QUOTATION PRICED TO : PT. PP (Persero) Tbk. - Quotation No : PR-162-260-R2 EPC Division - Quotation Date : 4 DECEMBER 2016 3rd Floor PP Plaza Jl. TB Simatupang No. 57, Jakarta, Indonesia - Inquiry No : By Email - Inquiry Date - JOB No : Attn : Procurement, EPC Division Dear Sirs, In response to your above mentioned Inquiry No, We are pleased to submit quotation as below conditions. No Description Quantity Unit Price Total Amount Remark 1 Supply of Piping, Fitting & Acessories GGCP 1 Lot - MATERIAL TAKE OFF FOR DEMIN WATER SYSTEM IDR 1,185,314,194.54 IDR 1,185,314,194.54 - MATERIAL TAKE OFF FOR STEAM SYSTEM wothout silencer IDR 1,597,951,021.71 IDR 1,597,951,021.71 * Silencer IDR 871,966,640.00 IDR 871,966,640.00 - Packing, Handling & Documentation 1 Lot Included EXCL. PPN 10% IDR 3,655,231,856.25 - Delivery Term : DDP SITE GRESIK - Delivery Time AS PER ATTCHEMENT - Payment Term : SKBDN 90 days - 5% engineering approval - 10% before shipping (warehouse inspection) - 70% Material on Site - 10% after installation, maksimal 2 bulan setelah MOS - 5% Retensi 12 bulan, counter warranty bond - Brand/Manufacturer : as attached - Validity : 90 days - Note : - Packing : Manufacture Standard Packing - Inspection : Maker's Inspection shall be final, any Addtional Test and/or 3rd Party Inspection shall be at Client's account - Coating & Marking : Manufacturer standard coating & Marking We do hope this quotation shall meet your expectation. Should you have any further queries, please feel free to directly communicate to the address at: [email protected]Yours Faithfully Ali Chaedaroh Business Director Phone : +62-21-7974367 Fax : +62-21-79180907 Dinni Ika TOTAL PRICE (IDR)
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
QUOTATION PRICED
TO : PT. PP (Persero) Tbk. - Quotation No : PR-162-260-R2
EPC Division - Quotation Date : 4 DECEMBER 2016
3rd Floor PP Plaza
Jl. TB Simatupang No. 57, Jakarta, Indonesia - Inquiry No : By Email
- Inquiry Date
- JOB No :
Attn :
Procurement, EPC Division
Dear Sirs,
In response to your above mentioned Inquiry No, We are pleased to submit quotation as below conditions.
No Description Quantity Unit Price Total Amount Remark
1 Supply of Piping, Fitting & Acessories GGCP 1 Lot
- MATERIAL TAKE OFF FOR DEMIN WATER SYSTEM IDR 1,185,314,194.54 IDR 1,185,314,194.54
- MATERIAL TAKE OFF FOR STEAM SYSTEM wothout silencer IDR 1,597,951,021.71 IDR 1,597,951,021.71
* Silencer IDR 871,966,640.00 IDR 871,966,640.00
- Packing, Handling & Documentation 1 Lot Included
EXCL. PPN 10%
IDR 3,655,231,856.25
- Delivery Term : DDP SITE GRESIK
- Delivery Time AS PER ATTCHEMENT
- Payment Term : SKBDN 90 days
- 5% engineering approval
- 10% before shipping (warehouse inspection)
- 70% Material on Site
- 10% after installation, maksimal 2 bulan setelah MOS
- 5% Retensi 12 bulan, counter warranty bond
- Brand/Manufacturer : as attached
- Validity : 90 days
- Note : - Packing : Manufacture Standard Packing
- Inspection : Maker's Inspection shall be final, any Addtional Test and/or 3rd
Party Inspection shall be at Client's account
- Coating & Marking : Manufacturer standard coating & Marking
We do hope this quotation shall meet your expectation. Should you have any further queries, please feel free to directly communicate
1 1 PIPE PIPE, A312 TP-304L, Smls, Sch. 40S, PE, ASME B36.19M 3/4 3/4 19 3/4 3/4 19 4 LENGTH 1,424,599.95 5,698,399.80 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
2 2 PIPE PIPE, A312 TP-304L, Smls, Sch. 10S, BE, ASME B36.19M 10 10 7 10 10 7 2 LENGTH 40,704,451.78 81,408,903.56 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
3 3 PIPE PIPE, A312 TP-304L, Smls, Sch. 10S, BE, ASME B36.19M 2 2 4 2 2 4 1 LENGTH 3,052,819.18 3,052,819.18 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
4 4 PIPE PIPE, A312 TP-304L, Smls, Sch. 10S, BE, ASME B36.19M 4 4 92 4 4 92 16 LENGTH 5,087,982.97 81,407,727.52 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
5 5 PIPE PIPE, A312 TP-304L, Smls, Sch. 10S, BE, ASME B36.19M 6 6 146 6 6 146 25 LENGTH 12,872,708.63 321,817,715.75 Schoeller blackmann AUSTRIA End of Februarry 2017 (date issued PO From PP end of November 2016)
6 6 PIPE PIPE, A312 TP-304L, Smls, Sch. 10S, BE, ASME B36.19M 8 8 8 8 8 8 2 LENGTH 36,464,465.97 72,928,931.94 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
7 7 90 ELBOW 90 ELBOW, A182-F304L, 3000#, SW, ASME B16.11 3/4 3/4 10 3/4 3/4 10 10 EA 206,635.87 2,066,358.70 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
8 8 90 ELBOW 90 ELBOW, A403 WP-304L, Smls, Sch. 10S, BW, ASME B16.9 10 10 2 10 10 2 2 EA 4,659,228.64 9,318,457.28 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
9 9 90 ELBOW 90 ELBOW, A403 WP-304L, Smls, Sch. 10S, BW, ASME B16.9 2 2 6 2 2 6 6 EA 214,990.82 1,289,944.92 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
10 10 90 ELBOW 90 ELBOW, A403 WP-304L, Smls, Sch. 10S, BW, ASME B16.9 4 4 29 4 4 29 29 EA 888,758.04 25,773,983.16 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
11 11 90 ELBOW 90 ELBOW, A403 WP-304L, Smls, Sch. 10S, BW, ASME B16.9 6 6 19 6 6 19 19 EA 1,954,462.04 37,134,778.76 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
12 12 ECC. REDUCER ECC. REDUCER, A403 WP-304L, Smls, Sch. 10S, BW, ASME B16.9 10 8 2 10 8 2 2 EA 3,200,692.69 6,401,385.38 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
13 13 ECC. REDUCER ECC. REDUCER, A403 WP-304L, Smls, Sch. 10S, BW, ASME B16.9 8 6 1 8 6 1 1 EA 1,175,661.14 1,175,661.14 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
14 14 RED. TEE RED. TEE, A403 WP-304L, Smls, Sch. 10S, BW, ASME B16.9 4 2 2 4 2 2 2 EA 813,563.47 1,627,126.94 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
15 15 RED. TEE RED. TEE, A182-F304L, 3000#, SW, ASME B16.11 3/4 1/2 2 3/4 1/2 2 2 EA 266,612.50 533,225.00 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
16 16 TEE TEE, A182-F304L, 3000#, SW, ASME B16.11 3/4 3/4 1 3/4 3/4 1 1 EA 266,612.50 266,612.50 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
17 17 TEE TEE, A403 WP-304L, Smls, Sch. 10S, BW, ASME B16.9 10 10 1 10 10 1 1 EA 7,408,753.91 7,408,753.91 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
18 18 TEE TEE, A403 WP-304L, Smls, Sch. 10S, BW, ASME B16.9 4 4 4 4 4 4 4 EA 813,563.47 3,254,253.88 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
19 19 TEE TEE, A403 WP-304L, Smls, Sch. 10S, BW, ASME B16.9 6 6 5 6 6 5 5 EA 2,684,774.39 13,423,871.95 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
20 20 TEE TEE, A403 WP-304L, Smls, Sch. 10S, BW, ASME B16.9 8 8 2 8 8 2 2 EA 3,505,499.25 7,010,998.50 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
21 21 NIPPLE NIPPLE, A182-F304L, 3000#, SW, ASME B16.11 3/4 3/4 22 3/4 3/4 22 22 EA 82,355.95 1,811,830.90 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
22 22 PLUG PLUG, A182-F304L, 3000#, NPTM, ASME B16.11 3/4 3/4 12 3/4 3/4 12 12 EA 52,218.45 626,621.40 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
23 23 SOCKOLET SOCKOLET, A182-F304L, 3000#, SW, MSS SP-97 4 3/4 8 4 3/4 8 8 EA 137,259.93 1,098,079.44 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
24 24 SOCKOLET SOCKOLET, A182-F304L, 3000#, SW, MSS SP-97 6 3/4 7 6 3/4 7 7 EA 137,259.93 960,819.51 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
25 25 STUB END STUB END, A312 WP-304L, ANSI Cl. 150, BW, ASME B16.9 3/4 3/4 5 3/4 3/4 5 5 EA 311,520.36 1,557,601.80 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
26 26 STUB END STUB END, A312 WP-304L, ANSI Cl. 150, BW, ASME B16.9 10 10 3 10 10 3 3 EA 6,053,312.10 18,159,936.30 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
27 27 STUB END STUB END, A312 WP-304L, ANSI Cl. 150, BW, ASME B16.9 2 2 10 2 2 10 10 EA 386,714.93 3,867,149.30 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
28 28 STUB END STUB END, A312 WP-304L, ANSI Cl. 150, BW, ASME B16.9 4 4 17 4 4 17 17 EA 980,960.91 16,676,335.47 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
29 29 STUB END STUB END, A312 WP-304L, ANSI Cl. 150, BW, ASME B16.9 6 6 23 6 6 23 23 EA 2,374,298.40 54,608,863.20 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
30 30 STUB END STUB END, A312 WP-304L, ANSI Cl. 150, BW, ASME B16.9 8 8 11 8 8 11 11 EA 4,441,999.88 48,861,998.68 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
31 31 BLIND FLANGE BLIND FLANGE, A105, ANSI Cl. 150,RF, ASME B16.5 4 4 2 4 4 2 2 EA 272,031.45 544,062.90 MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
32 32 BLIND FLANGE BLIND FLANGE, A105, ANSI Cl. 150,RF, ASME B16.5 6 6 3 6 6 3 3 EA 435,433.28 1,306,299.84 MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
33 33 BLIND FLANGE BLIND FLANGE, A105, ANSI Cl. 150,RF, ASME B16.5 8 8 1 8 8 1 1 EA 782,705.04 782,705.04 MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
34 34 FLANGE FLANGE, A105, ANSI Cl. 150, RF, Lap-Joint, ASME B16.5 3/4 3/4 5 3/4 3/4 5 5 EA 77,772.28 388,861.40 ULMA ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
35 35 FLANGE FLANGE, A105, ANSI Cl. 150, RF, Lap-Joint, ASME B16.5 10 10 3 10 10 3 3 EA 815,685.97 2,447,057.91 MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
36 36 FLANGE FLANGE, A105, ANSI Cl. 150, RF, Lap-Joint, ASME B16.5 2 2 10 2 2 10 10 EA 133,818.63 1,338,186.30 MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
37 37 FLANGE FLANGE, A105, ANSI Cl. 150, RF, Lap-Joint, ASME B16.5 4 4 24 4 4 24 24 EA 244,882.22 5,877,173.28 MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
CHECK
BY PPNO. PART NAME DESCRIPTION
SIZE
QTY
LARGE SMALL
DELIVERY TIME DDP GRESIKBRAND REMARKNO.
