PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN DAFTAR KUANTITAS PEKERJAAN PROPINSI Jateng No. RAB KOTA / KAB Banjarnegara KEGIATAN Cor Jalan Beto KECAMATAN Banjarnegara KELURAHAN Semampir UNIT PANJANG (m) RT/ RW Rt 5/2 123.00 No Uraian Pekerjaan Volume Sketsa dan Perhitungan 1 2 3 1 2 Cor Beton (V=123m x 1,5m x 0,1m) Diverifikasi Diperiksa Fasilitator Teknik UPL Junaydi Manislam Persiapan (V=123m x 1,5m)
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN
DAFTAR KUANTITAS PEKERJAAN
PROPINSI Jateng No. RABKOTA / KAB Banjarnegara
KEGIATAN Cor Jalan BetonKECAMATAN BanjarnegaraKELURAHAN Semampir UNIT PANJANG (m)
RT/ RW Rt 5/2 123.00
No Uraian PekerjaanVolume
Sketsa dan Perhitungan
1 2 31
2 Cor Beton (V=123m x 1,5m x 0,1m)
Diverifikasi DiperiksaFasilitator Teknik UPL
Junaydi Manislam
Persiapan (V=123m x 1,5m)
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN
DAFTAR KUANTITAS PEKERJAAN
LEMBAR /
Cor Jalan Beton
LEBAR (m) TINGGI (m)
1.5 0.1
Volume
Volume Satuan
4 5184.5 m2
18.45 m3
Diajukan Oleh :Panitia
..............................
Ketua
Lampiran BA No: PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN (PNPM - MP)
HASIL KESEPAKATAN
HARGA SATUAN UPAH/BAHAN/ALAT BULAN : juni 2012
Propinsi : Jawa Tengah KSM/Panitia :
Kabupaten : Banjarnegara Tanggal Dilaksanakan Survey 22-Jun-12
Kecamatan : Banjarnegara Tanggal Laporan dibuat :
Kelurahan/Desa Semampir
No. Uraian
HARGA SATUAN HASIL SURVEY*)
Satuan
Kelp.Masy. - 1 Kelp.Masy.-2 Kelp.Masy.-3
KETERANGANNama: ……….. Nama: ……….. Nama: ………..
Almt : ………. Almt : ………. Almt : ……….
Telp : - Telp : - Telp : -(1) (2) (3) (4) (5) (6) (7) (8) (9)I. TENAGA KERJA :
III. ALAT :1 Ember cor bh 7,500 2 Cangkul bh 50,000 3 linggis bh 50,000 4 palu bh 35,000 5 sekop bh 45,000 6 cetok bh 15,000 7 gergaji bh 40,000 8 catut bh 20,000 9 Benang Rol 2,000
10 papan cor lbr 500
*) Harga Satuan sampai dilokasi Kegiatan (sudah termasuk biaya Transport) Banjarnegara, .........................2012
HARGA SATUAN SESUAI
STANDAR KABUPATEN
REKOMENDASI HARGA TERENDAH YANG DIPILIH
UNTUK BULAN INI
HARGA SATUAN*)
HARGA SATUAN SESUAI
STANDAR KABUPATEN
REKOMENDASI HARGA TERENDAH YANG DIPILIH
UNTUK BULAN INI
Satuan
Toko/Pemasok …………….
Toko/Pemasok …………….
Toko/Pemasok …………….
HARGA SATUAN*)
Nama Toko/Pemasok
Telp : ____________
M3
M3
Mengetahui: Kades/Lurah :
.……………………Nama :
Jabatan : Kades/Lurah
Tandatangan :
Diperiksa Oleh: UPL
Nama :
Jabatan : UPL
Tandatangan :
Dibuat/Disepakati Oleh KSM/Panitia : .……………………
Nama :
Jabatan : Ketua KSM
Tandatangan :
Diperiksa Oleh: Faskel
Nama :
Jabatan : Faskel
Tandatangan :
Mengetahui : L K M :
.……………………Nama :
Jabatan : Ketua LKM
Tandatangan :
Form - RAB 9
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN (PNPM MP)
RENCANA ANGGARAN BIAYA SWADAYA DAN PNPM MP/ BLMKota : BANJARNEGARA No RAB : _____________Kecamatan : BANJARNEGARA Jenis Kegiatan Cor Jalan BetonKelurahan Semampir Volume 18,45m3Nama Panitia : _____________ Lokasi Rt 5/2
No Uraian Pekerjaan Koefisien Volume SatuanHarga Satuan ( Rp )
Jumlah Harga Dan Sumber DanaJUMLAH BIAYA ( Rp )Swadaya PNPM BLM
Bahan Upah Bahan Upah Bahan Upah1 Persiapan 184.5 m2
A TENAGA KERJA1 Pekerja 0.1 18.5 OH 30,000 553,500 553,500 2 Mandor 0.05 9.23 OH 45,000 415,125 415,125
Sub Jumlah 1 968,625 968,625 2 Cor beton 1:3:5 18.45 m3
A TENAGA KERJA1 Pekerja 1.65 30.44 OH 30,000 913,275 913,275 2 Tukang Batu 0.275 5.074 OH 40,000 202,950 202,950 3 Kepala tukang 0.028 0.517 OH 45,000 23,247 23,247 4 Mandor 0.083 1.531 OH 45,000 68,911 68,911
