013RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA RAPPOALA, KEC. TOMPOBULUANGGARAN: TAHUN 2010NOURAIAN PEKERJAANVOL.SATHRG. SAT. (Rp.)JML. HARGABatu GunungPasir UrugPasirKerikil (Max. 30mm)Semen @50KgBesi BetonDia. 6Besi Beton Dia. 8Besi Beton Dia. 10Besi Beton Dia. 12Besi Beton Dia. 14Besi Beton Dia. 16Besi Beton Dia. 19Besi Beton Dia. 22Kawat BetonPakuBatu BataPapan Kelas IIIMinyak BekistingMultipleks 9mmBalok Kayu Kelas IIKayu DolkenRangka Plafond (hollow 4x4)Rangka Plafond (hollow 2x4)Gypsum 9mmGRCKeramik 30/30Keramik 40/40Keramik 10/40Cat KimexPlamurCat Kayu ICIResiduAtap SpandekNokWoodplankLoster Motif BintangKusen Kayu Kelas IPapan Kayu Kelas IPapan Kayu Kelas IIKaca 5 mmEngsel PintuKunci PintuGrendel PintuIPEK. PERSIAPANm3m3m3m3ZakbtgbtgbtgbtgbtgbtgbtgbtgKgKgBijim3ltrlbrm3Btgm1m1lbrlbrDosDosDosKgKgKgKgm2m'lbrBhm3m3m3m2bhbhbh1.Pek. Pengukuran dan Pas. Bowplank1.00Ls250,000.00250,000.002.Pek. Penyediaan P3K, Listrik Dan Air Kerja1.00Ls500,000.00500,000.003.Pek. Papan Nama Proyek1.00Ls350,000.00350,000.004.Pek. Pembongkaran Pintu Lama + Teras Lama1.00Ls540,000.00540,000.00Jumlah1,640,000.00IIPEK. TANAH DAN PONDASI1.Pek. Galian Tanah Pondasi1.30m325,575.0033,247.501.100.201.302.Pek. Urugan Kembali0.43m31,196.50518.483.Pek. Pasir Urug (Di Bawah Pondasi)0.03m3103,230.003,096.900.034.Pek. Pondasi Batu Kosong0.05m3189,294.009,464.700.055.Pek. Pondasi Batu Gunung 1:4 (Undak)0.11m3429,417.5047,235.930.116.Pek. Pondasi Trassram (Tangga Entrance dan Teras)5.49m2152,776.88838,745.045.49Jumlah932,308.55IIIPEK. STRUKTUR BETON44.081.Pek. Koloma.Type Kolom 20/20 (Teras)0.27m35,172,800.511,396,656.140.140.27Jumlah1,396,656.14IVPEKERJAAN DINDING1.Pas. Pasangan Batu 1/2 Bata (1:5)(Bekas Bongkaran Pintu)2.39m272,422.50173,089.782.384.780.002.Pek. Plesteran Biasa( 1 : 5 )4.78m222,943.00109,667.544.753.Pek. Plesteran Beton ( 1 : 3 )4.96m225,404.50126,006.324.964.Pek. Acian9.74m213,992.13136,283.30Jumlah545,046.93VPEKERJAAN PINTU DAN JENDELA1.Pek. Pintu Panil Kayu Kls. I7.40m2485,000.003,589,000.004.601.661.147.402.Pek. Jendela Kaca Bingkai Kayu Kls. I10.91m2324,380.003,538,985.801.665.231.662.3610.913.Pek. Jalusi Kayu Kls. I0.23m2595,175.00136,890.250.234.Pek. Pas. Kaca mati 5 mm1.84m2167,943.50309,016.041.100.741.845.Pas. Engsel Pintu (Tiap Daun pintu = 3 bh engsel)15.00Bh17,443.50261,652.5015.006.Pas. Engsel Jendela32.00Bh13,629.00436,128.0032.007.Pas. Hak Angin32.00Bh18,443.50590,192.0032.008.Pas. Grendel Jendela16.00Bh13,629.00218,064.0016.009.Pas. Kunci Biasa 2 Slag5.00Set142,845.00714,225.00Jumlah9,794,153.59VIPEK. PLAFOND1.Pek. Rangka Plafond Kayu Kls. II Uk. 50 x 100 cm, (kayu 4/6)123.91m260,400.607,484,238.3527.7260.9035.29123.912.Pek. Plafond Eternit 1 x 1 M123.91m223,207.002,875,579.373.Pek. List Datar Plafond335.51m'10,999.003,690,274.4929.8029.40163.65112.66335.51Jumlah14,050,092.21VIIPEKERJAAN LANTAI1.Pek. Lantai Kerja Beton Tebal 5 cm0.86m3573,735.34493,412.400.0517.180.860.902.Pek. Lantai Utama Dan entrance Keramik 30/30 cm104.63m2114,973.0012,029,624.9982.870021.76104.63Jumlah12,523,037.39VIIIPEK. PENGECATAN1.Pek. Cat Tembok9.74m211,586.40112,851.542.Pek. Cat Plafond178.58m211,586.402,069,099.3154.673.Pek. Cat Kayu31.54m224,574.50775,079.7314.8013.543.2031.544.Pek. Cat Atap Seng232.96m210,190.502,373,978.8868.58164.38232.965.Pek. Cat Tembok Lama202.24m27,801.601,577,795.58266.8064.56202.246.Pek. Cat Kayu Kuseng Lama + Lesplank Lama41.62m221,781.50906,546.0331.849.7841.627.Pek. Residu Rangka Plafond109.04m25,358.00584,236.32123.91545.20109.04Jumlah8,399,587.39IXPEK. KONSTRUKSI ATAP1.Pek. Kuda - Kuda Kayu 6/12 Kls. II (Teras Dan Sambulayang)0.62m34,667,100.002,893,602.0041.8635.429.060.622.Pek. Gording Kayu 5/10 Kls. II0.60m34,301,920.002,581,152.0031.8488.430.603.Pek. Pas. Atap Seng Gelombang Teras Dan Sambulayang68.58m232,296.002,214,859.6829.8538.7368.584.Pek. Nok/Bubungan Seng Plat3.68m'29,212.00107,500.163.685.Pek. Ganti Atap Seng Gelombang (Atap Utama Bagian Belakang)10.00m232,296.00322,960.0010.006.Pek. Jurai Talang Atap7.20m'162,940.001,173,168.007.207.Pek. Lisplank Kayu Kls. II54.15m'54,567.002,954,803.0554.158.Pek. Ganti Lisplank Kayu Kls. II (Belakang)12.80m'54,567.00698,457.6012.80Jumlah12,946,502.49XPEK. INSTALASI LISTRIK1.Pek. Instalasi Titik Mata Lampu7.00ttk264,230.001,849,610.002.Pek. Instalasi Titik Stop Kontak6.00ttk192,570.001,155,420.003.Pek. Pas. Lampu SL 18 Watt7.00Bh36,000.00252,000.004.Pas. Saklar Tunggal3.00Bh13,000.0039,000.005.Pas. Saklar Ganda2.00Bh14,000.0028,000.006.Pas. Stop Kontak6.00Bh14,500.0087,000.007.Pas. MCB, Lengkap1.00Unit150,000.00150,000.00Jumlah3,561,030.00XIPEK. PAGAR DEPAN1.Pek. Tanah Dan Pondasi44.36-Pek. Galian Tanah Pondasi18.63m325,575.00476,462.250.4218.63-Pek. Urugan Kembali6.21m31,196.507,430.27-Pek. Pasir Urug (Di Bawah Pondasi)2.66m3103,230.00274,591.800.062.66-Pek. Pondasi Batu Kosong5.32m3189,294.001,007,044.080.125.32-Pek. Pondasi Batu Gunung 1:49.98m3429,417.504,285,586.650.239.982.Pek. Struktur Beton-Pek. Sloef 12/150.74m34,633,813.383,429,021.900.0241.360.74-Pek. Kolom 15/15 (Pilar Pagar)0.77m34,232,702.873,259,181.210.021.700.773.Pek. Pasangan Dinding Dan plesteran-Pas. Pasangan Batu 1/2 Bata (1:5)23.02m272,422.501,667,165.950.6038.3623.02-Pek. Plesteran Biasa( 1 : 5 )46.03m222,943.001,056,066.2946.03-Pek. Plesteran Beton ( 1 : 3 )30.41m225,404.50772,550.8518.0012.4130.41-Pek. Acian76.44m213,992.131,069,558.044.Pek. Pengecatan-Pek. Cat Tembok76.44m211,586.40885,664.425.Pek. Pagar Besi-Pek. Reling Pagar Besi Beton, P = 13,91 M , T = 75 Cm10.43m2650,000.006,781,125.00Jumlah24,971,448.69XIIPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.Pek. Penyelesaian Akhir/Pembersihan1.00Ls150,000.00150,000.00Jumlah150,000.00RealcostRp90,909,863.380.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.010.0042500.007,215.62Rekapitulasi Material/Bahan Pembangunan Masjid Nurul Yasin Pangkep8.0027000.007,231.82NoNama MaterialVolumeSatuan1.0Batu Gunung0.00m32.0Pasir Urug0.00m33.0Pasir0.00m34.0Kerikil (Max. 30mm)0.00m35.0Semen @50Kg0Zak7.0Besi Beton Dia. 80btg8.0Besi Beton Dia. 100btg9.0Besi Beton Dia. 120btg10.0Besi Beton Dia. 140btg11.0Besi Beton Dia. 160btg12.0Kawat Beton0.00Kg13.0Paku0.00Kg14.0Batu Bata0Biji15.0Papan Kelas III0.00m316.0Minyak Bekisting0ltr17.0Multipleks 9mm0lbr18.0Balok Kayu Kelas II0.00m319.0Kayu Dolken0Btg20.0Rangka Plafond (hollow 4x4)0.00m121.0Rangka Plafond (hollow 2x4)0.00m122.0Gypsum 9mm0lbr23.0Keramik 30/300Dos24.0Keramik 40/400Dos25.0Cat Kimex0.00Kg26.0Plamur0.00Kg27.0Cat Kayu ICI0.00Kg28.0Atap Spandek0.00m229.0Nok0.00m'30.0Woodplank0lbr31.0Loster Motif Bintang0Bh32.0Kusen Kayu Kelas I0.00m333.0Papan Kayu Kelas I0.00m334.0Kaca 5 mm0.00m235.0Engsel Pintu0bh36.0Kunci Pintu0bh37.0Grendel Pintu0bh

