Top Banner
Quality Control Reviews [v.Aug-09]
35

Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Dec 29, 2015

Download

Documents

Loraine Owens
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Quality Control Reviews[v.Aug-09]

Page 2: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Quality Control Reviews• Welcome• The Nexia International Audit Committee• The quality control programme• Planning the review• Introduction to the reviewer’s pack• Reviewing the firm’s procedures• Reviewing the audit files• Feedback and recommendations• Finalising the report• What happens next?

Page 3: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

The Nexia International Audit Committee

• Who are they?

• What do they do?

• How do quality control reviewers interact with the Committee?

Page 4: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Nexia International Audit Committee – who are they?• Chairman – Felix Lozano (N&C America)• Deputy chairman – Michel Girbes (Europe)• Jojo Alveido (Asia Pacific)• Al Anderson (N&C America)• Mike Bishop (Europe)• Grant Block (N&C America)• Horacio Brihet (South America)• George Dakis (Asia Pacific)• Percy Italia (MEA)• Anton Lewis (MEA)• Svetlana Romanova (Europe)• Yvonne Lang (Technical Adviser) (Europe)

Page 5: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Responsibilities of the Audit Committee• Quality control programme• Annual confirmation from members• Audit manual• Information for members• Special projects – e.g. independence requirements• Audit Forum

Page 6: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Interaction quality control reviewers and the audit committee• Here to help each other• Audit Committee produces reviewers pack• Keep us informed through the

Technical & Quality Manager• Completed reports are considered by the

Committee

Page 7: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

The quality control programme

• Purpose

• Frequency of reviews

Page 8: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Purpose of the quality control programme

• Protect our reputation

• Confidence amongst members

• Consider new members

• Opportunity for members to develop and learn from each other

Page 9: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Frequency of reviews

• Existing members – at least every three years

• When forms part of recommendation from previous review

• New members – prior to membership

Page 10: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

The reviewer’s pack – an introduction

• Guide through the process

• Combines review and reporting in one place

• Suggestions for improvements are always welcome

Page 11: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Planning the review

• Initial contact with firm

• Who pays what?– Time– Travel– Accommodation– Budget

Page 12: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Initial contact with firm

• Audit committee/regional chairman

• Some guidance as to what to expect

• Reviewer liaise with key contact at firm as to logistics of review

Page 13: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Who pays for what - time• 50% of ‘standard’ charge rate• Paid through audit committee budget – bill to Nexia International• Include

– Time spent on review– Time completing report– Time answering any questions from the Audit Committee

• Do not include– Travel time

• Please bill promptly – within 3 months of review

Page 14: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Who pays for what - travel

• Currently under review

• Air fares – economy class within Europe

• Bill to Nexia International

Page 15: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Who pays for what - accommodation

• Should be arranged by firm subject to review

• Paid for by the firm subject to review

• If you pay – bill to Nexia and it will be recharged

Page 16: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

The reviewer’s pack

• Combines:– Reporting– Recommendations– Work programme

Page 17: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Section D – Details of review

• Hopefully self-explanatory

Page 18: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Section E – Background informationOrganisation structure• Partner profile

– Succession issues– ‘Sleeping’ partners

• Staff profile– Sufficient– Suitably qualified and experienced

• Sub-contractors and consultants– How are these controlled– Checking of qualifications, independence etc.

Page 19: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Background informationClients• Profile

– High dependence on one client– Small number in specialist sector– One or two listed companies

Page 20: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Background informationRecent regulatory/other reviews• Outcome

– Any matters requiring specific follow up– Extent of reliance

Page 21: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Background informationAudit documentation• In house developed

• Predecessor firms

• Maintenance

Page 22: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Section F – ISQC1 Compliance• Firm-wide procedures• The importance of ‘tone at the top’• ISQC 1• The Nexia International Quality Manual• Consideration of ‘no’ answers

– Acceptable for size of firm now– What about the future?

Page 23: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Reviewing the audit files

• Selecting the sample

• Dealing with groups

• Detail of review

• Recording questions and findings

• Discussion with audit partner

Page 24: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Selecting a sample• Smaller firms

– One file per audit partner minimum

• Larger firms– Cross-section

• Partners• Industries• Consider international work

• Maximum sample ordinarily should be 5• Any questions please ask the technical adviser

Page 25: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Dealing with groups

• Do not have to do the whole group!

• Consolidation

• Significant subsidiary

Page 26: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Approach to review

• Discuss audit with partner/manager

• Financial statements

• Planning

• Fieldwork

• Completion

Page 27: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Considerations

• Does the work reflect what was planned?

• Is it clear what work was done?

• Is it clear how conclusions were reached?

• Do we agree with the conclusions reached?

Page 28: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Detail of review

• Matters requiring clarification– Notes– Discuss with partner/manager

• Complete programme

• Record any explanatory comments

Page 29: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Feedback and recommendations

• Closing meeting

• Grading the recommendations

• Key considerations

Page 30: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Closing meeting

• Important part of process

• Discuss findings and recommendations

• No surprises!

• Explain what will happen with report

• Document meeting in reporting pack

Page 31: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Recommendations - grading

• A – require immediate attention

• B – attention in near future

• C – require attention as practice grows or environment develops

Page 32: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Key considerations

• Summary for Audit Committee

• Include any matters you think are important for the Audit Committee to consider

Page 33: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Finalising the report• Agreeing it with the firm

– Send in draft– Suggest give them a deadline to respond

• Sending it to Technical & Quality Manager– Review

• Further questions

Page 34: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

What happens next?

• Consideration by the Audit Committee– Technical & Quality Manager circulates– Highlights any matters of concern

• Further questions

• Recommendation to Board

Page 35: Quality Control Reviews [v.Aug-09]. Quality Control Reviews Welcome The Nexia International Audit Committee The quality control programme Planning the.

Quality Control Reviews[v.Aug-09]