Sub Jumlah 2 1,847,530 1,208,383 8,200,000 11,255,913 3 Alat
1 Cangkul Ls 3 buah 50,000 150,000 150,000 2 Ember Ls 5 buah 7,500 37,500 37,500 3 Cetok Ls 5 buah 15,000 75,000 75,000 4 Sekop Ls 2 buah 45,000 90,000 90,000 5 Benang Ls 2 roll 2,000 4,000 4,000 6 papan Ls 50 lbr 500 25,000 25,000
Sub Jumlah 3 381,500 381,500 4 BIAYA ADMINISTRASI
Pengadaan materai Ls 5 buah 6,000 30,000 30,000 Papan proyek Ls 1 buah 50,000 50,000 50,000 Dokumentasi Ls 2 lbr 2,500 5,000 5,000 Penyusunan Proposal & LPJ Ls 100 lbr 150 15,000 15,000 ATK Ls 1 set 10,000 10,000 10,000
Sub Total Administrasi 110,000 110,000 Jumlah Biaya ( RP ) 4,516,038 8,200,000 12,716,038 Jumlah Total Biaya Upah Swadaya & PNPM / BLM ( Rp ) 2,177,008 - 2,177,008 Jumlah Total Biaya Konstruksi Swadaya & PNPM / BLM ( 1 + 2 + 3 + 4 ) 4,406,038 8,200,000 12,606,038 Dibulatakan BLM 4,406,000 8,200,000 12,606,000
Diverifikasi oleh Diverifikasi olehFaskel UPL
Junaydi Manislam
M3
M3
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI PERKOTAAN (PNPM MP)REKAPITULASI ANGGARAN BIAYA SWADAYA DAN PNPM MP/ BLM
Kota : BANJARNEGARA No RAB : __________
Kecamatan : BANJARNEGARA Jenis Kegiatan Cor Jalan Beton
Kelurahan Semampir Volume 18,45m3
Nama Panitia : _____________ Lokasi Rt 5/2
No Uraian SatuanVolume Kebutuhan JUMLAH BIAYA ( Rp )
TOTAL Dari Swadaya Dari PNPM BLM1 TENAGA KERJA
Mandor HOK 11 11 - 45,000 484,036 -
Kepala Tukang HOK 1 1 - 45,000 23,247 -
Tukang batu HOK 5 5 - 40,000 202,950 -
Pekerja HOK 49 49 - 30,000 1,466,775 -
Sub Total Tenaga Kerja 2,177,008 - 2 BAHAN
Semen portland Kg 5,092 1,566 3,526 1,180 1,847,530 4,161,266
Sub Total konsumsiJumlah Biaya ( RP ) 4,516,038 8,200,000
Jumlah Total Biaya Upah Swadaya & PNPM / BLM ( Rp ) 2,177,008 -
Jumlah Total Biaya Konstruksi Swadaya & PNPM / BLM ( 1 + 2 + 3 + 4 ) 4,406,038 8,200,000
Diverifikasi oleh Diverifikasi oleh Disiapkan Oleh KSM
Faskel UPL
Junaydi Manislam ( …………………….)
Format ini dapat disesuaikan dengan kebutuhan pekerjaan dilapangan. Cat :Hasil Rekapitulasi volume swadaya ini menjadi dasar Berita Acara Kesepakatan swadaya
Harga Satuan ( Rp )
Dari Swadaya
Dari PNPM BLM
Form - RAB 6Lamp. BA Kesanggupan Kontribusi Swadaya Masyarakat
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT- MANDIRI PERKOTAAN (PNPM - MP)
REKAPITULASI KEBUTUHAN TENAGA KERJA/BAHAN/ALAT DAN ADMINISTRASI
Propinsi : Jawa Tengah KSM/Panitia : ...........................Kabupaten : Banjarnegara Jenis Kegiatan Cor Jalan BetonKecamatan : Banjarnegara Volume 18,45m3Kelurahan/Desa Semampir Lokasi Rt 5/2
No. Uraian Satuan Jumlah/Volume Kebutuhan
A TENAGA KERJA :1 Ketua Kelompok/Mandor HOK 11 2 Tukang HOK 5 3 Pekerja HOK 49
B BAHAN/MATERIAL : 1 Semen portland Kg 5,092 2 Pasir Beton M3 13 3 Split M3 14
C A L A T : 1 Cangkul buah 3 2 Ember buah 5 3 Cetok buah 5 4 Sekop buah 2 5 Benang roll 2 6 papan lbr 50
D ADMINISTRASI :1 Pengadaan materai Ls 5 2 Papan proyek Ls 1 3 Dokumentasi Ls 2 4 Penyusunan Proposal & LPJ Ls 100 5 ATK Ls 1 6 Pengujian Kwalitas Air Minum - -
Form ini dapat diperbanyak sesuai kebutuhan Jumlah Item Kegiatan(Harus diarsipkan oleh KSM/Panitia)
Form - RAB 5
FASKEL
(Junaydi)
UPL
)Manislam)
DIBUAT OLEH: KETUA
KSM/PANITIA
)..…………………(
DIPERIKSA OLEH: Banjarnegara,
2012
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT - MANDIRI PERKOTAAN(PNPM - MP)
REKAPITULASI RENCANA ANGGARAN BIAYA (SWADAYA DAN BLM)
Propinsi : Jawa Tengah KSM/Panitia :