Ds RappolembaREKAPITULASI RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA RAPPOLEMBA, KEC. TOMPOBULUANGGARAN: TAHUN 2010NOJ E N I S P E K E R J A A NTOTAL HARGA (Rp.)IPEK. PERSIAPANRp.3,332,500.00IIPEKERJAAN DINDINGRp.17,731,903.78IIIPEKERJAAN PINTU DAN JENDELARp.10,185,563.00VIPEK. PLAFONDRp.20,211,238.82VPEKERJAAN LANTAIRp.7,629,608.28VIPEK. PENGECATANRp.13,374,797.08VIIPEK. KONSTRUKSI ATAPRp.12,353,459.40VIIIPEK. INSTALASI LISTRIKRp.5,940,460.00IXPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIRRp.150,000.00REAL COST TOTALRp.90,909,530.36PPN 10%Rp.9,090,953.04TOTAL COSTRp.100,000,483.39DIBULATKANRp.100,000,000.00TERBILANG : Seratus juta rupiah,-Sungguminasa, April 2010Disetujui :Konsultan Perencana,PEJABAT PEMBUAT KOMITMENCV. MALLOMO ENGINEERINGHj. RIKE SUSANTI, STSJAMSIR, STNip. 19680731 199803 2 002DirekturDisetujuiKEPALA BIDANG CIPTA KARYAKABUPATEN GOWAIr. H. MAHMUDDIN, M.SiNip. 19680303 199403 1 013RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA RAPPOLEMBA, KEC. TOMPOBULUANGGARAN: TAHUN 2010NOURAIAN PEKERJAANVOL.SATHRG. SAT. (Rp.)JML. HARGABatu GunungPasir UrugPasirKerikil (Max. 30mm)Semen @50KgBesi BetonDia. 6Besi Beton Dia. 8Besi Beton Dia. 10Besi Beton Dia. 12Besi Beton Dia. 14Besi Beton Dia. 16Besi Beton Dia. 19Besi Beton Dia. 22Kawat BetonPakuBatu BataPapan Kelas IIIMinyak BekistingMultipleks 9mmBalok Kayu Kelas IIKayu DolkenRangka Plafond (hollow 4x4)Rangka Plafond (hollow 2x4)Gypsum 9mmGRCKeramik 30/30Keramik 40/40Keramik 10/40Cat KimexPlamurCat Kayu ICIResiduAtap SpandekNokWoodplankLoster Motif BintangKusen Kayu Kelas IPapan Kayu Kelas IPapan Kayu Kelas IIKaca 5 mmEngsel PintuKunci PintuGrendel PintuIPEK. PERSIAPANm3m3m3m3ZakbtgbtgbtgbtgbtgbtgbtgbtgKgKgBijim3ltrlbrm3Btgm1m1lbrlbrDosDosDosKgKgKgKgm2m'lbrBhm3m3m3m2bhbhbh1.Pek. Pengukuran dan Pas. Bowplank1.00Ls100,000.00100,000.002.Pek. Penyediaan P3K, Listrik Dan Air Kerja1.00Ls350,000.00350,000.003.Pek. Papan Nama Proyek1.00Ls350,000.00350,000.004.Pek. Pembongkaran Atap Lama + Kupas Plesteran Lama1.00Ls2,532,500.002,532,500.00Jumlah3,332,500.00IIPEKERJAAN DINDING1.Pas. Pasangan Batu 1/2 Bata (1:5)3.00m272,422.50217,267.503.000.002.Pek. Plesteran Biasa( 1 : 5 )474.20m222,943.0010,879,570.6093.00279.0041.90237.10474.203.Pek. Acian474.20m213,992.136,635,065.68Jumlah17,731,903.78IIIPEKERJAAN PINTU DAN JENDELA1.Pek. Pintu Panil Kayu Kls. I15.87m2485,000.007,696,950.003.2312.6415.872.Pas. Engsel Pintu (Tiap Daun pintu = 3 bh engsel)30.00Bh17,443.50523,305.0030.003.Pas. Tarikan Stainless2.00Bh278,145.00556,290.004.Pas. Kunci Pelor1.00Set266,258.00266,258.005.Pas. Kunci Biasa 2 Slag8.00Set142,845.001,142,760.00Jumlah10,185,563.00VIPEK. PLAFOND1.Pek. Rangka Plafond Kayu Kls. II Uk. 50 x 100 cm, (kayu 4/6)208.69m260,400.6012,605,001.21136.9622.1049.63208.692.Pek. Plafond Eternit 1 x 1 M208.69m223,207.004,843,068.833.Pek. List Datar Plafond251.22m'10,999.002,763,168.78130.9019.07101.25251.22Jumlah20,211,238.82VPEKERJAAN LANTAI1.Pek. Lantai Utama Dan entrance Keramik 30/30 cm66.36m2114,973.007,629,608.2817.750048.6166.36Jumlah7,629,608.28VIPEK. PENGECATAN1.Pek. Cat Tembok (Plesteran Yang Baru/Habis Dikupas)474.20m211,586.405,494,270.882.Pek. Cat Plafond219.77m211,586.402,546,343.1311.083.Pek. Cat Kayu48.75m224,574.501,198,006.8831.7417.0148.754.Pek. Cat Atap Seng184.36m210,190.501,878,720.585.Pek. Cat Tembok Lama (Pas. Dinding Tambahan)46.50m27,801.60362,774.4093.0046.506.Pek. Cat Kayu Kuseng +Pintu Lama + Lesplank Lama41.81m221,781.50910,684.5230.6811.1441.817.Pek. Residu Rangka Plafond183.65m25,358.00983,996.70208.69918.24183.65Jumlah13,374,797.08VIIPEK. KONSTRUKSI ATAP1.Pek. Kuda - Kuda Kayu Rangka Sambulayang 5/7 Kls. II0.29m34,667,100.001,353,459.0041.820.292.Pek. Gording Kayu 5/10 Kls. II (ganti Gording Lama 10%)0.18m34,301,920.00774,345.60361.201.810.183.Pek. Ganti Dan Pas. Atap Seng Gelombang184.36m232,296.005,954,090.56128.0829.3626.93184.364.Pek. Nok/Bubungan Seng Plat19.13m'29,212.00558,825.5619.135.Pek. Lisplank Kayu Kls. II (Ganti Lesplank)68.04m'54,567.003,712,738.6837.9430.1068.04Jumlah12,353,459.40VIIIPEK. INSTALASI LISTRIK1.Pek. Instalasi Titik Mata Lampu12.00ttk264,230.003,170,760.002.Pek. Instalasi Titik Stop Kontak10.00ttk192,570.001,925,700.003.Pek. Pas. Lampu TL 2 x 203.00Bh85,000.00255,000.004.Pek. Pas. Lampu SL 18 Watt9.00Bh36,000.00324,000.005.Pas. Saklar Tunggal6.00Bh13,000.0078,000.006.Pas. Saklar Ganda3.00Bh14,000.0042,000.007.Pas. Stop Kontak10.00Bh14,500.00145,000.00Jumlah5,940,460.00IXPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.Pek. Penyelesaian Akhir/Pembersihan1.00Ls150,000.00150,000.00Jumlah150,000.00RealcostRp90,909,530.360.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.010.0042500.007,215.62Rekapitulasi Material/Bahan Pembangunan Masjid Nurul Yasin Pangkep8.0027000.007,231.82NoNama MaterialVolumeSatuan1.0Batu Gunung0.00m32.0Pasir Urug0.00m33.0Pasir0.00m34.0Kerikil (Max. 30mm)0.00m35.0Semen @50Kg0Zak7.0Besi Beton Dia. 80btg8.0Besi Beton Dia. 100btg9.0Besi Beton Dia. 120btg10.0Besi Beton Dia. 140btg11.0Besi Beton Dia. 160btg12.0Kawat Beton0.00Kg13.0Paku0.00Kg14.0Batu Bata0Biji15.0Papan Kelas III0.00m316.0Minyak Bekisting0ltr17.0Multipleks 9mm0lbr18.0Balok Kayu Kelas II0.00m319.0Kayu Dolken0Btg20.0Rangka Plafond (hollow 4x4)0.00m121.0Rangka Plafond (hollow 2x4)0.00m122.0Gypsum 9mm0lbr23.0Keramik 30/300Dos24.0Keramik 40/400Dos25.0Cat Kimex0.00Kg26.0Plamur0.00Kg27.0Cat Kayu ICI0.00Kg28.0Atap Spandek0.00m229.0Nok0.00m'30.0Woodplank0lbr31.0Loster Motif Bintang0Bh32.0Kusen Kayu Kelas I0.00m333.0Papan Kayu Kelas I0.00m334.0Kaca 5 mm0.00m235.0Engsel Pintu0bh36.0Kunci Pintu0bh37.0Grendel Pintu0bh

Ds TaneteREKAPITULASI RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA TANETE, KEC. TOMPOBULUANGGARAN: TAHUN 2010NOJ E N I S P E K E R J A A NTOTAL HARGA (Rp.)IPEK. PERSIAPANRp.2,515,000.00IIPEK. TANAH DAN PONDASIRp.256,665.15IIIPEK. STRUKTUR BETONRp.16,410,736.31IVPEKERJAAN DINDINGRp.7,993,024.32VPEKERJAAN PINTU DAN JENDELARp.7,925,264.79VIPEK. PLAFONDRp.15,543,488.92VIIPEKERJAAN LANTAIRp.1,025,901.33VIIIPEK. PENGECATANRp.4,358,424.58IXPEK. KONSTRUKSI ATAPRp.29,906,641.79XPEK. INSTALASI LISTRIKRp.4,083,650.00XIPEK. SANITASI DAN INSTALASIRp.740,809.30XIIPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIRRp.150,000.00REAL COST TOTALRp.90,909,606.47PPN 10%Rp.9,090,960.65TOTAL COSTRp.100,000,567.12DIBULATKANRp.100,000,000.00TERBILANG : Seratus juta rupiah,-Sungguminasa, April 2010Disetujui :Konsultan Perencana,PEJABAT PEMBUAT KOMITMENCV. MALLOMO ENGINEERINGHj. RIKE SUSANTI, STSJAMSIR, STNip. 19680731 199803 2 002DirekturDisetujuiMengetahui/Menyetujui :KEPALA BIDANG CIPTA KARYAKEPALA DINAS PEKERJAAN UMUMKABUPATEN GOWAKABUPATEN GOWAIr. H. MAHMUDDIN, M.SiIr. H. MUH. AMIN YAKUB, M. SiNip. 