Quality Environment (5S) Quality Environment (5S) STEP BY STEP STEP BY STEP IMPLEMENTATION IMPLEMENTATION
63

QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Mar 08, 2018

Download

Documents

buingoc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Quality Environment (5S) Quality Environment (5S)

STEP BY STEPSTEP BY STEPIMPLEMENTATIONIMPLEMENTATION

Page 2: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

OUTLINE OF PRESENTATIONOUTLINE OF PRESENTATION

INTRODUCTION TO QE ACTIVITIES AND ITS BENEFIT

ROLES & RESPONSIBILITIES OF THE COMMITTEE STEP BY STEP QE IMPLEMENTATION

2

Page 3: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

PART 1PART 1

INTRODUCTION TO QE ACTIVITIES AND ITS BENEFIT ROLES & RESPONSIBILITIES OF THE COMMITTEE

3

Page 4: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

QE (5S) Management TechniquesQE (5S) Management TechniquesINTRODUCTION

Today, it is increasingly recognised that QE (5S) managementtechniques enhance productivity and competitiveness. In order tobecome a World Class Gemba, an organisation has to go through acontinuous and systematic process to :

• Identify, reduce and eliminate waste• Enhance teamwork• Enhance operation effectiveness in a better working

environment• Form the basic advanced model for Productivity and Quality

Improvement

Page 5: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

UNDERSTANDING QE (5S)

QE (5S) is a management tool from Japan, that focuses onestablishing a quality environment in the organisation,ensuring adherence to standards and in the process, fostersthe spirit of continual improvement.

It focuses on five management techniques that are thefoundation for any organisation’s competitive initiative. TheQE (5S) are defined with examples as follows.

Page 6: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

SORT

To sort and systematically discarditems that are not needed in theworkplace

Page 7: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

SET IN ORDER

To arrange necessary items in aneat and systematic manner sothat they can be easily retrievedfor use and to return after use.

Page 8: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

SHINE

To clean and inspect theworkplace thoroughly so thatthere is no dirt on the floor,machines and equipments.

Page 9: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

STANDARDISE

To maintain a high standard ofworkplace organisation bykeeping everything clean andorderly at all times.

Page 10: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

SUSTAIN

To train people to practise the QE(5S) system continuously so thatit becomes habitual and ingrainedin the culture of the organisation.

Page 11: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

WHY QE (5S)

The QE (5S) concept is easy for everyone to understandbecause :

• It does not require the understanding of difficultterminologies.

• It is simple, driven by logic and natural to humanbehavior.

• It is within the reach of all type and size of industry ororganisation.

Page 12: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

WHAT IS NOT QE (5S)

• A housekeeping exercise• A way to blame people for defects• A way to force people to do their work• A way to make people work harder and faster• A monthly or yearly flavour e.g. Quality Month

Page 13: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

BENEFITS OF QE (5S) IMPLEMENTATION

Today, many organisations have implemented the QE (5S)system with astonishing results as voiced by our customers,the CEO’s and MDs of the Malaysian National QE (5S)Award Winners :

“We have not seen any approach to improvement that isSIMPLER or more POWERFUL that can beImplemented at LOWER COST”

Page 14: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

The benefits are :

• Workplace becomes cleaner and better organised.• Shopfloor and office operation becomes safer.• Visible results enhance the generation of more and better

ideas.• Lead-time reduced.• Changeover time reduced by streamlining operations.• Breakdowns and minor stops eliminated on production lines.• Defects reduced by mistake proofing.• Clear methods and standards are established .• In-process inventory is reduced.• Space usage is improved.• Customer complaints are reduced.

Page 15: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

KEYSTO QE (5S) SUCCESS

In order for the QE (5S) system to be successful, the mostimportant factor is the commitment, participation andinvolvement of EVERYONE and strong visible support fromtop management. Generally, QE (5S) activities should becarried out systematically as follows :• Visit QE (5S) model companies for continualimprovement.• Train everyone adequately on QE (5S) Practices.• Promote QE (5S) Campaign.• Plan systematic approach following the Plan-Do-

Check-Act (P-D-C-A) Cycle.• Practise Performance Measurement and Reward

System.

Page 16: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

HOWTO INITIATE QE (5S) IMPLEMENTATION

The QE (5S) approach outlined in this guidebook is a simpleand systematic methodology which can be introduced andimplemented in any size and type of organisation.