SIZE
QTY OFFER QTY UNIT
MATERIAL TAKE OFF FOR DEMIN WATER SYSTEM
LARGE SMALL
unit price total price
COOCHECK
BY PPNO. PART NAME DESCRIPTION
SIZE
QTY
LARGE SMALL
DELIVERY TIME DDP GRESIKBRAND REMARKNO.
SIZE
QTY OFFER QTY UNIT
MATERIAL TAKE OFF FOR DEMIN WATER SYSTEM
LARGE SMALL
unit price total price
38 38 FLANGE FLANGE, A105, ANSI Cl. 150, RF, Lap-Joint, ASME B16.5 6 6 23 6 6 23 23 EA 394,938.11 9,083,576.53 MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
39 39 FLANGE FLANGE, A105, ANSI Cl. 150, RF, Lap-Joint, ASME B16.5 8 8 11 8 8 11 11 EA 541,220.56 5,953,426.16 MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
40 40 GASKET GASKET, Compressed, Non-Asbestos, Thk:3.0mm, RF,ASME B16.5/ASME B16.21 3/4 3/4 5 3/4 3/4 5 5 EA 7,623.13 38,115.65 NICHIAS LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
41 41 GASKET GASKET, Compressed, Non-Asbestos, Thk:3.0mm, RF,ASME B16.5/ASME B16.21 10 10 3 10 10 3 3 EA 165,530.86 496,592.58 NICHIAS LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
42 42 GASKET GASKET, Compressed, Non-Asbestos, Thk:3.0mm, RF,ASME B16.5/ASME B16.21 2 2 10 2 2 10 10 EA 19,602.34 196,023.40 NICHIAS LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
43 43 GASKET GASKET, Compressed, Non-Asbestos, Thk:3.0mm, RF,ASME B16.5/ASME B16.21 4 4 24 4 4 24 24 EA 46,827.80 1,123,867.20 NICHIAS LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
44 44 GASKET GASKET, Compressed, Non-Asbestos, Thk:3.0mm, RF,ASME B16.5/ASME B16.21 6 6 23 6 6 23 23 EA 66,430.15 1,527,893.45 NICHIAS LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
45 45 GASKET GASKET, Compressed, Non-Asbestos, Thk:3.0mm, RF,ASME B16.5/ASME B16.21 8 8 11 8 8 11 11 EA 99,100.71 1,090,107.81 NICHIAS LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
46 46 BOLT AND NUTS BOLT AND NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194 Gr. 2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B1/2 80 20 1/2 80 20 20 EA 7,698.28 153,965.60 tristars LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
47 47 BOLT AND NUTS BOLT AND NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194 Gr. 2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B5/8 110 192 5/8 110 192 192 EA 14,187.73 2,724,044.16 tristars LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
48 48 BOLT AND NUTS BOLT AND NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194 Gr. 2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B5/8 85 80 5/8 85 80 80 EA 12,226.42 978,113.60 tristars LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
49 49 BOLT AND NUTS BOLT AND NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194 Gr. 2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B3/4 120 184 3/4 120 184 184 EA 21,432.98 3,943,668.32 tristars LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
50 50 BOLT AND NUTS BOLT AND NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194 Gr. 2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B3/4 125 88 3/4 125 88 88 EA 21,886.01 1,925,968.88 tristars LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
51 51 BOLT AND NUTS BOLT AND NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194 Gr. 2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B7/8 125 36 7/8 125 36 36 EA 21,886.01 787,896.36 tristars LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
52 52 BASKET STRAINERBASKET STRAINER, BY DATA SHEET (07-STR-476A & 07-STR-476B) 6 6 2 6 6 2 2 EA 53,620,815.36 107,241,630.72 sechang KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
53 53 BASKET STRAINERBASKET STRAINER, BY DATA SHEET (07-STR-477A & 07-STR-477B) 8 8 2 8 8 2 2 EA 79,643,060.12 159,286,120.24 sechang KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
54 54 PIPE
PIPE, A53 Gr. B, Smls, Sch. 40, BE,ASME B36.10M
4 4 17 4 4 17 3 LENGTH 2,021,320.18 6,063,960.54 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)SIZE 4"
55 55 PIPE
PIPE, A53 Gr. B, Smls, Sch. 40, BE,ASME B36.10M
6 6 33 6 6 33 6 LENGTH 3,554,618.36 21,327,710.16 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)SIZE 6 "
56 56 90 ELBOW
90 ELBOW, A234 WPB, Smls, Sch. 40, BW, ASME B16.9
4 4 2 4 4 2 2 EA 212,454.50 424,909.00 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
57 57 90 ELBOW
90 ELBOW, A234 WPB, Smls, Sch. 40, BW, ASME B16.9
6 6 9 6 6 9 9 EA 484,587.23 4,361,285.07 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
58 58 NIPPLE
NIPPLE , A105, #3000, SW, ASME B16.11
3/4 3/4 3 3/4 3/4 3 3 EA 28,794.75 86,384.25 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
59 59 PLUG
PLUG, A105, #3000, TRD, ASME B16.11
3/4 3/4 2 3/4 3/4 2 2 EA 14,471.97 28,943.94 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
60 60 SOCKOLET
SOCKOLET, A105, SW, MSS SP-97
6 3/4 3 6 3/4 3 3 EA 57,738.68 173,216.04 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
61 61 TEE
TEE, A234 WPB, Smls, Sch. 40, BW, ASME B16.9
4 4 1 4 4 1 1 EA 359,262.94 359,262.94 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
62 62 TEE
TEE, A234 WPB, Smls, Sch. 40, BW, ASME B16.9
6 6 2 6 6 2 2 EA 844,894.55 1,689,789.10 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
63 63 TREADOLET
TREADOLET, A105, NPTF, MSS SP-97
6 1/2 1 6 1/2 1 1 EA 45,952.24 45,952.24 TK BEND KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
64 64 FLANGE
FLANGE, A105, ANSI Cl. 150, SO-RF, ASME B16.5
2 2 1 2 2 1 1 EA 120,750.41 120,750.41 MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
65 65 FLANGE
FLANGE, A105, ANSI Cl. 150, SO-RF, ASME B16.5
4 4 2 4 4 2 2 EA 218,745.76 437,491.52 MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
66 66 FLANGE
FLANGE, A105, ANSI Cl. 150, SO-RF, ASME B16.5
6 6 11 6 6 11 11 EA 355,733.43 3,913,067.73 MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
67 67 GASKET GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 3mm, RF, ASME
B16.5/ASME B16.20
2 2 6 2 2 6 6 EA 59,896.03 359,376.18 NICHIAS LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
68 68 GASKET GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 3mm, RF, ASME
B16.5/ASME B16.20
4 4 4 4 4 4 4 EA 128,504.22 514,016.88 NICHIAS LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
69 69 GASKET GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 3mm, RF, ASME
B16.5/ASME B16.20
6 6 12 6 6 12 12 EA 199,290.44 2,391,485.28 NICHIAS LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
70 70 BOLT AND NUTS
BOLT AND NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B
5/8 85 12 5/8 85 12 12 EA 12,226.42 146,717.04 tristars LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
71 71
BOLT AND NUTS BOLT AND NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B
5/8 90 40 5/8 90 40 40 EA 12,678.36 507,134.40 tristars LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
72 72
BOLT AND NUTS BOLT AND NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B
3/4 105 96 3/4 105 96 96 EA 19,773.32 1,898,238.72 tristars LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