19680303 199403 1 013Nip. 19580425 197903 1 003RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA TANETE, KEC. TOMPOBULUANGGARAN: TAHUN 2010NOURAIAN PEKERJAANVOL.SATHRG. SAT. (Rp.)JML. HARGABatu GunungPasir UrugPasirKerikil (Max. 30mm)Semen @50KgBesi BetonDia. 6Besi Beton Dia. 8Besi Beton Dia. 10Besi Beton Dia. 12Besi Beton Dia. 14Besi Beton Dia. 16Besi Beton Dia. 19Besi Beton Dia. 22Kawat BetonPakuBatu BataPapan Kelas IIIMinyak BekistingMultipleks 9mmBalok Kayu Kelas IIKayu DolkenRangka Plafond (hollow 4x4)Rangka Plafond (hollow 2x4)Gypsum 9mmGRCKeramik 30/30Keramik 40/40Keramik 10/40Cat KimexPlamurCat Kayu ICIResiduAtap SpandekNokWoodplankLoster Motif BintangKusen Kayu Kelas IPapan Kayu Kelas IPapan Kayu Kelas IIKaca 5 mmEngsel PintuKunci PintuGrendel PintuIPEK. PERSIAPANm3m3m3m3ZakbtgbtgbtgbtgbtgbtgbtgbtgKgKgBijim3ltrlbrm3Btgm1m1lbrlbrDosDosDosKgKgKgKgm2m'lbrBhm3m3m3m2bhbhbh1.Pek. Pengukuran dan Pas. Bowplank1.00Ls150,000.00150,000.002.Pek. Penyediaan P3K, Listrik Dan Air Kerja1.00Ls500,000.00500,000.003.Pek. Papan Nama Proyek1.00Ls350,000.00350,000.004.Pek. Pembongkaran Atap Lama, Dinding Depan Dan Kupas Plesteran1.00Ls1,515,000.001,515,000.00Jumlah2,515,000.00IIPEK. TANAH DAN PONDASI1.Pek. Pondasi Trassram (Entrance/Teras)1.68m2152,776.88256,665.151.68Jumlah256,665.15IIIPEK. STRUKTUR BETON1.Pek. Koloma.Type Kolom 20/200.84m35,172,800.514,345,152.430.140.84b.Type Kolom Praktis Kp 12/150.24m35,117,952.871,228,308.690.010.242.Pek. Ringbalk Dan Kuda - Kuda Betona.Ringbalk Praktis 12/150.99m35,441,613.745,387,197.600.0255.170.99b.Ringbalk / Blk Gantung 15/250.23m35,179,685.481,191,327.660.046.000.23c.Ringbalk / Blk Gantung 20/250.60m34,558,496.802,735,098.080.0512.000.60d.Ringbalk Kuda - Kuda Beton 12/150.28m35,441,613.741,523,651.850.0215.750.28Jumlah16,410,736.31IVPEKERJAAN DINDING55.171.Pas. Pasangan Batu 1/2 Bata (1:5)33.21m272,422.502,405,151.230.5027.595.6233.210.002.Pek. Plesteran Biasa( 1 : 5 )97.71m222,943.002,241,760.5378.4219.2997.713.Pek. Plesteran Beton ( 1 : 3 )16.80m225,404.50426,795.602.8016.804.Pek. Acian208.64m213,992.132,919,316.9694.13Jumlah7,993,024.32VPEKERJAAN PINTU DAN JENDELA1.Pek. Pintu Panil Kayu Kls. I7.52m2485,000.003,647,200.004.852.677.522.Pek. Jendela Kaca Bingkai Kayu Kls. I6.56m2324,380.002,127,932.803.253.316.563.Pek. Pintu PVC (Toilet/Km)1.00Bh350,000.00350,000.004.Pek. Memindahkan Kuseng Pintu1.00Bh150,000.00150,000.005.Pek. Pas. Kaca mati 5 mm0.31m2167,943.5052,062.490.316.Pas. Engsel Pintu (Tiap Daun pintu = 3 bh engsel)15.00Bh17,443.50261,652.5015.007.Pas. Engsel Jendela16.00Bh13,629.00218,064.0016.008.Pas. Hak Angin16.00Bh18,443.50295,096.009.Pas. Grendel Jendela8.00Bh13,629.00109,032.0010.Pas. Kunci Biasa 2 Slag5.00Set142,845.00714,225.00Jumlah7,925,264.79VIPEK. PLAFOND1.Pek. Rangka Plafond Kayu Kls. II Uk. 50 x 100 cm, (kayu 4/6)185.91m260,400.6011,229,075.55113.4172.50185.9122.Pek. Plafond Eternit 1 x 1 M185.91m223,207.004,314,413.373.Pek. List Datar Plafond0.0m'10,999.000.089.44156.00245.44Jumlah15,543,488.92VIIPEKERJAAN LANTAI1.Pek. Urugan Tanah Di Bawah Lantai + Pemadatan0.44m3112,880.0049,667.200.4402.Pek. Urugan Pasir Di Bawah Lantai0.22m3103,230.0022,710.600.2203.Pek. Lantai Kerja Beton Tebal 5 cm (Teras)0.11m3573,735.3463,110.890.1104.Pek. Lantai Utama Dan entrance Keramik 30/30 cm0.0m2114,973.000.02.2000112.19114.396.Pek. Lantai Keramik Toilet/KM/WC, Uk. 20 x 201.23m2125,917.50154,878.531.237.Pek. Keramik Dinding Toilet/KM/WC, Uk. 20 x 255.61m2131,111.25735,534.113.745.610Jumlah1,025,901.33VIIIPEK. PENGECATAN1.Pek. Cat Tembok208.64m211,586.402,417,386.502.Pek. Cat Plafond0.0m211,586.400.03.Pek. Cat Kayu0.0m224,574.500.015.0420.1535.194.Pek. Cat Atap Seng0.0m210,190.500.02.Pek. Cat Tembok Lama248.80m27,801.601,941,038.08286.9938.19248.806.Pek. Cat Kayu Kuseng +Pintu Lama0.0m221,781.500.066.2223.187.Pek. Residu Rangka Plafond0.0m25,358.000.0818.01163.60Jumlah4,358,424.58IXPEK. KONSTRUKSI ATAP1.Pek. Kuda - Kuda Kayu 6/12 Kls. II1.66m34,667,100.007,747,386.00115.8496.3918.641.662.Pek. Gording Kayu 5/10 Kls. II1.65m34,301,920.007,098,168.00206.33104.4618.811.653.Pek. Pas. Atap Seng Gelombang239.81m232,296.007,744,903.76149.2978.9011.61239.814.Pek. Nok/Bubungan Seng Plat27.53m'29,212.00804,206.3627.535.Pek. Jurai Talang Atap12.97m'162,940.002,113,331.806.3312.676.Pek. Lisplank Kayu Kls. II80.61m'54,567.004,398,645.8746.3534.2680.61Jumlah29,906,641.79XPEK. INSTALASI LISTRIK1.Pek. Instalasi Titik Mata Lampu10.00ttk264,230.002,642,300.002.Pek. Instalasi Titik Stop Kontak5.00ttk192,570.00962,850.003.Pek. Pas. Lampu SL 18 Watt9.00Bh36,000.00324,000.004.Pas. Saklar Tunggal2.00Bh13,000.0026,000.005.Pas. Saklar Ganda4.00Bh14,000.0056,000.006.Pas. Stop Kontak5.00Bh14,500.0072,500.007.Pas. MCB, Lengkap0.0Unit150,000.000.0Jumlah4,083,650.00XIPEK. SANITASI DAN INSTALASI1.Pas. Klosed Jongkok1.00Bh403,280.00403,280.002.Pas. Kran Air Biasa1.00Bh22,932.5022,932.503.Pas. Floordrain Stainless1.00Bh40,845.0040,845.004.Pek. Pas. Pipa Air Bersih AW 3/4" (Distribusi)3.00m'19,343.1558,029.455.Pek. Pas. Pipa Air Bersih AW 1/2" (Distribusi)1.00m'18,568.1518,568.156.Pek. Pipa Buangan Air Mandi Dia. 3" (D)2.00m'49,288.5598,577.107.Pek. Pipa Buangan Air Kotor Dia. 3" (D)2.00m'49,288.5598,577.108.Pek. Perbaikan Septic tank (Beerputt)+ Peresapan0.0Unit1,000,000.000.0Jumlah740,809.30XIIPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.Pek. Penyelesaian Akhir/Pembersihan1.00Ls150,000.00150,000.00Jumlah150,000.00RealcostRp90,909,606.470.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.010.0042500.007,215.62Rekapitulasi Material/Bahan Pembangunan Masjid Nurul Yasin Pangkep8.0027000.007,231.82NoNama MaterialVolumeSatuan1.0Batu Gunung0.00m32.0Pasir Urug0.00m33.0Pasir0.00m34.0Kerikil (Max. 30mm)0.00m35.0Semen @50Kg0Zak7.0Besi Beton Dia. 80btg8.0Besi Beton Dia. 100btg9.0Besi Beton Dia. 120btg10.0Besi Beton Dia. 140btg11.0Besi Beton Dia. 160btg12.0Kawat Beton0.00Kg13.0Paku0.00Kg14.0Batu Bata0Biji15.0Papan Kelas III0.00m316.0Minyak Bekisting0ltr17.0Multipleks 9mm0lbr18.0Balok Kayu Kelas II0.00m319.0Kayu Dolken0Btg20.0Rangka Plafond (hollow 4x4)0.00m121.0Rangka Plafond (hollow 2x4)0.00m122.0Gypsum 9mm0lbr23.0Keramik 30/300Dos24.0Keramik 40/400Dos25.0Cat Kimex0.00Kg26.0Plamur0.00Kg27.0Cat Kayu ICI0.00Kg28.0Atap Spandek0.00m229.0Nok0.00m'30.0Woodplank0lbr31.0Loster Motif Bintang0Bh32.0Kusen Kayu Kelas I0.00m333.0Papan Kayu Kelas I0.00m334.0Kaca 5 mm0.00m235.0Engsel Pintu0bh36.0Kunci Pintu0bh37.0Grendel Pintu0bh