Kabupaten : Banjarnegara Jenis Kegiatan Cor Jalan Beton
Kecamatan : Banjarnegara Volume 18,45m3
Kelurahan/Desa Semampir Lokasi Rt 5/2
NO U R A I A N
Kegiatan : Kegiatan :Volume : Bobot Volume : Bobot
JUMLAH TOTALJumlah : Jumlah :No.RAB : (%) No.RAB : %
A TENAGA KERJA 2,177,008 - 2,177,008 17 2,177,008 - 2,177,008
B B A H A N 1,847,530 8,200,000 10,047,530 79 1,847,530 8,200,000 10,047,530
C ALAT 381,500 - 381,500 3 381,500 - 381,500
D BIAYA ADMINISTRASI 110,000 - 110,000 1 110,000 - 110,000
H JUMLAH (A s/d D) 4,516,038 8,200,000 12,716,038 100 4,516,038 8,200,000 12,716,038
I KONTRIBUSI SWADAYA MASYARAKAT LAINNYA
1 Tanah - -
2 Pohon/Tanaman - -
3 Dll.
J JUMLAH (1 s/d 3) - -
K JUMLAH (H + J) - 12,716,038
Form - RAB 7
FASKEL
( Junaydi)
UPL
(Manislam)
DIBUAT OLEH: KETUA KSM/PANITIA
)...………………………(
DIPERIKSA OLEH: Banjarnegara,
………....................,2012
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT - MANDIRI PERKOTAAN(PNPM - MP)
REKAPITULASI RENCANA ANGGARAN BIAYA (SWADAYA DAN BLM)
BobotTotal(%)
(14)
17
79
3
1
100
Form - RAB 7
DIBUAT OLEH: KETUA KSM/PANITIA
)...………………………(
Banjarnegara, ………....................,2012
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT MANDIRI (PNPM - MANDIRI) RENCANA JADWAL PELAKSANAAN KEGIATAN SARANA & PRASARANA
Propinsi : Jawa Tengah KSM/Panitia :Kabupaten : Banjarnegara Jenis Kegiatan Cor Jalan BetonKecamatan : Banjarnegara Volume 18,45m3Kelurahan/Desa Semampir Lokasi Rt 5/2
ANALISA BIAYA KONSTRUKSI (ABK)BANGUNAN GEDUNG DAN PERUMAHANTAHUN ANGGARAN 2012
A. PEKERJAAN PERSIAPAN
KODE Sat Uraian Koef. Sat. Harga Upah Harga Bahan
A.1 Pagar sementara dari seng gelombang tinggi 2 meterBambu 1.25 btg - 9,000.00 Semen Portland (PC) 2.5 kg - 1,260.00 Seng gelombang 3"-5" 1.2 lbr - 53,300.00 Pasir pasang 0.005 m3 - 135,900.00 Split 2/3 0.009 m3 - 180,000.00 Kayu 5/7 0.072 m3 - 2,115,000.00 Paku biasa 2"- 5" 0.06 kg - 13,400.00 Meni Besi 0.45 kg - 39,600.00 Tukang kayu 0.2 OH 32,800.00 - Pekerja 0.4 OH 24,200.00 - Kepala Tukang 0.02 OH 36,800.00 - Mandor 0.02 OH 36,800.00 -
Jumlah harga
A.2 Pengukuran dan pemasangan bouwplankKayu 5/7 0.012 m3 - 2,115,000.00 Paku biasa 2"- 5" 0.02 kg - 13,400.00 Kayu papan 3/20 0.007 m3 - 2,250,000.00 Tukang kayu 0.1 OH 32,800.00 - Pekerja 0.1 OH 24,200.00 - Kepala Tukang 0.01 OH 36,800.00 - Mandor 0.005 OH 36,800.00 -
Jumlah harga
A.3 Membersihkan lapangan dan perataanPekerja 0.1 OH 24,200.00 - Mandor 0.05 OH 36,800.00 -
Jumlah harga
A.4 Pembuatan Gudang semen dan alat - alatBambu 1.7 btg - 9,000.00 Kayu tahun 0.21 m3 - 2,115,000.00 Paku biasa 2" - 5" 0.3 kg - 13,400.00 PC 10.5 kg - 1,260.00 Pasir pasang 0.03 m3 - 135,900.00
1 M1
1 M1
1 M2
1 M2
Split 0.05 m3 - 180,000.00 Seng gelombang BJLS 2 1.5 lbr - 53,300.00 Tukang kayu 2 OH 32,800.00 - Pekerja 1 OH 24,200.00 - Kepala Tukang 0.2 OH 36,800.00 - Mandor 0.05 OH 36,800.00 -
Jumlah harga
A.5 Pembuatan steger dari bambu ukuran ( 40 x 50 x 20 ) cmBambu dia 6-8, 600 cm 1 btg - 9,000.00 Tali ijuk 0.25 kg - 22,500.00 Tukang kayu 0.170 OH 32,800.00 - Pekerja 0.25 OH 24,200.00 - Kepala Tukang 0.002 OH 36,800.00 - Mandor 0.0013 OH 36,800.00 -
E.9 Membuat 1 m2 acianSemen portland 3.25 Kg 1,260.00 Pekerja 0.2 OH 24,200.00 Tukang batu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.01 OH 36,800.00
F. PEKERJAAN KAYU (SNI 3434 - 2008)
F.1.kr Membuat Kusen Pintu dan Jendela Kayu Kruing
Kayu Kruing, balok 1.2 5,715,000.00 Paku biasa 2" - 5" 1.25 kg 13,400.00 Lem Kayu 1 kg 16,400.00 Pekerja 6 OH 24,200.00 Tukang kayu 18 OH 32,800.00 Kepala tukang 1.8 OH 36,800.00 Mandor 0.3 OH 36,800.00
F.1. bkr Membuat Kusen Pintu dan Jendela Kayu bangkirai
Kayu Bangkirai balok 1.2 9,900,000.00 Paku biasa 2" - 5" 1.25 kg 13,400.00 Lem Kayu 1 kg 16,400.00 Pekerja 6.0 OH 24,200.00
1 M2
1 M2
M3
1 M2
1 M3
M3
1 M3
M3
Tukang kayu 18.0 OH 32,800.00 Kepala tukang 1.8 OH 36,800.00 Mandor 0.3 OH 36,800.00
F.2.kr Membuat Pintu Panel Kayu Kruing
Kayu Kruing, papan 0.04 - 6,300,000.00 Lem kayu 0.05 kg - 16,400.00 Pekerja 1 OH 24,200.00 - Tukang kayu 3 OH 32,800.00 - Kepala tukang 0.3 OH 36,800.00 Mandor 0.05 OH 36,800.00
F.2.bkr Membuat Pintu Panel Kayu Bangkirai
