Remediation in and Under Buildings David L. Isopo, B.Sc. Project Manager Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP Quantum Murray LP Quantum Murray LP
36

Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Aug 04, 2018

Download

Documents

vuongphuc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Remediation in and Under Buildings

David L. Isopo, B.Sc.Project Manager

Quantum Remediation a Division of Quantum Murray LPPrairies Division

Quantum Murray LPQuantum Murray LPQuantum Murray LP

Page 2: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

QMLPQMLPQMLP

Page 3: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Remediation Inside Buildings• Case Study #1 - Asbestos Abatement - Vancouver

Remediation Under Buildings • Case Study #2 - Underpinning project - Lethbridge• Case Study #3 - Underpinning project - Calgary• Case Study #4 - Panel excavation and CDF backfill

projects in BC

Questions / comments

Agenda

Page 4: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Reasons for Remediation Inside BuildingsReasons for Remediation Inside Buildings

• Unsafe work/living environment needs remedy• Improve air quality• Building renovation in areas where hazardous

materials are present• Hazards require removal as part of demolition

process• Emergency, fire or spill response

Page 5: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Common Hazardous MaterialsCommon Hazardous Materials

• Asbestos• Lead paint• Mould• Biomedical waste• Mercury• Silica dust• Rodent and bird feces• PCB ballasts

Page 6: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Hazard Assessment Protocol

RecognitionIf you are working in a building that may have hazardous

materials present you should have an survey of the building completed prior to executing any work.

EvaluationA qualified person should determine the risk(s) associated with

the hazardous materials and determine how easily they may become disturbed to release contaminants.

ControlEliminate exposure through barriers, engineering controls and/or

personal protective equipment

Page 7: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Case Study #1

Vancouver International AirportDomestic Check-in Gallery Upgrade

Remediation Inside BuildingsRemediation Inside Buildings

Page 8: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

QMLPQMLPQMLPThe Challenge

• Demolish all interior fixtures, including removal of the roof system and exterior cladding

• Remove asbestos containing materials from domestic check-in gallery with a minimum disruption to the Airport Authority and its airlines.

The Solution• An extensive asbestos abatement and demolition

program undertaken in the active Domestic Terminal Building (DTB) over a two year period involving over 100 site personnel

Page 9: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Roof Removal and Containment

Page 10: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Terminal Containment

Page 11: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

CompleteAirtight

Containment

CompleteAirtight

Containment

Terminal Containment

Page 12: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Reasons for Remediation Under a BuildingReasons for Remediation Under a Building

• Remediation to address unsafe or unhealthy work conditions

• Site remediation in support of a property transaction where Certificate of Compliance is required

• Owner addressing off-site impacts under adjacent buildings where risk assessment is not a viable remediation solution

• To improve structure while addressing contaminant

Page 13: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Common Hazardous MaterialsCommon Hazardous Materials

• USTs• Hydrocarbons• Dry cleaning chemicals• H2S gas• Heavy metals• Hydrocarbon vapours• PCB Contaminated soil

Page 14: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Considerations When Underpinning

Considerations When Underpinning

• Worker Safety!• Confined Space• Condition and age of structure• Adjacent structures, retaining walls, etc.• Depth of excavation/plume• Condition and composition of ground• Water table level/dewatering• Quality of project team• Timing of trades and supplies• Gravity!!!

Page 15: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Case Study #2

Underpinning and shoring between roadway and building at industrial site in Lethbridge

Remediation Under BuildingsRemediation Under Buildings

Page 16: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

QMLPQMLPQMLPThe Challenge

To remove 1500 m3 of contaminated soil from beneath an industrial building to a depth of 10m. Ensure main floor slab is not undermined and stocked mechanical room is kept in tact

The SolutionA design build project including underpinning one

side of industrial building adjacent to the mechanical room. Shoring along roadway at opposite end using shoring caissons and timber lagging

Page 17: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Underpinning

Page 18: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Excavation

Page 19: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

QMLPQMLPQMLP

Page 20: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Case Study #3

Underpinning and shoring between roadway and building at commercial site in Calgary

Remediation Under BuildingsRemediation Under Buildings

Page 21: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

QMLPQMLPQMLPThe Challenge

To remove contaminated plume from under former service station - now a restaurant. Complete work in tight timeline in order to ensure restaurant remains in business

The SolutionAnother design build project including underpinning

frontage of restaurant and parkade. Shoring along adjacent retaining wall using shoring caissons and timber lagging

Page 22: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

QMLPQMLPQMLP

Page 23: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

QMLPQMLPQMLP

•13 jacked steel piles installed along front of restaurant and parkade

•Property to the south at higher elevation therefore shoring required to reinforce retaining wall

•Bulk excavation between the building and Centre Street North to a depth of 4m

•Installation of impermeable liner along south and west side

•Excavation limit up to property line therefore reinstated boulevard and curb

Page 24: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Underpinning

Page 25: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Shoring

Page 26: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Benefits to Underpinning RemediationBenefits to Underpinning Remediation

• Business occupying the building can remain in operation

• Ensuring a clean site within a project timeline as opposed to lengthy in-situ treatment systems• months vs. years

• Often improving the integrity of an older building• Readily accessible technologies• Cost effective

Page 27: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Case Study #4

Alternating Panel Excavation and CDF backfill at Two Sites in BC

Remediation Under BuildingsRemediation Under Buildings

Page 28: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

QMLPQMLPQMLPThe Challenge

• To remove contaminated plume from under load bearing structures without underpinning and backfill to ensure structural integrity

• To work within a confined area in order to completely remove contaminated plume

The Solution• Conduct alternating panel excavations to required

depth in order to completely remove contamination• Backfill using Control Density Fill (CDF) which

ensures 100% compaction and integrity of structure

Page 29: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

QMLPQMLPQMLP

•Panel excavation depth of 2m

•Removal of 250m3 of contaminated soil

•Active Dwelling

Page 30: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Panel Excavation and CDF OptionPanel Excavation and CDF Option

Page 31: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Panel Excavation and CDF OptionPanel Excavation and CDF Option

•Depth of excavation 6m

•Mechanical room above contaminated plume

•Series of utilities to south end of mechanics bay

•Confined work area

•Contaminated plume inside building adjacent to exterior wall and canopy footing (2’*2’*4’)

Page 32: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

QMLPQMLPQMLP

Page 33: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

Benefits to Panel Excavation and CDF Backfill

Benefits to Panel Excavation and CDF Backfill

• Business occupying the building can remain in operation

• Ensuring a clean site within a project timeline as opposed to lengthy in-situ treatment systems• months vs. years

• Often improving the integrity of an older building• Readily accessible technologies and supplies

• Even more Cost effective

Page 34: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

If You Can’t Pin it, Move it!!!If You Can’t Pin it, Move it!!!

Page 35: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

QMLPQMLPQMLP

Thank-you

For More [email protected](403) 999-6237

Page 36: Quantum Murray LP - ESAA · Quantum Remediation a Division of Quantum Murray LP Prairies Division Quantum Murray LP. QMLP. Remediation Inside Buildings ... Underpinning and shoring

ReferencesReferences

• Russ J. Renburg, P.Eng. – W&R Foundation Specialists• Percy Dumba – QMLP General Manager, Prairies• Stephen Custeau, P.Eng., MBA – QMLP Principal• Gil Fife – QMLP General Superintendent, Prairies• Rick Henrique – QMLP Superintendent• Matt Kokan, M.A.Sc., P.Eng. – Geopacific Consultants

Ltd. Principal• John R. Taylor, P.Eng. – Hemmera Envirochem Inc.