Ds JulukanayaREKAPITULASI RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: PEMBANGUNAN/REHAB KANTOR DESA JULU'KANAYA, KEC. BIRINGBULUANGGARAN: TAHUN 2010NOJ E N I S P E K E R J A A NTOTAL HARGA (Rp.)IPEK. PERSIAPANRp.1,092,500.00IIPEK. TANAH DAN PONDASIRp.9,755,186.28IIIPEK. STRUKTUR BETONRp.15,735,006.66IVPEKERJAAN DINDINGRp.19,167,168.50VPEKERJAAN PINTU DAN JENDELARp.16,965,811.25VIPEKERJAAN LANTAIRp.5,434,029.18VIIPEK. PENGECATANRp.3,950,650.86VIIIPEK. KONSTRUKSI ATAPRp.18,659,468.48IXPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIRRp.150,000.00REAL COST TOTALRp.90,909,821.22PPN 10%Rp.9,090,982.12TOTAL COSTRp.100,000,803.34DIBULATKANRp.100,000,000.00TERBILANG : Seratus juta rupiah,-Sungguminasa, April 2010Disetujui :Konsultan Perencana,PEJABAT PEMBUAT KOMITMENCV. MALLOMO ENGINEERINGHj. RIKE SUSANTI, STSJAMSIR, STNip. 19680731 199803 2 002DirekturDisetujuiKEPALA BIDANG CIPTA KARYAKABUPATEN GOWAIr. H. MAHMUDDIN, M.SiNip. 19680303 199403 1 013RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: PEMBANGUNAN/REHAB KANTOR DESA JULU'KANAYA, KEC. BIRINGBULUANGGARAN: TAHUN 2010NOURAIAN PEKERJAANVOL.SATHRG. SAT. (Rp.)JML. HARGABatu GunungPasir UrugPasirKerikil (Max. 30mm)Semen @50KgBesi BetonDia. 6Besi Beton Dia. 8Besi Beton Dia. 10Besi Beton Dia. 12Besi Beton Dia. 14Besi Beton Dia. 16Besi Beton Dia. 19Besi Beton Dia. 22Kawat BetonPakuBatu BataPapan Kelas IIIMinyak BekistingMultipleks 9mmBalok Kayu Kelas IIKayu DolkenRangka Plafond (hollow 4x4)Rangka Plafond (hollow 2x4)Gypsum 9mmGRCKeramik 30/30Keramik 40/40Keramik 10/40Cat KimexPlamurCat Kayu ICIResiduAtap SpandekNokWoodplankLoster Motif BintangKusen Kayu Kelas IPapan Kayu Kelas IPapan Kayu Kelas IIKaca 5 mmEngsel PintuKunci PintuGrendel PintuIPEK. PERSIAPANm3m3m3m3ZakbtgbtgbtgbtgbtgbtgbtgbtgKgKgBijim3ltrlbrm3Btgm1m1lbrlbrDosDosDosKgKgKgKgm2m'lbrBhm3m3m3m2bhbhbh1.Pek. Pengukuran dan Pas. Bowplank1.00Ls192,500.00192,500.002.Pek. Penyediaan P3K, Listrik Dan Air Kerja1.00Ls550,000.00550,000.003.Pek. Papan Nama Proyek1.00Ls350,000.00350,000.00Jumlah1,092,500.00IIPEK. TANAH DAN PONDASI49.001.Pek. Galian Tanah Pondasi28.61m325,575.00731,700.750.5627.440.900.2828.612.Pek. Urugan Kembali9.54m31,196.5011,410.623.Pek. Pasir Urug (Di Bawah Pondasi)4.05m3103,230.00418,081.500.083.920.134.054.Pek. Pondasi Batu Kosong8.10m3189,294.001,533,281.400.167.840.268.105.Pek. Pondasi Batu Gunung 1:414.87m3429,417.506,385,438.2314.580.3014.876.Pek. Pondasi Trassram (Tangga Entrance dan Teras)4.42m2152,776.88675,273.794.42Jumlah9,755,186.28IIIPEK. STRUKTUR BETON1.Pek. Sloef 12/201.18m33,905,627.124,608,640.010.0249.001.182.Pek. Koloma.Type Kolom 20/200.30m35,172,800.511,551,840.150.047.600.30b.Type Kolom Praktis Kp 12/150.76m35,117,952.873,889,644.180.0242.000.763.Pek. Ringbalk Dan Kuda - Kuda Betona.Ringbalk Praktis 12/150.94m35,441,613.745,115,116.920.0252.000.94b.Ringbalk / Blk Gantung 15/250.11m35,179,685.48569,765.400.043.000.11Jumlah15,735,006.66IVPEKERJAAN DINDING49.001.Pas. Pasangan Batu 1/2 Bata (1:5)129.39m272,422.509,370,747.283.15154.3524.96129.390.002.Pek. Plesteran Biasa( 1 : 5 )258.78m222,943.005,937,189.54258.783.Pek. Plesteran Beton ( 1 : 3 )6.05m225,404.50153,697.235.600.456.054.Pek. Acian264.83m213,992.133,705,534.46Jumlah19,167,168.50VPEKERJAAN PINTU DAN JENDELA81.501.Pek. Kuseng Kayu Kls. I0.57m39,308,925.005,306,087.250.010.572.Pek. Pintu Panil Kayu Kls. I9.60m2485,000.004,656,000.009.603.Pek. Jendela Kaca Bingkai Kayu Kls. I12.25m2324,380.003,973,655.0012.254.Pas. Engsel Pintu (Tiap Daun pintu = 3 bh engsel)18.00Bh17,443.50313,983.0018.005.Pas. Engsel Jendela34.00Bh13,629.00463,386.0034.006.Pas. Hak Angin34.00Bh18,443.50627,079.007.Pas. Tarikan Stainless2.00Bh278,145.00556,290.008.Pas. Grendel Jendela17.00Bh13,629.00231,693.009.Pas. Kunci Pelor1.00Set266,258.00266,258.0010.Pas. Kunci Biasa 2 Slag4.00Set142,845.00571,380.00Jumlah16,965,811.25VIPEKERJAAN LANTAI65.071.Pek. Urugan Tanah Di Bawah Lantai + Pemadatan19.52m3112,880.002,203,417.600.3019.52102.Pek. Urugan Pasir Di Bawah Lantai13.01m3103,230.001,343,022.300.2013.01403.Pek. Lantai Kerja Beton Tebal 5 cm3.29m3573,735.341,887,589.280.0565.773.29Jumlah5,434,029.18VIIPEK. PENGECATAN1.Pek. Cat Tembok264.83m211,586.403,068,426.312.Pek. Cat Kayu (Kusen Dan Lesplank)35.90m224,574.50882,224.5524.450.0011.4535.90Jumlah3,950,650.86VIIIPEK. KONSTRUKSI ATAP1.Pek. Kuda - Kuda Kayu 6/12 Kls. II1.23m34,667,100.005,740,533.00128.0742.631.232.Pek. Gording Kayu 5/10 Kls. II0.86m34,301,920.003,699,651.20125.1046.660.863.Pek. Pas. Atap Seng Gelombang133.28m232,296.004,304,410.88123.879.41133.284.Pek. Nok/Bubungan Seng Plat39.30m'29,212.001,148,031.606.6024.9137.7839.305.Pek. Jurai Talang Atap7.78m'162,940.001,267,673.207.786.Pek. Lisplank Kayu Kls. II45.80m'54,567.002,499,168.6045.80Jumlah18,659,468.48IXPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.Pek. Penyelesaian Akhir/Pembersihan1.00Ls150,000.00150,000.00Jumlah150,000.00RealcostRp90,909,821.220.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.010.0042500.007,215.62Rekapitulasi Material/Bahan Pembangunan Masjid Nurul Yasin Pangkep8.0027000.007,231.82NoNama MaterialVolumeSatuan1.0Batu Gunung0.00m32.0Pasir Urug0.00m33.0Pasir0.00m34.0Kerikil (Max. 30mm)0.00m35.0Semen @50Kg0Zak7.0Besi Beton Dia. 80btg8.0Besi Beton Dia. 100btg9.0Besi Beton Dia. 120btg10.0Besi Beton Dia. 140btg11.0Besi Beton Dia. 160btg12.0Kawat Beton0.00Kg13.0Paku0.00Kg14.0Batu Bata0Biji15.0Papan Kelas III0.00m316.0Minyak Bekisting0ltr17.0Multipleks 9mm0lbr18.0Balok Kayu Kelas II0.00m319.0Kayu Dolken0Btg20.0Rangka Plafond (hollow 4x4)0.00m121.0Rangka Plafond (hollow 2x4)0.00m122.0Gypsum 9mm0lbr23.0Keramik 30/300Dos24.0Keramik 40/400Dos25.0Cat Kimex0.00Kg26.0Plamur0.00Kg27.0Cat Kayu ICI0.00Kg28.0Atap Spandek0.00m229.0Nok0.00m'30.0Woodplank0lbr31.0Loster Motif Bintang0Bh32.0Kusen Kayu Kelas I0.00m333.0Papan Kayu Kelas I0.00m334.0Kaca 5 mm0.00m235.0Engsel Pintu0bh36.0Kunci Pintu0bh37.0Grendel Pintu0bh