1232 1,185,314,194.54
1PIPE
PIPE, A106 Gr. B, Smls, Sch. 80, BE, ASME B36.10M 14 14 45.8 14 1449 9 LENGTH 25,477,955.20 229,301,596.80 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
2PIPE
PIPE, A53 Gr. B, Smls, Sch. 20, BE,ASME B36.10M 12 12 8.6 12 1210 2 LENGTH 9,893,522.43 19,787,044.86 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
3PIPE
PIPE, A106 Gr. B, Smls, Sch. 80, BE, ASME B36.10M 12 12 32.9 12 1235 6 LENGTH 16,389,716.64 98,338,299.84 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
4PIPE
PIPE, A53 Gr. B, Smls, Sch. 20, BE,ASME B36.10M 10 10 24 10 1026 5 LENGTH 7,483,712.89 37,418,564.45 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
5PIPE
PIPE, A106 Gr. B, Smls, Sch. 80, BE, ASME B36.10M 10 10 27.3 10 1029 5 LENGTH 11,913,683.08 59,568,415.40 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
6PIPE
PIPE, A106 Gr. B, Smls, Sch. 80, BE, ASME B36.10M 8 8 3.3 8 84 1 LENGTH 8,020,949.12 8,020,949.12 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
7PIPE
PIPE, A53 Gr. B, Smls, Sch. 40, BE,ASME B36.10M 6 6 81 6 685 15 LENGTH 3,506,844.20 52,602,663.00 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
8PIPE
PIPE, A106 Gr. B, Smls, Sch. 80, BE, ASME B36.10M 6 6 20.1 6 622 4 LENGTH 5,281,183.15 21,124,732.60 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
9PIPE
PIPE, A53 Gr. B, Smls, Sch. 40, BE,ASME B36.10M 4 4 1.7 4 42 1 LENGTH 1,994,308.83 1,994,308.83 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
10PIPE
PIPE, A106 Gr. B, Smls, Sch. 80, BE, ASME B36.10M 4 4 25 4 427 5 LENGTH 2,769,847.48 13,849,237.40 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016) QTY 5 PCS
11PIPE
PIPE, A106 Gr. B, Smls, Sch. 80, BE, ASME B36.10M 3 3 80 3 384 14 LENGTH 1,895,134.43 26,531,882.02 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
12PIPE
PIPE, A53 Gr. B, Smls, Sch. 40, BE,ASME B36.10M 2 2 5.6 2 26 1 LENGTH 675,423.12 675,423.12 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
13PIPE
PIPE, A106 Gr. B, Smls, Sch. 80, BE, ASME B36.10M 2 2 1.5 2 22 1 LENGTH 928,295.72 928,295.72 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
14PIPE
PIPE, A312-TP316, Smls, Sch. 40S, BE, ASME B36.10M 2 2 52.4 2 252.4 9 LENGTH 4,386,607.72 39,479,469.48 SANDVIK SWEDEN End of Februarry 2017 (date issued PO From PP end of November 2016) PLEASE QUOTE
15PIPE
PIPE, A106 Gr. B, Smls, Sch. 40, PE, ASME B36.10M 1 1 21.8 1 123 4 LENGTH 366,618.27 1,466,473.08 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
16PIPE
PIPE, A312-TP316, Smls, Sch. 40S, BE, ASME B36.10M 1 1 10 1 111 2 LENGTH 2,335,076.35 4,670,152.70 SANDVIK SWEDEN End of Februarry 2017 (date issued PO From PP end of November 2016)
17PIPE
PIPE, A53 Gr. B, Smls, Sch. 80,PE,ASME B36.10M 0.75 0.75 15.6 0.75 0.7517 3 LENGTH 322,905.55 968,716.65 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
18PIPE
PIPE, A106 Gr. B, Smls, Sch. 40, PE, ASME B36.10M 0.75 0.75 18.5 0.75 0.7520 4 LENGTH 248,172.36 992,689.44 NSSMC JAPAN End of Februarry 2017 (date issued PO From PP end of November 2016)
1945 ELBOW
45 ELBOW, A234 WPB, Smls, Sch.80, BW, ASME B16.9 14 14 1 14 141 1 LENGTH 4,365,344.40 4,365,344.40 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
2090 ELBOW
90 ELBOW, A234 WPB, Smls, Sch.80, BW, ASME B16.9 14 14 6 14 146 6 EA 5,769,925.85 34,619,555.10 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
2190 ELBOW
90 ELBOW, A234 WPB, Smls,Sch. 20, BW, ASME B16.9 12 12 2 12 122 2 EA 1,854,965.96 3,709,931.92 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
2290 ELBOW
90 ELBOW, A234 WPB, Smls, Sch.80, BW, ASME B16.9 12 12 18 12 1218 18 EA 4,166,645.35 74,999,616.30 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
2390 ELBOW
90 ELBOW, A234 WPB, Smls,Sch. 20, BW, ASME B16.9 10 10 12 10 1012 12 EA 1,112,420.28 13,349,043.36 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
2490 ELBOW
90 ELBOW, A234 WPB, Smls, Sch.80, BW, ASME B16.9 10 10 10 10 1010 10 EA 2,477,997.85 24,779,978.50 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
2590 ELBOW
90 ELBOW, A234 WPB, Smls, Sch.80, BW, ASME B16.9 8 8 3 8 83 3 EA 1,443,438.17 4,330,314.51 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
2690 ELBOW
90 ELBOW, A234 WPB, Smls, Sch. 40, BW, ASME B16.9 6 6 29 6 629 29 EA 478,349.55 13,872,136.95 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
2790 ELBOW
90 ELBOW, A234 WPB, Smls, Sch.80, BW, ASME B16.9 6 6 8 6 68 8 EA 700,745.29 5,605,962.32 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
2890 ELBOW
90 ELBOW, A234 WPB, Smls, Sch.80, BW, ASME B16.9 4 4 10 4 410 10 EA 279,503.32 2,795,033.20 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
2990 ELBOW
90 ELBOW, A234 WPB, Smls, Sch.80, BW, ASME B16.9 3 3 22 3 322 22 EA 160,578.26 3,532,721.72 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
3090 ELBOW
90 ELBOW, A234 WPB, Smls, Sch. 40, BW, ASME B16.9 2 2 3 2 23 3 EA 60,787.19 182,361.57 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
3190 ELBOW
90 ELBOW, A234 WPB, Smls, Sch.80, BW, ASME B16.9 2 2 1 2 21 1 EA 77,419.03 77,419.03 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
3290 ELBOW
90 ELBOW, A403 WP316, SMLS, BW, Sch. 40S, ASME B16.9 2 2 13 2 213 13 EA 336,022.16 4,368,288.08 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
3390 ELBOW
90 ELBOW, A105, #3000, SW, ASME B16.11 1 1 13 1 113 13 EA 73,297.87 952,872.31 S.W TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
3490 ELBOW
90 ELBOW, A182-F316, #6000, SW, ASME B16.11 1 1 3 1 13 3 EA 465,102.94 1,395,308.82 S.W TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
3590 ELBOW
90 ELBOW, A105, #3000, SW, ASME B16.11 0.75 0.75 14 0.75 0.7514 14 EA 43,272.24 605,811.36 S.W TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
3690 ELBOW
90 ELBOW, A105, #3000, SW, ASME B16.11 0.75 0.75 13 0.75 0.7513 13 EA 43,272.24 562,539.12 S.W TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
37CAP
CAP, A105, #3000, THD, ASME B16.11 0.75 0.75 2 0.75 0.752 2 EA 28,848.15 57,696.30 THR'D TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
38CON. REDUCER
CON. REDUCER, A234 WPB, Smls,Sch. 20, BW, ASME B16.9 12 10 1 12 101 1 EA 987,313.47 987,313.47 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
39CON. REDUCER
CON. REDUCER, A234 WPB, Smls, Sch.80, BW, ASME B16.9 12 10 1 12 101 1 EA 1,600,336.81 1,600,336.81 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
40CON. REDUCER
CON. REDUCER, A234 WPB, Smls,Sch. 20, BW, ASME B16.9 12 8 1 12 81 1 EA 1,032,057.55 1,032,057.55 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
41CON. REDUCER
CON. REDUCER, A234 WPB, Smls,Sch. 20 X Sch. 40, BW, ASME B16.9 12 6 1 12 61 1 EA 1,266,816.79 1,266,816.79 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
42CON. REDUCER
CON. REDUCER, A234 WPB, Smls, Sch.80, BW, ASME B16.9 10 8 2 10 82 2 EA 1,121,987.26 2,243,974.52 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
