QUANTITY SURVEY QUANTITY SURVEY AND AND BILL OF QUANTITY BILL OF QUANTITY CONCEPT CONCEPT ACTIVITY LEVEL PLANNING SYSTEM
24
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Quantity Survey

QUANTITY SURVEY QUANTITY SURVEY AND AND

BILL OF QUANTITYBILL OF QUANTITYCONCEPTCONCEPT

ACTIVITY LEVEL PLANNING SYSTEM

Page 2: Quantity Survey

Quantity Survey - DefinitionQuantity Survey - Definition

• To calculate the quantities in a predetermined structured way.

• Bifurcating the project into small areas.

• Identifying the each activity with unique mark numbers.

• Data Base Management

Page 3: Quantity Survey

Quantity Survey - StandardsQuantity Survey - Standards

• Contract Technical Documents

• IS Codes

Page 4: Quantity Survey

Quantity Survey - AdvantageQuantity Survey - Advantage

• Tracking Scope

• Precise Resource Planning

• To avoid multiple working by various level persons

• Uniformity in Reporting & Billing

• Faster Certification

Page 5: Quantity Survey

Quantity Survey - Basic - CivilQuantity Survey - Basic - Civil

• Unique Identification mark for

Drawing Number with Rev. Number

Area Code

Mark Type

Item Code

Mark Number

Page 6: Quantity Survey

AreaArea• Main Project - Hydrogen Unit

- Reformer Section

- Compressor House

- Technological Structure

- Pipe Rack

- PSA Foundations

- Cable Trench

- Paving etc

Page 7: Quantity Survey

Mark Type for CivilMark Type for Civil

• Pile Cap - PC

• Pedestals - PD

• Plinth Beam - PB

• Beams & Slab - BS etc

Page 8: Quantity Survey

QS Code & Client CodeQS Code & Client Code• QS Code is nothing but the Client Items.

For ExampleQs Code Client Code Item Description

1 1.10 Excavation in ordinary soil1a 1.10 a Excavation in ordinary soil upto 2m1b 1.10 b Excavation in ordinary soil 2 - 3.5m1c 1.10 c Excavation in ordinary soil below 3.5m2 1.20 Back Filling with Excavated Earth3 1.30 PCC 1:4:84 1.40 RCC M205 1.50 Formwork

5a 1.50 a Formwork Straight5b 1.50 b Formwork Curved6 1.6 Rebar

6a 1.60 a Rebar upto 12mm dia6b 1.60 b Rebar 16mm & above

Page 9: Quantity Survey

Mark No.- CivilMark No.- CivilConstructable Units are to be given separate Mark Constructable Units are to be given separate Mark Numbers. For ExampleNumbers. For Example

Raft - RFT1

PD1 PD2Pedestals

Mark Nos.. QS Codes Involved

1) Excavation

2) PCC

3) Rebar

4) Form work

5) Foundation Bolt

6) RCC

7) Back Filling

Page 10: Quantity Survey

Mark Number - CivilMark Number - Civil

SNO UNIQUE ID UOM QTY 1 195-1/PR-A/RFT/67A/RFT-1 CUM 14.40Here,

1951 - Represents A drawing code for drawing no 195 Rev 1 which has been referred for calculating quantity.

PR-A Represents Area code for Pipe Rack for “A” Row

RFT Represents a code for type of structure which in this case is Foundation Raft.

67A Represents Activity code for item “R.C.C. in foundation M-25 Grade.

RFT-1 Represents Mark No. as shown in the above referred drawing or as suggested by the quantity surveyors for easy identification ie the Raft for pipe rack grid 1

Page 11: Quantity Survey

Quantity Survey - Basic - Quantity Survey - Basic - StructuralStructural

• Unique Identification mark for

Drawing Number with Rev. Number

Area Code

Mark Type

Mark Number

Page 12: Quantity Survey

Mark Type for StructuralMark Type for Structural

• Column - C• Crane Girder - CGR• Cross Beam / Tie Beam - CB / TB• Trestle - TRL• Bracing - BCG• Gusset Plate - GT• Bracket - BKT• Truss - TRS

Page 13: Quantity Survey

Mark Number - StructuralMark Number - Structural

Pipe Rack Portal No.:1

Portal Column RHS

P1CR

Portal Column LHSP1CL

Portal BeamP1B1

P1B2

BracketBKT1

Bracing BCG1

Page 14: Quantity Survey

Item No.: StructuralItem No.: Structural

Portal Column Mark No.: P2CR

2 Base Plate3 Stiffener

5 Rib Plate

6 Cap Plate 7 Bracket8 Moment Plate

1 Column ISMB

4 Gusset Plate

10 Rod

9 Chair Cleat

Page 15: Quantity Survey

Mark Number - StructuralMark Number - Structural

SNO UNIQUE ID UOM QTY 1 195-1/PR-B/C/P2CR MT 2.50Here,

195-1 Represents A drawing code for drawing no 195 Rev 1 which has been referred for calculating quantity.

PR-B Represents Area code Pipe Rack in row “B”

“C” Represents a code for type of structure which in this case is Column.

P2CR Represents Mark No. as shown in the above referred drawing - Right Side Portal Column in Grid No 02.

Page 16: Quantity Survey

STRUCTURAL - GeneralSTRUCTURAL - General

• Establishing Marking concepts with detail.

• Change of Sections updation at regular intervals

• Unit weights approvals

• Rolling Margin Establishment

Page 17: Quantity Survey

Quantity Survey - Basic - PipingQuantity Survey - Basic - Piping

• Unique Identification mark for

Area / Line Number

Service

Specification

ISO No. (Drg No.)

Spool Number

Page 18: Quantity Survey

Service - ExampleService - Example

• Process Water - PW

• Cooling Water - CW

• Lube Oil - LO

• Purging Oil - PO

• Steam Line Low Pressure - SL

• Steam Line Medium Pressure - SM

• Steam Line High Pressure - SH

Page 19: Quantity Survey

Mark Number - PipingMark Number - Piping

SNO UNIQUE ID UOM QTY 1 AG/10SW/1502/A1A/SP21 ID/IM 50/100Here,

AG Represents Area Code for Above Ground Piping

10SW Represents the Size & Service - 10” Line for Service Water.

1502 Represents the line number which is from ISO itself.

A1A Represents the Specification of pipe - Material & Class.

SP21 Represents Spool Number.

Page 20: Quantity Survey

PIPINGPIPING

• Marking the Field Joint in line with GAD

• Spoolwise BOQ Calculation

• Different Symbols for Shop / Field Joint

• Releasing the ISO & Joint Master along with ID / IM Calculation

Page 21: Quantity Survey

PIPINGPIPING

• Updation of Revision Drawings & Calculation as per revision using suffix for the joints.

• Separate Marking for Joints Deleted, Modified, Tie Joints, Repair due S/C’s mistake.

• As built drawing after completion

Page 22: Quantity Survey

PIPING BOQPIPING BOQ

Spool No.: 21BOQ

1) Pipe size & length2) Elbow size & length3) Valve size & length

Joint Master

1) No. of shop joint & size 2) No. of field joint & size

Total Inch Mtr. of Spool 21

Total Inch Diaof Spool 21

ISO No. 1502

1

2

3

4

5

6

Page 23: Quantity Survey

Process Cycle - Quantity SurveyProcess Cycle - Quantity Survey

BOQ Preparation by SE/QS

Cross Checking by PE

Submission to Client

Approval by Client by QS/PE

Copy to SEExecution

Deviations/Change of sections from SE

Incorporation in QS

Submission & Approval from Client by QS/PE

Page 24: Quantity Survey