Kayu Bangkirai , papan 0.04 - 11,162,700.00 Lem kayu 0.05 kg - 16,400.00 Pekerja 1 OH 24,200.00 - Tukang kayu 3 OH 32,800.00 - Kepala tukang 0.3 OH 36,800.00 Mandor 0.05 OH 36,800.00
F.3.kr Membuat Pintu dan Jendela Kaca Kayu Kruing
Kayu Kruing, papan 0.024 6,300,000.00 Lem Kayu 0.3 kg 16,400.00 Pekerja 0.8 OH 24,200.00 Tukang kayu 2.4 OH 32,800.00 Kepala tukang 0.24 OH 36,800.00 Mandor 0.04 OH 36,800.00
F.3.bkr Membuat Pintu dan Jendela Kaca Kayu Bangkirai
Kayu Bangkirai papan 0.024 11,162,700.00 Lem Kayu 0.3 kg 16,400.00 Pekerja 0.8 OH 24,200.00 Tukang kayu 2.4 OH 32,800.00 Kepala tukang 0.24 OH 36,800.00 Mandor 0.04 OH 36,800.00
F.4.kr Membuat Pintu Kayu Lapis (plywood) Rangkap, Rangka Kayu Kruing
Kayu Kruing, papan 0.025 6,300,000.00 Paku biasa 1/2" - 1" 0.03 Kg 18,600.00 Lem kayu 0.5 Lt 16,400.00
1 M2
M3
1 M2
M3
1 M2
M3
1 M2
M3
1 M2
M3
Plywood tbl 4 mm uk 9 1 Lbr 54,700.00 Pekerja 0.7 OH 24,200.00 Tukang kayu 2.1 OH 32,800.00 Kepala tukang 0.21 OH 36,800.00 Mandor 0.035 OH 36,800.00
F.4.bkr Membuat Pintu Kayu Lapis (Plywood) Rangkap, Rangka Kayu Bangkirai
Kayu Bangkirai, papan 0.025 11,162,700.00 Paku biasa 1/2" - 1" 0.03 Kg 18,600.00 Lem kayu 0.5 Lt 16,400.00 Plywood tbl 4 mm uk 9 1 Lbr 54,700.00 Pekerja 0.7 OH 24,200.00 Tukang kayu 2.1 OH 32,800.00 Kepala tukang 0.21 OH 36,800.00 Mandor 0.035 OH 36,800.00
F.5.kr Membuat Pintu Plywood Rangkap, Rangka ekspose Kayu Kruing
Kayu Kruing, papan 0.0256 6,300,000.00 Paku biasa 1/2" - 1" 0.03 Kg 18,600.00 Lem kayu 0.5 Lt 16,400.00 Plywood tbl 4 mm uk 9 1 Lbr 54,700.00 Pekerja 0.8 OH 24,200.00 Tukang kayu 2.4 OH 32,800.00 Kepala tukang 0.24 OH 36,800.00 Mandor 0.04 OH 36,800.00
F.5.bkr Membuat Pintu Plykwood Rangkap, Rangka ekspose Kayu Bangkirai
Kayu Bangkirai, papan 0.0256 11,162,700.00 Paku biasa 1/2" - 1" 0.03 Kg 18,600.00 Lem kayu 0.5 Lt 16,400.00 Plywood tbl 4 mm uk 9 1 Lbr 54,700.00 Pekerja 0.8 OH 24,200.00 Tukang kayu 2.4 OH 32,800.00 Kepala tukang 0.24 OH 36,800.00 Mandor 0.04 OH 36,800.00
F.6.kr Memasang Konstruksi Kuda-Kuda Konvensional Kayu Kruing
Kayu Kruing, balok 1.1 5,715,000.00 Besi Strip 15 Kg 16,200.00 Paku biasa 2" - 5" 5.6 Kg 13,400.00 Pekerja 4.0 OH 24,200.00 Tukang kayu 12.0 OH 32,800.00
1 M2
M3
1 M2
M3
1 M2
M3
1 M3
M3
Kepala tukang 1.2 OH 36,800.00 Mandor 0.2 OH 36,800.00
F.6.bkr Memasang Konstruksi Kuda-Kuda Konvensional Kayu Bangkirai
Kayu Bangkirai, balok 1.1 9,900,000.00 Besi Strip 15 Kg 16,200.00 Paku biasa 2" - 5" 5.6 Kg 13,400.00 Pekerja 4.0 OH 24,200.00 Tukang kayu 12.0 OH 32,800.00 Kepala tukang 1.2 OH 36,800.00 Mandor 0.2 OH 36,800.00
F.7.bkr Memasang Konstruksi Gording Kayu Bangkirai
Kayu Bangkirai, balok 1.1 9,900,000.00 Besi Strip 15 Kg 16,200.00 Paku biasa 2" - 5" 3.0 Kg 13,400.00 Pekerja 2.4 OH 24,200.00 Tukang kayu 7.2 OH 32,800.00 Kepala tukang 0.72 OH 36,800.00 Mandor 0.12 OH 36,800.00
F.7.kr Memasang Konstruksi Gording Kayu Kruing
Kayu Kruing, balok 1.1 5,715,000.00 Besi Strip 15 Kg 16,200.00 Paku biasa 2" - 5" 3.0 Kg 13,400.00 Pekerja 2.4 OH 24,200.00 Tukang kayu 7.2 OH 32,800.00 Kepala tukang 0.72 OH 36,800.00 Mandor 0.12 OH 36,800.00
F.8.Kr Memasang rangka atap Kayu Kruing
Kayu Kruing, balok, kas 0.014 5,715,000.00
Kayu Kruing, balok, ren 0.0036 5,715,000.00 Paku biasa 2" - 5" 0.25 Kg 13,400.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.005 OH 36,800.00
F.8.thn Memasang rangka atap Kayu Tahun
1 M3
M3
1 M3
M3
1 M3
M3
1 M2
M3
M3
1 M2
Kayu Tahun, balok kaso 0.014 2,115,000.00
Kayu Tahun, balok, ren 0.0036 2,115,000.00 Paku biasa 2" - 5" 0.25 Kg 13,400.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.005 OH 36,800.00
F.9.kr Memasang Rangka Langit-Langit (1.00 x 1.00) m, Kayu Kruing
Kayu Kruing, balok 0.0154 5,715,000.00 Paku biasa 2" - 5" 0.2 Kg 13,400.00 Pekerja 0.15 OH 24,200.00 Tukang kayu 0.3 OH 32,800.00 Kepala tukang 0.03 OH 36,800.00 Mandor 0.075 OH 36,800.00
F.9.thn Memasang Rangka Langit-Langit (1.00 x 1.00) m, Kayu Tahun
Kayu Tahun, balok 0.0154 2,115,000.00 Paku usuk 0.2 Kg 13,400.00 Pekerja 0.15 OH 24,200.00 Tukang kayu 0.3 OH 32,800.00 Kepala tukang 0.03 OH 36,800.00 Mandor 0.075 OH 36,800.00
F.10.kr Memasang Rangka Langit-Langit (60 x 60) m, Kayu Kruing