Ds BelaboriREKAPITULASI RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: PEMBANGUNAN KANTOR DESA BELA'BORI, KEC. PARANGLOEANGGARAN: TAHUN 2010NOJ E N I S P E K E R J A A NTOTAL HARGA (Rp.)IPEK. PERSIAPANRp.1,092,500.00IIPEK. TANAH DAN PONDASIRp.9,755,186.28IIIPEK. STRUKTUR BETONRp.15,735,006.66IVPEKERJAAN DINDINGRp.19,167,168.50VPEKERJAAN PINTU DAN JENDELARp.16,965,811.25VIPEKERJAAN LANTAIRp.5,434,029.18VIIPEK. PENGECATANRp.3,950,650.86VIIIPEK. KONSTRUKSI ATAPRp.18,659,468.48IXPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIRRp.150,000.00REAL COST TOTALRp.90,909,821.22PPN 10%Rp.9,090,982.12TOTAL COSTRp.100,000,803.34DIBULATKANRp.100,000,000.00TERBILANG : Seratus juta rupiah,-Sungguminasa, April 2010Disetujui :Konsultan Perencana,PEJABAT PEMBUAT KOMITMENCV. MALLOMO ENGINEERINGHj. RIKE SUSANTI, STSJAMSIR, STNip. 19680731 199803 2 002DirekturDisetujuiKEPALA BIDANG CIPTA KARYAKABUPATEN GOWAIr. H. MAHMUDDIN, M.SiNip. 19680303 199403 1 013RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: PEMBANGUNAN KANTOR DESA BELA'BORI, KEC. PARANGLOEANGGARAN: TAHUN 2010NOURAIAN PEKERJAANVOL.SATHRG. SAT. (Rp.)JML. HARGABatu GunungPasir UrugPasirKerikil (Max. 30mm)Semen @50KgBesi BetonDia. 6Besi Beton Dia. 8Besi Beton Dia. 10Besi Beton Dia. 12Besi Beton Dia. 14Besi Beton Dia. 16Besi Beton Dia. 19Besi Beton Dia. 22Kawat BetonPakuBatu BataPapan Kelas IIIMinyak BekistingMultipleks 9mmBalok Kayu Kelas IIKayu DolkenRangka Plafond (hollow 4x4)Rangka Plafond (hollow 2x4)Gypsum 9mmGRCKeramik 30/30Keramik 40/40Keramik 10/40Cat KimexPlamurCat Kayu ICIResiduAtap SpandekNokWoodplankLoster Motif BintangKusen Kayu Kelas IPapan Kayu Kelas IPapan Kayu Kelas IIKaca 5 mmEngsel PintuKunci PintuGrendel PintuIPEK. PERSIAPANm3m3m3m3ZakbtgbtgbtgbtgbtgbtgbtgbtgKgKgBijim3ltrlbrm3Btgm1m1lbrlbrDosDosDosKgKgKgKgm2m'lbrBhm3m3m3m2bhbhbh1.Pek. Pengukuran dan Pas. Bowplank1.00Ls192,500.00192,500.002.Pek. Penyediaan P3K, Listrik Dan Air Kerja1.00Ls550,000.00550,000.003.Pek. Papan Nama Proyek1.00Ls350,000.00350,000.00Jumlah1,092,500.00IIPEK. TANAH DAN PONDASI49.001.Pek. Galian Tanah Pondasi28.61m325,575.00731,700.750.5627.440.900.2828.612.Pek. Urugan Kembali9.54m31,196.5011,410.623.Pek. Pasir Urug (Di Bawah Pondasi)4.05m3103,230.00418,081.500.083.920.134.054.Pek. Pondasi Batu Kosong8.10m3189,294.001,533,281.400.167.840.268.105.Pek. Pondasi Batu Gunung 1:414.87m3429,417.506,385,438.2314.580.3014.876.Pek. Pondasi Trassram (Tangga Entrance dan Teras)4.42m2152,776.88675,273.794.42Jumlah9,755,186.28IIIPEK. STRUKTUR BETON1.Pek. Sloef 12/201.18m33,905,627.124,608,640.010.0249.001.182.Pek. Koloma.Type Kolom 20/200.30m35,172,800.511,551,840.150.047.600.30b.Type Kolom Praktis Kp 12/150.76m35,117,952.873,889,644.180.0242.000.763.Pek. Ringbalk Dan Kuda - Kuda Betona.Ringbalk Praktis 12/150.94m35,441,613.745,115,116.920.0252.000.94b.Ringbalk / Blk Gantung 15/250.11m35,179,685.48569,765.400.043.000.11Jumlah15,735,006.66IVPEKERJAAN DINDING49.001.Pas. Pasangan Batu 1/2 Bata (1:5)129.39m272,422.509,370,747.283.15154.3524.96129.390.002.Pek. Plesteran Biasa( 1 : 5 )258.78m222,943.005,937,189.54258.783.Pek. Plesteran Beton ( 1 : 3 )6.05m225,404.50153,697.235.600.456.054.Pek. Acian264.83m213,992.133,705,534.46Jumlah19,167,168.50VPEKERJAAN PINTU DAN JENDELA81.501.Pek. Kuseng Kayu Kls. I0.57m39,308,925.005,306,087.250.010.572.Pek. Pintu Panil Kayu Kls. I9.60m2485,000.004,656,000.009.603.Pek. Jendela Kaca Bingkai Kayu Kls. I12.25m2324,380.003,973,655.0012.2514.Pas. Engsel Pintu (Tiap Daun pintu = 3 bh engsel)18.00Bh17,443.50313,983.0018.0015.Pas. Engsel Jendela34.00Bh13,629.00463,386.0034.0017.Pas. Hak Angin34.00Bh18,443.50627,079.0018.Pas. Tarikan Stainless2.00Bh278,145.00556,290.0019.Pas. Grendel Jendela17.00Bh13,629.00231,693.0020.Pas. Kunci Pelor1.00Set266,258.00266,258.0021.Pas. Kunci Biasa 2 Slag4.00Set142,845.00571,380.00Jumlah16,965,811.25VIPEKERJAAN LANTAI65.071.Pek. Urugan Tanah Di Bawah Lantai + Pemadatan19.52m3112,880.002,203,417.600.3019.52102.Pek. Urugan Pasir Di Bawah Lantai13.01m3103,230.001,343,022.300.2013.01403.Pek. Lantai Kerja Beton Tebal 5 cm3.29m3573,735.341,887,589.280.0565.773.29Jumlah5,434,029.18VIIPEK. PENGECATAN1.Pek. Cat Tembok264.83m211,586.403,068,426.313.Pek. Cat Kayu (Kusen Dan Lesplank)35.90m224,574.50882,224.5524.450.0011.4535.90Jumlah3,950,650.86VIIIPEK. KONSTRUKSI ATAP1.Pek. Kuda - Kuda Kayu 6/12 Kls. II1.23m34,667,100.005,740,533.00128.0742.631.232.Pek. Gording Kayu 5/10 Kls. II0.86m34,301,920.003,699,651.20125.1046.660.863.Pek. Pas. Atap Seng Gelombang133.28m232,296.004,304,410.88123.879.41133.284.Pek. Nok/Bubungan Seng Plat39.30m'29,212.001,148,031.606.6024.9137.7839.305.Pek. Jurai Talang Atap7.78m'162,940.001,267,673.207.786.Pek. Lisplank Kayu Kls. II45.80m'54,567.002,499,168.6045.80Jumlah18,659,468.48IXPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.Pek. Penyelesaian Akhir/Pembersihan1.00Ls150,000.00150,000.00Jumlah150,000.00RealcostRp90,909,821.220.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.010.0042500.007,215.62Rekapitulasi Material/Bahan Pembangunan Masjid Nurul Yasin Pangkep8.0027000.007,231.82NoNama MaterialVolumeSatuan1.0Batu Gunung0.00m32.0Pasir Urug0.00m33.0Pasir0.00m34.0Kerikil (Max. 30mm)0.00m35.0Semen @50Kg0Zak7.0Besi Beton Dia. 80btg8.0Besi Beton Dia. 100btg9.0Besi Beton Dia. 120btg10.0Besi Beton Dia. 140btg11.0Besi Beton Dia. 160btg12.0Kawat Beton0.00Kg13.0Paku0.00Kg14.0Batu Bata0Biji15.0Papan Kelas III0.00m316.0Minyak Bekisting0ltr17.0Multipleks 9mm0lbr18.0Balok Kayu Kelas II0.00m319.0Kayu Dolken0Btg20.0Rangka Plafond (hollow 4x4)0.00m121.0Rangka Plafond (hollow 2x4)0.00m122.0Gypsum 9mm0lbr23.0Keramik 30/300Dos24.0Keramik 40/400Dos25.0Cat Kimex0.00Kg26.0Plamur0.00Kg27.0Cat Kayu ICI0.00Kg28.0Atap Spandek0.00m229.0Nok0.00m'30.0Woodplank0lbr31.0Loster Motif Bintang0Bh32.0Kusen Kayu Kelas I0.00m333.0Papan Kayu Kelas I0.00m334.0Kaca 5 mm0.00m235.0Engsel Pintu0bh36.0Kunci Pintu0bh37.0Grendel Pintu0bh

Ds TamalateaREKAPITULASI RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA TAMALATEA, KEC. MANUJUANGGARAN: TAHUN 2010NOJ E N I S P E K E R J A A NTOTAL HARGA (Rp.)IPEK. PERSIAPANRp.2,443,000.00IIPEK. TANAH DAN PONDASIRp.315,575.31IIIPEK. STRUKTUR BETONRp.17,128,119.89IVPEKERJAAN DINDINGRp.8,123,774.27VPEKERJAAN PINTU DAN JENDELARp.6,536,542.35VIPEK. PLAFONDRp.16,953,338.04VIIPEKERJAAN LANTAIRp.1,241,075.79VIIIPEK. PENGECATANRp.6,721,337.12IXPEK. KONSTRUKSI ATAPRp.55,562,210.36XPEK. INSTALASI LISTRIKRp.3,505,190.00XIPEK. PAGAR SAMPINGRp.14,374,094.92XIIPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIRRp.3,459,648.14REAL COST TOTALRp.136,363,906.19PPN 10%Rp.13,636,390.62TOTAL COSTRp.150,000,296.80DIBULATKANRp.150,000,000.00TERBILANG : Seratus lima puluh juta rupiah,-Sungguminasa, April 2010Disetujui :Konsultan Perencana,PEJABAT PEMBUAT KOMITMENCV. MALLOMO ENGINEERINGHj. RIKE SUSANTI, STSJAMSIR, STNip. 19680731 199803 2 002DirekturDisetujuiKEPALA BIDANG CIPTA KARYAKABUPATEN GOWAIr. H. MAHMUDDIN, M.SiNip. 19680303 199403 1 013RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA TAMALATEA, KEC. MANUJUANGGARAN: TAHUN 2010NOURAIAN PEKERJAANVOL.SATHRG. SAT. (Rp.)JML. HARGABatu GunungPasir UrugPasirKerikil (Max. 30mm)Semen @50KgBesi BetonDia. 