Top Banner
Quality Control
3

Quality Control (10) Quality checked at the end of the process (1) Right first time (2) Uses inspectors at the end of the process (11) Need to spend.

Dec 24, 2015

Download

Documents

Edmund Young
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Quality Control (10) Quality checked at the end of the process (1) Right first time (2) Uses inspectors at the end of the process (11) Need to spend.

Quality ControlQuality Control

Page 2: Quality Control (10) Quality checked at the end of the process (1) Right first time (2) Uses inspectors at the end of the process (11) Need to spend.

(10) Quality checked at the

end of the process

(1) Right first time

(2) Uses inspectors at

the end of the process

(11) Need to spend money

on staff training

(9) Can meet workers

esteem needs

(13) Possible staff

resistance

(5) Increases a firms labour

costs

(6) Quality standards need to be

agreed

(4) Empowers employees

(7) Everyone responsible for quality

(15) Does little to encourage

staff to improve quality

(14) Can improve staff

motivation

(3) Takes responsibility

away from the workers

(8) Workers may not

welcome extra responsibility(12) May slow

down production when first

implemented

(16) Increases workers

responsibility

Which are features of TQM?

1

2

3

4

5

10

6

7

8

9

11

10

20

30

40

50

100

60

70

80

90

110

Values

Next

Page 3: Quality Control (10) Quality checked at the end of the process (1) Right first time (2) Uses inspectors at the end of the process (11) Need to spend.

TEAM