R. Bailey, PS/SPS days, January 2005 Towards the CCC
Jan 21, 2016
R. Bailey, PS/SPS days, January
2005
Towards the CCC
R. Bailey, PS/SPS days, January
2005
Status December 2004
R. Bailey, PS/SPS days, January
2005
Reminder of what CCC is about
Merging of PS and SL divisions into AB department in 2003 One Operations group Only makes sense in a single control room
DG decided early in 2004 that this will be on the B874 site
Bring together under one roof MCR operations PCR operations TCR operations LHC cryogenic operations
Result; the Cern Control Centre Operational from 2006
R. Bailey, PS/SPS days, January
2005
Issues addressed over the last year(s)
Requirements and modifications to building 874 Requirements and layout of the CCC Interior design of the CCC Specification and procurement of the consoles Staff needed in the coming years
People involved; R.Bailey, M.Bätz, B.Frammery, D.Manglunki, R.Saban, L.Serio
(CCCWG) M.Delrieux, R.Giachino, S.Knoops, E.Liénard, L.Randot,
L.Stewart (IDOC) M.Clark, D.Hartley, J.Wood (CCD) R.Ballet, A.Bland, P.Charrue, J.J.Cloye, C.Frisk, R.Hopkins
(AB/CO) J.L.Baldy, S.Anghelone, M.Poehler, P.Vachetta (TS/CE) L.Burguete-Oliete, M.Colin, R.Forrest, R.Lauckner ($$)
R. Bailey, PS/SPS days, January
2005
Modified building 874 - rez
625m2
R. Bailey, PS/SPS days, January
2005
Modified building 874 - etage
R. Bailey, PS/SPS days, January
2005
CCC layout issues
Contents 35 control console modules 5 access console modules 4 Mail/etc PC tables 1 social area Storage furniture
Consultants used Several iterations
Criteria applied Links between the facilities Accessibility to different areas Balance between open and closed Density of people Noise levels
R. Bailey, PS/SPS days, January
2005
CCC layout – final
Laura Stewart AT/ECR
SPS
LHC
PS
TI cryo
R. Bailey, PS/SPS days, January
2005
CCC interior design issues
Lighting 7x11 direct/indirect (20%-80%) from ceiling provide
background level of 200+ Lux Task lighting at workstation level
Acoustics Ceiling, walls, floor & furniture acoustically treated Acoustic screens behind consoles RT<0.6s
Interior decoration 3 Harmonious colour schemes from CCD 4th chosen by IDOC
R. Bailey, PS/SPS days, January
2005
CCC interior design - final
Mike Clark CCD
R. Bailey, PS/SPS days, January
2005
Consoles specification - final
R. Bailey, PS/SPS days, January
2005
Procurement; 4 firms invited to tender
R. Bailey, PS/SPS days, January
2005
Dates and schedules
End of SPS run 2004
Building ready end 10/2005
CCC operational 02/2006
2004 20062005
R. Bailey, PS/SPS days, January
2005
Staff evolution for AB/OP
R. Bailey, PS/SPS days, January
2005
Outstanding issues
Standard computers for all consoles Different OS 2006 start-up with existing 2004 applications When to converge ?
4 different Access systems SPS & EA as is PS panels emulated LHC new system When to converge ?
Communications in/out/within CCC Fast analog signals in CCC Parking space Office space
R. Bailey, PS/SPS days, January
2005
The bottom line
Restart all machines from CCC in 2006 PS and SPS off ~ 18 months Remote operation Long checkout periods
In case CCC is late Keep MCR active Access systems ?
2006 is going to be fun!