Top Banner
457 Minna, Suite 100 San Francisco, CA 94103 415.367.9399 buildgc.com ZARA Valley Fair INC
25

Qualification Package_ZARA

Mar 31, 2016

Download

Documents

Katie Wilson

Qualification Package Build Group
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Qualification Package_ZARA

457 Minna, Suite 100San Francisco, CA 94103

415.367.9399buildgc.com

ZARA Valley FairINC

Page 2: Qualification Package_ZARA

Build Group is a general contractor focused on providing a higher than usual level of service to exclusive clientele. Highly selective about deploying their top tier staff, the owners have deep understanding of their clients’ business and are committed to providing Principal involvement on all projects. To them client relationships are everything and are driven by trust and integrity. While most general contractors are simply pricing plans, Build Group staff source new real estate opportunities and figure out creative ways to make deals pencil.

In 2007, long time colleagues Ross Edwards, Eric Horn, Bob Hopper, Scott Brauninger and Dave Williams formed Build Group. The group had spent many years growing a large Bay Area construction company but felt inspired to do something more entrepreneurial which would allow them to work more closely with their clients. With this in mind, they created a flat company structure that breaks conventional corporate structure and constantly looks at how things can be done better. Their willingness to roll up their sleeves, do real work and grind it out has cultivated a construction company full of innovators and true builders.

In the beginning of 2010 Build Group acquired Fine Line Group, a high-end retail and seismic upgrade company with over thirty-years of construction experience. The company is known for evolving creative building methodologies and project delivery strategies that successfully manage and support clients’ design and business goals. The acquisition brought personnel with experience in high-end restaurant, hotel and flagship retail expertise. Fine Line Group has a wide-ranging repertoire of high-end interior projects that includes luxury brands such as Gucci, Christian Dior, John Varavatos and Anne Fontaine. The company has also built many signature restaurants including Kokkari, Postrio and Redwood Park in San Francisco.

Build Group has grown consistently since its inception. In August 2011 the company was included on the prestigious Inc. 500 list, which profiles the nation’s fastest growing companies. The San Francisco Business Times also recognized Build Group in 2011 as one of the fastest growing companies and one of the largest commercial contractors in the Bay Area. In 2012, Build Group ranked #2 in the San Francisco Business Times Healthiest Employers and #2 on the 100 Fastest-Growing Private Companies in the Bay Area.

About

INC

Page 3: Qualification Package_ZARA

H & M’s flagship store in a historic building on Powell St. features new escalators, large video display screens, all new stone flooring, 42 high end dressing rooms, new restrooms, employee locker rooms and kitchen as well as a carefully restored historical ceiling, entry and 400 linear feet of new sidewalk.

The Post Street store features all new stone flooring, a new glass balcony overlooking the entry, a grand staircase, new exterior sidewalks, new restrooms and 20 high end dressing rooms.

Both stores were completed one month ahead of schedule.

ARCHITECT TEK Architects MBH Architects

PROJECT DURATION 20 weeks Powell St. 20 weeks Post St.

PROJECT SIZE 40,000 sf Powell St. 18,000 sf Post St.

H & M FLAGSHIPS SAN FRANCISCO, CA POWELL ST. & POST ST. LOCATIONS

INC

Page 4: Qualification Package_ZARA

The Honolulu store was Gucci’s first design/build project turn key. The store remained in business throughout the entire construction period, and was completed three weeks ahead of schedule with zero change orders. The project included a structural upgrade to the building, with a two-story high ornamental storefront finished with stainless steel panels.

Both stores included imported Italian millwork in high lacquered rosewood. All fixtures were supplied and installed by the construction team.

ARCHITECT Gensler Architects

PROJECT DURATION 20 weeks San Francisco 18 weeks Honolulu

PROJECT SIZE 7,700 sf San Francisco 10,000 sf Honolulu

GUCCI FLAGSHIP SAN FRANCISCO & HONOLULU

INC

Page 5: Qualification Package_ZARA

The seventh and the largest of the John Varvatos stores, the San Francisco flagship features two floors of sophisticated interiors, showcasing the Varvatos casual to formal menswear attire. Solid walnut floors are throughout this design/build project.

The construction team coordinated with both architects on the East and West coasts and met a very aggressive schedule.