To start the QE (5S) : Step-by-Step Implementation, eachphase must be thoroughly analysed and addressed using theP-D-C-A Cycle and 5W2H approach as follows :

Page 17: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

PLAN

• Preparation :

Provide training and education for everyone. Form QE (5S) Council. Set-up QE (5S) Zones. Determine QE (5S) objectives, goals andimplementation phases. Plan QE (5S) action plan and QE (5S) Launch.

Page 18: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

DO

• Sort : Identify what is necessary.

• Set in Order : Define what and how to arrange.

• Shine : Identify dirt sources. Identify root causes. Take action to eliminate dirt sources and root causes.

Page 19: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

• Standardise :

Who is responsible ? What actions to take to maintain the desired condition ? When must those actions be taken ? Where must they apply ? What procedures need to be followed ?

Page 20: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

• Sustain :

Everyone understands, obeys and practises the rulesand procedures

Continual efforts at sustaining the desired condition

Page 21: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

CHECK

• Assessment :

Conduct Internal QE (5S) Audit Benchmark within the department and with other

organisations Ensure the established QE (5S) procedures are followed

through

Page 22: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

ACT

• Continual Improvement :

Develop QE (5S) practices into a HABIT Compare actual goals with set goals Reward and recognise efforts of staff Register QE (5S) Certification Participate in National QE (5S) Competitions Review Plan-Do-Check-Act Cycle

To ensure successful QE (5S) Implementation, each phasemust proceed accordingly as illustrated in the ROADMAPTO QE (5S) IMPLEMENTATION

Page 23: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

ROADMAPTO QE (5S) IMPLEMENTATIONImproving organisation performance is an ongoing challenge andorganisations benefit best from a holistic approach, and here is anextremely useful ROADMAPTO QE (5S) IMPLEMENTATION.

• The fundamental process for Productivity and QualityImprovements

• A firm foundation for Continual Improvement• Best Practices• Key Performance Results

PHASE 1 and 2 are the ENABLERS. PHASE 3 and 4 are the actual RESULTSachieved. After each cycle review :

• The phase which require improvement• The approaches which will impact on the results• The self-assessment to gauge the effectiveness of actions taken

Page 24: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

ROADMAP TO QE (5S) IMPLEMENTATION

PREPARATION

CONTINUAL CREATIVITY AND INNOVATION

ENABLERS RESULTS

Sort

Set in order

Shine

Standardise

Sustain

CONTINUAL

IMPROVEMENT

SELF-ASSESSMENT AND QE (5S) CERTIFICATION

PLAN DO CHECK ACT

PHASE 1 PHASE 2 PHASE 3 PHASE 4

Page 25: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

STEP 1 : FORMATION OF QE (5S) COUNCIL

Objectives:

To enhance total participation at all levels of employees and develop a continuous improvement culture and best performance spirit in the teams.

QE (5S) Council

QE (5S) Council comprises the following:

• QE (5S) Steering Committee

Managing Director as Advisor

General Manager as Chairman

Head of Departments as Facilitators

• QE (5S) Training Committee

• QE (5S) Promotion Committee * QE (5S) Audit Committee

Page 26: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

The QE (5S) Steering Committee are responsible for developing the implementation plan, and the selection of team members is to be based on ability, organisational representation and expertise. The functions of the Training Committee, Promotion Committee and the Audit Committee.

QE (5S) implementation responsibilities are to be distributed throughout the organisation. Every member must know their own QE (5S) responsibilities and perform accordingly. It is the duty of the Chairman to administer accountability for each of the responsibilities, as outlined below:

Appoint:

• QE (5S) Coordinator

• QE (5S) Facilitators and QE (5S) Leader from each department

Page 27: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

ROLE AND RESPONSIBILITIES OF:

QE (5S) Chairman:

• Communicates with everyone involved.

• Ensures total organisation participation.

• Supports QE (5S) implementation activities.

• Establishes accountability for assigned responsibilities.

Page 28: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

QE (5S) Coordinator:

• Communicates with everyone involved.

• Facilitate work group implementation activities.

• Motivate and monitor implementation activities.

• Ensure total organisation participation.

• Act as a resource for information

Page 29: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

QE (5S) Facilitators:

• Support QE (5S) implementation.

• Communicate with everyone involved.

• Motivate work groups.

• Ensure employee implementation plan.

• Monitor measurement systems.

Page 30: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

QE (5S) Leaders:

• Participate in work group implementation process.

• Communicate with everyone involved.

• Monitor progress of group activities.