43CON. REDUCER
CON. REDUCER, A234 WPB, Smls,Sch. 20 X Sch. 40, BW, ASME B16.9 8 6 1 8 61 1 EA 405,640.42 405,640.42 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
44CON. REDUCER
CON. REDUCER, A234 WPB, Smls, Sch.80, BW, ASME B16.9 4 3 2 4 32 2 EA 150,128.17 300,256.34 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
45CON. SWAGE
CON. SWAGE, A403 WP316, SMLS, BW, Sch. 40S, ASME B16.9 2 1 1 2 11 1 EA 437,285.08 437,285.08 BE*PE / 4"L TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
46ECC. REDUCER
ECC. REDUCER, A234 WPB, Smls,Sch. 20 X Sch. 40, BW, ASME B16.9 12 6 1 12 61 1 EA 1,553,973.70 1,553,973.70 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
47ECC. REDUCER
ECC. REDUCER, A234 WPB, Smls,Sch. 20, BW, ASME B16.9 10 8 1 10 81 1 EA 709,134.81 709,134.81 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
48ECC. REDUCER
ECC. REDUCER, A234 WPB, Smls,Sch. 20 X Sch. 40, BW, ASME B16.9 10 6 2 10 62 2 EA 895,911.91 1,791,823.82 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
49ECC. REDUCER
ECC. REDUCER, A234 WPB, Smls,Sch. 20 X Sch. 40, BW, ASME B16.9 8 4 1 8 41 1 EA 670,130.92 670,130.92 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
50ECC. REDUCER
ECC. REDUCER, A234 WPB, Smls, Sch.80, BW, ASME B16.9 4 2 2 4 22 2 EA 231,962.74 463,925.48 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
51NIPPLE PE
NIPPLE PE, A105, #3000, SW, ASME B16.11 0.75 0.75 9 0.75 0.759 9 EA 28,406.60 255,659.40 BE*PE / 4"L TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
52NIPPLE PE
NIPPLE PE, A105, #3000, SW, ASME B16.11 0.75 0.75 4 0.75 0.754 4 EA 28,406.60 113,626.40 BE*PE / 4"L TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
53NIPPLE PE X THD
NIPPLE PE X THD, A105, #3000, SW X NPTM, ASME B16.11 0.75 0.75 2 0.75 0.752 2 EA 28,406.60 56,813.20 BE*PE / 4"L TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
CHECK BY
PP
DESCRIPTION
SIZE
QTY
LARGE SMALL
DELIVERY TIME DDP GRESIK t. price REMARKS BRAND COOLARG
E
SMAL
L
MATERIAL TAKE OFF FOR STEAM DISTRIBUTION SYSTEM
(FINAL MTO / PP SCOPE)
SIZE
QTY
OFFE
R
QTY/
UNIT UNIT price
NO. PART NAME
CHECK BY
PP
DESCRIPTION
SIZE
QTY
LARGE SMALL
DELIVERY TIME DDP GRESIK t. price REMARKS BRAND COOLARG
E
SMAL
L
MATERIAL TAKE OFF FOR STEAM DISTRIBUTION SYSTEM
(FINAL MTO / PP SCOPE)
SIZE
QTY
OFFE
R
QTY/
UNIT UNIT price
NO. PART NAME
54NIPPLE PE X THD
NIPPLE PE X THD, A105, #3000, SW X NPTM, ASME B16.11 0.5 0.5 2 0.5 0.52 2 EA 22,224.86 44,449.72 BE*PE / 4"L TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
55PLUG
PLUG, A105, #3000, THD, ASME B16.11 0.75 0.75 6 0.75 0.756 6 EA 14,276.90 85,661.40 THR'D TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
56PLUG
PLUG, A105, #3000, THD, ASME B16.11 0.75 0.75 4 0.75 0.754 4 EA 14,276.90 57,107.60 THR'D TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
57SOCKOLET
SOCKOLET, A105, #3000, SW, MSS SP-97 14 1 1 14 11 1 EA 80,657.09 80,657.09 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
58SOCKOLET
SOCKOLET, A105, #3000, SW, MSS SP-97 14 0.75 2 14 0.752 2 EA 56,960.39 113,920.78 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
59SOCKOLET
SOCKOLET, A105, #3000, SW, ASME B16.11 10 0.75 3 10 0.753 3 EA 56,960.39 170,881.17 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
60SOCKOLET
SOCKOLET, A105, #3000, SW, MSS SP-97 8 1 1 8 11 1 EA 80,657.09 80,657.09 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
61SOCKOLET
SOCKOLET, A105, #3000, SW, MSS SP-97 6 1 1 6 11 1 EA 80,657.09 80,657.09 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
62SOCKOLET
SOCKOLET, A105, #3000, SW, ASME B16.11 6 0.75 8 6 0.758 8 EA 56,960.39 455,683.12 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
63SOCKOLET
SOCKOLET, A105, #3000, SW, MSS SP-97 6 0.75 1 6 0.751 1 EA 56,960.39 56,960.39 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
64SOCKOLET
SOCKOLET, A105, #3000, SW, ASME B16.11 4 0.75 1 4 0.751 1 EA 56,960.39 56,960.39 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
65SOCKOLET
SOCKOLET, A105, #3000, SW, MSS SP-97 4 0.75 2 4 0.752 2 EA 56,960.39 113,920.78 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
66SOCKOLET
SOCKOLET, A105, #3000, SW, MSS SP-97 3 0.75 2 3 0.752 2 EA 56,960.39 113,920.78 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
67SOCKOLET
SOCKOLET, A182-F316, #6000, SW, MSS SP-97 2 1 1 2 11 1 EA 278,031.47 278,031.47 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
68TEE
TEE, A234 WPB, Smls,Sch. 20, BW, ASME B16.9 10 10 1 10 101 1 EA 2,091,197.05 2,091,197.05 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
69TEE
TEE, A234 WPB, Smls, Sch. 40, BW, ASME B16.9 6 6 1 6 61 1 EA 834,094.42 834,094.42 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
70TEE
TEE, A234 WPB, Smls, Sch.80, BW, ASME B16.9 6 6 1 6 61 1 EA 1,220,306.50 1,220,306.50 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
71TEE
TEE, A234 WPB, Smls, Sch.80, BW, ASME B16.9 3 3 2 3 32 2 EA 289,659.06 579,318.12 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
72TEE
TEE, A403 WP316, SMLS, BW, Sch. 40S, ASME B16.9 2 2 1 2 21 1 EA 678,226.07 678,226.07 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
73TEE
TEE, A105, #3000, SW, ASME B16.11 1 1 2 1 12 2 EA 89,782.53 179,565.06 S.W TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
74TEE
TEE, A105, #3000, SW, ASME B16.11 0.75 0.75 3 0.75 0.753 3 EA 54,899.81 164,699.43 S.W TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
75TEE
TEE, A105, #3000, SW, ASME B16.11 0.75 0.75 3 0.75 0.753 3 EA 54,899.81 164,699.43 S.W TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
76TEE RED.
TEE RED., A234 WPB, Smls, Sch.80, BW, ASME B16.9 14 12 1 14 121 1 EA 5,996,589.95 5,996,589.95 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
77TEE RED.
TEE RED., A234 WPB, Smls, Sch.80, BW, ASME B16.9 14 10 2 14 102 2 EA 5,996,589.95 11,993,179.90 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
78TEE RED.
TEE RED., A234 WPB, Smls, Sch.80, BW, ASME B16.9 14 8 1 14 81 1 EA 5,996,589.95 5,996,589.95 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
79TEE RED.
TEE RED., A234 WPB, Smls, Sch.80, BW, ASME B16.9 12 6 1 12 61 1 EA 5,463,782.14 5,463,782.14 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
80TEE RED.
TEE RED., A234 WPB, Smls,Sch. 20 X Sch. 40, BW, ASME B16.9 10 6 5 10 65 5 EA 2,091,197.05 10,455,985.25 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
81TEE RED.
TEE RED., A234 WPB, Smls, Sch.80, BW, ASME B16.9 10 6 1 10 61 1 EA 3,471,198.70 3,471,198.70 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
82TEE RED.
TEE RED., A234 WPB, Smls, Sch. 40, BW, ASME B16.9 6 4 2 6 42 2 EA 834,094.42 1,668,188.84 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
83TEE RED.
TEE RED., A234 WPB, Smls, Sch. 40, BW, ASME B16.9 4 2 1 4 21 1 EA 354,714.59 354,714.59 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
84TEE RED.