6Besi Beton Dia. 8Besi Beton Dia. 10Besi Beton Dia. 12Besi Beton Dia. 14Besi Beton Dia. 16Besi Beton Dia. 19Besi Beton Dia. 22Kawat BetonPakuBatu BataPapan Kelas IIIMinyak BekistingMultipleks 9mmBalok Kayu Kelas IIKayu DolkenRangka Plafond (hollow 4x4)Rangka Plafond (hollow 2x4)Gypsum 9mmGRCKeramik 30/30Keramik 40/40Keramik 10/40Cat KimexPlamurCat Kayu ICIResiduAtap SpandekNokWoodplankLoster Motif BintangKusen Kayu Kelas IPapan Kayu Kelas IPapan Kayu Kelas IIKaca 5 mmEngsel PintuKunci PintuGrendel PintuIPEK. PERSIAPANm3m3m3m3ZakbtgbtgbtgbtgbtgbtgbtgbtgKgKgBijim3ltrlbrm3Btgm1m1lbrlbrDosDosDosKgKgKgKgm2m'lbrBhm3m3m3m2bhbhbh1.Pek. Pengukuran dan Pas. Bowplank1.00Ls150,000.00150,000.002.Pek. Penyediaan P3K, Listrik Dan Air Kerja1.00Ls500,000.00500,000.003.Pek. Papan Nama Proyek1.00Ls350,000.00350,000.004.Pek. Pembongkaran Atap Lama,Kuseng Pintu Dan Kolom Depan1.00Ls1,443,000.001,443,000.00Jumlah2,443,000.00IIPEK. TANAH DAN PONDASI1.Pek. Galian Tanah Pondasi (Undak)1.00m325,575.0025,575.000.131.002.Pek. Urugan Kembali0.33m31,196.50398.833.Pek. Pasir Urug (Di Bawah Pondasi) (Undak)0.20m3103,230.0020,646.000.030.204.Pek. Pondasi Batu Kosong (Undak)0.40m3189,294.0075,717.600.050.405.Pek. Pondasi Batu Gunung 1:4 (Undak)0.45m3429,417.50193,237.880.060.45Jumlah315,575.31IIIPEK. STRUKTUR BETON1.Pek. Koloma.Type Kolom 20/201.12m35,172,800.515,793,536.570.141.12b.Type Kolom Praktis Kp 12/150.22m35,117,952.871,125,949.630.020.182.Pek. Ringbalk Dan Kuda - Kuda Betona.Ringbalk Praktis 12/150.77m35,441,613.744,190,042.580.0242.900.77b.Ringbalk / Blk Gantung 15/250.26m35,179,685.481,346,718.230.047.000.26c.Ringbalk / Blk Gantung 20/250.81m34,558,496.803,692,382.410.0516.200.81d.Ringbalk Kuda - Kuda Beton 12/150.18m35,441,613.74979,490.470.0210.000.18Jumlah17,128,119.89IVPEKERJAAN DINDING42.901.Pas. Pasangan Batu 1/2 Bata (1:5) (Penambahan Tinggi Dinding)29.47m272,422.502,134,291.080.6126.173.3029.470.002.Pas. Pasangan Batu 1/2 Bata (1:5) (Bungkus Kolom Praktis)12.00m272,422.50869,070.001.0012.003.Pek. Plesteran Biasa( 1 : 5 )105.30m222,943.002,415,897.9058.9412.0034.634.Pek. Plesteran Beton ( 1 : 3 )31.25m225,404.50793,890.6315.3615.8931.255.Pek. Acian136.55m213,992.131,910,624.67Jumlah8,123,774.27VPEKERJAAN PINTU DAN JENDELA15.201.Pek. Kuseng Kayu Kls. I0.11m39,308,925.001,023,981.750.010.112.Pek. Pintu Panil Kayu Kls. I5.32m2485,000.002,580,200.005.323.Pek. Jendela Kaca Bingkai Kayu Kls. I3.92m2324,380.001,271,569.603.924.Pas. Engsel Pintu (Tiap Daun pintu = 3 bh engsel)12.00Bh17,443.50209,322.005.Pas. Engsel Jendela12.00Bh13,629.00163,548.006.Pas. Hak Angin12.00Bh18,443.50221,322.007.Pas. Tarikan Stainless2.00Bh278,145.00556,290.008.Pas. Grendel Jendela6.00Bh13,629.0081,774.009.Pas. Kunci Biasa 2 Slag3.00Set142,845.00428,535.00Jumlah6,536,542.35VIPEK. PLAFOND1.Pek. Rangka Plafond Kayu Kls. II Uk. 50 x 100 cm, (kayu 4/6)171.26m260,400.6010,344,206.7695.4575.82171.262.Pek. Plafond Eternit 1 x 1 M171.26m223,207.003,974,430.823.Pek. List Datar Plafond239.54m'10,999.002,634,700.4675.00164.54239.54Jumlah16,953,338.04VIIPEKERJAAN LANTAI1.Pek. Lantai Kerja Beton Tebal 7 cm0.56m3573,735.34321,291.790.078.00000.562.Pek. Lantai Keramik 30/30 cm (Ganti Keramik Existing yang rusak)8.00m2114,973.00919,784.004.0000Jumlah1,241,075.79VIIIPEK. PENGECATAN1.Pek. Cat Tembok136.55m211,586.401,582,122.922.Pek. Cat Plafond171.26m211,586.401,984,286.863.Pek. Cat Kayu30.77m224,574.50756,157.3710.6420.1330.774.Pek. Cat Tembok Lama186.88m27,801.601,457,963.01242.5020.98221.5234.63186.885.Pek. Cat Kayu Kuseng Lama6.12m221,781.50133,302.786.126.Pek. Residu Rangka Plafond150.71m25,358.00807,504.18753.56150.71Jumlah6,721,337.12IXPEK. KONSTRUKSI ATAP1.Pek. Kuda - Kuda Kayu 6/12 Kls. II1.76m34,667,100.008,214,096.00150.7164.5228.721.762.Pek. Gording Kayu 5/10 Kls. II1.33m34,301,920.005,721,553.60124.30115.2325.661.333.Pek. Pas. Kaso 5/7 + Reng 3/4 (Rangka atap Genteng Metal)221.17m278,367.0017,332,429.394.Pek. Penutup Atap Genteng metal221.17m274,268.0016,425,853.56226.3915.1020.32221.175.Nok/Bubungan Atap Genteng metal26.09m'80,819.002,108,567.7120.145.9526.096.Pek. Jurai Talang Atap8.39m'162,940.001,367,066.608.397.Pek. Lisplank Kayu Kls. II80.50m'54,567.004,392,643.5080.50Jumlah55,562,210.36XPEK. INSTALASI LISTRIK1.Pek. Instalasi Titik Mata Lampu8.00ttk264,230.002,113,840.002.Pek. Instalasi Titik Stop Kontak5.00ttk192,570.00962,850.003.Pek. Pas. Lampu SL 18 Watt8.00Bh36,000.00288,000.004.Pas. Saklar Tunggal2.00Bh13,000.0026,000.005.Pas. Saklar Ganda3.00Bh14,000.0042,000.006.Pas. Stop Kontak5.00Bh14,500.0072,500.00Jumlah3,505,190.00XIPEK. PAGAR SAMPINGA.Pek. Pagar Samping Kiri Kantor Desa15.80m'1.Pek. Tanah Dan Pondasi15.80-Pek. Galian Tanah Pondasi8.85m325,575.00226,338.750.568.85-Pek. Urugan Tanah Kembali2.95m31,196.503,529.68-Pek. Pasir Urug Alas Pondasi1.26m3103,230.00130,069.800.081.26-Pek. Pas. Batu Kosong2.53m3189,294.00478,913.820.162.53-Pek. Pondasi Bt. Gunung 1 : 44.03m3429,417.501,730,552.530.264.032.Pek. Struktur Beton-Pek. Sloef 12/150.28m34,633,813.381,297,467.750.0215.800.28-Pek. Kolom 15/150.24m34,232,702.871,015,848.690.0210.500.24-Pek. Ringbalk pagar 12/150.28m35,441,613.741,523,651.850.0215.800.283.Pek. Dinding-Pek. Pas. Dinding 1/2 Bt. (1 : 5)17.70m272,422.501,281,878.251.2014.7517.70-Pek. Plesteran Biasa (1 : 5)35.40m222,943.00812,182.2035.40-Pek. Plesteran Beton (1 : 3)14.53m225,404.50369,127.3914.53-Pek. Acian49.93m213,992.13698,626.804.Pek. Pengecatan Dinding Pagar (cat Tembok)49.93m211,586.40578,508.95B.Pek. Pagar Samping Kanan Puskesmas Pembantu (PUSTU)26.00m'1.Pek. Tanah Dan Pondasi26.00-Pek. Galian Tanah Pondasi14.56m325,575.00372,372.000.5614.56-Pek. Urugan Tanah Kembali4.85m31,196.505,807.01-Pek. Pasir Urug Alas Pondasi2.08m3103,230.00214,718.400.082.08-Pek. Pas. Batu Kosong4.16m3189,294.00787,463.040.164.16-Pek. Pondasi Bt. Gunung 1 : 46.63m3429,417.502,847,038.030.266.63Jumlah14,374,094.92XIIPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.Pek. Pelataran Jalan Masuk Beton K. 225, T = 15 Cm. Uk = 3 m x 10 m4.50m3735,477.373,309,648.140.1530.004.502.Pek. Penyelesaian Akhir/Pembersihan1.00Ls150,000.00150,000.00Jumlah3,459,648.14RealcostRp121,989,811.270.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.010.0042500.007,215.62Rekapitulasi Material/Bahan Pembangunan Masjid Nurul Yasin Pangkep8.0027000.007,231.82NoNama MaterialVolumeSatuan1.0Batu Gunung0.00m32.0Pasir Urug0.00m33.0Pasir0.00m34.0Kerikil (Max. 30mm)0.00m35.0Semen @50Kg0Zak7.0Besi Beton Dia. 80btg8.0Besi Beton Dia. 100btg9.0Besi Beton Dia. 120btg10.0Besi Beton Dia. 140btg11.0Besi Beton Dia. 160btg12.0Kawat Beton0.00Kg13.0Paku0.00Kg14.0Batu Bata0Biji15.0Papan Kelas III0.00m316.0Minyak Bekisting0ltr17.0Multipleks 9mm0lbr18.0Balok Kayu Kelas II0.00m319.0Kayu Dolken0Btg20.0Rangka Plafond (hollow 4x4)0.00m121.0Rangka Plafond (hollow 2x4)0.00m122.0Gypsum 9mm0lbr23.0Keramik 30/300Dos24.0Keramik 40/400Dos25.0Cat Kimex0.00Kg26.0Plamur0.00Kg27.0Cat Kayu ICI0.00Kg28.0Atap Spandek0.00m229.0Nok0.00m'30.0Woodplank0lbr31.0Loster Motif Bintang0Bh32.0Kusen Kayu Kelas I0.00m333.0Papan Kayu Kelas I0.00m334.0Kaca 5 mm0.00m235.0Engsel Pintu0bh36.0Kunci Pintu0bh37.0Grendel Pintu0bh