Employees’ responsibilities

• Participate in group activities with full commitment

Page 31: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

STEP 2 : SET-UP QE (5S) ZONES

QE (5S) Coordinator will demarcate the zones. QE (5S) Facilitators will assign responsibilities and divide activities into manageable tasks. This involves:• Obtaining the layout of the entire work area and dividing each section

into small zones• Assigning one team to each section, determining the number of people per team, and displaying the names of team members and their areas• Ensuring that at least one person is assigned to each section and

there is a leader for every team• Ensuring that section size and team strength are uniform• Defining who is responsible for shared spaces

Page 32: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

STEP 3 : QE (5S) TRAINING

Objectives :

To disseminate QE (5S) methodology and prepare the workforce for meaningful participation in QE (5S) activities.

This training programme, which is the starting point of QE (5S): Step-by-Step Implementation, encourages workers to become actively involved in the application exercises. This is the responsibility of the QE (5S) Training Committee.

Once the preliminary training is completed, everyone will have the required basic knowledge, and be responsible for action in progress. Plans describing implementation of the QE (5S) phases must be prepared and released during the QE (5S) declaration.

Page 33: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

The most common mistake organisations make when implementing the QE (5S) system, is the failure to train adequately at the outset. Training should proceed as follows:

• QE (5S) Awareness for Top Management

• QE (5S) Awareness for Operators

• Step-by-Step QE (5S) Implementation for Facilitators

• Step-by-Step Internal QE (5S) Audit

Page 34: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

STEP 4 : QE (5S) DECLARATION / LAUNCH

Objectives :

To announce the promotion plan for the sole purpose of promoting the establishment of QE (5S) activities.

Guidelines for QE (5S) Launch :

At this point, management must endorse the QE (5S) plan, set targets, policy, and goals for the Step-by-Step Implementation.

• Announcement of QE (5S) Policy, Objectives and Goals

• Announcement of QE (5S) Zones

• Announcement of the QE (5S) Slogan

After the successful QE (5S) Launch, proceed to the Step-by-Step Implementation plan.

Page 35: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

QE (5S) COUNCILSteering Committee

Training

Coordinator

Promotion Audit

The Steering Committee assist in implementing QE (5S) activities.

Page 36: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

An example of QE (5S) policy and goal

We shall continuously maintain a high standard of QE (5S) practices at our workplace, through teamwork and self discipline. In doing so, we shall achieve :-

• Improved productivity

• Consistent high quality products and services

• Timely delivery

• Reduced cost

• Safe working environment

To be recognised as a National QE (5S) Model Company

QE (5S) POLICY

QE (5S) GOAL

Page 37: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Functions

• Identify QE (5S) training for everyone.

• Schedule all types of QE (5S) training.

QE (5S) Awareness Training

Step-by-Step QE (5S) implementation for Facilitators

Step-by-Step Internal QE (5S) Audit

QE (5S) TRAINING COMMITTEE

Page 38: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Functions

• Promote QE (5S) campaigns.

• Identify and recommend promotional activities.

• Recommend and grant rewards or recognition to

individuals / groups who have participated or won in the

promotional activities.

• Review the effectiveness of promotion campaigns.

QE (5S) PROMOTION COMMITTEE

Page 39: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Functions

• Develop QE (5S) evaluation criteria, guidelines and 3S

Improvement stickers.

• Assist in sustaining QE (5S) activities through QE (5S)

Internal Audit.

• Submit monthly audit summary report to top management.

• Develop guidelines for measuring the impact of audit.

QE (5S) AUDIT COMMITTEE

Page 40: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

PART 2PART 2

STEP BY STEP QE IMPLEMENTATION

40

Page 41: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Guidelines for Practising SORT

Description:The first S focuses on eliminating unnecessary items in the workplace.

Guidelines:It is the series of steps which keep only

• what is needed

• the amount needed and

• when it is needed

To implement the first S the Red-Tag process is commonly employed. The Red-Tag strategy helps to identify unwanted items and determine their usefulness. There are six steps involved in creating a successful Red-Tagging process.

Page 42: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Step 1 : Launch the Red-Tag ProjectThis is usually done by the QE (5S) Steering Committee by creating holding areas and planning for the disposal of unwanted items using the Red-Tag form.

Step 2 : Identify the Red-Tag Targets

Specify the type of items and the physical work areas to be evaluated.

Step 3 : Set Red-Tag Criteria

Three questions need to be asked to determine if an item is necessary.