In addition to the remodel of the interior space, there team also completed a full seismic upgrade on the building.

ARCHITECT DucDuc New York Pollack Associates SF

PROJECT DURATION 12 weeks

PROJECT SIZE 6,500 sf seismic upgrade Historic building

JOHN VARVATOS FLAGSHIP @ UNION SQUARE SAN FRANCISCO, CA

INC

Page 6: Qualification Package_ZARA

This elegant tenant improvement project required exceptional attention to detail. The store’s exquisite mahogany millwork was custom fabricated and shipped from Italy. Because the wood paneling was prefabricated overseas, all surface walls needed to be built to exact dimensions.

The custom lighting package, designed to add a dramatic atmosphere, included multiple recessed and halogen spot fixtures.

The construction team utilized the fast track method, providing quick and efficient project construction, enabling Bottega Veneta to be open on schedule and in time for the prime retail sales season.

ARCHITECT The Phillips Group

PROJECT DURATION 4 weeks

PROJECT SIZE 2,700 sf

BOTTEGA VENETA FLAGSHIP @ UNION SQUARE SAN FRANCISCO, CA

INC

Page 7: Qualification Package_ZARA

This is Coach’s San Francisco flagship store. The project included the installation of a new 2 story staircase, custom finished cherry fixtures, and Tasmanian oak floors.

All millwork was provided and installed by the Fine Line Group. In keeping with the early thirties theme, the store is decorated with hand-painted murals, custom carpeting and style lighting elements.

From start to finish this project was turned around in only eight weeks.

ARCHITECT Brand + Allen Architects

PROJECT DURATION 2 Months

PROJECT SIZE 5,000 sf

COACH @ UNION SQUARE SAN FRANCISCO, CA

INC

Page 8: Qualification Package_ZARA

One of the few flagship stores for Jimmy Choo, the Union Square store is a staple for the brand. The high-end retail space includes expansive custom millwork, mirror-lined walls and extravagant chandleries. The Build Group team completed the project on a minimal 12 week schedule in the historic building. After demolition, the team discovered additional upgrades needed to be completed due to the original 1906 building erection. With open communication and quick problem solving tactics, Build Group recommended overtime to keep the project on track. The storefront canopy also had to be redesigned to allow for drainage, fresh air and exhaust venting. The superintendent redesigned the canopy and received approval from the architect to proceed. Additionally the team coordinated with tenants above to get air conditioning into the space.

ARCHITECT Atmosphere Group

PROJECT DURATION 12 weeks

PROJECT SIZE 2,300 sf

JIMMY CHOO FLAGSHIP @ UNION SQUARE SAN FRANCISCO, CA

INC

Page 9: Qualification Package_ZARA

TORY BURCH SAN FRANCISCO, CA

This signature retail project is the first flagship store for Tory Burch in San Francisco. The Build Group team remained tight quality control over all high-end finishes including lacquer paint, brass and a custom storefront to deliver the architect’s vision.

ARCHITECT O’Neil Langan Architects, P.C.

PROJECT DURATION 10 weeks

PROJECT SIZE 1,000 sf

INC

Page 10: Qualification Package_ZARA

This simple, yet elegant retail store was a full design/build - MEPS project. With the architect located in New York, the construction team employed a local firm for all plan stamping and permit expediting.

The interior of this store showcases clean, European-style millwork and fixtures, complimented by beautiful French limestone floors. The design features are subtly illuminated with recessed lighting.

Additional work included the construction of two fitting rooms, a restroom, a storage room, storefront and canvas awnings.

ARCHITECT Tuller McNealus Feld

PROJECT DURATION 8 weeks

PROJECT SIZE 1,100 sf

ANNE FONTAINE FLAGSHIP @ UNION SQUARE SAN FRANCISCO, CA

INC

Page 11: Qualification Package_ZARA

This project was a full Design Build - MEPS project.

The flooring is beautiful Travertine marble tile with exquisite inlaid sandstone strips. Wall finishes include hand painted faux stone. Because the elegant maple millwork was specially fabricated in Canada, Build Group had to carefully construct the space to meet the exact dimensions.

One notable feature in the space is the floor to ceiling metal beaded curtain that divides the main floor from a private display shelf, complete with a library-style rolling ladder.

