* * * * * +0.0 +0.0 +0.0 BUS GATE BUS GATE Extent of Works T86 T23 (TPO1458-2012) T87 T24 (TPO1458-2012) TSRGD 2019 Diagram 953 TSRGD 2019 Diagram 953 TSRGD 2019 Diagram 953 TSRGD 2019 Diagram 953 55.70 55.57 1 in 50m fall 55.19 54.65 54.81 2m 1.5m 1.5m 1.5m 2m 1.5m 1.5m 1.5m 1.5m 1.5m 2m 2m 7.49m 1.50m 1.00m 1.50m 3m 1.0m (Wide) x 0.75m (High) Culvert + Wing walls Invert Level- 54.12m AOD R20m 6.1m 3m TSRGD 2019 Diagram 1048.5 Red HFS to enhance awareness of bus gate Red HFS to enhance awareness of bus gate 6.1m R20m 1m 3.7m 3m T84 T85 T371 to be removed. T370 Route to continue and connect with NMRES. Refer to Context Plan for Info. P10 western access. Alignment to guide vehicles to the right upon exit. 1m Maintenance Margin TSRGD 2019 Diagram 1048.5 TSRGD 2019 Diagram 1003A Proposed Badger Sett 82m Bridleway crossing. The route south of the Bus Gate will be subject to a later RM Application. Bridleway Sightline to be kept clear between 1.5m-2.7m for equestrians Sightline to be kept clear between 1.5m-2.7m for equestrians Illuminated Diag. 616 Height 600mm Mounting Height 2,740mm Diag.954 Mounting Height 2,500mm Diag.513.2 Mounted Below Diag. 954 Diag.832.10A Mounted Below Diag. 513.2 Illuminated Diag. 613 600 Diameter Mounting height 2400mm Crossing suitable for equestrians with non slip surface Proposed Sump Buster WARNING Illuminated Diag. 616 Height 600mm Mounting Height 2,740mm Diag.954 Mounting Height 2,500mm Diag.513.2 Mounted Below Diag. 954 Diag.832.10A Mounted Below Diag. 513.2 Except buses Max speed 10 SUMP BREAKER Except buses Max speed 10 SUMP BREAKER CCTV Monitoring of Bus Gate Usage CCTV Monitoring of Bus Gate Usage 1.25m 1.25m 1.2m * * + +0.0 +0.0 BUS GATE BUS GATE T86 T23 (TPO1458-2012) T87 T24 43m Forward Visibility Splay Westbound 2m 1.5m 1.5m 1.5m 2m 1.5m 1.5m 2m 7.49m 1.50m Sightlines to be kept unobstructed between 0.6m-2.0m above ground level * * • +0.0 +0.0 +0.0 +0.0 BUS GATE Extent of Works T86 T23 (TPO1458-2012) 43m Forward Visibility Splay Eastbound 1.50m Intervisibility (82m) Bridleway CCTV Monitoring of Bus Gate Usage CCTV Monitoring of Bus Gate Usage * * * * * * * * * * * * * * * * * * * STOP BUS STOP BUS STOP BUS * * * * * * * * * • • • • • • • • • • +1.5 +1.5 +1.5 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 +0.0 C J K SETT T4 BUS GATE BUS GATE 56.1m Hogwood Lane JAMES WATT ROAD Co Const & Ward Bdy CR Drain CP Arborfield Garrison Co Const & Ward Bdy CP Hogwood Lane Pond Arborfield Garrison 56.1m El Sub 1179 7a 9a 6a 8a 2a 1a 4 1 8 5 14 El Sub Sta Sta Rowanwood Rookery Court 1 4 1 2 3 4 1 5 Falcon Business Park IVANHOE ROAD WELLER DRIVE El Sub Sta Kestrel Buildings MARINO WAY 1 3 15 13 2 8 10 16 18 42 29 23 38 32 39 30 B B B B B C C C STOP BUS B B B B B C C C STOP BUS Extent of Works 43m Forward Visibility Splay Eastbound 43m Forward Visibility Splay Westbound 55.70 55.57 1 in 50m fall 55.19 54.65 54.81 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 110.58 0.00 10.00 20.00 30.00 40.00 10.00 20.00 30.00 40.00 50.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 120.00 130.00 140.00 150.00 160.00 170.00 180.00 190.00 200.00 210.00 220.00 230.00 240.00 250.00 260.00 270.00 280.00 290.00 300.00 310.00 320.00 330.00 340.00 350.00 360.00 370.00 380.00 390.00 400.00 410.00 420.00 430.00 440.00 450.00 460.00 470.00 473.45 0.00 10.00 20.00 30.00 40.00 50.00 56.48 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 110.58 -5.