Ds LonjobokoREKAPITULASI RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA LONJOBOKO, KEC. PARANGLOEANGGARAN: TAHUN 2010NOJ E N I S P E K E R J A A NTOTAL HARGA (Rp.)IPEK. PERSIAPANRp.2,570,000.00IIPEK. TANAH DAN PONDASIRp.360,271.64IIIPEK. STRUKTUR BETONRp.1,617,268.77IVPEKERJAAN DINDINGRp.2,091,598.65VPEKERJAAN PINTU DAN JENDELARp.350,000.00VIPEK. PLAFONDRp.11,809,299.40VIIPEKERJAAN LANTAIRp.2,988,208.94VIIIPEK. PENGECATANRp.3,973,483.65IXPEK. KONSTRUKSI ATAPRp.62,074,094.70XPEK. INSTALASI LISTRIKRp.1,968,290.00XIPEK. SANITASI DAN INSTALASIRp.957,306.65XIIPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIRRp.150,000.00REAL COST TOTALRp.90,909,822.40PPN 10%Rp.9,090,982.24TOTAL COSTRp.100,000,804.64DIBULATKANRp.100,000,000.00TERBILANG : Seratus juta rupiah,-Sungguminasa, April 2010Disetujui :Konsultan Perencana,PEJABAT PEMBUAT KOMITMENCV. MALLOMO ENGINEERINGHj. RIKE SUSANTI, STSJAMSIR, STNip. 19680731 199803 2 002DirekturDisetujuiKEPALA BIDANG CIPTA KARYAKABUPATEN GOWAIr. H. MAHMUDDIN, M.SiNip. 19680303 199403 1 013RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR DESA LONJOBOKO, KEC. PARANGLOEANGGARAN: TAHUN 2010NOURAIAN PEKERJAANVOL.SATHRG. SAT. (Rp.)JML. HARGABatu GunungPasir UrugPasirKerikil (Max. 30mm)Semen @50KgBesi BetonDia. 6Besi Beton Dia. 8Besi Beton Dia. 10Besi Beton Dia. 12Besi Beton Dia. 14Besi Beton Dia. 16Besi Beton Dia. 19Besi Beton Dia. 22Kawat BetonPakuBatu BataPapan Kelas IIIMinyak BekistingMultipleks 9mmBalok Kayu Kelas IIKayu DolkenRangka Plafond (hollow 4x4)Rangka Plafond (hollow 2x4)Gypsum 9mmGRCKeramik 30/30Keramik 40/40Keramik 10/40Cat KimexPlamurCat Kayu ICIResiduAtap SpandekNokWoodplankLoster Motif BintangKusen Kayu Kelas IPapan Kayu Kelas IPapan Kayu Kelas IIKaca 5 mmEngsel PintuKunci PintuGrendel PintuIPEK. PERSIAPANm3m3m3m3ZakbtgbtgbtgbtgbtgbtgbtgbtgKgKgBijim3ltrlbrm3Btgm1m1lbrlbrDosDosDosKgKgKgKgm2m'lbrBhm3m3m3m2bhbhbh1.Pek. Pengukuran dan Pas. Bowplank1.00Ls150,000.00150,000.002.Pek. Penyediaan P3K, Listrik Dan Air Kerja1.00Ls500,000.00500,000.003.Pek. Papan Nama Proyek1.00Ls350,000.00350,000.004.Pek. Pembongkaran Atap Lama Dan Dinding1.00Ls1,570,000.001,570,000.00Jumlah2,570,000.00IIPEK. TANAH DAN PONDASI2.901.Pek. Galian Tanah Pondasi1.16m325,575.0029,667.000.401.162.Pek. Urugan Kembali0.39m31,196.50462.653.Pek. Pasir Urug (Di Bawah Pondasi)0.20m3103,230.0020,646.000.070.204.Pek. Pondasi Batu Kosong0.41m3189,294.0077,610.540.140.415.Pek. Pondasi Batu Gunung 1:40.54m3429,417.50231,885.450.190.54Jumlah360,271.64IIIPEK. STRUKTUR BETON1.Pek. Sloef 12/150.05m34,633,813.38231,690.670.023.000.052.Pek. Koloma.Type Kolom Praktis Kp 12/150.18m35,117,952.87921,231.520.029.900.183.Pek. Ringbalka.Ringbalk Praktis 12/150.05m35,441,613.74272,080.690.023.000.054.Pek. Plat Betona.Plat Meja Beton, T = 10 cm0.06m33,204,431.60192,265.900.06Jumlah1,617,268.77IVPEKERJAAN DINDING1.Pas. Pasangan Batu 1/2 Bata (1:5)8.70m272,422.50630,075.758.700.002.Pek. Plesteran Biasa( 1 : 5 )39.57m222,943.00907,854.5126.2213.3539.573.Pek. Acian39.57m213,992.13553,668.39Jumlah2,091,598.65VPEKERJAAN PINTU DAN JENDELA1.Pek. Pintu PVC (Toilet/Km)1.00Bh350,000.00350,000.00Jumlah350,000.00VIPEK. PLAFOND1.Pek. Rangka Plafond Kayu Kls. II Uk. 50 x 100 cm, (kayu 4/6)121.77m260,400.607,354,981.0623.8297.95121.772.Pek. Plafond Eternit 1 x 1 M (Plafond ruang Belakang + Plafond Luar)121.77m223,207.002,825,916.393.Pek. List Datar Plafond148.05m'10,999.001,628,401.9534.80113.25148.05Jumlah11,809,299.40VIIPEKERJAAN LANTAI1.Pek. Lantai Kerja Beton Tebal 5 cm0.18m3573,735.34103,272.363.560.17812.Pek. Lantai Keramik 30/30 cm (Ganti Keramik Pecah)1.74m2114,973.00200,053.021.74003.Pek. Lantai Keramik Toilet/KM/WC, Uk. 20 x 201.82m2125,917.50229,169.851.824.Pek. Keramik Meja Beton, Uk. 20 x 250.70m2131,111.2591,777.880.705.Pek. Keramik Dinding Toilet/KM/WC, Uk. 20 x 25 (Termasuk Km. Lama)18.03m2131,111.252,363,935.847.0510.98Jumlah2,988,208.94VIIIPEK. PENGECATAN1.Pek. Cat Tembok39.57m211,586.40458,473.852.Pek. Cat Plafond121.77m211,586.401,410,875.933.Pek. Cat Kayu (Lesplank)31.08m224,574.50763,775.4631.084.Pek. Cat Tembok Lama (Daerah Km/Wc Lama)6.00m27,801.6046,809.606.005.Pek. Cat Plafond Lama (bagian dalam)92.21m27,801.60719,385.5492.216.Pek. Residu Rangka Plafond107.16m25,358.00574,163.28121.77535.79107.16Jumlah3,973,483.65IXPEK. KONSTRUKSI ATAP1.Pek. Gording Kayu 5/10 Kls. II (Asumsi Semua Gording Utama Diganti)1.79m34,301,920.007,700,436.80357.411.792.Pek. Pas. Kaso 5/7 + Reng 3/4 (Rangka atap Genteng Metal)283.22m278,367.0022,195,101.743.Pek. Penutup Atap Genteng metal283.22m274,268.0021,034,182.96107.3950.0368.9117.3139.58283.224.Nok/Bubungan Atap Genteng metal24.11m'80,819.001,948,546.0924.115.Pek. Jurai Talang Atap14.80m'162,940.002,411,512.008.556.3214.866.Pek. Lisplank Kayu Kls. II (semua Lisplank Diganti)124.33m'54,567.006,784,315.11124.33Jumlah62,074,094.70XPEK. INSTALASI LISTRIK1.Pek. Instalasi Titik Mata Lampu5.00ttk264,230.001,321,150.002.Pek. Instalasi Titik Stop Kontak2.00ttk192,570.00385,140.009.Pek. Pas. Lampu SL 18 Watt5.00Bh36,000.00180,000.0010.Pas. Saklar Tunggal3.00Bh13,000.0039,000.0011.Pas. Saklar Ganda1.00Bh14,000.0014,000.0012.Pas. Stop Kontak2.00Bh14,500.0029,000.00Jumlah1,968,290.00XIPEK. SANITASI DAN INSTALASI1.Pas. Klosed Jongkok1.00Set403,280.00403,280.002.Pas. Kran Air Biasa1.00Bh22,932.5022,932.503.Pas. Floordrain Stainless1.00Bh40,845.0040,845.004.Pek. Pas. Pipa Air Bersih AW 3/4" (Distribusi)4.00m'19,343.1577,372.605.Pek. Pas. Pipa Air Bersih AW 1/2" (Distribusi)1.00m'18,568.1518,568.156.Pek. Pipa Buangan Air Mandi Dia. 3" (D)4.00m'49,288.55197,154.207.Pek. Pipa Buangan Air Kotor Dia. 3" (D)4.00m'49,288.55197,154.20Jumlah957,306.65XIIPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.Pek. Penyelesaian Akhir/Pembersihan1.00Ls150,000.00150,000.00Jumlah150,000.00RealcostRp90,909,822.400.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.010.0042500.007,215.62Rekapitulasi Material/Bahan Pembangunan Masjid Nurul Yasin Pangkep8.0027000.007,231.82NoNama MaterialVolumeSatuan1.0Batu Gunung0.00m32.0Pasir Urug0.00m33.0Pasir0.00m34.0Kerikil (Max. 30mm)0.00m35.0Semen @50Kg0Zak7.0Besi Beton Dia. 80btg8.0Besi Beton Dia. 100btg9.0Besi Beton Dia. 120btg10.0Besi Beton Dia. 140btg11.0Besi Beton Dia. 160btg12.0Kawat Beton0.00Kg13.0Paku0.00Kg14.0Batu Bata0Biji15.0Papan Kelas III0.00m316.0Minyak Bekisting0ltr17.0Multipleks 9mm0lbr18.0Balok Kayu Kelas II0.00m319.0Kayu Dolken0Btg20.0Rangka Plafond (hollow 4x4)0.00m121.0Rangka Plafond (hollow 2x4)0.00m122.0Gypsum 9mm0lbr23.0Keramik 30/300Dos24.0Keramik 40/400Dos25.0Cat Kimex0.00Kg26.0Plamur0.00Kg27.0Cat Kayu ICI0.00Kg28.0Atap Spandek0.00m229.0Nok0.00m'30.0Woodplank0lbr31.0Loster Motif Bintang0Bh32.0Kusen Kayu Kelas I0.00m333.0Papan Kayu Kelas I0.00m334.0Kaca 5 mm0.00m235.0Engsel Pintu0bh36.0Kunci Pintu0bh37.0Grendel Pintu0bh