Additional work included storage and break room facilities in the basement complete with kitchenette, lockers, and shelving.

ARCHITECT Brand + Allen Architects

PROJECT DURATION 9 Weeks

PROJECT SIZE 3,200 sf

LONGCHAMP @ UNION SQUARE SAN FRANCISCO, CA

INC

Page 12: Qualification Package_ZARA

This project is a two story tenant improvement that consists of floors with beautiful white imported tile and polished industrial safety steel on a curved staircase and at the escalator entry. The custom millwork, including two cash wrap stations and a backlit plexiglass fixture at the entrance, were fabricated in Italy and shipped directly to the site for installation. Illumination consists of new recessed lighting and hanging halogen fixtures throughout.

Additional upgrades included:• Existing elevator and escalators• HVAC, electrical and sprinkler systems• New front sidewalk• 30 foot high external marquis

ARCHITECT Atlaschi + Hatfield Architects

PROJECT DURATION 14 weeks

PROJECT SIZE 7,640 sf

BENETTON FLAGSHIP @ UNION SQUARE SAN FRANCISCO, CA

INC

Page 13: Qualification Package_ZARA

References, Press and Testimonials

Page 14: Qualification Package_ZARA

INC

References for Flagship Retail

Lee Pearce/VP of Operations for Christian Dior & Gucci 011.44.77.85.380.649m

•We did both Gucci’s Flagship Stores at both Honolulu and Union Square. The Union Square project had a large structural component.

Sal Masotto/VP for Westfield 415.512.6776 909.549.0446m

•Operations Manager for San Francisco Centre: Build Group built over 25 retail stores within San Francisco Centre.

John McNulty/President of MBH Architects 510.747.1103w 510.501.3212m

•We did many retail stores for MBH including the Flagship Store for H &M on Union Square (40,000 square feet).

Daniele Minestrini/Design Director for Diesel 212.755.9200 x320

•We did the Flagship Store for Diesel on Union Square with Daniele.

Eric Lukenich/Loffredo Brooks Design 212.679.7729 x235 917.693.4557m

•We did the Flagship Store for John Varvatos on Union Square with Eric. This project also had a very large structural component.

Charlie Kridler/VP of Retail & Partner/Gensler & Associates (415) 846-9366

•We worked on over 10 retail project on Union Square with Charlie. Several of these projects had a large structural component.

Page 15: Qualification Package_ZARA

San Francisco Chronicle

What will Brad Ogden’s spectacular new San Francisco restaurant, One Market, and the new Coach leather goods store at Post and Grant have in common with 20 Talbot’s apparel stores in three states, Brobeck’s just-completed Palo Alto law office and three Alders Duty Free shops in Las Vegas?

They’re all projects of Fine Line Group, a San Francisco general contracting firm that’s not at all general.

“We’ve been increasing revenues 30 percent to 35 percent a year for the past three years. This year we’ll double to somewhere between $15 million and $20 million in new business. We’ve got 12 projects under way and another 12 in negotiation.”

Santori, 46, has all the usual answers as to why his company is “so hot” – quality workmanship, fast-track performance, good follow-up and maintenance. “Ninety percent of our business is repeat.”

But Fine Line also offers something that is unique.

“Despite the computers in the office, construction is one of the most backward of businesses.” Santori said. “There’s always been an adversarial relationship between the contractor and the architect/owner. We’ve tossed that old negative way of doing business out the window. We take the team approach and share some of the risk that normally falls entirely on the owner.”

Fine Line works up its budget from the architect’s schematic drawings rather than the much more expensive working drawings. “Only the subcontractors know the real cost of building,” Santori said. “So we bring all the potential subcontractors to the job site and walk them through the project. Then we can commit to a price that the developer

can take to his investors as a firm number.”

By so doing, Santori says he can save an owner 10 percent or more of a project’s overall cost. That can be especially significant when construction runs from $250 to $300 a square foot – as it did for the Splendido’s and McCormick & Kuleto restaurants, both recent Fine Line jobs.

A fourth-generation San Franciscan who worked his way through Lowell, USF and Cal as a carpenter, Santori began by specializing in interiors for major exhibits at the Legion and DeYoung museums and the California Academy of Sciences. When Prop 13 killed off much museum funding, he switched to retail and restaurant interiors.