Kayu Kruing, balok 0.0163 5,715,000.00 Paku usuk 0.25 Kg 13,400.00 Pekerja 0.20 OH 24,200.00 Tukang kayu 0.3 OH 32,800.00 Kepala tukang 0.03 OH 36,800.00 Mandor 0.01 OH 36,800.00
F.10.thn Memasang Rangka Langit-Langit (60 x 60) m, Kayu Tahun
Kayu Tahun, balok 0.0163 2,115,000.00 Paku usuk 0.25 Kg 13,400.00 Pekerja 0.20 OH 24,200.00 Tukang kayu 0.3 OH 32,800.00 Kepala tukang 0.03 OH 36,800.00 Mandor 0.01 OH 36,800.00
F.11.kr Memasang Lisplang ukuran (3 x 20) cm, Kayu Kruing
M3
M3
1 M2
M3
1 M2
M3
1 M2
M3
1 M2
M3
1 M1
Kayu Kruing, papan 0.0108 6,300,000.00 Paku biasa 2" - 5" 0.1 Kg 13,400.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.2 OH 32,800.00 Kepala tukang 0.02 OH 36,800.00 Mandor 0.005 OH 36,800.00
F.11.bkr Memasang Lisplang ukuran (3 x 20) cm, Kayu Bangkirai
Kayu Bangkirai, papan 0.0108 11,162,700.00 Paku biasa 2" - 5" 0.1 Kg 13,400.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.2 OH 32,800.00 Kepala tukang 0.02 OH 36,800.00 Mandor 0.005 OH 36,800.00
F.12.kr Memasang Lisplang ukuran (3 x 30) cm, Kayu Kruing
Kayu Kruing, papan 0.011 6,300,000.00 Paku biasa 2" - 5" 0.05 Kg 13,400.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.2 OH 32,800.00 Kepala tukang 0.02 OH 36,800.00 Mandor 0.005 OH 36,800.00
F.12.bkr Memasang Lisplang ukuran (3 x 30) cm, Kayu Bangkirai
Kayu Bangkirai, papan 0.011 11,162,700.00 Paku biasa 2" - 5" 0.05 Kg 13,400.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.2 OH 32,800.00 Kepala tukang 0.02 OH 36,800.00 Mandor 0.005 OH 36,800.00
F.13.kr Memasang dinding pemisah teakwood rangkap, rangka Kayu Kruing
Kayu Kruing, Balok 0.028 5,715,000.00 Paku triplek 0.15 Kg 18,600.00 Lem Kayu 0.56 Lt 16,400.00 Teakwood 120x240 cm 0.86 Lbr 33,900.00 Pekerja 0.15 OH 24,200.00 Tukang kayu 0.45 OH 32,800.00 Kepala tukang 0.045 OH 36,800.00 Mandor 0.008 OH 36,800.00
M3
1 M1
M3
1 M1
M3
1 M1
M3
1 M2
M3
F.13.bkr Pasang dinding pemisah teakwood rangkap, rangka Kayu Bangkirai
Kayu Bangkirai, Balok 0.028 9,900,000.00 Paku triplek 0.15 Kg 18,600.00 Lem Kayu 0.56 Lt 16,400.00 Teakwood 120x240 cm 0.86 Lbr 33,900.00 Pekerja 0.15 OH 24,200.00 Tukang kayu 0.45 OH 32,800.00 Kepala tukang 0.045 OH 36,800.00 Mandor 0.008 OH 36,800.00
1 M2
M3
G. PEKERJAAN BETON ( SNI 7394-2008 )
G.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87Semen portland 247 Kg 1,260.00
Pasir Beton 0.7449 180,000.00
Split 0.74 180,000.00 Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00
G.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78Semen portland 276 Kg 1,260.00
Pasir Beton 0.7097 180,000.00
Split 0.7496 180,000.00 Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00
1 M3
M3
M3
1 M3
M3
M3
Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00
G.3 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72Semen portland 299 Kg 1,260.00
Pasir Beton 0.6849 180,000.00
Split 0.7533 180,000.00 Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00
G.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87Semen portland 230 Kg 1,260.00
Pasir Beton 0.7654 180,000.00
Split 0.7607 180,000.00 Air 200 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00
G.5 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66Semen portland 326 Kg 1,260.00
Pasir Beton 0.6514 180,000.00
Split 0.7622 180,000.00 Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00
G.6 Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61Semen portland 352 Kg 1,260.00
Pasir Beton 0.6266 180,000.00
Split 0.7637 180,000.00 Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00
1 M3
M3
M3
1 M3
M3
M3
1 M3
M3
M3
1 M3
M3
M3
Mandor 0.083 OH 36,800.00
G.7 Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58Semen portland 371 Kg 1,260.00
Pasir Beton 0.5983 180,000.00
Split 0.7756 180,000.00 Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00
G.8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56Semen portland 384 Kg 1,260.00
Pasir Beton 0.5931 180,000.00
Split 0.7696 180,000.00 Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00
G.9 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53Semen portland 406 Kg 1,260.00
Pasir Beton 0.5863 180,000.00