TEE RED., A234 WPB, Smls, Sch.80, BW, ASME B16.9 4 2 1 4 21 1 EA 461,717.70 461,717.70 SML'S TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
85TREADOLET
TREADOLET, A105, #3000, THD, MSS SP-97 14 0.75 1 14 0.751 1 EA 59,462.53 59,462.53 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
86TREADOLET
TREADOLET, A105, #3000, THD, MSS SP-97 14 0.5 1 14 0.51 1 EA 45,332.82 45,332.82 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
87TREADOLET
TREADOLET, A105, #3000, THD, MSS SP-97 12 0.75 1 12 0.751 1 EA 59,462.53 59,462.53 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
88TREADOLET
TREADOLET, A105, #3000, THD, MSS SP-97 10 0.75 1 10 0.751 1 EA 59,462.53 59,462.53 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
89TREADOLET
TREADOLET, A105, #3000, THD, ASME B16.11 6 0.5 2 6 0.52 2 EA 45,332.82 90,665.64 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
90TREADOLET
TREADOLET, A105, #3000, THD, MSS SP-97 3 0.75 1 3 0.751 1 EA 59,462.53 59,462.53 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
91WELDOLET
WELDOLET, A234 WPB, Smls, Sch.80, BW, MSS SP-97 14 6 1 14 61 1 EA 1,862,472.36 1,862,472.36 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
92WELDOLET
WELDOLET, A234 WPB, Smls, Sch.80, BW, MSS SP-97 14 4 2 14 42 2 EA 413,146.82 826,293.64 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
93WELDOLET
WELDOLET, A234 WPB, Smls, Sch.80, BW, MSS SP-97 14 3 2 14 32 2 EA 275,970.90 551,941.80 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
94WELDOLET
WELDOLET, A234 WPB, Smls, Sch. 40, BW, ASME B16.9 10 2 1 10 21 1 EA 125,548.36 125,548.36 - TK KOREA End of Februarry 2017 (date issued PO From PP end of November 2016)
95FLANGE
FLANGE, A105, ANSI Cl. 600, WN, RF, ASME B16.5 14 14 4 14 144 4 EA 7,457,579.59 29,830,318.36 - ULMA ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
96FLANGE
FLANGE, A105, ANSI Cl. 150, SO-RF, ASME B16.5 12 12 3 12 12 3 3 EA 1,398,338.48 4,195,015.44 - ULMA ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
97FLANGE
FLANGE, A105, ANSI Cl. 600, WN, RF, ASME B16.5 12 12 2 12 12 2 2 EA 5,783,092.95 11,566,185.90 - MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
98FLANGE
FLANGE, A105, ANSI Cl. 150, SO-RF, ASME B16.5 10 10 6 10 10 6 6 EA 740,230.48 4,441,382.88 - MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
99FLANGE
FLANGE, A105, ANSI Cl. 600, WN, RF, ASME B16.5 10 10 3 10 10 3 3 EA 4,625,030.44 13,875,091.32 - MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
100FLANGE
FLANGE, A105, ANSI Cl. 600, WN, RF, ASME B16.5 8 8 1 8 81 1 EA 2,932,946.14 2,932,946.14 - MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
101FLANGE
FLANGE, A105, ANSI Cl. 150, SO-RF, ASME B16.5 6 6 12 6 6 12 12 EA 350,938.29 4,211,259.48 - MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
102FLANGE
FLANGE, A105, ANSI Cl. 600, WN, RF, ASME B16.5 6 6 8 6 6 8 8 EA 1,834,557.81 14,676,462.48 - ULMA ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
103FLANGE
FLANGE, A105, ANSI Cl. 150, SO-RF, ASME B16.5 4 4 1 4 4 1 1 EA 215,797.15 215,797.15 - MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
104FLANGE
FLANGE, A105, ANSI Cl. 150, SO-RF, ASME B16.5 4 4 1 4 4 1 1 EA 215,797.15 215,797.15 - MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
105FLANGE
FLANGE, A105, ANSI Cl. 600, WN, RF, ASME B16.5 4 4 7 4 47 7 EA 827,993.25 5,795,952.75 - ULMA ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
106FLANGE
FLANGE, A105, ANSI Cl. 600, WN, RF, ASME B16.5 3 3 6 3 36 6 EA 446,935.87 2,681,615.22 - MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
CHECK BY
PP
DESCRIPTION
SIZE
QTY
LARGE SMALL
DELIVERY TIME DDP GRESIK t. price REMARKS BRAND COOLARG
E
SMAL
L
MATERIAL TAKE OFF FOR STEAM DISTRIBUTION SYSTEM
(FINAL MTO / PP SCOPE)
SIZE
QTY
OFFE
R
QTY/
UNIT UNIT price
NO. PART NAME
107FLANGE
FLANGE, A105, ANSI Cl. 150, SO-RF, ASME B16.5 2 2 1 2 2 1 1 EA 119,122.74 119,122.74 - MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
108FLANGE
FLANGE, A105, ANSI Cl. 600, WN, RF, ASME B16.5 2 2 3 2 2 3 3 EA 279,193.91 837,581.73 - ULMA ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
109FLANGE
FLANGE, A182-F316, ANSI Cl. 900, WN, RF, ASME B16.15 2 2 1 2 22 1 EA 3,764,978.91 3,764,978.91 - SEYU ITALY End of Februarry 2017 (date issued PO From PP end of November 2016) QTY 1
110FLANGE
FLANGE, A105, ANSI Cl. 600, WN, RF, ASME B16.5 1 1 12 1 112 12 EA 146,647.30 1,759,767.60 - MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
111FLANGE
FLANGE, A182-F316, ANSI Cl. 600, SW, RF, ASME B16.15 1 1 1 1 14 1 EA 1,013,512.30 1,013,512.30 SEYU ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
112FLANGE
FLANGE, A105, ANSI Cl. 150, SW-RF, ASME B16.5 0.75 0.75 18 0.75 0.7518 18 EA 78,512.71 1,413,228.78 SEYU ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
113FLANGE
FLANGE, A105, ANSI Cl. 600, WN, RF, ASME B16.5 0.75 0.75 18 0.75 0.7518 18 EA 124,086.19 2,233,551.42 SEYU ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
114BLIND FLANGE
BLIND FLANGE, A105, ANSI Cl. 600, RF, ASME B16.5 14 14 1 14 141 1 EA 9,371,439.74 9,371,439.74 - MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
115BLIND FLANGE
BLIND FLANGE, A105, ANSI Cl. 150, RF, ASME B16.5 10 10 1 10 101 1 EA 1,195,739.58 1,195,739.58 - ULMA ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
116BLIND FLANGE
BLIND FLANGE, A105, ANSI Cl. 600, RF, ASME B16.5 8 8 1 8 81 1 EA 3,275,424.00 3,275,424.00 - ULMA ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
117BLIND FLANGE
BLIND FLANGE, A105, ANSI Cl. 150, RF, ASME B16.5 6 6 1 6 61 1 EA 429,563.80 429,563.80 - MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
118BLIND FLANGE
BLIND FLANGE, A105, ANSI Cl. 600, RF, ASME B16.5 6 6 2 6 62 2 EA 1,552,994.98 3,105,989.96 - MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
119BLIND FLANGE
BLIND FLANGE, A105, ANSI Cl. 150, RF, ASME B16.5 4 4 1 4 41 1 EA 268,364.58 268,364.58 - MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
120BLIND FLANGE
BLIND FLANGE, A105, ANSI Cl. 150, RF, ASME B16.5 4 4 1 4 41 1 EA 268,364.58 268,364.58 - MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
121BLIND FLANGE
BLIND FLANGE, A105, ANSI Cl. 600, RF, ASME B16.5 3 3 2 3 32 2 EA 406,325.84 812,651.68 - MFF ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
122BLIND FLANGE
BLIND FLANGE, A182-F316, ANSI Cl. 900, RF, ASME B16.15 2 2 1 2 21 1 EA 3,214,803.34 3,214,803.34 - SEYU ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
123GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 4.5mm, RF, ASME B16.5/ASME B16.2014 14 5 14 145 5 EA 490,973.03 2,454,865.15 tombo ITALY End of Februarry 2017 (date issued PO From PP end of November 2016)
124GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 3mm, RF, ASME B16.5/ASME B16.2012 12 2 12 122 2 EA 458,742.86 917,485.72 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
125GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 4.5mm, RF, ASME B16.5/ASME B16.2012 12 3 12 123 3 EA 322,301.77 966,905.31 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
126GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 3mm, RF, ASME B16.5/ASME B16.2010 10 6 10 106 6 EA 301,889.33 1,811,335.98 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
127GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 4.5mm, RF, ASME B16.5/ASME B16.2010 10 5 10 105 5 EA 421,140.99 2,105,704.95 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
128GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 4.5mm, RF, ASME B16.5/ASME B16.208 8 1 8 81 1 EA 297,591.97 297,591.97 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
129GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 3mm, RF, ASME B16.5/ASME B16.206 6 14 6 614 14 EA 196,604.08 2,752,457.12 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
130GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 4.5mm, RF, ASME B16.5/ASME B16.206 6 8 6 68 8 EA 234,205.96 1,873,647.68 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
131GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 3mm, RF, ASME B16.5/ASME B16.204 4 2 4 42 2 EA 126,772.03 253,544.06 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
132GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 3mm, RF, ASME B16.5/ASME B16.204 4 1 4 41 1 EA 126,772.03 126,772.03 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
133GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 4.5mm, RF, ASME B16.5/ASME B16.204 4 7 4 47 7 EA 140,738.44 985,169.08 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
134GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 4.5mm, RF, ASME B16.5/ASME B16.203 3 6 3 36 6 EA 98,839.21 593,035.26 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
135GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 3mm, RF, ASME B16.5/ASME B16.202 2 1 2 21 1 EA 59,088.66 59,088.66 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
136GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 4.5mm, RF, ASME B16.5/ASME B16.202 2 4 2 24 4 EA 62,311.67 249,246.68 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
137GASKET
GASKET, Spiral Wound Gasket, Hoop SS316, Flex. Graphite Filler, IR SS316, OR Low-CS, Thk: 3mm, RF, ASME B16.5/ASME B16.202 2 2 2 22 2 EA 62,311.67 124,623.34 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
138GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 4.5mm, RF, ASME B16.5/ASME B16.201 1 12 1 112 12 EA 34,378.85 412,546.20 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
139GASKET
GASKET, Spiral Wound Gasket, Hoop SS316, Flex. Graphite Filler, IR SS316, OR Low-CS, Thk: 3mm, RF, ASME B16.5/ASME B16.201 1 4 1 14 4 EA 34,378.85 137,515.40 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
140GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 3mm, RF, ASME B16.5/ASME B16.200.75 0.75 18 0.75 0.7518 18 EA 29,007.16 522,128.88 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
141GASKET
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 4.5mm, RF, ASME B16.5/ASME B16.200.75 0.75 18 0.75 0.7518 18 EA 32,230.18 580,143.24 tombo LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
142BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2H1.375 250 120 1.375 250120 120 EA 113,628.56 13,635,427.20 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
143BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2H1.25 235 60 1.25 23560 60 EA 87,681.13 5,260,867.80 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
144BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2H1.25 230 64 1.25 23064 64 EA 86,339.27 5,525,713.28 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
145BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2H1.125 200 12 1.125 20012 12 EA 64,419.53 773,034.36 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
146BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2H1 185 96 1 18596 96 EA 39,815.01 3,822,240.96 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
147BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2H1 175 0 1 1750 - EA 38,920.09 - tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
148BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2H5/8 95 48 5/8 9548 48 EA 9,394.02 450,912.96 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
149BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2H0.875 155 76 0.875 15576 76 EA 26,394.37 2,005,972.12 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
150BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B0.875 130 24 0.875 13024 24 EA 23,262.66 558,303.84 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
151BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B0.875 125 72 0.875 12572 72 EA 22,367.74 1,610,477.28 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
152BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B0.875 120 0 0.875 1200 - EA 21,451.33 - tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
153BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2H0.75 130 48 0.75 13048 48 EA 17,894.19 858,921.12 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
154BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B0.75 105 116 0.75 105116 116 EA 15,657.42 1,816,260.72 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
155BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2H0.625 110 24 0.625 11024 24 EA 9,842.02 236,208.48 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
156BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2H0.625 110 16 0.625 11016 16 EA 9,842.02 157,472.32 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
157BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2H0.625 95 16 0.625 9516 16 EA 9,394.02 150,304.32 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
158BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B0.625 90 80 0.625 9080 80 EA 8,947.10 715,768.00 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
159BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2H0.625 90 72 0.625 9072 72 EA 8,947.10 644,191.20 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
CHECK BY
PP
DESCRIPTION
SIZE
QTY
LARGE SMALL
DELIVERY TIME DDP GRESIK t. price REMARKS BRAND COOLARG
E
SMAL
L
MATERIAL TAKE OFF FOR STEAM DISTRIBUTION SYSTEM
(FINAL MTO / PP SCOPE)
SIZE
QTY
OFFE
R
QTY/
UNIT UNIT price
NO. PART NAME
160BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B0.625 85 4 0.625 854 4 EA 8,947.10 35,788.40 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
161BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B0.375 95 8 0.375 958 8 EA 12,314.08 98,512.64 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
162BOLT & NUTS
BOLT & NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2H0.375 95 8 0.375 958 8 EA 12,507.46 100,059.68 tristar LOCAL End of Februarry 2017 (date issued PO From PP end of November 2016)
163STEAM TRAP
STEAM TRAP, SEE DATASHEET FOR STEAM TRAP (SST-26953, SST-26957) 1 1 2 1 12 2 EA 77,476,539.32 154,953,078.64 100% PT at SW CONNECTION TLV JAPAN 18 WEEKS DDP GRESIK
164STEAM TRAP
STEAM TRAP, SEE DATASHEET FOR STEAM TRAP (SST-26954, SST-26955, SST-26962)0.75 0.75 3 0.75 0.753 3 EA 49,934,301.36 149,802,904.08 100% PT at SW CONNECTION TLV JAPAN 18 WEEKS DDP GRESIK
165STEAM TRAP
STEAM TRAP, SEE DATASHEET FOR STEAM TRAP (SST-26952, SST-26961, SST-26960)0.75 0.75 3 0.75 0.753 3 EA 75,573,213.93 226,719,641.79 100% PT at SW CONNECTION TLV JAPAN 18 WEEKS DDP GRESIK
166 SILENCER SILENCER, BY DATASHEET 12 12 1 12 12 1 1 EA
SIZETOO BIG
FOR
INSTALATION
1,597,951,021.71
PLEASE FIND THE QUOTATION AS PER SHEET 3
166 SILENCER SILENCER, BY DATASHEET 12 12 1 EA 871,966,640.00 871,966,640.00 AARDING / (CCO: THAILAND/ MALAYSIA) 20-22 WEEKS
TOTAL PRICE DDP GRESIK (EXCLD PPN 10%) 871,966,640.00
TOTAL PRICE BRAND DELIVERY TIME DDP GRESIK
MATERIAL TAKE OFF FOR STEAM DISTRIBUTION SYSTEM
(FINAL MTO / PP SCOPE)
NO. PART NAME DESCRIPTION
SIZE
QTYLARGE SMALL
UNIT UNIT PRICE
Our Ref : 028/DK/MG/XI/16Date : 28‐Nov‐16
To: PT. PP (Persero) Tbk ( Att: Dinni ) From : DikoThank you for your inquiry, we are pleased to offer as follows. Email : [email protected] contact us with any queries quoting our quotation number above. Mobile : 085210707055
67GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR
2 2 6 EA TRISTAR / INGI Offer Class 150# 52,940 317,641.50
68GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR
4 4 4 EA TRISTAR / INGI Offer Class 150# 107,588 430,353.00
69GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR
6 6 12 EA TRISTAR / INGI Offer Class 150# 153,698 1,844,370.00
70BOLT AND NUTS, A193‐B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194‐2H, Hex. Nuts,
0.625 85 12 EA ALLOY MAS / BBN / KAU 13,840 166,080.00
71BOLT AND NUTS, A193‐B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194‐2H, Hex. Nuts,
0.625 90 40 EA ALLOY MAS / BBN / KAU 14,705 588,200.00
72BOLT AND NUTS, A193‐B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194‐2H, Hex. Nuts,
0.75 105 96 EA ALLOY MAS / BBN / KAU 25,950 2,491,200.00
IDR 1,203,417,704.80
TERMS & CONDITIONS : Yours Faithfully,1. Prices : IDR Currency ( Exclude VAT ) PT. Mitra Galperti2. Delivery point : Ex Works Cikarang3. Delivery Time : Ex Stock ‐ 8 Weeks4. Brand / Origin : As above5. Certification : 3.16. COO : JAPAN (JFE, NSS)
ITALY (GALPERTI, ULMA, MEGA, VIAR, TECHNOFORGE) SPAIN (TUBOS) FRANCE (VALLOUREC) DIKO LOKAL (INGI, BBN, ALLOY MAS, KAU, TRISTAR)
7. Payment Terms : NETT 30 DAYS8. Validity : 1 Week9. We offer for complete order, partial orders subject to our confirmation10. Materials are subject to prior sale
TOTAL
Our Ref : 029/DK/MG/XI/16Date : 28‐Nov‐16
To: PT. PP (Persero) Tbk ( Att: Dinni ) From : DikoThank you for your inquiry, we are pleased to offer as follows. Email : [email protected] contact us with any queries quoting our quotation number above. Mobile : 085210707055
VOLUME UNITLARGE SMALL a b UNIT PRICE TOTAL PRICE
1PIPE, A106 Gr. B, Smls, Sch. 80, BE, ASME B36.10M
0.375 95 8 EA ALLOY MAS / BBN / KAU 3/8 x 95 11,016 88,128.00
163STEAM TRAP, SEE DATASHEET FOR STEAM TRAP (SST‐26953, SST‐26957)
1 1 2 EA NO OFFER ‐ ‐
164STEAM TRAP, SEE DATASHEET FOR STEAM TRAP (SST‐26954, SST‐26955, SST‐26962)
0.75 0.75 3 EA NO OFFER ‐ ‐
165STEAM TRAP, SEE DATASHEET FOR STEAM TRAP (SST‐26952, SST‐26961, SST‐26960)
0.75 0.75 3 EA NO OFFER ‐ ‐
IDR 1,164,284,955.90
TERMS & CONDITIONS : Yours Faithfully,1. Prices : IDR Currency ( Exclude VAT ) PT. Mitra Galperti2. Delivery point : FOT Gresik3. Delivery Time : Ex Stock ‐ 8 Weeks ( Partial Shipment )4. Brand / Origin : As above5. Certification : 3.16. COO : JAPAN (JFE, NSS, BKL, BKN)
KOREA (TK) THAILAND (AWAJI) ITALY (GALPERTI, ULMA, MEGA, VIAR, TECHNOFORGE) DIKO SPAIN (TUBOS) FRANCE (VALLOUREC) LOKAL (INGI, BBN, ALLOY MAS, KAU, TRISTAR)
7. Payment Terms : To Be Discusess8. Validity : 1 Week9. We offer for complete order, partial orders subject to our confirmation10. Materials are subject to prior sale
TOTAL
Quotation No : QTN‐2/MST/11/16/024TEN.Rev.01 Date : 25 November 2016
To. : PT. PP-EPCAttn : PROCUREMENT EPC Div.Subject : Tender Pengadaan Piping, Fitting, Flange,
Demin Water, Steam Water, & Plant Water
No Item Code Description Qty UoM Price/ Unit Total Price
1 MTO FOR DEMIN WATER SYSTEM Piping, Fitting, Flange, Bolt & Nut, Strainer 1 LOT IDR 2,605,845,082 IDR 2,605,845,082
2 MTO FOR STEAM DISTRIBUTION Piping, Fitting, Flange, Gasket, Bolt & Nut 1 LOT IDR 3,077,394,681 IDR 3,077,394,681
SYSTEM
Detail pricing as attached
TOTAL IDR 5,683,239,763
VAT IDR 568,323,976
TOTAL AMOUNT IDR 6,251,563,739
PT. MANDIRI SELARAS TEKNIKINDO
Dear Mr/ Mrs/ Ms,Thank you very much for your enquiry.We are pleased to offer on the following material subject to our standard term & condition of sale
Terms and Conditions1. Validity of quotation : 2 weeks2. Payment terms : TBA3. Delivery term : As per attachment4. Point of Delivery : DDP Gresik Site 5. All material certificate will be copies of the original6. No Purchase Order cancelation7. Origin as per attached MTO8. Tolerance as applicable standard9. Material grade offered is based on Standard Specification without suplementary10. Manufactured material will be process after approval drawing/spech11. Manufactured fitting can't be cancelled after drawing approval12. Fitting and pipe specification can be changed based on negotiation on both side
If your company need more information, please don't hesitate to contact our sales person, Mr. Gitan Haen at phone number 081384215950 or 088977578888.Thank you very much for your attention, and we looked forward to hear from you soon.
