Top Banner
1/9/2014 1 Raj Sachdeva PMP & Oracle Certified Master Section Manager Pace Suburban Bus [email protected]
17
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: R preso at ow

1/9/2014 1

Raj SachdevaPMP & Oracle Certified MasterSection Manager Pace Suburban [email protected]

Page 2: R preso at ow
Page 3: R preso at ow
Page 4: R preso at ow

1/9/2014 4

Page 5: R preso at ow

To provide a single Enterprise Asset Management solution that would integrate with the current Oracle e-Business Suite (EBS) implementation

eAM solution had to meet the business needs of these six business units while causing minimal business process changes – Create work order in 30 seconds!!!!!

FIFO Costing & warranty tracking

Work order Billing for Third Party Contractor

Item Rebuild Work Order

Pace’s upper management required full business intelligence visibility.

Asset transfer and Asset Tracking

Data conversion and migration

Performance management

Training to mechanics and foremen

1/9/2014 5

Page 6: R preso at ow

1/9/2014 6

Work Order in 30Seconds

Page 7: R preso at ow

1. Enter the Asset (Bus) Number 2. Enter Object Code 3. Click Save

Page 8: R preso at ow

1. Scroll down to Operation Requirements2. Enter Mechanic Employee Number or Last Name

Page 9: R preso at ow

1. Click Save Click Print Work Order

Page 10: R preso at ow

Solid team work

Business involved in every phase of implementation cycle and decision making

Acceptance to business changes

Thorough project plan and activities

Well constructed “TO Be” processes

One final CRP and Go Live

Integration considerations for Exadata and OBIEE

1/9/2014 10

Page 11: R preso at ow

1/9/2014 11

Page 12: R preso at ow

1/9/2014 12

Page 13: R preso at ow

Key points is “TO BE “Processes which includes gather requirements, Configuration and Build Phase.

Minimum number of instances Data Conversion in Flashback mode of database Pilot testing in medium busy and the busiest repair

workshop. Testing of existing modules Upgrade in parallel of

implementation in-house Migration of Oracle e-Business database to Exadata with

Oracle Active Data Guard. Upgrade testing of existing modules with eAM and

Inventory enabled Oracle Navigation Training and then role based training

and finally hand holding UPK training during go-live.

1/9/2014 13

Page 14: R preso at ow

Migration Oracle E-Business database to Exadata RAC with active data guard.

Cache the major inventory and eAM table related to WIP

All reports point to Active data guard standby server

1/9/2014 14

Page 15: R preso at ow

OBIEE BI-Publisher Reporting tools with organization security and Single Sign On

Implementation of OBIA eAM and Supply Chain Management to create the ad hoc reports and dash board for eAM and Inventory

1/9/2014 15

Page 16: R preso at ow

1/9/2014 16

Page 17: R preso at ow

1/9/2014 17