Split 0.76 180,000.00 Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00
G.10 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52Semen portland 413 Kg 1,260.00
Pasir Beton 0.5837 180,000.00
Split 0.7563 180,000.00
1 M3
M3
M3
1 M3
M3
M3
1 M3
M3
M3
1 M3
M3
M3
Air 215 ltr 3.00 Pekerja 1.65 OH 24,200.00 Tukang Batu 0.275 OH 32,800.00 Kepala tukang 0.028 OH 36,800.00 Mandor 0.083 OH 36,800.00
G.11 1 Kg Pembesian dengan Besi Polos atau Besi UlirBesi beton (polos/ulir) 1.05 Kg 8,550.00 Kawat beton 0.015 Kg 21,900.00 Pekerja 0.007 OH 24,200.00 Tukang kayu 0.007 OH 32,800.00 Kepala tukang 0.0007 OH 36,800.00 Mandor 0.0004 OH 36,800.00
G.12 Memasang Bekisting untuk Pondasi
Kayu tahun 0.04 2,115,000.00 Paku biasa 2' - 5" 0.3 Kg 13,400.00 Minyak bekisting/solar 0.1 Lt 6,100.00 Pekerja 0.52 OH 24,200.00 Tukang kayu 0.26 OH 32,800.00 Kepala tukang 0.026 OH 36,800.00 Mandor 0.026 OH 36,800.00
G.13 Memasang Bekisting untuk Sloof
Kayu tahun 0.045 2,115,000.00 Paku biasa 2' - 5" 0.3 Kg 13,400.00 Minyak bekisting/solar 0.1 Lt 6,100.00 Pekerja 0.520 OH 24,200.00 Tukang kayu 0.260 OH 32,800.00 Kepala tukang 0.026 OH 36,800.00 Mandor 0.026 OH 36,800.00
G.14 Memasang Bekisting untuk Kolom
Kayu tahun 0.04 2,115,000.00 Paku biasa 2' - 5" 0.4 Kg 13,400.00 Minyak bekisting/solar 0.2 Lt 6,100.00
Balok kayu tahun 0.015 2,115,000.00 Papan bekisting kayu t 1.5 Lbr 26,100.00
Kayu tahun 0.04 2,115,000.00 Paku biasa 2' - 5" 0.4 Kg 13,400.00 Minyak bekisting/solar 0.2 Lt 6,100.00
Balok kayu tahun 0.02 2,115,000.00 Papan bekisting kayu t 1.50 Lbr 26,100.00 Bambu 2.0 Btg 9,000.00 Pekerja 0.66 OH 24,200.00 Tukang kayu 0.33 OH 32,800.00 Kepala tukang 0.033 OH 36,800.00 Mandor 0.006 OH 36,800.00
G.16 Memasang Bekisting untuk Lantai
Kayu tahun 0.04 2,115,000.00 Paku biasa 2' - 5" 0.4 Kg 13,400.00 Minyak bekisting/solar 0.2 Lt 6,100.00
Balok kayu tahun 0.015 2,115,000.00 Papan bekisting kayu t 1.5 Lbr 26,100.00
Kayu tahun terentang 0.03 2,115,000.00 Paku biasa 2' - 5" 0.4 Kg 13,400.00 Minyak bekisting/solar 0.15 Lt 6,100.00
Balok kayu tahun 0.015 2,115,000.00 Papan bekisting kayu t 1.5 Lbr 26,100.00 Bambu 2 Btg 9,000.00 Pekerja 0.66 OH 24,200.00 Tukang kayu 0.33 OH 32,800.00 Kepala tukang 0.033 OH 36,800.00 Mandor 0.033 OH 36,800.00
1 M2
M3
M3
1 M2
M3
M3
Bambu Æ (8-10 cm)
1 M2
M3
M3
G.22 Membuat Dinding Beton Bertulang ( 150 kg besi + bekisting )
Kayu tahun 0.24 2,115,000.00 Paku biasa 2" - 5" 3.2 Kg 13,400.00 Minyak bekisting/solar 1.6 Lt 6,100.00 Besi beton polos 157.5 Kg 8,550.00 Kawat beton 2.25 Kg 21,900.00 Semen portland 336 Kg 1,260.00
Pasir beton 0.54 180,000.00
Koral beton 0.81 180,000.00
Kayu Tahun balok 0.16 2,115,000.00 Papan kayu tahun 2.8 lbr 26,100.00 Bambu 24 btg 9,000.00 Pekerja 5.3 OH 24,200.00 Tukang batu 0.275 OH 32,800.00 Tukang kayu 1.3 OH 32,800.00 Tukang besi 1.05 OH 32,800.00 Kepala tukang 0.262 OH 36,800.00 Mandor 0.265 OH 36,800.00
G.23 Membuat Tangga Beton Bertulang ( 200 kg besi + bekisting )
Membuat 1 m3 beton mut 1 718,896.94 Pembesian dengan Besi 200 Kg 9,745.48
Memasang Bekisting un 1.4 187,824.80
G.24 Membuat Kolom Penguat Beton Bertulang (11 X 11) cm
Kayu tahun 0.002 2,115,000.00 Paku biasa 2" - 5" 0.01 Kg 13,400.00
1 M3
M3
M3
M3
M3
1 M3
M3
M2
1 M1
M3
Besi beton polos 3 Kg 8,550.00 Kawat beton 0.045 Kg 21,900.00 Semen portland 4 Kg 1,260.00
G.25 Membuat Ring Balok Beton Bertulang (10 X 15) cm
Kayu tahun 0.003 2,115,000.00 Paku biasa 2" - 5" 0.02 Kg 13,400.00 Besi beton polos 3.6 Kg 8,550.00 Kawat beton 0.05 Kg 21,900.00 Semen portland 5.5 Kg 1,260.00
H.5.a Pasang atap asbes gelombang (2,25 x 0,92) x 5 mmAsbes gelombang 0.6 lbr 50,500.00 Paku Pancing 60 x 230 0.12 Kg 25,000.00 Pekerja 0.14 OH 24,200.00 Tukang kayu 0.075 OH 32,800.00 Kepala tukang 0.008 OH 36,800.00 Mandor 0.008 OH 36,800.00
H.5.b Pasang atap asbes gelombang (2,00 x 0,92) x 5 mmAsbes gelombang 0.6 lbr 35,800.00 Paku Pancing 60 x 230 0.12 Kg 25,000.00 Pekerja 0.14 OH 24,200.00 Tukang kayu 0.07 OH 32,800.00 Kepala tukang 0.007 OH 36,800.00
1 M2
1 M1
M3
1 M1
M3
1 M2
1 M2
Mandor 0.007 OH 36,800.00