Ds BontoparangREKAPITULASI RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR LURAH BONTOPARANG, KEC. PARANGLOEANGGARAN: TAHUN 2010NOJ E N I S P E K E R J A A NTOTAL HARGA (Rp.)IPEK. PERSIAPANRp.2,800,000.00IIPEK. PLAFONDRp.18,087,947.18IIIPEK. PENGECATANRp.6,923,518.22IVPEK. KONSTRUKSI ATAPRp.44,715,945.89VPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIRRp.200,000.00REAL COST TOTALRp.72,727,411.29PPN 10%Rp.7,272,741.13TOTAL COSTRp.80,000,152.42DIBULATKANRp.80,000,000.00TERBILANG : Delapan puluh juta rupiah,-Sungguminasa, April 2010Disetujui :Konsultan Perencana,PEJABAT PEMBUAT KOMITMENCV. MALLOMO ENGINEERINGHj. RIKE SUSANTI, STSJAMSIR, STNip. 19680731 199803 2 002DirekturDisetujuiKEPALA BIDANG CIPTA KARYAKABUPATEN GOWA1.4966666667Ir. H. MAHMUDDIN, M.SiNip. 19680303 199403 1 013RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: REHAB. KANTOR LURAH BONTOPARANG, KEC. PARANGLOEANGGARAN: TAHUN 2010NOURAIAN PEKERJAANVOL.SATHRG. SAT. (Rp.)JML. HARGABatu GunungPasir UrugPasirKerikil (Max. 30mm)Semen @50KgBesi BetonDia. 6Besi Beton Dia. 8Besi Beton Dia. 10Besi Beton Dia. 12Besi Beton Dia. 14Besi Beton Dia. 16Besi Beton Dia. 19Besi Beton Dia. 22Kawat BetonPakuBatu BataPapan Kelas IIIMinyak BekistingMultipleks 9mmBalok Kayu Kelas IIKayu DolkenRangka Plafond (hollow 4x4)Rangka Plafond (hollow 2x4)Gypsum 9mmGRCKeramik 30/30Keramik 40/40Keramik 10/40Cat KimexPlamurCat Kayu ICIResiduAtap SpandekNokWoodplankLoster Motif BintangKusen Kayu Kelas IPapan Kayu Kelas IPapan Kayu Kelas IIKaca 5 mmEngsel PintuKunci PintuGrendel PintuIPEK. PERSIAPANm3m3m3m3ZakbtgbtgbtgbtgbtgbtgbtgbtgKgKgBijim3ltrlbrm3Btgm1m1lbrlbrDosDosDosKgKgKgKgm2m'lbrBhm3m3m3m2bhbhbh1.Pek. Pengukuran dan Pas. Bowplank1.00Ls150,000.00150,000.002.Pek. Penyediaan P3K, Listrik1.00Ls450,000.00450,000.003.Pek. Papan Nama Proyek1.00Ls350,000.00350,000.004.Pek. Pembongkaran Atap Lama (3 Unit Bangunan)1.00Ls1,850,000.001,850,000.00Jumlah2,800,000.00IIPEK. PLAFONDABANGUNAN TENGAH + SELASAR PENGHUBUNGLuarDalam1.Pek. Rangka Plafond Kayu Kls. II Uk. 50 x 100 cm, (kayu 4/6)91.86m260,400.605,548,399.1291.86(Pek. Rangka plafond Luar/Overstek Dan Sambulayang)2.Pek. Plafond Eternit 1 x 1 M (Plafond Luar Dan Sambulayang)91.86m223,207.002,131,795.023.Pek. List Datar Plafond (Plafond Luar Dan Sambulayang)121.44m'10,999.001,335,718.56121.44BBANGUNAN SAYAP KANAN1.Pek. Rangka Plafond Kayu Kls. II Uk. 50 x 100 cm, (kayu 4/6)43.92m260,400.602,652,794.3543.92(Pek. Rangka plafond Luar/Overstek Dan Sambulayang)2.Pek. Plafond Eternit 1 x 1 M (Plafond Luar Dan Sambulayang)43.92m223,207.001,019,251.443.Pek. List Datar Plafond (Plafond Luar Dan Sambulayang)78.55m'10,999.00863,971.4578.55CBANGUNAN SAYAP KIRI1.Pek. Rangka Plafond Kayu Kls. II Uk. 50 x 100 cm, (kayu 4/6)43.92m260,400.602,652,794.3543.92(Pek. Rangka plafond Luar/Overstek Dan Sambulayang)2.Pek. Plafond Eternit 1 x 1 M (Plafond Luar Dan Sambulayang)43.92m223,207.001,019,251.443.Pek. List Datar Plafond (Plafond Luar Dan Sambulayang)78.55m'10,999.00863,971.4578.55Jumlah18,087,947.18IIIPEK. PENGECATAN1.Pek. Cat Plafond (Plafond Luar)179.70m211,586.402,082,076.082.Pek. Cat Kayu (Lesplank)59.00m224,574.501,449,895.5059.003.Pek. Cat Atap Seng (Bangunan Tengah + Atap selasar Penghubung)260.84m210,190.502,658,090.024.Pek. Residu Rangka Plafond (Plafond Luar)136.89m25,358.00733,456.62179.69718.74143.75Jumlah6,923,518.22IVPEK. KONSTRUKSI ATAPABANGUNAN TENGAH + SELASAR PENGHUBUNG1.Pek. Gording Kayu 5/10 Kls. II (Asumsi 50% Diganti)0.85m34,301,920.003,656,632.00260.84339.101.702.Pek. Pas. Atap Seng Gelombang + Sambulayang (Bangunan Tengah)260.84m232,296.008,424,088.64269.328.48260.843.Pek. Nok/Bubungan Seng Plat (Bangunan Tengah)22.75m'29,212.00664,573.0022.754.Pek. Jurai Talang Atap (Bangunan Tengah)8.42m'162,940.001,371,954.804.218.425.Pek. Lisplank Kayu Kls. II (Bangunan Tengah)91.63m'54,567.004,999,974.2156.6634.9791.63BBANGUNAN SAYAP KANAN1.Pek. Gording Kayu 5/10 Kls. II (Asumsi 50% Diganti)0.51m34,301,920.002,193,979.20157.11204.241.022.Pek. Pas. Atap Seng Gelombang + Sambulayang (Bang. Sayap Kanan)157.11m232,296.005,074,024.56164.106.99157.113.Pek. Nok/Bubungan Seng Plat (Bangunan Sayap Kanan)11.35m'29,212.00331,556.2011.354.Pek. Jurai Talang Atap (Bangunan Sayap Kanan)7.74m'162,940.001,261,155.603.877.745.Pek. Lisplank Kayu Kls. II (Bangunan Sayap Kanan)72.18m'54,567.003,938,646.0618.3253.8672.18CBANGUNAN SAYAP KIRI1.Pek. Gording Kayu 5/10 Kls. II (Asumsi 50% Diganti)0.51m34,301,920.002,193,979.20157.11204.241.022.Pek. Pas. Atap Seng Gelombang + Sambulayang (Bangunan Sayap Kiri)157.11m232,296.005,074,024.56164.106.99157.113.Pek. Nok/Bubungan Seng Plat (Bangunan Sayap Kiri)11.35m'29,212.00331,556.2011.354.Pek. Jurai Talang Atap (Bangunan Sayap Kiri)7.74m'162,940.001,261,155.603.877.745.Pek. Lisplank Kayu Kls. II (Bangunan Sayap Kiri)72.18m'54,567.003,938,646.0618.3253.8672.18Jumlah44,715,945.89VPEK. SARANA INFRASTRUKTUR DAN PENYELESAIAN AKHIR0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.001.Pek. Penyelesaian Akhir/Pembersihan1.00Ls200,000.00200,000.00Jumlah200,000.00RealcostRp72,727,411.290.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.010.0042500.007,215.62Rekapitulasi Material/Bahan Pembangunan Masjid Nurul Yasin Pangkep8.0027000.007,231.82NoNama MaterialVolumeSatuan1.0Batu Gunung0.00m32.0Pasir Urug0.00m33.0Pasir0.00m34.0Kerikil (Max. 30mm)0.00m35.0Semen @50Kg0Zak7.0Besi Beton Dia. 80btg8.0Besi Beton Dia. 100btg9.0Besi Beton Dia. 120btg10.0Besi Beton Dia. 140btg11.0Besi Beton Dia. 160btg12.0Kawat Beton0.00Kg13.0Paku0.00Kg14.0Batu Bata0Biji15.0Papan Kelas III0.00m316.0Minyak Bekisting0ltr17.0Multipleks 9mm0lbr18.0Balok Kayu Kelas II0.00m319.0Kayu Dolken0Btg20.0Rangka Plafond (hollow 4x4)0.00m121.0Rangka Plafond (hollow 2x4)0.00m122.0Gypsum 9mm0lbr23.0Keramik 30/300Dos24.0Keramik 40/400Dos25.0Cat Kimex0.00Kg26.0Plamur0.00Kg27.0Cat Kayu ICI0.00Kg28.0Atap Spandek0.00m229.0Nok0.00m'30.0Woodplank0lbr31.0Loster Motif Bintang0Bh32.0Kusen Kayu Kelas I0.00m333.0Papan Kayu Kelas I0.00m334.0Kaca 5 mm0.00m235.0Engsel Pintu0bh36.0Kunci Pintu0bh37.0Grendel Pintu0bh

Ds UlujangangREKAPITULASI RENCANA ANGGARAN BIAYA (RAB)REHABILITASI SEDANG/BERAT FASILITAS UMUMKABUPATEN GOWAPEKERJAAN: PEMBANGUNAN/REHAB. KANTOR DESA ULUJANGANG, KEC. BONTOLEMPANGANANGGARAN: TAHUN 2010NOJ E N I S P E K E R J A A NTOTAL HARGA (Rp.)IPEK. PERSIAPANRp.1,150,000.00IIPEK. TANAH DAN PONDASIRp.17,038,002.81IIIPEK. STRUKTUR BETONRp.28,660,396.69IVPEKERJAAN DINDINGRp.34,992,076.55VPEKERJAAN PINTU DAN JENDELARp.23,102,931.07VIPEK. PLAFONDRp.15,576,815