His Fine Line partner is Bob Helmers, 46.

Their pet project of the moment is the $2.5 million-plus One Market restaurant being built for acclaimed chef Ogden, 38 and his Lark Creek Inn partner, Mike Deller, 46. It’s scheduled to open by Thanksgiving in the old SP Building at the corner of Market and Steuart.

The restaurant will be one of the city’s largest, with floor-to-ceiling windows looking on to the Embarcadero and the Ferry Building. It will employ 150 people and seat more than 300 – 10 of them at a chef’s table in the kitchen, which will take up more than 40 percent of the 10,300-square-foot space.

Copyright  ©  by  the  San  Francisco  Chronicle. 

Reprinted by permission.

Upscale Contractor On The Fast Track

By Lloyd Watson

Page 16: Qualification Package_ZARA

San Francisco Business Times

In the last 20 years, contractor John Santori has rebuilt himself, his company and the construction industry at least a half a dozen times.

Changing the course of his own life wasn't difficult. If Santori had followed his original career path to attend Columbia University Medical School, he would still be his same innovative self, and no doubt gone on to become something like a reconstructive surgeon. Instead, Santori has reinvented the way seismic work and high-end retail and restaurants projects are done.

Changing the ways of the construction industry proved more difficult. Said Santori, "The construction business isn't very innovative."

Santori chose a career in construction, in 1974, after spending his summers framing houses for his uncle. Building seemed like it would be a lot more fun than the years of studying that medical school required. Soon he learned that it would also be more challenging.

Santori's first company, Santori Construction, started out with small projects and was soon called on to renovate San Francisco's California Academy of Sciences and the Legion of Honor.

"We were cheap," said Santori, who loved the opening parties that went with doing museum work.

In 1979, Proposition 13 wiped out all the funding for library and museum construction and almost demolished Santori's company.

To stay alive, Santori turned to high-end retail construction, signing on four partners who each put in $500 for a total of $2,000 in startup funds. They spent the money on stationery for their new company, the Fine Line Group, photocopied the American Institute of

Architect's San Francisco directory and went door-to-door looking for projects. Lacking retail experience, work was difficult to get, so Fine Line took what other construction firms wouldn't. In 1980, their largest job was for the department store Liberty House. Their fee: $5,000.

At a Christmas party, Santori announced that Fine Line was going out of business in March.

After that announcement, they received $4 million in letters of intent from Liberty House and Bullock's. Fine Line decided to give the construction industry another try.

Wanting to be like the big players in the industry, it moved from its original home in Marin to San Francisco.

Soon, Liberty House pulled out of California, and so did Bullock's. "We learned a new word -- diversification," Santori said.

IBM was Fine Line's next big client, but the 1980s were also a time of downsizing for the technology giant.

During this series of disasters, Santori picked up on a way of doing construction that would save his business -- and the budgets of others.

While working with a Los Angeles architecture firm, Santori was introduced to the Japanese fast-track method of building.

Santori was astounded by the method's short construction period. He studied it for 10 years before finding a client that would allow him to test his new-found approach to building.

Rizzoli's bookstore decided to give the method a try. Santori had already

>>

Convincing Others to Try Something New

By Susan Smith Hendrickson

Page 17: Qualification Package_ZARA

San Francisco Business Times

remodeled two of the chain's stores, and the owner was anxious to try anything that would prevent him from closing a third store and losing business during the long remodeling process.

"With Japanese fast track, you can advertise that you are closing on a Friday, `come see our new store on Monday,' " said Santori.

Because of the months spent planning, measuring and doing most of the building off-site (which is cheaper), construction of a store happens almost overnight.

Fine Line's first Japanese fast track project was a success and the company realized it had found a niche: meeting next to impossible deadlines.

The company reinforced its theory by completing the renovation of the French Lycee School in San Francisco in five-and-a-half months, four months ahead of its set schedule.

Santori next applied Japanese fast-track construction to the seismic renovation of Rizzoli's San Francisco store. The project had a 14- month deadline. Fine Line completed it in five-and-a-half months.

Now Santori wants to completely change the way seismic work is done in the Bay Area. After all, a lot of buildings still have to get up to code before the 2002 deadline. To help them, Fine Line has joined with two universities and started a new division, Composite Structures, to test a new building material made out of carbon fiber, which is 10 times stronger than steel.