Sincerely,Gitan
1
MATERIAL TAKE OFF FOR DEMIN WATER SYSTEM
No DESCRIPTIONSIZE
QTY UNITPRICE (OFFERING)
BRAND COO Delivery Time Delivery TermLARGE SMALL PRICE/UNIT TOTAL
1 3/4 3/4 24 M 385,000 9,240,000 Sumitomo/ US Steel/Tubos JPN/USA/EUR 4-6 Weeks DDP GRESIK
2 10 10 12 M 11,700,000 140,400,000 Sumitomo/ US Steel/Tubos JPN/USA/EUR 8-12 Weeks DDP GRESIK
3 2 2 4 M 704,000 2,816,000 Sumitomo/ US Steel/Tubos JPN/USA/EUR 4-6 Weeks DDP GRESIK
4 4 4 96 M 1,350,000 129,600,000 Sumitomo/ US Steel/Tubos JPN/USA/EUR 4-6 Weeks DDP GRESIK
5 6 6 150 M 3,350,000 502,500,000 Sumitomo/ US Steel/Tubos JPN/USA/EUR 4-6 Weeks DDP GRESIK
6 8 8 12 M 8,500,000 102,000,000 Sumitomo/ US Steel/Tubos JPN/USA/EUR 4-6 Weeks DDP GRESIK
7 4 4 18 M 275,000 4,950,000 US STEEL/TUBOS/JFE/TENARIS US/EUR/JPN 4-6 Weeks DDP GRESIK
8 6 6 36 M 500,000 18,000,000 US STEEL/TUBOS/JFE/TENARIS US/EUR/JPN 4-6 Weeks DDP GRESIK
STEAM TRAP, SEE DATASHEET FOR STEAM TRAP (SST-26953, SST-26957)
STEAM TRAP, SEE DATASHEET FOR STEAM TRAP (SST-26954, SST-26955, SST-26962)
STEAM TRAP, SEE DATASHEET FOR STEAM TRAP (SST-26952, SST-26961, SST-26960)
STEAM HEADER SILENCER AS PER DATA SHEET
PT. Karya Prima Suplindo Quotation No. 03/KPS/RHG/XI/16‐PP
To : Ref. No : 03/KPS/RHG/XII/16-PPPT.PP (Persero),Tbk Re : Quotation
Date December 5, 2016Address : 3rd Floor PP PLAZA
Jl. TB. Simatupang No. 57. Jakarta, Indonesia Job No : GGCP-00-L8-BQ-005-PPPhone : +6221-8408303 Project : PT. PETROKIMIA GRESIKFax : +6221-8403992 Subject : STEAM DISTRIBUTION SYSTEMAttn : Mr. Satrio Agung Wijonarko/Mrs. Dinni Ika Ningsih
Dear Sir,
We have the pleasure in quoting your requirement as follows :
1 1 1,551,749,000Rp VAT 10% 155,174,900Rp
GRAND TOTAL 1,706,923,900Rp Terms & ConditionsDelivery time : 6-8 WEEKSDelivery Point : DDP GRESIKPayment : ADVANCE SKBDN 90 DAYS BEFORE DELIVERYValidity : 60 DAYSOrigin/Brand : As per stated on brand columnNote : Ex - stock subject to prior sales
We hope this quotation could meet your requirement. Thank you for your attention, and we are waiting for your favorable order.
Best Regards,
Roberto Hamonangan0812 8381 8762
Quotation for SUPPLY MTO 1ST MTO FROM P&ID Lot
QUOTATION
NO. DESCRIPTION Qty Sub TotalUnit
PT. Karya Prima Suplindo Jl. Pangeran Jayakarta 68 Blok C4, Jakarta Pusat 10730 Tel. (021) 639 800, 639 8001 (Hunting) Fax. (021) 624 6236, 624 6237Website : www.karyaprimasuplindo.co.id ; Email [email protected]
PT. Karya Prima Suplindo Quotation No. 03/KPS/RHG/XI/16‐PP
No. PART NAME SIZE 1 SIZE 2
Qty Unit Brand Price Amount Remarks
1PIPE, A106 Gr. B, Smls, Sch. 80, BE, ASME B36.10M 14 14 48 M
163STEAM TRAP, SEE DATASHEET FOR STEAM TRAP (SST-26953, SST-26957) 1 1 2 EA
SPIRAX SARCO/ AMSTORONG INTERNATIONAL
93,153,000Rp Rp 186,306,000
164STEAM TRAP, SEE DATASHEET FOR STEAM TRAP (SST-26954, SST-26955, SST-26962)
0.75 0.75 3 EASPIRAX SARCO/ AMSTORONG INTERNATIONAL
17,555,300Rp Rp 52,665,900
165STEAM TRAP, SEE DATASHEET FOR STEAM TRAP (SST-26952, SST-26961, SST-26960)
0.75 0.75 3 EASPIRAX SARCO/ AMSTORONG INTERNATIONAL
65,920,600Rp Rp 197,761,800
Sub Total 1,551,749,000Rp
Vat 10% 155,174,900Rp
Grand Total 1,706,923,900Rp
PT. Karya Prima Suplindo Jl. Pangeran Jayakarta 68 Blok C4, Jakarta Pusat 10730 Tel. (021) 639 800, 639 8001 (Hunting) Fax. (021) 624 6236, 624 6237Website : www.karyaprimasuplindo.co.id ; Email [email protected]
PT. Karya Prima Suplindo Quotation No. 04/KPS/RHG/X/16‐PP Rev.1
To : Ref. No : 04/KPS/RHG/XII/16-PP Rev.2PT.PP (Persero),Tbk Re : Quotation
Date December 5, 2016Address : 3rd Floor PP PLAZA
Jl. TB. Simatupang No. 57. Jakarta, Indonesia Job No : GGCP-00-L8-BQ-004-PPPhone : +6221-8408303 Project : PT. PETROKIMIA GRESIKFax : +6221-8403992 Subject : DEMIN WATER SYSTEM-R0Attn : Mr. Satrio Agung Wijonarko/Mrs. Dinni Ika Ningsih
Dear Sir,
We have the pleasure in quoting your requirement as follows :
1 1 1,626,565,500Rp VAT 10% 162,656,550Rp
GRAND TOTAL 1,789,222,050Rp Terms & ConditionsDelivery time : 6-8 WEEKSDelivery Point : DDP GRESIKPayment : ADVANCE SKBDN 90 DAYS BEFORE DELIVERYValidity : 60 DAYSOrigin/Brand : As per stated on brand columnNote : Ex - stock subject to prior sales
We hope this quotation could meet your requirement. Thank you for your attention, and we are waiting for your favorable order.
