Testing: Unit Testing / User Manual Module: Quality
Management
ENVIRONMENT
SYSTEM : SAP R/3 ECC 6.0
CLIENT : 200
UNIT TESTING SCENARIO
SCENARIO NUMBER : BPML QM03-16
DESCRIPTION : GAUGE CALIBRATION
PREPARED & TESTED BY
NAME : JL Hatekar
SIGNATURE :
DATE :
TEAM :
Approved By : Kabir R (PwC)
Page 1 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
1. Transaction Code/ Path
Enter the menu path of the transaction code, which is going to
be tested by the user.
Menu Path Logistics - CreateT.Code IP11
2. Input Data
1. Enter the Input parameters, which need to be given by the
user during the testing of this scenario.
2. Input the value for the fields and then if required, copy the
screen shot of the input screen after the table.
3. If the scenario has multiple screen inputs, which needs to be
processed, repeat the step 2 for every screen.
2.1 Input Screen Name Create Sales Order: Initial Screen
Description of the Field
Nature of the Field Value of the Field
Order Type Mandatory
Select New entries
Page 2 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Select Packages
Click New Entry And make the entries as per requirement in
respective columns as shown below
Page 3 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Save the data . Strategy 3_5_7days created.
END
Page 4 of 29
-
Testing: Unit Testing / User Manual Module: Quality ManagementTO
CREATE CALIBRATION TASK LIST
Menu Path Logistics - CreateT.Code IA05 / 06
ENTER
GO TO OPERATION , TYPE CONTROL KEY QM01 AND OPERATION DESC.
Page 5 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
GO TO MntPack AT BOTTOM MENU
Tick the required calibration frequency and Go to Insp. Charat
bottom menu and click
Page 6 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Select the MIC by drill down or Select Quant. / Qual.
Characteristics, type Short text of Insp Char. And go to Control
Indicator and tick required data as shown in below screen and
tick
Page 7 of 29
-
Testing: Unit Testing / User Manual Module: Quality
ManagementClick on tick , following screen will display. Drill down
on selected set as it is Qualitative Inspection char.
Click on selected set selection following screen will
display
Page 8 of 29
-
Testing: Unit Testing / User Manual Module: Quality
ManagementSelect the selected set and click on tick following
screen will display.
Also select the defect catalog and code group and ENTER
Select the sampling scheme from drill down. Enter, following
screen will display.
Page 9 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Similarly for Quantitative char. Tick on Quant. And type desc,
select the line and go to control indicator. And select the
required function as shown in following screen.
Click on tick,
Page 10 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Click on tick, enter the required values as shown in following
screen.
Enter and select the Sampling procedure from drill down
Page 11 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Enter, following screen will display
Select both the lines and
SAVE.------------------------------------------------------------------------------------------------------------CREATE
MAINTENANCE PLANMenu Path Logistics - CreateT.Code IP42 / 02/
03
Page 12 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Select Maint. Plan. Cat. As PM Maintenance Order and select the
strategy from drill down.
Enter
Page 13 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Half portion of above screen as given below
Page 14 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Go to Maint. Plan scheduling parameters tab enter, enter Call
horizon, Scheduling period, tick completion requirement, Start of
cycle.
Page 15 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Page 16 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Click on next screen will display
Tick of Equipment task list if the task list is created for an
equipment or tick on Gen. task if the task list is created for
general ( All items same) & execute. Following screen will
display.
Page 17 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Save and following screen will display, and Created maintenance
plan No. will display at bottom of Screen ( Here it is 151)
Page 18 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
To created Scheduling T code IP10Enter maintenance Plan, Hit
Enter
Page 19 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Click of Start date of start of cycle will display or give date
of start of cycle
Click on Tick, calibration cycle sill display.
Page 20 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Save to start the Cycle, the Inspection lot / Order will get
created.To check inspection lot T code QA32, The schedule call can
be seen from IP24, to see the Order T code IW33
To see Inspection lot T codeQA32
Page 21 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Execute,
List of inspection lot will get display. To see the Schedule
calls T code IP24 ( Use Variant /PM)
Page 22 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Page 23 of 29
-
Testing: Unit Testing / User Manual Module: Quality
ManagementExecute , -- Work order 4000502 is created.
Order can be seen from T Code -- IW33Give order No. 4000502
Enter
Page 24 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Go to Operation Tab
END
Page 25 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Page 26 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Page 27 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Page 28 of 29
-
Testing: Unit Testing / User Manual Module: Quality
Management
Page 29 of 29