"In every other industry, you have to deal with the Steve Jobs-types, working away in their garages, trying to innovate," said Santori, a biochemist by degree. "I named my company the Fine Line Group, not Fine Line Construction, because I don't know where we will be in 10 years."

Copyright 1999 American City Business Journals Inc.

Continued

Page 18: Qualification Package_ZARA

FINE LINE GROUP

Pacific Business News

Time is money, especially in Waikiki, where rents often soar into the double digits per square foot per month, and downtime can destroy the bottom line.

On the ground floor of the Royal Hawaiian Shopping Center, workers are putting in double shifts to build out a posh Givenchy store slated to open by Memorial Day weekend. The catch is they didn’t start until May 6. In just four weeks, more than a dozen subcontractors will have gutted and re-built a 2,000-square-foot space to specifications in half the time it normally takes.

San Francisco-based general contractor Fine Line Group Inc. uses what company President John Santori calls “Japanese fast-track construction.”

The Japanese method is budget-driven, and there is no such thing as a change order or cost overrun, he said. Subcontractors participate in the planning process, along with the architect and owner. All components – such as cabinetry and storefront – are manufactured off-site, and on-site assembly is carefully choreographed for maximum efficiency. Santori said all on-site construction and installation is

being done by local union workers, and comes in at about $180 - $200 per square foot, often cheaper than traditional American techniques.

Santori said the Givenchy store is Fine Line’s first job in Hawaii, but the firm has been building custom interiors since 1979. He said most of the work involves high-end retail stores, including build-outs on cruise ships. Fine Line is targeting the Hawaii market with fast-track construction, he said, because high rents mean time is crucial, especially in the context of the visitor industry.But Santori said he is looking to the entire Pacific Rim, starting with Guam and Saipan, and is considering opening an office in Honolulu. “I’d like to put a team together in Hawaii,” he said, to serve those other markets. He said Fine Line employs about 50, and has gross sales of $15 million to $20 million per year.

The Givenchy store is being developed by Waikiki Trader Corp., which operates 29 theme stores in Hawaii and on the Mainland, including Endangered Species Stores, LeSportsac and Prima Classe.Cleigh Pang, Waikiki Trader vice president of operations, said he has used fast-track construction in two Endangered Species locations on the Mainland, and is sold on the concept.

Paris-based Givenchy sells men’s and women’s apparel and accessories, which have traditionally been carried by Island department stores. The move to open a store, analysts say, is part of a trend among upscale lines to address consumer preferences for branded-store shopping, which is perceived as more entertaining than department stores.

Royal Hawaiian Shopping Center Property Manager Jonathan Kim listed the Polo Store, Louis Vuitton, Burberry’s Ltd. And Chanel Boutiques among

those which have followed that pattern. And the Givenchy operation, he said, “is keeping with our marketing plan of offering designer products, and fits right in with our tenant mix, which attracts Japanese visitors.”

Marketing consultant Taka Kono, publisher of the Japan report, said specialty stores are much more powerful than boutiques within department stores. “For Japanese tourists, who are increasingly time-conscious, and are unfamiliar with Hawaii’s geography, it is much easier to shop at specialty stores dedicated to their favorite brands than to hunt down the products at several locations.”

Copyright  ©1996  by  Pacific  BusinessNews. 

Reprinted by permission.

Givenchy Employs the Fast-Track Process

By Chuck Davis

Page 19: Qualification Package_ZARA

Hospitality Design

On time and on budget are words clients like to hear – but often don’t – from their contractors. With the Fine Line Group, a San Francisco-based commercial interior construction firm headed by CEO John S. Santori, clients can anticipate a construction experience that is designed to save time, money, and energy often spent on unforeseen problems.

According to Santori, Fine Line does this by following a methodology of teamwork based on Japanese management principals.

Specializing in high-end West Coast restaurant projects, Santori’s 40-person firm is responsible for building some of San Francisco’s most successful venues, such as the $2.5 – million One Market restaurant and McCormick & Kuleto’s, created by award-winning restaurant designer Paul Kuleto.