H.5.c Pasang atap asbes gelombang (3,00 x 1,05) x 5 mmAsbes gelombang 0.35 lbr - Paku Pancing 60 x 230 0.12 Kg 25,000.00 Pekerja 0.14 OH 24,200.00 Tukang kayu 0.07 OH 32,800.00 Kepala tukang 0.007 OH 36,800.00 Mandor 0.007 OH 36,800.00
H.5.d Pasang atap asbes gelombang (2,10 x 1,05) x 4 mmAsbes gelombang 0.51 lbr - Paku Pancing 60 x 230 0.12 Kg 25,000.00 Pekerja 0.14 OH 24,200.00 Tukang kayu 0.067 OH 32,800.00 Kepala tukang 0.007 OH 36,800.00 Mandor 0.007 OH 36,800.00
H.6 Pasang atap seng gelombangSeng gelombang 3" x 6" 0.7 lbr 78,000.00 Paku seng 0.02 Kg 25,000.00 Pekerja 0.12 OH 24,200.00 Tukang kayu 0.06 OH 32,800.00 Kepala tukang 0.006 OH 36,800.00 Mandor 0.006 OH 36,800.00
H.7 Pasang nok sengSeng plat 3"x6" BJLS 30 0.3 lbr 28,200.00 Paku Sekrup 3.5" 0.04 Kg 27,400.00 Pekerja 0.15 OH 24,200.00 Tukang kayu 0.07 OH 32,800.00 Kepala tukang 0.008 OH 36,800.00 Mandor 0.006 OH 36,800.00
H.8 Pasang atap genteng betonGenteng beton 11 bh 6,200.00 Paku biasa 0.03 kg 13,400.00 Pekerja 0.2 OH 24,200.00 Tukang kayu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.01 OH 36,800.00
1 M2
1 M2
1 M2
1 M1
1 M2
H.9 Pasang atap genteng metalGenteng Metal 1.25 lbr 97,200.00 Paku biasa 0.03 kg 13,400.00 Pekerja 0.2 OH 24,200.00 Tukang kayu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.01 OH 36,800.00
H.10 Pasang Nok genteng metalGenteng Metal 3 lbr 19,800.00 Paku biasa 0.05 kg 13,400.00 Pekerja 0.25 OH 24,200.00 Tukang kayu 0.15 OH 32,800.00 Kepala tukang 0.015 OH 36,800.00 Mandor 0.013 OH 36,800.00
I.2 Memasang 1 m2 langit-langit akustik ukuran (30 x 30) cmAkustik 12 Lbr 4,500.00 Paku triplek 0.05 kg 18,600.00 Pekerja 0.12 OH 24,200.00 Tukang kayu 0.12 OH 32,800.00 Kepala tukang 0.012 OH 36,800.00 Mandor 0.006 OH 36,800.00
I.3 Memasang 1 m2 langit-langit akustik ukuran (30 x 60) cmAkustik 5.8 Lbr 10,950.00 Paku triplek 0.05 kg 18,600.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.005 OH 36,800.00
1 M2
1 M1
1 M2
1 M2
1 M2
I.4 Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mmTripleks 0.375 Lbr 54,600.00 Paku triplek 0.03 kg 18,600.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.005 OH 36,800.00
I.5 Memasang 1 m2 langit-langit gypsum board ukuran (1200x2400x9) mm,Gypsum Board 0.364 Lbr 57,600.00 Paku sekrup 0.11 kg 27,400.00 Pekerja 0.1 OH 24,200.00 Tukang kayu 0.05 OH 32,800.00 Kepala tukang 0.005 OH 36,800.00 Mandor 0.005 OH 36,800.00
I.6 Memasang 1 m’ list plafond gysum profil, polos tebal 10 cmList Gypsum profil 1.05 m1 6,900.00 Tepung Gypsum 0.15 kg 4,950.00 Pekerja 0.06 OH 24,200.00 Tukang kayu 0.06 OH 32,800.00 Kepala tukang 0.006 OH 36,800.00 Mandor 0.003 OH 36,800.00
I.6 Memasang 1 m’ list plafond gysum profil, polos tebal 12 cmList Gypsum profil 1.05 m1 8,300.00 Tepung Gypsum 0.15 kg 4,950.00 Pekerja 0.06 OH 24,200.00 Tukang kayu 0.06 OH 32,800.00 Kepala tukang 0.006 OH 36,800.00 Mandor 0.003 OH 36,800.00
I.7 List Langit-langit kayu profilList kayu profil 1.05 m1 3,450.00 Paku 0.01 kg 18,600.00 Pekerja 0.05 OH 24,200.00 Tukang kayu 0.05 OH 32,800.00 Kepala tukang 0.005 OH 36,800.00 Mandor 0.003 OH 36,800.00
1 M2
1 M2
1 M1
1 M1
1 M1
I.8. Kr Langit-langit asbes (1,00x1,00) tbl 3,2 mm, rangka kayu kruingKayu Kruing balok 0.0120 m3 5,715,000.00 Paku eternit 0.0600 kg 18,600.00 Asbes 1,00 x 1,00 m 1.1000 lbr 8,650.00 Pekerja 0.1800 OH 24,200.00 Tukang kayu 0.3200 OH 32,800.00 Kepala tukang 0.0320 OH 36,800.00 Mandor 0.0090 OH 36,800.00
I.8. Thn Langit-langit asbes (1,00x1,00) tbl 3,2 mm, rangka TahunKayu Tahun balok 0.0120 m3 2,115,000.00 Paku eternit 0.0600 kg 18,600.00 Asbes 1,00 x 1,00 m 1.1000 lbr 8,650.00 Pekerja 0.1800 OH 24,200.00 Tukang kayu 0.3200 OH 32,800.00 Kepala tukang 0.0320 OH 36,800.00 Mandor 0.0090 OH 36,800.00
J.16. Sl. U b 1 M1 Memasang saluran U dijepit batu bata galian tanah 0.25 M3 19,070.00 - pasir urug 0.025 M3 140,468.00 batu bata 1.2 M2 63,252.30 plesteran 0.7 M2 21,579.66 beton cor u 1 m1 27,000.00
J.17. Sl. U b 1 M3 Memasang saluran U dijepit batu kali galian tanah 0.615 M3 19,070.00 - batu batu kali 0.27 M2 428,925.60 pasir urug 0.0225 M3 140,468.00 plesterran 0.3 M2 21,579.66 beton cor u 0.075 M3 27,000.00