• Is it useful ?• How often is it needed ?• How much is needed ?

Page 43: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Step 4 : Attach the Tag.

The Red-Tagging event must be quick and decisive. The

target scope must be completed before the QE (5S) Lunch.

Step 5 : Evaluate Red-Tagged Items.

Decide what to throw and the actions required

Page 44: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Figure 1. First S Action Plan

Step 6 : Document the Results of Red-Tagging.Results must be logged for accounting purposes so that the organisation can measure the improvements and savings realised through the process.

UNNECESSARY ITEMS

Throw away immediatelyItems having no value and easy to dispose

REQUIRED ACTION

Look for buyer who offers the best price

Items having some sale value

Work out the least costly and safest way for disposal

Items having no value and their disposal is costly

Page 45: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

When Red-Tagging is completed and action taken as in Figure 1, workflow is reduced, communication between workers is improved and productivity is enhanced.

The key word in this description is the elimination of unnecessary items in the workplace. Sorting is an excellent technique to transform a cluttered workplace layout into an effective area to improve efficiency and safety.

Potential Impacts :

• Necessary items are identified and positioned in the right workplace and location.

• Unwanted items are eliminated.• Searching time is reduced.• Working environment is improved.• Space utilisation is maximised.

Page 46: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

SORTSORT Elimination of unnecessary things Elimination of unnecessary things or wastesor wastes

Eliminate wastes of resources, Eliminate wastes of resources, materials, spaces, shelves, materials, spaces, shelves,

cabinets, etc.cabinets, etc.

Reduce WIP inventoryReduce WIP inventory

EXPECTED RESULT OF 1EXPECTED RESULT OF 1STST SS

Page 47: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Phase 2: QE (5S): Step-by-Step Implementation

Guidelines for Practising SET IN ORDER

Description:

The second S reflects a very popular saying: “A place foreverything in it’s place”. It emphasises safety, efficiency andeffective storage and consequently improves the appearance ofthe workplace.

Guidelines:

Once the first S has been successfully implemented, what is leftshould be arranged so that there is ease of use and storage asillustrated in Figure 2.

Page 48: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Figure 2. Second S Action Plan

NECESSARY ITEMS REQUIRED ACTION

Items frequently used

Items sometime used

Items not used at all but must kept

Can be placed near the point of use

Must be stored separatelyWith clear identification

Can be placed further away

The process shown in Figure 2, eliminates waste in production orin clerical activities and ensures all materials, tools andequipments have designated locations which are easy to find.

Page 49: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

The second S includes activities such as:

• Mark reference materials with an oblique line to detect disorderfrom a distance.

• Put names and numbers on all jigs and tools.

• Store tools beside the machine with which they will be usedaccording to sequence of work operations.

• Organise files and store using colour code to make it easy toidentify materials at a glance.

• Store similar items together.

• Store different items in separate rows.

• Do not stack items together, use rack or shelf.

• Use smalls bins to organise small items

Page 50: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

• Use colour for quick identification of items.

• Label clearly each item and its storage area (Visual Control)

• Use see-through cover for better visibility.

• Use specially designed carts to organise tools, jigs andmeasuring devices that are needed for each particular machine.

• Create tool boards.

The key word in this description is anyone. Labelling isspecifically for other people who need what is in area, when thearea owner is away. The benefit is searching time reduced.When orderliness is established, there is no human energywaste or excess inventory.

Page 51: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Potential Impacts:

• Items easily returned to its designated location after use.

• Required items easily located, stored and retrieved.

• First-In First-Out (FIFO) is practised.• Retrieval time is reduced.

• Right Item, Right Place, Right Quantity and Right Method (4R) are inplace.

Page 52: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

EXPECTED RESULT OF 2EXPECTED RESULT OF 2ndnd SS

No more searching No more searching

Place for EverythingPlace for Everything

a. Reduce settinga. Reduce setting--up timeup time

b. Prevent b. Prevent -- misplacing, leaking oilmisplacing, leaking oil

-- wasting energy, materials wasting energy, materials -- products, etc.products, etc.

Page 53: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

c.Improve c.Improve -- space utilization,space utilization,

-- work conditionswork conditions

d. Eliminate d. Eliminate -- searching time,searching time,

-- dangerous conditions dangerous conditions

-- etc.etc.

Page 54: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Guidelines for Practising SHINE

Description:

The third S stresses on cleanliness because it ensures a morecomfortable and safer workplace, as well as better visibility, whichreduces retrieval time and ensures higher quality work, product orservice.