What sets his firm apart from the competition, Santori says, is the amount of pre-construction planning that goes into each of its projects. “Pre-planning allows us to make scheduling and budgetary commitments that are invariably met,” he adds.

On all Fine Line projects, a team composed of the client, architect, contractor, and subcontractors is organized at the outset of a project. In the earliest stages of planning, each team member participates in several inspections to become totally familiar with the project so that there are no surprises down the road. “Each team member will be expected to perform as specified and for the price agreed to,” Santori explains.

Team members each have an equal voice in the numerous plan reviews and revisions that take place during the planning period. It is only after final revised schematics are approved by everyone on the team and an

item-by-item budget review is performed that actual work begins – with fewer hitches than might be the case without such meticulous pre-planning.

Though he earned a biochemistry degree from the University of California, Berkeley in 1970, Santori has always had a taste for the construction business. He worked for an uncle framing house during his college days, “and it progressed from there,” he says. In 1974, he started his own construction firm, which worked mainly on museum projects. That firm, eventually renamed the Fine Line Group, expanded its market to include retail and restaurant projects, as well as some hotel projects for Hyatt.

With annual billings of $20 million, Santori and his Fine Line Group are at work currently on the California Culinary Academy, Chalkers Billiard Club, and Silks restaurant, all located in San Francisco.

Reprinted  with  the  permission  of  HOSPITALITY 

DESIGN Magazine.

On Time & On Budget

By Suzanne Dorn

Page 20: Qualification Package_ZARA

Visual Merchandising + Store Design

How does a construction company enjoy 20- to 30-percent growth in the depths of a recession when its principal clients are retailers going through the worst down market in a decade? By accepting smaller profit margins, by being more versatile and budget-conscious than competitors and by helping clients solve time constraint and design problems.

At least that’s the formula used by San Francisco-based contractor Fine Line Group. Fine Line’s President and COO, Bruce Clymer, says it’s worked so well that the company expects 30- to 40-percent growth throughout the rest of the year.

Since its inception in 1979, Fine Line’s 40 employees, under the direction of CEO John Santori, have gathered clients such as Coach, Talbots, Liberty House, Confetti candy stores, Duty Free Shops, Sharper Image and Hyatt Regency Hotels. While the group’s work is primarily confined to the Southwest – California, New Mexico, Nevada and Arizona – future plans include venturing to the Northwest and Hawaii.

“The recession has given us a lot of good customer,” Clymer says. “Our

versatility has insulated us to some degree … and our willingness to offer additional services that other builders don’t offer has worked in our favor.”

One of those services includes site surveys. For example, the firm reviewed four possible locations for Talbot’s flagship store in San Francisco’s Union Square. Before leases closed, Fine Line found asbestos problems in one and structural problems in another. They also advised Talbots of city building codes and restrictions that might adversely affect their project.

“After site selection, we quickly got involved with the construction teams, helping to develop cost estimates,” Clymer explains. “There were some plaster ceilings in the existing space. The architects contacted us to see what we could do to salvage and determine whether we could repeat those original details throughout the space. That’s the kind of challenge we love to rise to.”

Say you’re a store designer who has just been given a rehab assignment with a limited budget, a ridiculously short completion date of eight weeks and very upscale expectations for the result. Is this mission impossible?

Maybe not. You fall into the classic profile of clients that sought the services of Fine Line Group this past year. Satisfied clients include such retail icons as I. Magnin, Bullock’s, Gumps and Coach.

“We were able to do a renovation for Coach in eight weeks, Talbots took about ten weeks… and that was in the middle of the earthquake.” Clymer says.

The Coach renovation, at Post and Grand Streets in San Francisco, involved a new façade, plus internal remodeling. “We knew an eight-week schedule was very ambitious,” admits Michael Fernbacher, Coach’s project manager. The renovation budget was

incomplete and some of the finishing detail had yet to be determined. These challenges left Fine Line undaunted – they assigned Steve Fairclough to the project as field superintendent.

“Steve has a millwork background,” Fernbacher explains. “This makes him sensitive to the larger architectural issues – and ability to see further ahead. Also, we are very much problem-solvers. Where many builders are always complaining about design problems, Fine Line becomes part of the design team – they think like designers.”