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 120.00 130.00 130.83 0.00 10.00 20.00 30.00 40.00 3m R20m 6.1m 3m 6.1m R20m 1m 3.7m 3m T84 T85 T371 to be removed. T370 Intervisibility (82m) 82m Bridleway Sightlines to be kept unobstructed between 0.6m-2.0m above ground level Illuminated Diag. 616 Height 600mm Mounting Height 2,740mm Diag.954 Mounting Height 2,500mm Diag.513.2 Mounted Below Diag. 954 Diag.832.10A Mounted Below Diag. 513.2 Ensign Bollard Diag. 956 Illuminated Diag. 613 600 Diameter Mounting height 2400mm Illuminated Diag. 616 Height 600mm Mounting Height 2,740mm Diag.954 Mounting Height 2,500mm Diag.513.2 Mounted Below Diag. 954 Diag.832.10A Mounted Below Diag. 513.2 Illuminated Diag. 616 Height 600mm Mounting Height 2,740mm Diag.954 Mounting Height 2,500mm Diag.513.2 Mounted Below Diag. 954 Diag.832.10A Mounted Below Diag. 513.2 Except buses 10 Except buses 10 CCTV Monitoring of Bus Gate Usage CCTV Monitoring of Bus Gate Usage 1.25m 1.25m 1.2m S2 - Suitable for Information Document/Drawing Number JNP Group Internal Project Number: - - - - -- H01234 CALA Homes Thames Ltd. Hogwood Farm Phase 2 Bus Gate General Arrangement HOGP2 JNP 66 XX DR C 2001 P5 As Shown FI_60_20 Leamington Spa Sheffield • www.jnpgroup.co.uk Chesham Brighouse • Glasgow Hartlepool • • Project - Originator - Volume/System - Level/Location - Type - Discipline - Number Revision: Suitability: Rev. Date Description Drn / Chk'd / App'd Client Logo: © Copyright JNP Group Ltd, Complies to ISO7200:2004 - JNP QA Ref: QD019 Rev E Job: Title: Client: Classification: Scale @ A1: 2020 General Notes 1. Where this drawing has been issued in electronic .dwg format it has been done so in good faith. JNP Group do not take any responsibility for any inaccuracies in the electronic data, which should be checked against the paper (or .pdf) drawing issue. Any apparent discrepancies should be immediately reported to JNP Group. The electronic .dwg file should not be assumed to be to scale and should not be used for 'overlaying', setting out or checking of any third party information. All dimensions should be taken from the paper (or .pdf) version of the drawing. Electronic drawings may contain third party information. JNP Group take no responsibility for this information, which should be checked against the originators paper drawing(s). 2. All dimensions to be checked on site prior to construction/fabrication. 3. Do not scale from this drawing. 4. Any discrepancies between drawings of different scales, and between drawings and specification where appropriate to be notified to JNP Group for decision. 5. Copyright reserved. This drawing may only be used for The Client and location specified in the title block. It may not be copied or disclosed to any third party without the prior written consent of JNP Group. 6. This drawing should only be used for construction if the drawing status is "Construction". JNP Group take no responsibility for construction works undertaken to drawings which are not marked with this status. jnpgroup LEGEND Red High Friction Surfacing Pole with Signface TREES Tree Preservation Order BS 5837:2012 Tree Quality Categories Category A - High Quality Category B - Moderate Quality Category C - Low Quality Tree Canopy Root Protection Area Tree Preservation Order Forward Visibility Eastbound (SSD = 43m) Forward Visibility Westbound (SSD = 43m) Context Plan Scale: 1:2000 Site Access General Arrangement LEGEND Future Bus Route P1 P2 NMRES P1 27.11.20 Update to Bus Link - Layby removed SW/SW/SW P2 18.12.20 Landscaping proposals added through PG1 JR/SW/SW P3 10.02.21 Bridleway crossing visibility splays added JR/SW/SW P4 21.04.2021 Redline boundary and crossing bridleway alignment updates SW/SW/SW P5 23.06.21 Sump Buster, CCTV and Additional advanced signage SW/SW/SW