Guidelines:

The third S is to thoroughly clean the work area. Daily follow-upcleaning is absolutely necessary to maintain a clutter-freeworkplace and a desirable environment. SHINE speaks for itself.Everyone enjoys working in a clean environment which raisesmorale and increases productivity.

Page 55: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

To successfully implement the third S as a daily value-adding activity, thefollowing steps must be practised.

Step 1: Delegate Cleaning Assignments.

Cleanliness is the responsibility of EVERY employee and theworkplace must be divided into distinct cleanliness areas, whichcan be based on:

• 5S Zones:

Show all the cleanliness areas and the names of the peopleresponsible for them.

• 5S Schedules:

Show in greater detail the different areas and the names othose responsible for them, including daily rosters.

Page 56: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Step 2: Determine What is to be Cleaned.

Develop targets and categories them for ease of use.

Step 3: Determine the Methods to be Used.

Decide on the tools and materials required and what is to becleaned in each area. Cleanliness must be practised daily andmust take only a short time to execute. Standards must beadopted to ensure people do the cleaning efficiently.

Step 4: Prepare the Cleaning Tools and Materials.

Set up cleaning tools and the required materials in such a mannerso that they are easily retrieved for use.

Page 57: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Step 5: Implement Cleanliness

All equipment malfunction or defects must be fixed orreconditioned.

The key word in this description is keeping the workplace andeverything in it clean and in good functional condition. This isachieved through the combination of the cleaning function anddefect detection.Potential Impacts:• Higher quality work and products.• More comfortable and safer work environment• Greater visibility and reduced retrieval time• Lower maintenance cost• Creates positives impression on visitors and during customer

inspections

Page 58: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Guideline for Practising STANDARDISEGuideline for Practising STANDARDISE

Description:Description:

The continue employment of the 3S will ensure a highstandard of workplace organisation.

GuidelinesGuidelines::Once the 3S are in place, the next step is to concentrateon standardizing best practices. The plant must includethe creation of procedures and simple daily checklistswhich are to be visibly displayed at every workplace.

Page 59: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Job responsibilities that include: Who is responsible? (ownership) What actions must be taken to maintain the

desired condition? When must those actions be taken? Where must they apply? What procedures will be followed to ensure

compliance? Cleaning procedures Maintenance schedules

The checklists must serve as visual signpost to ensure thatthe daily 3S requirements are carried out habitually as bestpractices in the work area. Examples of checklists are:

Page 60: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

The key word is to consolidate the 3S establishing standardprocedures. This activity is carries out to determine the bestwork practices and find ways of ensuring that everyonecarries out their individual activity in their workplace.

PotentialPotential ImpactsImpacts::

• Better workplace standards.

• Better Visual Control Systems.

• Establishment of Rules and Standard Operation Procedure(SOP).

• Information sharing on required standards.

• Improvement in operation and workflow.

Page 61: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

Guidelines for Guidelines for PractisingPractising SUSTAINSUSTAIN

DescriptionDescription::

The fifth S is to make it a habit of maintaining the momentumof the previous four S to ensure sustainability of the systemand to make further improvement by encouraging effectiveuse of P-D-C-A Cycle.

GuidelinesGuidelines::• Build awareness of the importance of 5S through

retraining.• Reward and recognise efforts of staff.• Use techniques / approaches / strategies to sustain

activities.

ReviewReview::• 5S Slogans and Posters• 5S Newsletters to share the progress of 5S activities.• 5S Achievements – standards and performance indicators

Page 62: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

The last S stands for SUSTAIN which requires self-discipline without which it is impossible tomaintain consistent standards of quality, safetyand cleanliness.

The key word is this description is shared values.Shared values are achieved through coaching andteam participation, not shouting orders andimposing penalties. The implementation of 5Sinvolves coaching to get the workers to do thesimple things right. Buying in to these basicvalues is the essential starting point to develop aWorld Class organisation.

Page 63: QE - Step by Step Implementation - FCQ …-+Step... · people per team, and displaying the names of team ... (5S): Step-by-Step Implementation, ... Launch the Red-Tag Project This

PotentialPotential ImpactsImpacts::

• Compliance to workplace rules.

• Team spirit and discipline are developed.

• The ‘Kaizen’ mentality is inculcated in theemployees.

• Adoption of best practices.

• Enhance operation effectiveness in a better workingenvironment.