Fairclough sweated out every detail, according to Fernbacher. Fine Line located subcontractors to accommo-date special metalworking require-ments. Innovative construction methods, that involved removing, restructuring and reusing existing metal design elements, economically solved design problems on the façade. Unique scaffolding allowed ceiling and floor work to progress simultaneously. Tasmanian oak cabinetry and trim gave the Coach store the look of rich mahogany at a fraction of the price.

“They kept moving, taking it all in as we went,” says Fernbacher. “We had considerable changes – both in design and price – and they were able to accommodate it all.” Gene Messina, Coach’s manager of store construc-tion, was so pleased with the final result that he’s decided to replicate many of the Fine Line’s ideas in the firm’s other stores.

The secret of Fine Line’s success lies in the company’s philosophy of selecting clients with whom they hope to build long-term relationships. Clymer says Fine Line works to develop a team concept between client, architects and other contrac-tors.

>>

Problem Solving – Fine Line Group’s Competitive Edge

By Bob Jordan

Page 21: Qualification Package_ZARA

Visual Merchandising + Store Design

“Another of our services is our ability to provide subcontractors who provide quality work at competitive prices,” says Clymer. “We try to target clients who are growing. We repeat a lot of work with different architects. This enables us to negotiate attractive prices. It also makes it easier to devise alternative ways of constructing thing within structural limitations.

“Systemization is the key,” insists Clymer. “We are highly organized, with highly developed computer systems. This permits us to organize our subcon-tractors more efficiently. We’re able to be more creative on the financial end, allowing projects to move forward before the design is complete.”

As an example, in the Coach project Fine Line separated the façade from the prime contract. This permitted the firm to set a ballpark figure and begin construc-tion while the final design problems and costs were worked out for the rest of the project.

Leadership is another key. “We often teach our subcontractors how to bid,” Clymer says. “We teach them to develop detailed proposals. We keep them trim. We’re really strong on realistic bids. Then we protect our subs – we make sure we keep our promises.”

Trust is extended through the client-architect-builder team. It makes for long-term, stable relationships where work can be done on a handshake if need be.

This worked to everyone’s advantage in a multi-store project at San Francisco’s Embarcadero Center. Fine Line contracted to construct some 20 separate projects. In some instances clients were moving into space currently occupied by other clients.

“We were on an extremely tight sched-ule,” Clymer explains. “We didn’t have time to design everything first, so we

designed, budgeted and built as we went. “The result is a level of trust and credibility that’s earned Fine Line repeat business with 80 percent of its clients.

Clymer’s background suits him well in heading up such an innovative construc-tion firm. The grandson of a builder and son of an engineer, he worked as a boat builder, earning degrees in both anthro-pology and psychology. Early travels took him to Brazil and other foreign countries, where he was introduced to new and exotic building styles, techniques and materials. He built store for Joseph Magnin and then, as an independent consultant, built Gump’s stores in Dallas and Beverly Hills before joining Fine Line in 1988.

Admitting that the “Wal-Mart price point element” has introduced a new dynamic to retailing, Clymer still insists that image and quality design are here to stay.

Great design of the future, he says, will involve creating a strong image that enhances what a retailer’s client is seeking. An image of not only what the store sells, but of how the store wants its customers feel about what it sells. According to Clymer, the stores that do well in the future will be those that stay focused on what they sell – stores that are well planned and customer friendly. There will be less fear of signage. Pillars and columns will be mixed with new materials. “We now have stones and slates available in California that until recently we didn’t even know existed,” he says.

Lighting is gaining in importance as restrictive codes in some areas are forcing more creative approaches. In that regard, Clymer says that the United States makes the best lighting in the world, but the best design-oriented, mass-produced lighting now comes from Italy. Ergonomics, in terms of putting focus points at level more comfortable for customers, is taking on greater importance.

Clymer says we’ll see more stores-within-stores using different materials while still maintaining architectural balance. “Building in flexibility has become very important,” he stresses. “We’re building more modular showcases – cases lit from above rather than from within.”

Entertainment and convenience will be increasingly important to store design. “Look what Disney is doing.” Clymer says. “They’re creating entertainment and excitement.” Some recent jewelry stores Fine Line has worked on have video centers, toy centers, and couches where children can be entertained while their parents are looking at fine jewelry. “The trick,” says Clymer. “Is to balance entertainment with good merchandising concepts.”