Best Regards,
Roberto Hamonangan0812 8381 8762
Quotation for SUPPLY MTO 1ST MTO FROM P&ID Lot
QUOTATION
NO. DESCRIPTION Qty Sub TotalUnit
PT. Karya Prima Suplindo Jl. Pangeran Jayakarta 68 Blok C4, Jakarta Pusat 10730 Tel. (021) 639 800, 639 8001 (Hunting) Fax. (021) 624 6236, 624 6237Website : www.karyaprimasuplindo.co.id ; Email [email protected]
PT. Karya Prima Suplindo Quotation No. 04/KPS/RHG/X/16‐PP Rev.1
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 3mm, RF, ASME B16.5/ASME B16.20
2 2 6 EAINGI/ KLINGER/ NIPPON VALQUA
35,600Rp Rp 213,600 OFFER TO HOOP: SS316L; FILLER GRPHITE; IR:SS316L; OR:CS
PT. Karya Prima Suplindo Jl. Pangeran Jayakarta 68 Blok C4, Jakarta Pusat 10730 Tel. (021) 639 800, 639 8001 (Hunting) Fax. (021) 624 6236, 624 6237Website : www.karyaprimasuplindo.co.id ; Email [email protected]
PT. Karya Prima Suplindo Quotation No. 04/KPS/RHG/X/16‐PP Rev.1
No. PART NAMESIZE
1SIZE
2Qty Unit Brand Price Amount Remarks
60
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 3mm, RF, ASME B16.5/ASME B16.20
4 4 4 EAINGI/ KLINGER/ NIPPON VALQUA
72,200Rp Rp 288,800 OFFER TO HOOP: SS316L; FILLER GRPHITE; IR:SS316L; OR:CS
61
GASKET, Spiral Wound Gasket, Hoop SS304, Flex. Graphite Filler, IR SS304, OR Low-CS, Thk: 3mm, RF, ASME B16.5/ASME B16.20
6 6 12 EAINGI/ KLINGER/ NIPPON VALQUA
106,700Rp Rp 1,280,400 OFFER TO HOOP: SS316L; FILLER GRPHITE; IR:SS316L; OR:CS
62BOLT AND NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B
0.63 85 12 EA PRIMA STEEL 6,600Rp Rp 79,200
63BOLT AND NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B
0.63 90 40 EA PRIMA STEEL 10,400Rp Rp 416,000
64BOLT AND NUTS, A193-B7, Full Thd, ASME B18.2.1/B1.1 CL.2A, A194-2H, Hex. Nuts, ASME B18.2.2/B1.1 CL.2B
0.75 105 96 EA PRIMA STEEL 11,100Rp Rp 1,065,600
65STUB END, A312 WP-304L, ANSI Cl. 150, BW, ASME B16.9 0.75 0.75 5 EA SOONSTEEL 142,000Rp Rp 710,000
STUD END SMLS S.10s SA/A403 WP304/L or WP 316/L MSS-SP43 TYPE-A
66STUB END, A312 WP-304L, ANSI Cl. 150, BW, ASME B16.9 10 10 3 EA SOONSTEEL 20,891,400Rp Rp 62,674,200
STUD END SMLS S.40s SA/A403 WP304/L or WP 316/L MSS-SP43 TYPE-A
67STUB END, A312 WP-304L, ANSI Cl. 150, BW, ASME B16.9 2 2 10 EA SOONSTEEL 567,400Rp Rp 5,674,000
STUD END SMLS S.40s SA/A403 WP304/L or WP 316/L MSS-SP43 TYPE-A
68STUB END, A312 WP-304L, ANSI Cl. 150, BW, ASME B16.9 4 4 17 EA SOONSTEEL 1,234,200Rp Rp 20,981,400
STUD END SMLS S.10s SA/A403 WP304/L or WP 316/L MSS-SP43 TYPE-A
69STUB END, A312 WP-304L, ANSI Cl. 150, BW, ASME B16.9 6 6 23 EA SOONSTEEL 5,819,400Rp Rp 133,846,200
STUD END SMLS S.40s SA/A403 WP304/L or WP 316/L MSS-SP43 TYPE-A
70STUB END, A312 WP-304L, ANSI Cl. 150, BW, ASME B16.9 8 8 11 EA SOONSTEEL 6,816,200Rp Rp 74,978,200
STUD END SMLS S.40s SA/A403 WP304/L or WP 316/L MSS-SP43 TYPE-A
PT. Karya Prima Suplindo Jl. Pangeran Jayakarta 68 Blok C4, Jakarta Pusat 10730 Tel. (021) 639 800, 639 8001 (Hunting) Fax. (021) 624 6236, 624 6237Website : www.karyaprimasuplindo.co.id ; Email [email protected]
PT. Karya Prima Suplindo Quotation No. 04/KPS/RHG/X/16‐PP Rev.1
No. PART NAMESIZE
1SIZE
2Qty Unit Brand Price Amount Remarks
71BASKET STRAINER, BY DATA SHEET (07-STR-476A & 07-STR-476B) 6 6 2 EA
SPIRAL SARCO/ AMSTRONG INTERNATIONAL
123,035,300Rp Rp 246,070,600
72BASKET STRAINER, BY DATA SHEET (07-STR-477A & 07-STR-477B) 8 8 2 EA
SPIRAL SARCO/ AMSTRONG INTERNATIONAL
184,214,800Rp Rp 368,429,600
Sub Total 1,626,565,500Rp
Vat 10% 162,656,550Rp
Grand Total 1,789,222,050Rp
PT. Karya Prima Suplindo Jl. Pangeran Jayakarta 68 Blok C4, Jakarta Pusat 10730 Tel. (021) 639 800, 639 8001 (Hunting) Fax. (021) 624 6236, 624 6237Website : www.karyaprimasuplindo.co.id ; Email [email protected]
PT. Karya Prima Suplindo Quotation No. 03/KPS/RHG/XI/16‐PP
To : Ref. No : 03/KPS/RHG/XII/16-PPPT.PP (Persero),Tbk Re : Quotation
Date December 5, 2016Address : 3rd Floor PP PLAZA
Jl. TB. Simatupang No. 57. Jakarta, Indonesia Job No : GGCP-00-L8-BQ-005-PPPhone : +6221-8408303 Project : PT. PETROKIMIA GRESIKFax : +6221-8403992 Subject : STEAM DISTRIBUTION SYSTEMAttn : Mr. Satrio Agung Wijonarko/Mrs. Dinni Ika Ningsih
Dear Sir,
We have the pleasure in quoting your requirement as follows :
1 1 -Rp VAT 10% -Rp
GRAND TOTAL -Rp Terms & ConditionsDelivery time : 6-8 WEEKSDelivery Point : DDP GRESIKPayment : ADVANCE SKBDN 90 DAYS BEFORE DELIVERYValidity : 60 DAYSOrigin/Brand : As per stated on brand columnNote : Ex - stock subject to prior sales
We hope this quotation could meet your requirement. Thank you for your attention, and we are waiting for your favorable order.
Best Regards,
Roberto Hamonangan0812 8381 8762
Quotation for SUPPLY MTO 1ST MTO FROM P&ID Lot
QUOTATION
NO. DESCRIPTION Qty Sub TotalUnit
PT. Karya Prima Suplindo Jl. Pangeran Jayakarta 68 Blok C4, Jakarta Pusat 10730 Tel. (021) 639 800, 639 8001 (Hunting) Fax. (021) 624 6236, 624 6237Website : www.karyaprimasuplindo.co.id ; Email [email protected]
PT. Karya Prima Suplindo Quotation No. 03/KPS/RHG/XI/16‐PP
No. PART NAME SIZE 1 SIZE 2
Qty Unit Brand Price Amount Remarks
1PIPE, A106 Gr. B, Smls, Sch. 80, BE, ASME B36.10M 14 14 48 M
163STEAM TRAP, SEE DATASHEET FOR STEAM TRAP (SST-26953, SST-26957) 1 1 2 EA
SPIRAX SARCO/ AMSTORONG INTERNATIONAL
Rp -
164STEAM TRAP, SEE DATASHEET FOR STEAM TRAP (SST-26954, SST-26955, SST-26962)
0.75 0.75 3 EASPIRAX SARCO/ AMSTORONG INTERNATIONAL
Rp -
165STEAM TRAP, SEE DATASHEET FOR STEAM TRAP (SST-26952, SST-26961, SST-26960)
0.75 0.75 3 EASPIRAX SARCO/ AMSTORONG INTERNATIONAL
Rp -
Sub Total -Rp
Vat 10% -Rp
Grand Total -Rp
PT. Karya Prima Suplindo Jl. Pangeran Jayakarta 68 Blok C4, Jakarta Pusat 10730 Tel. (021) 639 800, 639 8001 (Hunting) Fax. (021) 624 6236, 624 6237Website : www.karyaprimasuplindo.co.id ; Email [email protected]
PT. Karya Prima Suplindo Quotation No. 04/KPS/RHG/X/16‐PP Rev.1
To : Ref. No : 04/KPS/RHG/XII/16-PP Rev.2PT.PP (Persero),Tbk Re : Quotation
Date December 5, 2016Address : 3rd Floor PP PLAZA
Jl. TB. Simatupang No. 57. Jakarta, Indonesia Job No : GGCP-00-L8-BQ-004-PPPhone : +6221-8408303 Project : PT. PETROKIMIA GRESIKFax : +6221-8403992 Subject : DEMIN WATER SYSTEM-R0Attn : Mr. Satrio Agung Wijonarko/Mrs. Dinni Ika Ningsih
Dear Sir,
We have the pleasure in quoting your requirement as follows :
1 1 -Rp VAT 10% -Rp
GRAND TOTAL -Rp Terms & ConditionsDelivery time : 6-8 WEEKSDelivery Point : DDP GRESIKPayment : ADVANCE SKBDN 90 DAYS BEFORE DELIVERYValidity : 60 DAYSOrigin/Brand : As per stated on brand columnNote : Ex - stock subject to prior sales
We hope this quotation could meet your requirement. Thank you for your attention, and we are waiting for your favorable order.
Best Regards,
Roberto Hamonangan0812 8381 8762
Quotation for SUPPLY MTO 1ST MTO FROM P&ID Lot
QUOTATION
NO. DESCRIPTION Qty Sub TotalUnit
PT. Karya Prima Suplindo Jl. Pangeran Jayakarta 68 Blok C4, Jakarta Pusat 10730 Tel. (021) 639 800, 639 8001 (Hunting) Fax. (021) 624 6236, 624 6237Website : www.karyaprimasuplindo.co.id ; Email [email protected]
PT. Karya Prima Suplindo Quotation No. 04/KPS/RHG/X/16‐PP Rev.1