O.14 1 m2 Memasang Kawat NyamukKawat Nyamuk Nylon 1.1 m2 21,900.00 Pengelasan 11.11 cm 1,539.30 Baja Strip (0,2x2) cm 1.716 kg 10,700.00 Pekerja 0.1 OH 24,200.00 Tukang besi 0.1 OH 32,800.00 Kepala tukang 0.01 OH 36,800.00 Mandor 0.005 OH 36,800.00
O.15 1 m1 Memasang Talang Datar/Jurai, Seng BJLS 20 Lebar 50 cmSeng Plat 1.05 lbr 24,400.00 Paku Biasa 1 -2,5 cm 0.015 kg 13,400.00 Kayu Papan tahun 0.019 m3 2,250,000.00
9,680.00 M.1 Mengikis/mengerok permukaan cat tembok lama 6,560.00 Soda api 0.05 Kg 736.00 Pekerja 0.15 OH 736.00 Mandor 0.0025 OH 17,712.00 62,470.00 80,182.00
1 M2
M.2 Pengecatan bidang kayu lamaPlamir 0.15 KgCat dasar 0.17 KgCat penutup 0.17 KgPekerja 0.07 OHTukang cat 0.075 OHKepala tuk 0.0075 OH
Mandor 0.0025 OH
225,000.00 M.3 Pengecatan Bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
100.00 Cat meni 0.2 Kg 9,680.00 Plamir 0.15 Kg 6,560.00 Cat dasar 0.17 Kg 736.00 Cat penutup 0.26 Kg 736.00 Pekerja 0.07 OH 17,712.00 225,100.00 242,812.00 Tukang cat 0.009 OH
Kepala tuk 0.006 OH
Mandor 0.0025 OH
57,500.00
11,070.00
9,680.00 M.4 Pengecatan Bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup ) 6,560.00 Cat meni 0.2 Kg 736.00 Plamir 0.15 Kg 736.00 Cat dasar 0.17 Kg 17,712.00 68,570.00 86,282.00 Cat penutup 0.35 Kg
Pekerja 0.07 OH
Tukang cat 0.105 OH
99,000.00 Kepala tuk 0.004 OH 14,805.00 Mandor 0.0025 OH
4,756.50 16,940.00
11,480.00 M.5 Pengecatan Bidang kayu dengan politur 1,288.00 Politur 0.2 Kg 1,288.00 Politur Jadi 0.372 Kg 30,996.00 118,561.50 149,557.50 Amplas 2 lbr
3 ASBES GELOMBANG 200 x 92 x 5 mm lbr 41,790.00 225 x 92 m x 5 mm lbr 58,905.00 300 x 105 m x 5 m lbr 210 x 105 m x 5 m lbr Bubungan Asbes G lbr 29,820.00 Bubungan Asbes G lbr
4 SENG GELOMBANG BJLS 0,18 panjang lbr BJLS 0,20 panjang lbr 62,160.00 BJLS 0,30 panjang lbr 90,930.00 BJLS 0,40 panjang lbr
V. BAHAN CETAK1 BUIS BETON Ǿ 10 CM - 100 CM Bh 17,850.00
Ǿ 20 CM - 100 CM Bh 21,000.00 Ǿ 30 CM - 100 CM Bh 31,500.00
Ǿ 50 CM - 100 CM Bh 57,750.00 Ǿ 60 CM - 100 CM Bh 78,750.00 Ǿ 70 CM - 100 CM Bh 94,500.00 U 10 CM - 100 CM Bh 17,850.00 U 15 CM - 100 CM Bh 23,100.00 U 20 CM - 100 CM Bh 31,500.00 U 30 CM - 100 CM Bh 36,750.00 U 50 CM - 100 CM
2 LUBANG ANGIN Rooster Super bata M2 304,605.00 Rooster semen 12 Bh 12,600.00
3 BATAKO Batako Bh 2,100.00
VI. BAHAN BESI1 BESI BETON Besi beton polos Kg 9,975.00
Besi beton ulir Kg 11,025.00
2 BESI PLAT Besi Plat kg 12,495.00
3 BESI PROFIL Besi Profil kg 12,495.00
4 BESI SIKU L 40x40x4 Kg 12,495.00 L 50x50x5 Kg 12,495.00 L 60x60x6 Kg 12,495.00
5 KAWAT Kawat beton/bend Kg 25,515.00 Kawat Las Kg 31,237.50 Pengelasan cm Kawat nyamuk M2 25,515.00
6 BAJA KONSTRUKSI Baja Konstruksi Kg 12,285.00
VII. BAHAN LANGIT - LANGIT1 ASBES Eternit polos KER Lbr 10,080.00
2 GYPSUM 120 x 240 x 9 mm Lbr 67,200.00 120 x 240 x 9 mm Lbr 67,200.00 Tepung Gypsum kg 5,775.00 List Propil Gypsum M1 7,980.00 List Propil Gypsum M1 9,607.50
4 AKUSTIK - uk. (30 x 60) cm Lbr 12,757.50 uk. (30 x 30) cm Lbr 5,250.00
5 LIST PROPIL KAYU M1 3,990.00
VIII. BAHAN FINISHING1 KAYU Sirlak Kg 191,362.50
Amplas kayu Lb 3,885.00 Plamur kayu/demp Kg 22,417.50 Cat kayu (avian,pr Kg 67,935.00 Minyak cat Lt 17,955.00 Lem Kayu Kg 19,136.25 Plitur Kemasan Lt 26,355.00 Menie Kg 46,200.00 Soda api Kg 17,325.00 Spritus Lt 19,136.25
2 TEMBOK Rol kuas Bh Plamur tembok Kg 22,417.50 Cat tembok Kg 18,585.00 Sintex 5 kg 140,332.50 Danabrite 5 kg Catylac 5 kg 99,487.50 Mowilex 5 kg 255,150.00
XI. BAHAN SANITAIR1 KLOSET DUDUK Kloset duduk INA Bh 845,460.00
2 KLOSET JONGKOK Kloset Jongkok INA Bh 160,125.00
3 WASTAFEL Wastafel Gantung Bh 325,421.25
4 URINOIR Urinoir Keramik st Bh 493,158.75
5 BAK PENAMPUNG AIR Bak Penampung (32 Bh 888,195.00 Bak Penampung (1. Bh 1,490,160.00
6 BAK CUCI Bak cuci piring sta Bh 416,325.00
7 BAK MANDI Bak mandi fiber g Bh 365,085.00
8 LAIN - LAIN Kran air 3/4" atau Bh 35,175.00 Seal Tape Bh 4,042.50 Floor drain plastik Bh 12,600.00
XII. ALAT PENGIKAT KAYU1 Paku usuk, reng dan dudur Kg 15,540.00 2 Paku triplek/eternit Kg 21,630.00 3 Paku seng Kg 29,085.00 4 Paku sekrup Kg 31,893.75 5 Baud beugel Kg 18,900.00
XIII. POMPA AIR1 POMPA AIR LISTRIK Nasional
NASIONAL 9 meter Bh 448,350.00 NASIONAL 15 mete Bh 1,345,050.00 NASIONAL 30 mete Bh 1,793,400.00