Despite new advances, Clymer believes classics are here to stay. “Store designers have to be more sensitive to both interior and exterior store imaging. They must combine good graphics with great lighting to create efficient stores that focus on the customer’s needs.”

Continued

Page 22: Qualification Package_ZARA

From: Gupta, NamrataSent: Wednesday, July 15, 2009 2:09 PMTo: '[email protected]'Subject: Bliss Fine Line Group recommendation

Dear Lee,

John Santori asked that I share with you my recent experience working with Fine Line Group. Specifically, John asked that I comment on the support his construction management team, led by Eric Robinson, has offered my bliss spa project during the pre-construction phase of our new 4000 sf spa in Hollywood, California.

While Fine Line Group has built successful spas for Bliss in the past, the Hollywood project is the first in which they have provided us with pre-construction/construction management services. These services fell into three main categories: design team management, coordination/technical review, and pricing/cost control. In all categories, Fine Line has added incredible value to my team. Specifically: they supported Bliss and the design team in scheduling and communication; they coordinated technical conflicts during design to avoid costly changes during construction; and finally, they led “value engineering” exercises that have brought down project costs substantially without sacrificing design quality. In each case, we have benefited greatly by including Fine Line Group in an “integrated” delivery process and not waiting until the start of construction to do so.

For all of these reasons and more, I can offer you my strongest endorsement of John’s team at Fine Line Group.

And should you need to, you may call me at the mobile number below for any additional details or questions you may have.

Respectfully,

NamrataDirector of Spa Development and DesignBliss Spa

Page 23: Qualification Package_ZARA

Daniel J. Barteluce P.C. Architects & Associates 36 West 25th Street New York, NY 10010

Barteluce Architects & Associates

Phone (212) 691-7200Fax (212) 691-7260

www.bapc.net

Daniel J. Barteluce Principal, CEO

Michael M. Gatti Sr. VP, Principal

Vice Presidents Laurent Charlet

Charles J. Petretti Michael J. Rostkowski

Brian Swanson

Associates Atilio Leveratto

Christopher Nubla Alice Perera

July 16, 2009 Re: Fine Line Group 457 Minna Street San Francisco, CA 94103 To whom it may concern: I understand that you are considering retaining the General Contractor or Construction Management services of Mr. John Santori and Fine Line Group. I have had the recent pleasure of working with John and his team on a number of projects including the flagship boutique for Diesel in San Francisco and the renovation of a 5 story townhouse here in New York City. Our firm specializes in luxury retail environments but has completed many projects of all different types and sizes. A brief look at our website www.bapc.net will give you a sense of the level of detail we require when we hire a general contractor. In my 20 year career I can honestly say that Fine Line Group is one of the best I have worked with. Their management team is proactive and smart, providing viable solutions to field issues instead of simply stating the problem. Their field superintendents consolidate their questions and clearly present the issues making our job easier benefitting the overall project. Most importantly, they take tremendous pride in the quality of their work; they are committed to building relationships, not simply making as much money as possible and moving on to the next. I would highly recommend Fine Line Group for any project you are considering and am available to talk to you and your team anytime. Don’t hesitate to call with any questions or comments. Sincerely,

Michael M. Gatti, AIA Principal

Page 24: Qualification Package_ZARA

June 10, 2003

To Whom It May Concern:

Gensler has worked with Fine Line Group for the past ten years on several projects including the Gucci stores in Ala Moana Center in Hawaii and Union Square in San Francisco.

We have found John Santori and his company to be conscientious in meeting project budgets and committed to maintaining project schedules. They have proven to be innovative problem solvers and are able to rise to the challenge of fast track deadlines while maintaining a quality product. They are easy to work with and are highly regarded by their clients and project consultant teams.

I would recommend John Santori and his company, the Fine Line Group Inc. as an exceptionally capable contractor for your project.

Sincerely,

Charlie KridlerVice President, RetailCK/LN

Architecture, Design & Planning Worldwide

San FranciscoSan Francisco

Two Harrison StreetSuite 400California 94105Tel: 415.433.3700Fax: 415.836.4599

Page 25: Qualification Package_ZARA

buildgc.com

457 Minna Street, Suite 100San Francisco, CA [email protected]